NM FLAP SJU 10(1)_ X-Section.pdf
PDF 14 MB Posted
- Attached to
- NM FLAP SJU 10(1) Cottonwood Campground Bridge
- Solicitation number
- 6982AF21B000023
About this file
This document provides details for a federal contract opportunity to construct the NM FLAP SJU 10(1) Cottonwood Campground Bridge project. The project scope includes installing a new 105-foot long by 35-foot wide bridge to span an arroyo crossing and provide accessible roadway access to a campground. Significant construction quantities include 3,950 cubic yards of embankment, 2,120 cubic yards of class 3 riprap, 1,220 cubic yards of class 4 riprap, and 194 cubic yards of structural concrete. The contract is set aside for small businesses. The estimated price range for the project is between $1,500,000 to $3,500,000. The construction period is anticipated from fall 2021 to April 2022, with an expected award date in late November 2021. The soliciting agency is the New Mexico Department of Transportation Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE
NM
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
COTTONWOOD CAMPGROUND RD. OVER ARROYO
BRIDGE NO. 9988
SAN JUAN COUNTY, NEW MEXICO
DRAWING NO.
DATE
August 2021 of 29
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
C. AGUILAR
CHECKED BYDRAWN BY
DESIGNED BY
D. BEAN
REVISIONS
BY
DATENO.
REVISIONSBY
c p w w o r k in g c e n tr a l0 d R
G A .d g n
P T
.4
P C
.1
L
15+00 grade
Proposed grade
Proposed structure
Location of
L
16+00
E L .7
.1
F il l fa c e A b u t .1
B e g in B r id g e
E L .2
.3
F il l fa c e A b u t .2
E n d B r id g e caisson (typ.)
30"Ø Drilled
FIX EXP
Mexico Type A32
Metal Railing New
El. 5693.50
Low chord
2'-0" min. Freeboard
EL. 5687.77
Q Water surface
-5.000%
V P I
E L ,6
.5
100' VC
L L
S h ld r
L a n e ty p
S h ld r
L a n e
"L
L = 181.67'
T = 92.93'
R = 350.00'
PI 17+45.12
Curve = RTE010-2
L = 326.44'
T = 170.78'
R = 450.00'
PI 13+39.75
Curve = RTE010-1
C Access Road
C Access Road) ground line (at Existing
A rr o y o
(Taken at C Access Road)
0.500%
Abut. No. 1
C Brg.
Abut. No.2
C Brg.
Q
Q
Q
Q
Q Vm
WS EL.
1.7
(cfs) (ft/s)
5687.17
172 3.0 5687.77
217 3.3 5687.92
267 3.6 5688.07
PLAN
ELEVATION
DATA TABLE
HYDRAULIC
L
PROFILE GRADE DIAGRAM
Elevations are at profile grade C Access Road
No Scale
GENERAL PLAN AND ELEVATION
1"=20'-0" E. SCHAWO
RG3231-A
S1
INDEX OF DRAWINGS
DRAWING NO. DESCRIPTIONSHEET NO.
85'-0" (C Brg. to C Brg.)L L
" (Back to Back of Backwall)16 1188'-3
12 Spaces @ 6'-3"=75'-0"5'-0"=15'-0" 3 Spa.@4'-0"
2'-0" 2'-0" 4'-0"
5'-0"=15'-0" 3 Spa.@
16+17.25
C Bridge Abut. No. 2L
15+32.25
C Bridge Abut. No. 1L
S29
S26 THRU S28
S22 THRU S25
S17 THRU S21
S16
S15
S14
S13
S12
S11
S10
S9
S8
S7
S6
S5
S4
S3
S2
S1
Bridge Railing, Steel Length = 117'-0"
25Q Scour Depth = 0.25 ft.
1'-6"
G3 for details
See sheet G1 thru
Riprap
EL. 5687.92
Q Water surface
(Typ.)
Elev. = 5665.78
Est. Tip
Elev. = 5663.71
Est. Tip
0.5%
Post SpacingPost Spacing
Berm Elev.=5692.50Berm Elev.=5692.00 details
G1 for
See Sheet
Riprap
15+15.40
Begin App. Slab
16+34.11
End of App. Slab
E 2,768,205.70
N 2,114,337.91
16+18.36
End Bridge
E 2,768,120.62
N 2,114,318.78
15+31.15
Begin Bridge
BRIDGE NUMBER PLATE
EXPANSION JOINT
TYPE A32 RAILING
REBAR LIST
APPROACH SLAB DETAILS
WINGWALL DETAILS
ABUTMENT DIAPHRAGM
TOP OF DECK ELEVATIONS
DECK REINFORCING PLAN BOTTOM BARS
DECK REINFORCING PLAN TOP BARS
INTERMEDIATE DIAPHRAGM
PRECAST, PRESTRESSED CONCRETE AASHTO GIRDER
BEARING DETAILS
FRAMING PLAN
TYPICAL SECTION
ABUTMENT CAP DETAILS
DRILLED SHAFT DETAILS
FOUNDATION LAYOUT
GENERAL NOTES & ESTIMATED QUANTITIES
GENERAL PLAN AND ELEVATION
13'-9" Wingwall
Pay Limits (Typ)
Structural Backfill, Pay Limits (Typ)
Structural Excavation, RG3231-AC
RG3231-Z THRU AB
RG3231-V THRU Y
RG3231-Q THRU U
RG3231-P
RG3231-O
RG3231-N
RG3231-M
RG3231-L
RG3231-K
RG3231-J
RG3231-I
RG3231-H
RG3231-G
RG3231-F
RG3231-E
RG3231-D
RG3231-C
RG3231-B
RG3231-A
15551
L I C
E
N
S
E
D
P
R
O
F
E S S
I O
N
A
L
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
W
M
X
I
C
O
8/10/2021
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G B .d g n
SPECIFICATIONS
GENERAL NOTES
ESTIMATED QUANTITIES
GENERAL NOTES &
NONE E. SCHAWO
RG3231-B
S2
MATERIALS
MISCELLANEOUS
GENERAL NOTES CONT.
