NM FLAP SJU10(1) Bid Tabulation Report.pdf
PDF 669 KB Posted
- Attached to
- NM FLAP SJU 10(1) Cottonwood Campground Bridge
- Solicitation number
- 6982AF21B000023
About this file
This bid tabulation report summarizes bids received for the NM FLAP SJU 10(1) Cottonwood Campground Bridge project. Key details include: the project scope which involves constructing a new bridge to span an arroyo and reconstructing the roadway alignment; quantities of embankment, riprap, structural concrete, and precast girders required; a cost estimate range of $1,500,000 to $3,500,000 and construction duration from fall 2021 to April 2022. Bids were received from five contractors ranging from $3,250,949 to $4,364,819 with J-Star Enterprises submitting the low bid of $3,250,949. The report lists unit prices and totals for over 50 line items. The project is designated as a total small business set-aside and anticipated award is in late November 2021.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 11/10/21
1 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF21B000023
Division: Central Federal Lands
State: NM County: San Juan
Federal Land: Opened at: Lakewood
Opened by: Jorey Deml
Date: 11/09/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
J-Star Enterprises Inc $3,250,949.20
ARROW INDIAN CONTRACTORS, INC. $3,487,394.07
449 S. 48th St. Ste 101 Tempe, AZ 85281
Siete, Inc. $3,861,580.00 8155 Park Road Rye, CO 81069
Technology Consruction Inc. $3,898,468.60 5430 Side Road Prescott, AZ 86301
Groundhog Excavating Inc $4,364,819.03
Engineer's Estimate $2,150,000.00
2 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0010 15101-0000 MOBILIZATION
J-Star Enterprises Inc Lump Sum $330,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $148,687.64 Siete, Inc. Lump Sum $400,000.00 Technology Consruction Inc. Lump Sum $200,000.00 Groundhog Excavating Inc Lump Sum $392,000.00 Engineer's Estimate ALL LPSM Lump Sum $207,300.50
A0020 15214-1000 SURVEY AND STAKING, BRIDGE
J-Star Enterprises Inc Lump Sum $23,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $51,330.99 Siete, Inc. Lump Sum $25,000.00 Technology Consruction Inc. Lump Sum $51,000.00 Groundhog Excavating Inc Lump Sum $30,410.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00
A0030 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
J-Star Enterprises Inc $15,300.00 $2,448.00
ARROW INDIAN CONTRACTORS, INC. $68,052.45 $10,888.39
Siete, Inc. $45,000.00 $7,200.00 Technology Consruction Inc. $63,600.00 $10,176.00 Groundhog Excavating Inc $200,900.00 $32,144.00 Engineer's Estimate 0.16 MILE $7,000.00 $1,120.00
A0040 15236-2000 SURVEY CONTROL, GRADE FINISHING
J-Star Enterprises Inc $11,500.00 $3,795.00
ARROW INDIAN CONTRACTORS, INC. $55,997.44 $18,479.16
Siete, Inc. $45,000.00 $14,850.00 Technology Consruction Inc. $25,000.00 $8,250.00 Groundhog Excavating Inc $36,800.00 $12,144.00 Engineer's Estimate 0.33 MILE $11,000.00 $3,630.00
A0050 15301-0000 CONTRACTOR QUALITY CONTROL
J-Star Enterprises Inc Lump Sum $140,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $223,989.76 Siete, Inc. Lump Sum $250,000.00 Technology Consruction Inc. Lump Sum $170,000.00 Groundhog Excavating Inc Lump Sum $386,700.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
