Bid Opening Summary.pdf
PDF 91 KB Posted
- Attached to
- NM FLAP SJU 10(1) Cottonwood Campground Bridge
- Solicitation number
- 6982AF21B000023
About this file
This document summarizes a bid opening for the NM FLAP SJU 10(1) Cottonwood Campground Bridge project. The bid opening was held on November 9, 2021 at 2:00 PM MST in Lakewood, Colorado. Five bids were received ranging from $3,250,949.20 to $4,364,819.03 with the engineer's estimate being $2,155,000. The apparent low bidder was J. Star Enterprises Inc. of New Orleans, Louisiana at $3,250,949.20.
The related federal contract opportunity is for the construction of a new bridge and roadway realignment at the Cottonwood Campground in New Mexico. Work includes embankment construction, riprap placement, structural concrete, precast prestressed concrete girders, drilled shafts, and other miscellaneous items. The project has an estimated cost between $1,500,000 to $3,500,000 and construction is anticipated from fall 2021 to April 2022. The solicitation is set aside for small businesses and issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: COTTONWOOD CAMPGROUND BRIDGE Project Number: NM FLAP SJU 10(1) Bid Opening Date: 11/9/2021 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: _Jorey Deml________
Amendments: (1)N/A__________ (2) _____________(3) (4)
Bidder’s Name SCHEDULE A BID TOTAL 1.Technology Construction, Inc Prescott, AZ
$3,898,468.60 $3,898,468.60
2.J. Star Enterprises Inc New Orleans, LA
$3,250,949.20 $3,250,949.20
3. Arrow Indian Contractors Inc Tempe, AZ
$3,487,441.80 $3,487,441.80
4. Siete, Inc Rye, CO
$3,861,580.00 $3,861,580.00
5. Groundhog Excavating Albuquerque, NM
$4,364,819.03
$4,364,819.03
Engineer’s Estimate
$2,155,000.00 $2,155,000.00
| Bid Opening Summary |
| Bid Opening Date: 11/9/2021 Time: 2:00 p.m. MST |
File details come from the government source that posted it. Updated .