Bridge Rating Program Version 6.8.
and Resistance Factor Rating (LRFR) methods using the AASHTOWare
These ratings were computed by the Load Factor Rating (LFR) and Load
Note:
Contracting Officer for approval prior to any deck work.
Contractor shall submit the girder profile data, camber data and finished deck elevation verification to the camber elevations. The contractor shall use this information to verify camber and finished deck elevations. The completed line of girders from centerline bearing to centerline bearing at tenth poins to calculate existing girder
Verification of girder camber before screed rails are set, the Contractor shall survey and plot girder profiles of each
Verification of Girder Camber:
on the right hand side of the road as one approaches the bridge.
shown on NMDOT standard drawing 543-09. The number plate shall be placed on the second post on the bridge deck
The Contractor shall furnish and place two (2) bridge number plates conforming to the bridge number plate details
Bridge Number Plates:
The metal railing shall be galvanized and then stained with the Natina product.
Railing Protective Coating:
specifications.
The top surface of the deck shall be machine grooved in the transverse direction of the deck per section 552 of the
Deck Slab:
information on the on-site soils.
Refer to Standard Specification 208, Structure Excavation and Backfill. The geotechnical report provides additional
Structrure Exacation and Backfill:
Concrete shall be structural concrete Class C.
30" Diameter Drilled Shaft
Drilled Shaft:
Concrete shall be structural concrete Class P (Prestressed). See Precast Girder Detail Sheets for concrete strength.
See Precast Girder Detail Sheets.
Prestressed Concrete Girders:
See Precast Girder Detail Sheets.
Prestressing Steel:
steel in the substructure shall be non-coated.
All reinforcing steel in the superstructure concrete shall be epoxy coated and all reinforcing
Bar splices, other than those shown on the plans, will not be paid for.
Minimum splice length for all bar sizes shall be as shown on the plans.
The minimum concrete cover to the face of any bar shall be 2", unless shown otherwise on the plans.
All reinforcing steel shall conform to AASHTO M31 or M322, Grade 60 deformed.
Reinforcing Steel:
Expansion joint filler shall meet the requirements of AASHTO M213.
Chamfer exposed edges of all concrete 3/4", unless noted otherwise on the plans.
Type II cement shall be used for all Cast-in-Place concrete.
All concrete shall be structural concrete Class A (AE) with a minimum 28-day compressive strength f'c=4,500 psi.
Concrete:
Seismic Zone 2 (Simple-Span Bridge)
Longitude = 107°40'45" W
Latitude = 36°48'37" N
Seismic Design:
HL-93. Maximum Dynamic Load Allowance, IM=33%
Live Load
Future Wearing Surface: 30 psf
Lateral Earth Pressure: equivalent fluid unit weight of soil, Active = 0.042 kcf
Concrete: 150 pcf.
Dead Loads
DESIGN LOAD
Projects, FP-14, U.S. Customary Units and Special Contract Requirements (SCR).
Federal Highway Administration Standard Specifications for Construciton of Roads and Bridges on Federal Highway
Construction
AASHTO LRFD Bridge Design Specifications, 9th Edition
Design
No. 55201-0200 Structural Concrete, Class A (AE).
associated to the Preformed Expansion Joint Filler with Silicone Joint Sealant installation shall be incidental to Item
Preformed Expansion Joint Filler with a Silicone Joint Sealant. The cost of all labor, equipment and material paid for with Item No. 55235-000 Expansion Joints. The joint between the deck and approach slab shall be a standard drawing 562-01. The cost of all labor, equipment and material associated to the joint installation shall be
The expansion joint between the approach slab and sleeper slab shall be a joint strip seal assembly per NMDOT
Expansion Joints:
Contracting Officer. All open holes are to fill with grout after erection is completed.
Size and location of erection holes in the girders shall be shown on the shop plans and will require approval by the
Girders:
(10) Includes the cost of the concrete and steel reinforcing.
(9) Includes the cost of the Natina stain finish.
(8) Includes the cost of furnishing and installing the preformed expansion joint filler with silicone joint sealant.
(7) Includes the cost of furnishing and installing intermediate diaphragms.
(6) Includes the cost of furnishing and installing sole plates.
(5) Includes the cost of furnishing and installing temporary casing for the drilled shafts.
(4) Includes the cost of furnishing and installing strip seal assemblies, and cover plates.
(3) Includes the cost of furnishing and installing steel curb.
(2) Includes the cost of furnishing and installing all joint material and misc. hardware shown for Abutment details
(1) Contract Quantity
QUANTITY NOTES:
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G C .d g n
P T
.4
P C
.1
15+00 grade
Proposed grade
Proposed
L
16+00
L L
L
L = 181.67'
T = 92.93'
R = 350.00'
PI 17+45.12
Curve = RTE010-2
L = 326.44'
T = 170.78'
R = 450.00'
PI 13+39.75
Curve = RTE010-1
C Access Road
C Access Road) ground line (at Existing
A rr o y o
Abut. No. 1
C Brg.
Abut. No.2
C Brg.
PLAN
L Abut. No.2
C Brg. L Abut. No. 1
C Brg.