3 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0060 15401-0000 CONTRACTOR TESTING
J-Star Enterprises Inc Lump Sum $47,900.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $100,608.74 Siete, Inc. Lump Sum $250,000.00 Technology Consruction Inc. Lump Sum $55,000.00 Groundhog Excavating Inc Lump Sum $187,800.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0070 15501-0000 CONSTRUCTION SCHEDULE
J-Star Enterprises Inc Lump Sum $8.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $6,405.05 Siete, Inc. Lump Sum $35,000.00 Technology Consruction Inc. Lump Sum $3,000.00 Groundhog Excavating Inc Lump Sum $7,810.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0080 15701-0000 SOIL EROSION CONTROL (TEMPORARY CONSTRUCTION CONTROLS)
J-Star Enterprises Inc Lump Sum $37,500.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $33,604.43 Siete, Inc. Lump Sum $75,000.00 Technology Consruction Inc. Lump Sum $30,000.00 Groundhog Excavating Inc Lump Sum $60,100.00 Engineer's Estimate ALL LPSM Lump Sum $12,000.00
A0090 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
J-Star Enterprises Inc Lump Sum $6.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $7,000.93 Siete, Inc. Lump Sum $15,000.00 Technology Consruction Inc. Lump Sum $15,000.00 Groundhog Excavating Inc Lump Sum $5,824.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00
A0100 15802-0000 WATERING FOR DUST CONTROL
J-Star Enterprises Inc Lump Sum $127,500.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $24,543.35 Siete, Inc. Lump Sum $30,000.00 Technology Consruction Inc. Lump Sum $250,000.00 Groundhog Excavating Inc Lump Sum $66,100.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
4 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0110 20101-0000 CLEARING AND GRUBBING
J-Star Enterprises Inc $15,100.00 $31,710.00
ARROW INDIAN CONTRACTORS, INC. $18,651.44 $39,168.02
Siete, Inc. $20,000.00 $42,000.00 Technology Consruction Inc. $20,000.00 $42,000.00 Groundhog Excavating Inc $4,986.00 $10,470.60 Engineer's Estimate 2.10 ACRE $4,300.00 $9,030.00
A0120 20301-2400 REMOVAL OF SIGN
J-Star Enterprises Inc $303.00 $1,515.00
ARROW INDIAN CONTRACTORS, INC. $373.63 $1,868.15
Siete, Inc. $50.00 $250.00 Technology Consruction Inc. $200.00 $1,000.00 Groundhog Excavating Inc $299.00 $1,495.00 Engineer's Estimate 5 EACH $190.00 $950.00
A0130 20302-0700 REMOVAL OF FENCE
J-Star Enterprises Inc $9.50 $617.50
ARROW INDIAN CONTRACTORS, INC. $46.70 $3,035.50
Siete, Inc. $40.00 $2,600.00 Technology Consruction Inc. $40.00 $2,600.00 Groundhog Excavating Inc $23.00 $1,495.00 Engineer's Estimate 65 LNFT $10.00 $650.00
A0140 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
J-Star Enterprises Inc $9.50 $13,775.00
ARROW INDIAN CONTRACTORS, INC. $8.79 $12,745.50
Siete, Inc. $20.00 $29,000.00 Technology Consruction Inc. $55.00 $79,750.00 Groundhog Excavating Inc $7.00 $10,150.00 Engineer's Estimate 1,450 SQYD $7.75 $11,237.50
A0150 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
J-Star Enterprises Inc Lump Sum $7,740.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $22,398.98 Siete, Inc. Lump Sum $50,000.00 Technology Consruction Inc. Lump Sum $51,000.00 Groundhog Excavating Inc Lump Sum $7,365.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00
5 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0160 20420-0000 EMBANKMENT CONSTRUCTION