DS No. 1
DS No. 3
DS No. 4
DS No. 6
DS No. 5DS No. 2
DRILLED SHAFT TABLE
FOUNDATION LAYOUT
1"=20'-0" E. SCHAWO
RG3231-C
S3
SW-02
SW-01
SW-01
SW-02
50/1"
99/80
50/2"
100/100 100/100
10-22-2020
77/12" 50/6"
75/6"
77/12"
50/1" 100/45
100/80
10-22-2020 grade
Proposed grade
Proposed
BORE HOLE
(SM) Silty Sand
SANDSTONE
DRILLED SHAFT
LEGEND
SW-02
50/1"
99/80
50/2"
100/100 100/100
10-22-2020
Designation
Boring
Blows/Foot or
Resistance in
Penetration Test
Test Sample and
Standard Penetration
USCS Symbol
Rock Core
Rock Quality Designation RQD (%)
Bottom of Boring
Completion
Date of
Recovery (%)
During Drilling
Groundwater Level
15+32.25
C Brg. Abut. No. 1
85'-0"
100/70
10/93
Blows/Inches driven
FOR DRILLED SHAFTS
FOUNDATION NOTES
E 2,768,120.08
N 2,114,318.66
15+31.15
Begin Bridge
15+32.25
C Brg. Abut. No. 1
E 2,768,206.24
N 2,114,338.03
16+18.36
End Bridge
4.0
24.5
5665.78
5690.28
Abut. No. 1
4.0
27.0
5663.71
5690.71
Abut. No. 2
Elev. = 5665.78
Est. Tip
Elev. = 5663.71
Est. Tip
Gravel with Silt and Sand
(GP-GM) Poorly Graded
Nominal Resistance/Shaft (Kips)
Factored Resistance * (Kips) (Strength I)
Rock Socket Length (Feet)
Estimated Shaft Length (Feet)
Estimated Tip Elevation (Feet)
Top of Shaft Elevation (Feet)
Drilled Shaft Spacing (Feet)
Quantity (Each)
Drilled Shaft Diameter (inches)
Shaft (typ.)
30"Ø Drilled foundation report: Title, Prepared by Shannon & Wilson and dated July, 2021.
1. Information regarding the nature of soil and site conditions can be obtained from the final
16+17.25
C Brg. Abut. No. 2
L
L
L
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G D .d g n
A A
T y p
C lr
D S T ie s s p a c e d a t 1
Rock
(15) #11DS1 Bars
C Drilled ShaftL
DRILLED SHAFT DETAIL
SECTION A-A
C Drilled ShaftL
C Drilled ShaftL
Stagger Hook Locations
#4DS2 Ties with 135° Hooks
Drilled Shaft
30" Diameter
@ Eq. Spacing
(14) #11DS1 Bars
" C lr.
(Typ.)
Complying with ASTM A970
Headed Deformed Bars
DRILLED SHAFT DETAILS
" = 1'-0"4
1 E. SCHAWO
RG3231-D
S4
NOTES:
5" Clr.
Top of Drilled Shaft
Bottom of Abutment Cap
R o c k S o c k e t
L e n g th m in
A b u
t. N o . 2
A b u
t. N o . 1 immediately after installing the cage.
approved support mechanism at the ground surface. The Contractor will place shaft concrete
1. The Contractor will maintain the reinforcement unit at the proper elevation and orientation with an
See Foundation Layout or General Plan and Elevation For Elevation
Estimated Tip
L
C Drilled ShaftL
LC Brg.
C Cap
LC Drilled Shaft
Plan View
Cap
Abutment
Drilled Shaft
30" Dia.
spacing may be adjusted slightly to avoid conflicts.
2. #5AB3 bars in cap not shown for clarity. #5AB3 bar per detail to avoid conflicts with #9AB1 Bars in Cap.
1. Contractor will orient drilled shaft reinforcing cage
Note:
(Bottom Mat)
(6)#9AB1 Bars
(4) CSL Access Tubes
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G E .d g n
12'-0" 12'-0"
"2 135'-1
L
LC Girder
1 Abut. No. 2
5 Abut. No. 1
LC Girder LC Girder LC Girder LC Girder
C Bridge
C Construction
L
Abut. No. 2 - Looking Up Stationing
Abut. No. 1 - Looking Down Stationing
LC Brg.
LC Girder LC Girder LC Girder LC Girder LC Girder
L C Bridge
C Construction
L
(BF)
Face
Back
(Typ.)
Restrainer
Expansion
(FF)
Face
Front
"16 53'-10 "16
53'-10
(Typ.) (Typ.)
A
A
B
B
(Typ.)
Joint Filler
1" Bituminous
B
B
Section A-A
V a r ie s
ELEVATION - ABUTMENT CAP
PLAN - ABUTMENT CAP
Abut. No. 2 - Looking Up Stationing
Abut. No. 1 - Looking Down Stationing
LC Brg.
L C Bridge
C Construction
L
"4 317'-6 "4
317'-6
"2 135'-1
PLAN WITH REINFORCING- ABUTMENT CAP
"4 35'-6 "4
35'-6
ABUTMENT CAP DETAILS
" = 1'-0"8
RG3231-E
S5
1'-6" 1'-6"
LC Brg.
1'-6"1'-6"
LC Brg.
1'-6"1'-6"
LC Brg.
Abut.
No. 1
Abut.
No. 2
Abutment No. 1 (Fixed)Abutment No. 2 (Expansion)
Abutment No. 2 (Expansion) Abutment No. 1 (Fixed)
Abut. No. 1 (Fixed)
Section B-B
Abut. No. 2 (Exp.)
Section B-B
(6) #9AB1
#4AB2 Bars#4AB2 Bars
(6) #9AB1
E q
S p a
M in
V a r ie s
E q
S p a
M in
.) (6) #9AB1
#4AB2 Bars#4AB2 Bars
(6) #9AB1
V a r ie s
E q
S p a
M in
.) (6) #9AB1
#4AB2 Bars#4AB2 Bars
(6) #9AB1
Restrainer
Expansion
(Typ. each bay)
Form w/ Bev. 2"x8"x4'-0"
Shear Key & Dowels
(Typ.)
Joint Filler
1" Bituminous
#9AB1 Bars#4AB2 Bars
(2)#5AB3 (2)#5AB3 (2)#5AB3
"2 135'-1
2"2" "2 170 Eq. Spa. = 34'-9
(142) #5AB3 Bars
65°0'0"
Elev. = 5690.71 (Abut. No. 2)
Elev. = 5690.28 (Abut. No. 1)
(Abut. No. 2)
Elev. = 5690.71
(Abut. No. 1)
Elev. = 5690.28
Diaphragm
Abutment #5AB4 Bars
Typical per bay
(3)#5AB4
1. Girder seat elevations are shown on the bearing detail sheet.
Note:
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G F .d g n
17'-6"
35'-0"
1'-6"
PGL
17'-6"
4'-0" 1'-6"
2%2%
2'-8" (typ.)
Driving Lane
12'-0"
Driving Lane
12'-0"
Shoulder
4'-0"
C Bridge
C Access Road
L
L
4 Spaces @ 7'-0" = 28'-0"
(5) Precast, Prestressed Concrete AASHTO Girder Type III (45")
3'-6" 3'-6"
TRANSVERSE SECTION
1 2 3 4 5 (Typ.)
Diaphragm Intermediate
C GirderLC GirderL
PARTIAL TRANSVERSE SECTION
(Typ.)
Diaphragm Intermediate
Halfround Typ.
Form W/3/4" Drip Groove
See Deck Reinforcing Plan For Reinforcing Information (Typ.)
BL Bar
Spacing
TL Bars TT Bars
BT Bars
BL Bars
(Typ.)
Haunch
2" Nominal
Shoulder
TYPICAL SECTION
RG3231-F
S6
3'-6" 7'-0"
3" 5 Spa. @ 6"=2'-6" 9" 1'-0" 10 Spaces @ 6" = 5'-0" 1'-0"
BL - Bottom Longitudinal Reinforcing
BT - Bottom Transverse Reinforcing
TL - Top Longitudinal Reinforcing
TT - Top Transverse Reinforcing railing posts.
deck under Provide level
D e c k
"2
C lr
C lr
3" 6" Spacing (TL Bar Spacing)
Railing Sheets
See Type A32
A32 (typ.)
New Mexico Type
Steel
Bridge Railing, Railing Sheets
See Type A32
A32 (typ.)
New Mexico Type
Steel
Bridge Railing, 15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G G .d g n
C Access RoadL
FRAMING PLAN
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L Abut. No. 1
C Brg. L
42'-6" 42'-6"
L
85'-0" (C Brg. to C Brg.)
86'-0" (Girder Length)
L L 6"6"
S p a c e s
S p a c e s
FRAMING PLAN
RG3231-G
S7
C Intermediate Diaphragm
(Typ.)
AASHTO Girder Type III (45") Precast, Prestressed Concrete
1'-7 9/16"
1'-7 9/16"
C GirderL
C GirderL
C GirderL
C GirderL
C GirderL
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G H .d g n
BEARING DETAILS
RG3231-H
S8
Restrainer Notes plywood cap.
6. 8" PVC end cap may be used in lieu of restrainers) the expansion abutment (4 total
5. Expansion restrainers shall be placed at girders and cetered on the restrainer.
4. #11 bar shall be installed perpendicular to separate paymet will be made.
Structural Concrete, Class A (AE) and no unit bid price for Item No. 55201-0200 of the restrainers shall be included in the girders as indicated on the plans. The cost
3. Use devices equally spaced between breaking strength of 42 kips.
min. 6x19 galvanized with a minimum
2. Restrainer cables shall be 3/4" diameter concrete intrusion.
1. Seal all openings in PVC pipe to prohibit
Width
Width
Length
C Girder
C Brg.
L
L
Elastomeric Bearing Pad Detail
A A
C GirderL
L
Shear Modulus = 0.13 (Minimum)
Hardness = 60 Durometer
Elastomeric Bearing Pad
Metal Shims
11 Gauge Sheet
L Pad
C Brg.
C Brg. Pad
C Brg.L
L
C GirderL
Width
Length
Plan
Plate
C Sole
B
B
Keeper Bar
1/2"x1"x1'-8"
Length
Typ.
1 A B C
Upstation
Section B - B
Sole Plate Detail
L Plate
C Sole r e c a s t, P r e s tr e s s e d C o n c r e te A
A S
H T
O G ir d e
S u p e r s tr u c tu r e D e p th
Deck = 8"
Nominal Haunch = 2" (Min.)
C GirderL
Typ. Typ. Shoe Plate
Details this sheet
Typ. Sole Plate
Details this sheet
Typ. Elastomeric Bearing Pad
Superstructure Depth Detail
Expansion Restrainer Detail
Elevation Section 8" Dia. PVC Pipe Assembly
Galvanized
Cable Clamp, 2'-0"
2'-0"
7"
7"
3" Clr.
LC Brg.
Assembly
8" Dia. PVC Pipe
Holes for Tie
Two 3/16" Dia.
Tie Wire.
Tie with Rebar
Metal Strap
Wire Tie or
Cable
D ia p h r a g m
C a s t to
C a p
C a s t
3/4" Dia. Cable
Diaphragm
Bottom of
Board with Masonite
Polystyrene
2" Extruded
Brg. Seat
Top of
Top and Bottom
#11 Rebar x 1'-6"
7/8" x 1 3/4"
Slotted Hole
3/16" Min. Dia.
6-1/2" Long Screw
10" Dia.
3/4" Thick Plywood
(Pre-Drill)
3/16" Min. Dia.
(6) 3" Long Screws
7 7/8" Dia.
3/4" Thick Plywood
Sch. 40
PVC Pipe
8" Dia.
C Girder
C Brg.
L
L
Beam End Plan
Pad
Bearing
Plate
Sole
Flange
Bottom
Edge of
2 5/8"
Bearing Device, Elastomeric.
sole plates will be included in the cost for item 56401-1000
1. The cost of all material, labor and equipment associated to the
Plan Section A-A
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G I .d g n
2'-3" 5'-2"
85'-8" 2
" Chamfer4
C BRG.L
#8E2
Symm. About C of GirderL
3 Typ.
85'-0" C BRG. to C BRG.