J-Star Enterprises Inc $33.50 $251,250.00
ARROW INDIAN CONTRACTORS, INC. $10.01 $75,075.00
Siete, Inc. $30.00 $225,000.00 Technology Consruction Inc. $58.00 $435,000.00 Groundhog Excavating Inc $49.00 $367,500.00 Engineer's Estimate 7,500 CUYD $50.00 $375,000.00
A0170 20801-0000 STRUCTURE EXCAVATION
J-Star Enterprises Inc $243.00 $1,215.00
ARROW INDIAN CONTRACTORS, INC. $10.92 $54.60
Siete, Inc. $35.00 $175.00 Technology Consruction Inc. $300.00 $1,500.00 Groundhog Excavating Inc $243.00 $1,215.00 Engineer's Estimate 5 CUYD $100.00 $500.00
A0180 20803-0000 STRUCTURAL BACKFILL
J-Star Enterprises Inc $355.00 $12,070.00
ARROW INDIAN CONTRACTORS, INC. $19.08 $648.72
Siete, Inc. $700.00 $23,800.00 Technology Consruction Inc. $75.00 $2,550.00 Groundhog Excavating Inc $434.00 $14,756.00 Engineer's Estimate 34 CUYD $160.00 $5,440.00
A0190 21101-2000 ROADWAY OBLITERATION, METHOD 2
J-Star Enterprises Inc $11.00 $12,100.00
ARROW INDIAN CONTRACTORS, INC. $8.53 $9,383.00
Siete, Inc. $20.00 $22,000.00 Technology Consruction Inc. $3.70 $4,070.00 Groundhog Excavating Inc $8.10 $8,910.00 Engineer's Estimate 1,100 SQYD $20.00 $22,000.00
A0200 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
J-Star Enterprises Inc $265.00 $265,000.00
ARROW INDIAN CONTRACTORS, INC. $243.96 $243,960.00
Siete, Inc. $115.00 $115,000.00 Technology Consruction Inc. $180.00 $180,000.00 Groundhog Excavating Inc $339.00 $339,000.00 Engineer's Estimate 1,000 CUYD $150.00 $150,000.00
6 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0210 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
J-Star Enterprises Inc $270.00 $283,500.00
ARROW INDIAN CONTRACTORS, INC. $270.73 $284,266.50
Siete, Inc. $120.00 $126,000.00 Technology Consruction Inc. $180.00 $189,000.00 Groundhog Excavating Inc $309.00 $324,450.00 Engineer's Estimate 1,050 CUYD $130.00 $136,500.00
A0220 25110-0400 GROUTED RIPRAP, METHOD A, CLASS 4
J-Star Enterprises Inc $520.00 $130,000.00
ARROW INDIAN CONTRACTORS, INC. $383.75 $95,937.50
Siete, Inc. $375.00 $93,750.00 Technology Consruction Inc. $450.00 $112,500.00 Groundhog Excavating Inc $481.00 $120,250.00 Engineer's Estimate 250 CUYD $100.00 $25,000.00
A0230 25125-0000 BOULDER (BARRIER BOULDER)
J-Star Enterprises Inc $242.00 $12,584.00
ARROW INDIAN CONTRACTORS, INC. $309.46 $16,091.92
Siete, Inc. $500.00 $26,000.00 Technology Consruction Inc. $1,170.00 $60,840.00 Groundhog Excavating Inc $702.00 $36,504.00 Engineer's Estimate 52 EACH $500.00 $26,000.00
A0240 30202-2000 ROADWAY AGGREGATE, METHOD 2
J-Star Enterprises Inc $55.00 $66,000.00
ARROW INDIAN CONTRACTORS, INC. $68.83 $82,596.00
Siete, Inc. $40.00 $48,000.00 Technology Consruction Inc. $76.00 $91,200.00 Groundhog Excavating Inc $66.00 $79,200.00 Engineer's Estimate 1,200 TON $70.00 $84,000.00
A0250 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
J-Star Enterprises Inc $165.00 $99,000.00
ARROW INDIAN CONTRACTORS, INC. $248.88 $149,328.00
Siete, Inc. $150.00 $90,000.00 Technology Consruction Inc. $220.00 $132,000.00 Groundhog Excavating Inc $221.00 $132,600.00 Engineer's Estimate 600 TON $190.00 $114,000.00
7 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 40601-0000 FOG SEAL
J-Star Enterprises Inc $1,720.00 $2,425.20
ARROW INDIAN CONTRACTORS, INC. $1,866.58 $2,631.88