L L
S tr a n d s
Match SE Bar Spacing
(3)#4SE2
(3)#4SE1
(5)#4SE2
(5)#4SE1
(8)#4SE2
(8)#4SE1
C BRG.
L
3 5
#7
#8
#4
#4
#4
#4
#4
"8
"4
"8
"2
"2
"2
3'-6"
3'-5"
8'-0" 8'-8"
11'-5"
4'-4"
4'-0"
"4 32'-9
1.
2.
3.
4.
5.
NOTE:
GIRDER DATA
Weight
@ Shoe Plate
Remove Concrete
3/4" Chamfer
Shoe Plate
"2
" x 1'- 0" x 1' - 82
8'-8" to hold down
"4
2 8" 8" "4
3"3"3" 3"
Camber @ Release
Camber @ Erection
Dead Load Defelection
25.1 Tons
2.1 in.
3.7 in.
1.5 in.
7"
#4HE
2" = 1'-6"
9 Spa. @
2" = 1'-6"
9 Spa. @
1'-10"
2" 2" 2" 2"
S tr a n d s
S p a
M in
ELEVATION
SHOE PLATE
SHOE PLATE
END VIEW
SHOE PLATE DETAIL
C OF GIRDER
SECTION NEAR
L
END VIEW
GIRDER BAR BENDING DIAGRAM BRIDGE DESIGN DATA
HALF ELEVATION TYPE 45 GIRDERS 5 REQ'D
(fpe = 35.707 kips per strand; losses = 8.235 kips per strand)
PRESTRESSING STEEL:
9.5 ksi
GIRDERS
fpy = 52.1 kips per strand.
fpu = 58.6 kips per strand;
strands.
0.6" diameter seven wire low relaxation
(ultimate compressive strength)f'c = at time of initial prestress) = 7.0 ksi.
f'ci (min. compressive strength of concrete
Design is in accordance with the AASHTO LRFD bridge design specifications 9th edition BAR TYPE SIZE "R" "X" LENGTH NO. REQ'D
HE
Length
1" CLR
1" CLR
Adjust S bars to Clear Conduit
R
R "X"
"X"
RR
R1'-72
'-1 3
4"
5" Min.
GIRDER END DETAIL
2" Sleeve
" Holes for Diaphragms16
1'-7
4 Bent Strands
Diaphragm Reinforcing
2" Sleeve for
Diaphragm Reinforcing
2" Sleeve for
22 Straight Strands
4 Draped Strands
6"
6'-0"
= 2'-6" 10 Spa.@3"
= 1'-6" 3 Spa.@6"
5 Spa. @ 1'-0"= 5'-0" 12 Spa. @ 1'-6"= 18'-0" 8 Spa. @ 2'-0"= 16'-0"
4'-0" See General Note #2
CONCRETE AASHTO GIRDER
PRECAST, PRESTRESSED
RG3231-I
S9
"2
1'-8
1'-0"
"2
1'-8
1'-10"
1'-4"
COMPOSITE SLAB:
CONVENTIONAL REINFORCING BARS:
Live load = HL-93
Allowance for future wearing surface = 30 psf f'c = 4.5 ksi fy = 60 ksi girder erection.
stability. The contractor shall install diaphragms during the girders are permanently secured for lateral contractor shall leave ties and bracing in place until immediately after erection to prevent overturning. The
The contractor shall tie and brace the girders depth of 1/4 inch and a maximum of 3/8 inch.
transversely over the entire flange width to a minimum
The contractor shall score top surfaces of girders seating losses.
to 46,800 lbs. Per strand will be allowed to offset shall be 43,900 lbs. Per strand. Slight overstressing up
AASHTO M-203 (grade 270). Initial prestressing force low-relaxation strands meeting the requirements of
The design shown is based on the use of 0.6" diameter reinforcing steel.
Reinforcing bars in the girder shall be epoxy coated other approved means.
be limited by weighting, fabrication scheduling or the time of deck slab placement. Camber growth is to predicted camber at erection dimension by 1 inch at the camber growth to a value not to exceed the camber growth to 90 days. The contractor shall limit the weight of the girder acting, with an allowance for calculated value due to the effect of prestressing with
The camber at erection dimension listed is the
#4TE1
#4SE1
#4TE1
#7EE1
#4HE1
#4SE2
#8EE2
Spacing
SE Bar
(10)#4SE2
(10)#4SE1
(12)#4SE2
(12)#4SE1
S p a c in g
H E a n d H
E B a r
EE1
EE2
SE1
SE2
HE1
TE1
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G J .d
INTERMEDIATE DIAPHRAGM
RG3231-J
S10
S
TYPE 45
N
(lb.)
WEIGHT
PLATE
BACK
BEAM TYPE
PRESTRESSED CONCRETE
(in.)
S1
(lb/ft)*
WEIGHT
UNIT
DIAPHRAGM
(lb.)
WEIGHT
ANGLE
CLIP
(in.)
H
(in.)
B
(in.)
C
(in.)
D
(in.)
L
(in.)
A
2"
B N S
D
L6 X 6 X 3/8"
N S
L
N S
78" Bolts W/Washers at nut and head (Typ.)
* Multiply by diaphragm length (S - A) to obtain total diaphragm weight.
15 10 2
4 2
16 2
3 13 3 3 28 16 7 galvanize the cut ends.
steel pipe (typ.) cold
1" Schedule 40 galvanize concrete cover
Minimum 3/4" threaded insert (Typ.)
7/8" High tension
CONNECTION DETAIL
INTERIOR GIRDER
elevations at connection points).
m = Slope of bent plate diaphragm (see bridge plans for
A = thickness of girder web plus 3" (See table).
c = Distance from top of beam to C of first insert.
H = Depth of bent plate diaphragm.
L = Length of back plates and clip angles.
S1= Hole spacing.
B = Distance from top of steel diaphragm to center of first hole.
CONNECTION DETAIL
EXTERIOR GIRDER
DIAPHRAGM PLACEMENT PATTERN
C SkewL
(clip angle/diaphragm connection).
D = Distance from clip angle edge to center of first hole
L
BACK PLATE DETAIL
(See note 3)
H
CLIP ANGLE DETAILS
L
N S
"2
3"2
"2
"2
SEE TABLE FOR HEIGHT "H"
3/8" BENT PLATE DIAPHRAGM
DIAPHRAGM END DETAIL SECTION A-A
Bent Plate Diaphragm
(See bridge plans for girder spacing)
15/16" Dia. Hole (Typ.)C
C
S-A m
S
15/16" Dia. Hole (Typ.)
P 5" X 3/8" X LL
Slotted Hole (Typ.)
15/16" X 2"
A
A
NOTES:
N = Number of bolt spaces in girder/clip angle connection.
incidental to item 55302-3300 Precast, Prestressed Concrete AASHTO Girder.
9. All costs associated to the material, labor and equipment associated to the steel diaphragms shall be indicating placement of diaphragm left or right of the centerline of construction.
8. All steel diaphragms shall be stamped or marked with paint on the upstation face of diaphragm achieve the specified installation tension.
bolts shall not exceed 5 kips. Tests shall be performed to determine the torque necessary to
7. At locations where steel is being fastened to concrete, the maximum installation tension for the
6. Threaded inserts and pipe inserts are incidental to the prestressed concrete beams.
prior to transport. Diaphragm installation shall be completed prior to deck placement.
5. Clip angles and back plates shall be attached to the prestressed girder at the girder fabrication site measures to ensure proper placement of inserts during the girder fabrication process.
design length by more than 1/16". The prestressed girder fabricator shall take appropriate more than 1/16". Also, the total length of the group of holes or inserts shall not vary from the
4. The vertical distance between any two holes or inserts shall not vary from the specified distance by plates.
sheet. Diaphragms shall be offset on all skewed bridges to facilitate the installation of the back
3. For skewed bridges, the opposing clip angle shall be replaced with the back plate shown on this in accordance with AASHTO M232.
2. Bolts shall meet the requirements of ASTM F3125 - Grade A325, TYPE 1. Bolts shall be galvanized
AASHTO M 111 conforming to AASHTO M270, Grade 36. Painting of these elements is not required.
1. All structural steel elements in this detail shall be composed of hot-dipped galvanized steel per
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G K .d g n
C Access RoadL
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L
Abut. No. 1
C Brg. L
S p a c e s
S p a c e s
85'-0"
S p a c e s
"8 716'-3
142 Spaces @ 6" = 71'-0"
(141) #5TTE1
29 Spaces @ 6" = 14'-6" 29 Spaces @ 6" = 14'-6"
TOP BARS
DECK REINFORCING PLAN
RG3231-K
S11
DECK REINFORCING - TOP BARS
Edge of Deck
Edge of Deck
2'-3"
Deck End of
Deck End of
"16
1'-9 "16
1'-9
"4
1-1 "4
1'-1
#5TTE2 thru #5TTE31
6" SPA.
2" CLR.
(3) #5TTE32
T
L E
T
L E
#5TTE2 thru #5TTE31
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G L .d g n
C Access RoadL
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L
Abut. No. 1
C Brg. L
S p a c e s
S p a c e s
85'-0"
"8 716'-3
143 Spaces @ 6" = 71'-6"
(142) #5BTE1
29 Spaces @ 6" = 14'-6" 29 Spaces @ 6" = 14'-6"
DECK REINFORCING - BOTTOM BARS
S p a
S p a
B
L E
B
L E
2'-3"
Lap Splice (Typ.)
Edge of Deck
Edge of Deck
Deck End of
Deck End of
BOTTOM BARS
DECK REINFORCING PLAN
RG3231-L
S12
"4
1'-1 "4
1'-1
"16
1'-6 "16
1'-6
#5BTE2 thru #5BTE31 #5BTE2 thru #5BTE31
6" SPA.
2" CLR.
(3) #5BTE32
B
L E
B
L E
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G
M .d g n
C Access RoadL
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L Abut. No. 1
C Brg. L
S p a c e s
S p a c e s
10 Equal Spaces
Span Length
LC
B r g
A b u t.
N o .1
LC
B r g
A b u t.
N o . 2
DEAD LOAD DEFLECTION DIAGRAM
grades by dimensions shown.
and superimposed dead loads, set screeds above finished
To compensate for deflection due to weight of deck slab
.0
.1
.1
.1
.1
.1
.0
.0
Lt. EOD
Rt. EODDECK PLAN
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
10 Equal Spaces = 85'-0"
"16 787'-2
LC Bridge
2. Abutment diaphragms and wingwalls shall be placed monolically with deck pour.
1. Concrete shall be placed full width of bridge from one end to the other.
Notes:
Deck End of
Deck End of
TOP OF DECK ELEVATIONS
RG3231-M
S13
.0
"4
1'-1 "4
1'-1
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G N .d g n
"16 1119'-3 "16
1119'-3
"16 738'-7
L
LC Girder
1 Abut. No. 2
5 Abut. No. 1
LC Girder LC Girder LC Girder LC Girder
C Bridge
C Construction
L
PLAN - ABUTMENT DIAPHRAGM
Abut. No. 2 - Looking Up Stationing
Abut. No. 1 - Looking Down Stationing
LC Brg.
ELEVATION - ABUTMENT DIAPHRAGM
LC Girder LC Girder LC Girder LC Girder LC Girder
L C Bridge
C Construction
L
(BF)
Face
Back for Reinforcing (Typ.)
See Wingwall Details
(Typ.)
Restrainer
Expansion
(FF)
Face
Front
"2 13'-10 "2
13'-10
(Typ.) (Typ.)
7"
(T yp .)Blo ck ou t
#4BWE1
A
A
B
B
T y p e n d o f g ir d e
B lo c k o u t
(Each Bay)
#4BWE2 (F. F.)
(Each Bay)
#4BWE3 (F. F.)