Siete, Inc. $750.00 $1,057.50 Technology Consruction Inc. $2,100.00 $2,961.00 Groundhog Excavating Inc $1,432.00 $2,019.12 Engineer's Estimate 1.41 TON $1,300.00 $1,833.00
A0270 41102-1000 PRIME COAT, METHOD 1
J-Star Enterprises Inc $1.75 $5,600.00
ARROW INDIAN CONTRACTORS, INC. $8.71 $27,872.00
Siete, Inc. $1.00 $3,200.00 Technology Consruction Inc. $2.45 $7,840.00 Groundhog Excavating Inc $1.77 $5,664.00 Engineer's Estimate 3,200 SQYD $2.00 $6,400.00
A0280 41105-0000 BLOTTER
J-Star Enterprises Inc $43.00 $215.00
ARROW INDIAN CONTRACTORS, INC. $186.66 $933.30
Siete, Inc. $50.00 $250.00 Technology Consruction Inc. $280.00 $1,400.00 Groundhog Excavating Inc $524.00 $2,620.00 Engineer's Estimate 5 TON $150.00 $750.00
A0290 41201-0000 TACK COAT
J-Star Enterprises Inc $1,150.00 $1,621.50
ARROW INDIAN CONTRACTORS, INC. $1,306.61 $1,842.32
Siete, Inc. $750.00 $1,057.50 Technology Consruction Inc. $1,260.00 $1,776.60 Groundhog Excavating Inc $1,211.00 $1,707.51 Engineer's Estimate 1.41 TON $1,400.00 $1,974.00
A0300 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
J-Star Enterprises Inc $1,100.00 $220,000.00
ARROW INDIAN CONTRACTORS, INC. $2,502.92 $500,584.00
Siete, Inc. $3,391.00 $678,200.00 Technology Consruction Inc. $1,875.00 $375,000.00 Groundhog Excavating Inc $2,251.00 $450,200.00 Engineer's Estimate 200 CUYD $1,200.00 $240,000.00
8 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0310 55235-0000 EXPANSION JOINTS
J-Star Enterprises Inc $365.00 $30,295.00
ARROW INDIAN CONTRACTORS, INC. $482.96 $40,085.68
Siete, Inc. $450.00 $37,350.00 Technology Consruction Inc. $195.00 $16,185.00 Groundhog Excavating Inc $482.00 $40,006.00 Engineer's Estimate 83 LNFT $275.00 $22,825.00
A0320 55302-3300 PRECAST, PRESTRESSED CONCRETE AASHTO GIRDER
J-Star Enterprises Inc $900.00 $387,000.00
ARROW INDIAN CONTRACTORS, INC. $774.42 $333,000.60
Siete, Inc. $1,100.00 $473,000.00 Technology Consruction Inc. $600.00 $258,000.00 Groundhog Excavating Inc $820.00 $352,600.00 Engineer's Estimate 430 LNFT $400.00 $172,000.00
A0330 55401-1000 REINFORCING STEEL
J-Star Enterprises Inc $3.75 $20,625.00
ARROW INDIAN CONTRACTORS, INC. $4.15 $22,825.00
Siete, Inc. $2.50 $13,750.00 Technology Consruction Inc. $3.80 $20,900.00 Groundhog Excavating Inc $3.80 $20,900.00 Engineer's Estimate 5,500 LB $2.20 $12,100.00
A0340 55401-2000 REINFORCING STEEL, EPOXY COATED
J-Star Enterprises Inc $3.00 $105,180.00
ARROW INDIAN CONTRACTORS, INC. $4.64 $162,678.40
Siete, Inc. $3.50 $122,710.00 Technology Consruction Inc. $2.75 $96,415.00 Groundhog Excavating Inc $3.70 $129,722.00 Engineer's Estimate 35,060 LB $2.00 $70,120.00
A0350 55601-0900 BRIDGE RAILING, STEEL (METAL RAILING, TYPE A32, STAINED)
J-Star Enterprises Inc $341.00 $79,794.00
ARROW INDIAN CONTRACTORS, INC. $622.19 $145,592.46
Siete, Inc. $600.00 $140,400.00 Technology Consruction Inc. $800.00 $187,200.00 Groundhog Excavating Inc $639.00 $149,526.00 Engineer's Estimate 234 LNFT $510.00 $119,340.00
9 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0360 56401-1000 BEARING DEVICE, ELASTOMERIC
J-Star Enterprises Inc $1,070.00 $10,700.00
ARROW INDIAN CONTRACTORS, INC. $1,473.35 $14,733.50
Siete, Inc. $4,500.00 $45,000.00 Technology Consruction Inc. $1,350.00 $13,500.00 Groundhog Excavating Inc $3,124.00 $31,240.00 Engineer's Estimate 10 EACH $1,800.00 $18,000.00