Line
Grade
Profile
Girder Blockout
Cap
Abutment
=4'-0" 4@1'-0"
(5) #4BWE6
BLOCKOUT DETAIL
Girder Diaphragm
Abutment
Concrete under girder blockout and material from
Remove all forming Sole Plate
Bearing Pad
Extend Blockout Full Length of Girder
B
B
V a r ie s
Section A-A
Expansion - Abutment No. 2 Fixed - Abutment No. 1
Deck Reinforcement
S p a
Sheets for Details
See Substructure
B
W E
See Note 1
NOTE:
1'-6" 1'-6"
6" 1'-0"
V a r ie s
S p a
See Note 1
Deck Reinforcement
1'-6"
1'-0"
1'-6"
6"
LC Brg.
LC Brg.
B
W E
#4BWE6
2" Clr.
Sheets for Details
See Substructure
(Typ. Each Bay)
Form W/Bev. 2"x8"x4'-0"
Shear Key & Dowels
Abut. No. 1 (Fixed)
Section B-B
Deck Reinforcement 1'-0"
1'-6"
C Brg.L
1'-6"
6"
Sheets for Details
See Substructure
See Note 1
2" Clr.
#4BWE6
B
W E
S p a
V a r ie s
Abut. No. 2 (Expansion)
Section B-B
Expansion Restrainer
"8
1'-7"8
1'-7
"16
1'-10 "16
1'-10
Abut.
No. 2
Abut.
No. 1
ABUTMENT DIAPHRAGM
RG3231-N
S14
(Each Bay)
#4BWE3 (F. F.)
(Typ.)
#4BWE6
to end of Girder 7" Wide Blockout
Material
Joint Filler
Masonite Board
Material with
2" Joint Filler
#4BWE
#4BWE1 (B.F.)
#4BWE4 (F.F.)
#4BWE1 (E.F.)
#4BWE1 (B.F.)
#4BWE5 (F.F.)
10" Spacing
#6BWE7 @
#4BWE1 Bars
Girder Web for
2" Dia. Holes in
10" Spacing
#6BWE7 @
#4BWE2 or #4BWE4 Bars
#4BWE3 or #4BWE5 Bars#4BWE3 or #4BWE5 Bars
#4BWE1 Bars
Girder Web for
2" Dia. Holes in
#4BWE1 Bars
Girder Web for
2" Dia. Holes in
10" Spacing
#6BWE7 @
#4BWE2 or #4BWE4 Bars
#4BWE1 Bars
Girder Web for
2" Dia. Holes in
#4BWE1 Bars
Girder Web for
2" Dia. Holes in
#4BWE3 or #4BWE5 Bars#4BWE3 or #4BWE5 Bars
(Typ.)
(Bituminous)
Material
1" Joint Filler
Masonite Board (Typ.)
(Bituminous) with
2" Joint Filler Material
Board with Masonite
(Bituminous)
2" Joint Filler
Board with Masonite
(Bituminous)
2" Joint Filler
Board with Masonite
(Bituminous)
2" Joint Filler
Board with Masonite
(Bituminous)
2" Joint Filler
#4BWE1 Bars
Girder Web for
2" Dia. Holes in
#4BWE1 (B.F.)
#4BWE5 (F.F.)
#4BWE1 (E.F.)
Structural Concrete, Class A (AE).
joint filler material and masonite board are included in the cost of item no. 55201-0200
(Bituminous). All joints shall be sealed with tape (typ.) to prevent concrete intrusion. The
3. The masonite board shall cover the top horizontal surfaces of the joint filler material
2. Deck, wingwall and abutment cap reinforcement not shown for clarity.
diaphragm.
20'. Tear Web Waterstop is to be applied the full length of the joint between the cap and placed along the length of the abutment but may be butt joined at intervals not to exceed
55201-0200 Structural Concrete, Class A (AE). The 4"x3/8" plates are to be continuously furnishing of the waterstop, the steel plates and bolts) will be considered incidental to item into concrete and concrete chemical anchor. Installation of the waterstop, (Including and 1/2" bolts to be galvanized. Bolt spacing shall be a maximum of 3'. Embed bolts 6"
1. Tear Web Waterstop: Anchor to abutment diaphragm and abutment cap with 4"x3/8" plates
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G O .d g n
Section A-A
Cap
Abutment
Diaphragm
Abutment
Approach Slab
1'-6" Chamfer
13'-9"
"8 71'-7
"4 11'-1
"8 710'-11
6"
1'-6"
65°0'0"
B.F.
F.F.
Elev. B
Elev. C Elev. A #5WLE2
C lr
C Brg.L
A
A
LC Brg.
6"
Elev. B
"8 710'-11
13'-9" "4
11'-1
"8 71'-7
Elev. A Elev. C#5WLE1F.F.
B.F.
1'-6"
"2
C lr
115°0'0"
3"
10 SPA.@1'-0"=10'-0"
"8 710'-11"8
12'-9
2" Clr.
2" Clr. 2" Clr."8
12'-5=
3 Eq. Spa.
Elev. C
Elev. A Elev. B
Sleeper Slab
Approach Slab
Finished Grade
C lr
S p a
W H
E F .F
W H
E T h u
W H
E B .F
W H
E T h u
C lr
Elev. D
C Brg.L
"4 33'-3 "4
110'-5
PLAN PLAN
Abut. No. 2 - Lt. Wingwall Similar
Abut. No. 1- Rt. Wingwall shown
Abut. No. 1 - Lt. Wingwall Similar
Abut. No. 2- Rt. Wingwall shown
Elevation
WINGWALL DETAILS
RG3231-O
S15
Material
3" Joint Filler
#4WVE
#9WHE
#4WHE
#4WVE
#4WVE
#9WHE
#4WHE
#4WVE
(Bituminous)
Filler Material
2" Joint
(Bituminous) material
3" joint filler
#4WHE1 F.F.
#9WHE8 B.F.
#4WHE2 F.F.
#4WVE1 THRU #4WVE11 (E.F.)
#4WPE1 E.F.
#4WVE12
Match WHE Bar Spacing
#5WLE1 or #5WLE2
Match WHE Bar Spacing
#5WLE1 or #5WLE2
#9WHE8 B.F.
#4WHE2 F.F.
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G P .d g n
PLAN - ABUTMENT DIAPHRAGM
Abut. No. 2 - Looking Up Stationing
Abut. No. 1 - Looking Down Stationing
8 1
19'-7" 19'-7"
"16 139'-2
"16 139'-2
2"2"
19'-7" 19'-7"
"A"
Dimension "A"
DETAIL 1
1'-0"
2" 2"
6" 6"
1'-2"x1'-0"x1/4" Galv. Plate
Approach slab
Sleeper slab
COVER PLATE DETAIL
Drawing 562-01
See NMDOT Standard
Bridge Joint Strip Seal
A B
C
D
EF
A A
SECTION A-A
B
B
SECTION B-B
Approach slab Sleeper slab
Extension (Typ.)
1'-0" Exp. Joint
Abutment Diaphragm
Sleeper Slab
"16 171 Equal Spaces = 38'-10
C ConstructionL
Wingwall
C lr
C lr
Wingwall
APPROACH SLAB DETAILS
RG3231-P
S16
3" embedment (Typ.)
Anchors with
(3) 1/2" Dia. Galv. Exp.
for dimension "A"
Drawing 562-01
See NMDOT Standard
Movement length = 100'-0"
Bridge joint strip seal
#6BWE7
1/2"
14'-0" 1'-6"
2"2"
4'-0"
Class A (AE))
Structural Concrete, cost of 55201-0200
(Included in the of sleeper footing full length & width sheet metal to run
16 Gage galvanized
See detail 1
4 Eq.Spa.=3'-8"
#4SSE1
O.C.
@ 1'-0"
#4SSE2
#9ABE1
#5ABE2
#4ATE1
#4ATE2
expansion joint details.
1. See sheet S27 thru S29 for
Notes:
item 55235-0000 Expansion Joints.
associated to the cover plate shall be incidental to
2. The cost of the labor, material and equipment plate.
1. Each end of expansion joint shall be covered with a
Notes:
edge of approach slab retainer bar 1'-0" beyond
Extend elast. Jt. seal &
Bridge joint strip seal
Abut.
No. 2
Abut.
No. 1
A
B E
B o tt o n M a t)
A
T E
T o p M a t)
(72) #9ABE1 (Bottom Mat)
(72) #4ATE1 (Top Mat)
#4SSE3 @ 1'-0" O.C.
Sealant
Joint Filler with Silicone
Preformed Expansion
Movement length = 0"
Silicone Sealant
Joint Filler with
Preformed Expansion cost of item 55201-0200 Structural Concrete, Class A (AE).
preformed expansion joint filler and silicone sealant is to be included in the
1. The cost associated to the labor, equipment and material associated to the
Notes:
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G Q R e b a r L is t
.d g n
NOTE:
B
STR
TYPE 2
A G
REBAR LIST 1
RG3231-Q
S17
TYPE 94
D
3. All "E" bars are epoxy coated.
Reinforcing bar list shall be completed and submitted in accordance with Section 554.03.2.
Dimensions in bending diagram are out-to-out of bars.1.
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G R R e b a r L is t
.d g n
NOTE:
B
STR
B
C
D
F
E A
TYPE 58
D
C
B
A
TYPE 52 TYPE 2
REBAR LIST 2
RG3231-R
S18
3. All "E" bars are epoxy coated.
Reinforcing bar list shall be completed and submitted in accordance with Section 554.03.2.
Dimensions in bending diagram are out-to-out of bars.1.
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G S R e b a r L is t
.d g n
NOTE:
B
STR
B
C
D
F
E A
TYPE 58
D
C
B
A
TYPE 52 TYPE 2
REBAR LIST 3
RG3231-S
S19
3. All "E" bars are epoxy coated.
Reinforcing bar list shall be completed and submitted in accordance with Section 554.03.2.
Dimensions in bending diagram are out-to-out of bars.1.
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G T R e b a r L is t
.d g n
NOTE:
B
STR
B
C
D
F
E A
TYPE 58
D
C
B
A
TYPE 52 TYPE 2
REBAR LIST 4
RG3231-T
S20
3. All "E" bars are epoxy coated.
Reinforcing bar list shall be completed and submitted in accordance with Section 554.03.2.
Dimensions in bending diagram are out-to-out of bars.1.
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G U R e b a r L is t
.d g n
NOTE:
B
STR
B
C
D
F
E A
TYPE 58
D
C
B
A
TYPE 52 TYPE 2
REBAR LIST 5
RG3231-U
S21
3. All "E" bars are epoxy coated.
Reinforcing bar list shall be completed and submitted in accordance with Section 554.03.2.
Dimensions in bending diagram are out-to-out of bars.1.
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G V .d
TYPE A32 RAILING
RG3231-V
S22
1. Thrie Beam Metal Barrier Connector not required.
Note:
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G
W .d
TYPE A32 RAILING CONT.
RG3231-W
S23
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G X .d
RG3231-X
S24
2. Thrie Beam Metal Barrier Connector not required.
1. See the General Plan and Elevation sheet for post spacing dimensions.
Notes:
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G Y .d
RG3231-Y
S25
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G Z .d g n only and an approved equal can be used.
Joint Strip Seal manufacturer's names are for illustration
EXPANSION JOINT
RG3231-Z
S26
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G A
A .d
EXPANSION JOINT CONT.
RG3231-AA
S27
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G A
B .d
EXPANSION JOINT CONT.
RG3231-AB
S28
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G A
C .d
BRIDGE NUMBER PLATE
RG3231-AC
S29
Survey Marker not required.
File details come from the government source that posted it. Updated .