A0370 56501-0300 DRILLED SHAFT, 30-INCH DIAMETER
J-Star Enterprises Inc $1,710.00 $265,050.00
ARROW INDIAN CONTRACTORS, INC. $2,316.17 $359,006.35
Siete, Inc. $750.00 $116,250.00 Technology Consruction Inc. $3,269.00 $506,695.00 Groundhog Excavating Inc $1,937.00 $300,235.00 Engineer's Estimate 155 LNFT $420.00 $65,100.00
A0380 56505-0000 CROSSHOLE SONIC LOGGING
J-Star Enterprises Inc $11,500.00 $69,000.00
ARROW INDIAN CONTRACTORS, INC. $1,866.58 $11,199.48
Siete, Inc. $3,500.00 $21,000.00 Technology Consruction Inc. $7,000.00 $42,000.00 Groundhog Excavating Inc $7,480.00 $44,880.00 Engineer's Estimate 6 EACH $1,450.00 $8,700.00
A0390 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
J-Star Enterprises Inc $166.00 $3,320.00
ARROW INDIAN CONTRACTORS, INC. $186.66 $3,733.20
Siete, Inc. $75.00 $1,500.00 Technology Consruction Inc. $244.00 $4,880.00 Groundhog Excavating Inc $177.00 $3,540.00 Engineer's Estimate 20 HOUR $115.00 $2,300.00
A0400 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
J-Star Enterprises Inc $60.00 $1,200.00
ARROW INDIAN CONTRACTORS, INC. $236.44 $4,728.80
Siete, Inc. $75.00 $1,500.00 Technology Consruction Inc. $307.00 $6,140.00 Groundhog Excavating Inc $120.00 $2,400.00 Engineer's Estimate 20 HOUR $120.00 $2,400.00
10 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0410 62201-2750 MOTOR GRADER
J-Star Enterprises Inc $112.00 $2,240.00
ARROW INDIAN CONTRACTORS, INC. $386.82 $7,736.40
Siete, Inc. $75.00 $1,500.00 Technology Consruction Inc. $307.00 $6,140.00 Groundhog Excavating Inc $163.00 $3,260.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
A0420 62301-0000 GENERAL LABOR
J-Star Enterprises Inc $61.00 $3,660.00
ARROW INDIAN CONTRACTORS, INC. $60.05 $3,603.00
Siete, Inc. $53.00 $3,180.00 Technology Consruction Inc. $82.00 $4,920.00 Groundhog Excavating Inc $55.00 $3,300.00 Engineer's Estimate 60 HOUR $50.00 $3,000.00
A0430 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
J-Star Enterprises Inc $259.00 $2,590.00
ARROW INDIAN CONTRACTORS, INC. $336.82 $3,368.20
Siete, Inc. $150.00 $1,500.00 Technology Consruction Inc. $1,600.00 $16,000.00 Groundhog Excavating Inc $271.00 $2,710.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00
A0440 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
J-Star Enterprises Inc $10,000.00 $19,000.00
ARROW INDIAN CONTRACTORS, INC. $21,749.68 $41,324.39
Siete, Inc. $5,000.00 $9,500.00 Technology Consruction Inc. $4,400.00 $8,360.00 Groundhog Excavating Inc $2,505.00 $4,759.50 Engineer's Estimate 1.90 ACRE $5,700.00 $10,830.00
A0450 62510-2000 SEEDING, HYDRAULIC METHOD
J-Star Enterprises Inc $7,130.00 $13,547.00
ARROW INDIAN CONTRACTORS, INC. $3,110.97 $5,910.84
Siete, Inc. $2,500.00 $4,750.00 Technology Consruction Inc. $3,200.00 $6,080.00 Groundhog Excavating Inc $1,459.00 $2,772.10 Engineer's Estimate 1.90 ACRE $2,000.00 $3,800.00
11 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0460 62515-2000 MULCHING, HYDRAULIC METHOD
J-Star Enterprises Inc $3,160.00 $6,004.00
ARROW INDIAN CONTRACTORS, INC. $4,355.36 $8,275.18
Siete, Inc. $3,500.00 $6,650.00 Technology Consruction Inc. $3,200.00 $6,080.00 Groundhog Excavating Inc $2,686.00 $5,103.40 Engineer's Estimate 1.90 ACRE $1,400.00 $2,660.00
A0470 63301-0000 SIGN SYSTEM
J-Star Enterprises Inc $860.00 $2,580.00
ARROW INDIAN CONTRACTORS, INC. $1,266.89 $3,800.67
Siete, Inc. $950.00 $2,850.00 Technology Consruction Inc. $22,600.00 $67,800.00 Groundhog Excavating Inc $675.00 $2,025.00 Engineer's Estimate 3 EACH $600.00 $1,800.00
A0480 63308-3000 OBJECT MARKER, TYPE 3
J-Star Enterprises Inc $359.00 $1,436.00
ARROW INDIAN CONTRACTORS, INC. $1,266.89 $5,067.56
Siete, Inc. $150.00 $600.00 Technology Consruction Inc. $586.00 $2,344.00 Groundhog Excavating Inc $292.70 $1,170.80 Engineer's Estimate 4 EACH $170.00 $680.00
A0490 63309-0000 DELINEATOR
J-Star Enterprises Inc $249.00 $2,490.00
ARROW INDIAN CONTRACTORS, INC. $933.29 $9,332.90
Siete, Inc. $65.00 $650.00 Technology Consruction Inc. $325.00 $3,250.00 Groundhog Excavating Inc $143.00 $1,430.00 Engineer's Estimate 10 EACH $45.00 $450.00
A0500 63312-0000 SPEED HUMP
J-Star Enterprises Inc $3,830.00 $7,660.00
ARROW INDIAN CONTRACTORS, INC. $955.51 $1,911.02
Siete, Inc. $2,500.00 $5,000.00 Technology Consruction Inc. $3,755.00 $7,510.00 Groundhog Excavating Inc $1,965.00 $3,930.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00
12 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0510 63316-1000 REMOVE AND RESET SIGN
J-Star Enterprises Inc $326.00 $2,608.00
ARROW INDIAN CONTRACTORS, INC. $777.74 $6,221.92
Siete, Inc. $800.00 $6,400.00 Technology Consruction Inc. $130.00 $1,040.00 Groundhog Excavating Inc $338.00 $2,704.00 Engineer's Estimate 8 EACH $525.00 $4,200.00
A0520 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
J-Star Enterprises Inc $1.25 $7,875.00
ARROW INDIAN CONTRACTORS, INC. $4.04 $25,452.00
Siete, Inc. $2.50 $15,750.00 Technology Consruction Inc. $1.80 $11,340.00 Groundhog Excavating Inc $1.70 $10,710.00 Engineer's Estimate 6,300 LNFT $1.00 $6,300.00
A0530 63405-0855 PAVEMENT MARKINGS, TYPE B, SPEED HUMP MARKINGS
J-Star Enterprises Inc $1,150.00 $4,600.00
ARROW INDIAN CONTRACTORS, INC. $1,493.26 $5,973.04
Siete, Inc. $350.00 $1,400.00 Technology Consruction Inc. $319.00 $1,276.00 Groundhog Excavating Inc $1,373.00 $5,492.00 Engineer's Estimate 4 EACH $270.00 $1,080.00
A0540 63501-0000 TEMPORARY TRAFFIC CONTROL
J-Star Enterprises Inc Lump Sum $47,500.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $47,208.33 Siete, Inc. Lump Sum $100,000.00 Technology Consruction Inc. Lump Sum $15,000.00 Groundhog Excavating Inc Lump Sum $75,500.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0550 63701-0000 FIELD OFFICE
J-Star Enterprises Inc $24,900.00 $24,900.00
ARROW INDIAN CONTRACTORS, INC. $18,665.81 $18,665.81
Siete, Inc. $50,000.00 $50,000.00 Technology Consruction Inc. $23,000.00 $23,000.00 Groundhog Excavating Inc $66,300.00 $66,300.00 Engineer's Estimate 1 EACH $13,000.00 $13,000.00
13 out of 13Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP SJU 10(1)
Project Name: Cottonwood Campground Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
J-Star Enterprises Inc $3,250,949.20
ARROW INDIAN CONTRACTORS, INC. $3,487,394.07
Siete, Inc. $3,861,580.00 Technology Consruction Inc. $3,898,468.60 Groundhog Excavating Inc $4,364,819.03 Engineer's Estimate $2,150,000.00
| 2021-11-22T06:47:29-0700 | |
| JOSEPHINE P HELMS |
File details come from the government source that posted it. Updated .