Breakdown_of_Proposal_Prices-Maadi_11-11_June_2014.xls

XLS spreadsheet 314 KB Posted

Attached to
Construction Services, Electrical Upgrade at the American Embassy Cairo, Egypt
Solicitation number
SGE500-14-R-0059
Issued by

About this file

Cost Breakdown Sheet by Work Site

View the file

Other files

File Type Posted
017800-Closeout_Submittal_5-2014.docx DOCX document
Solicitation _SGE500-14-R-0059.pdf PDF
013300__SUBMITTAL_PROCEDURES_5-2014.docx DOCX document
Protective_Devices_Coordination_Study_TechSpecs_JULY_2012.pdf PDF
262700_Wiring_Devices_ _Disconnectors_TechSpecs_JULY_2012.pdf PDF
263623_Automatic_Transfer_Switch_TechSpecs_JULY_2012.pdf PDF
012300_-_ALTERNATES_5-2014.docx DOCX document
014000-QUALITY_REQUIREMENTS_5-2014.docx DOCX document
Payment_ILC.pdf PDF
260500_Basic_Electrical_Materials_and_Methods _July_2012.pdf PDF
092400_Portland_Cement_Plaster_5-2014.docx DOCX document
012600_-_CONTRACT_MODIFICATION_PROCEDURES_5-2014.docx DOCX document
260526_Earthing_Systems_TechSpecs_JULY_2012.pdf PDF
262413_Low_Voltage_Switchboards_TechSpecs_JULY_2012.pdf PDF
016000-_PRODUCT_REQUIREMENTS_5-2014.docx DOCX document
017000_Execution_Requirements_5-2014.docx DOCX document
013200_-_CONSTRUCTION_PROGRESS_DOCUMENTATION_5-2014.docx DOCX document
261400_RMU_TechSpecs_JULY_2012.pdf PDF
262416_Panel_Boards_TechSpecs_JULY_2012.pdf PDF
Breakdown_of_Proposal_Prices-Maadi_55-17_June_2014.xls XLS spreadsheet
099123_Paint_5-2014.docx DOCX document
Breakdown_of_Proposal_Prices-FBOZ_June_2014.xls XLS spreadsheet
Performance_Guarantee_ILC.pdf PDF
265000_Lighting_TechSpecs_JULY_2012.pdf PDF
013000-_Administrative_Requirements_5-2014.docx DOCX document
011000_-_SUMMARY_5-2014.doc DOC document
260519_LV_Cables_TechSpecs_JULY_2012.pdf PDF
OCPD_ _Cable_Select_Check_Acc_NEC_JULY_2012.pdf PDF
RFP _signed.pdf PDF
OIG_Employee_Interview_Questionnaire.pdf PDF
260533_Conduit_ _Raceways_TechSpecs_JULY_2012.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Div 26 Elec. Work 11-11

Breakdown of Proposl Prices- Electric Work Division 26 Maadi 11/11 May 2014 Item DESCRIPTION Qty Unit Unit Price EGP Total Price EGP

APower Supply Equipment
A.1Installation of the Meduim Voltage Cable 11kV, as Utility Specification, 12/20kV from RMU to Transformer, termination and connection at the Main MV Distributor side, termination kits, accessories, and ancillary works necessary for a complete and operative system.
Manufacturer: El‐Sewedy or approved equal. (Work completed by Others and not included in this contract)10L.M0.000.00
BDistribution Boards and Electrical Panels
Supply, install, connect and test distribution board .The item includes all accessories and ancillary work required for a completely operative system as per the single line diagrams and specifications.

All necessary works to replacement of Existing Old Panels are included. Item includes, but is not limited to, temporary panels, cables, terminations, raceways, etc..

Manufacturer: Schneider‐Electric or approved equal

B.1MDB (Including all necessary works to replacement the Existing MDB)1EA
B.2PFC Panel1EA
B.3ATS‐Apart. 800A, (3 Sources). (Including all necessary works to replacement the Existing Gen. PNL). (Governemtn Furnished item)1EA
B.4ATS-Service 800A, (3 Sources). (Governemtn Furnished item)1EA
B.5SDB‐Apart.1EA
B.6SDB‐Serv.1EA
B.7Fire Pump ATS (3 Sources). (Governemtn Furnished item)1EA
B.8CB - Fire pump Box1EA
B.9MCC PNL (Including all necessary works to replacement the Existing MCC PNL)1EA
B.10Elev. PNL (Including all necessary works to replacement the Existing Elev. PNL)1EA
B.11LPP‐G1 (Including all necessary works to replacement the Existing LPP‐G1)1EA
B.12LPP‐G2 (Including all necessary works to replacement the Existing LPP‐G1)1EA
B.13LPP‐M.P.R.1EA
B.14LPP‐Sec.R.1EA
B.15Junction Box1 800A.1EA
B.16Junction Box2 800A.1EA
B.17Junction Box3 1000A.1EA
CPower Cables
Supply, install, connect, commission and test of low voltage cables (0.6/1KV). The item includes termination and all necessary accessories and ancillary works required for complete operative system as per the drawings and specifications.

All necessary works to replacement of Existing Old Cables are included.

Manufacturer: El‐Sewedy or approved equal

C.1(4x240)mm2, Cu, XLPE/PVC, 0.6/1kV, 4C
From Transformer to MDB60L.M
C.2(4x240)mm2, Cu, PVC/PVC, 0.6/1kV, 4C
From Generator1 to ATS‐Apart. (Junction Box1).63L.M
From Generator2 to ATS‐Serv. (Junction Box2)50L.M
From MDB to ATS‐Apart. (Junction Box3)66L.M
From ATS‐Apart. to ATS‐Serv. (Junction Box2)20L.M
From ATS‐Apart. (Junction Box1) to ATS‐Serv20L.M
From ATS‐Apart. (Junction Box3) to ATS‐Serv.26L.M
From ATS‐Apart. to SDB‐Apart.50L.M
From ATS‐Serv. to SDB‐Serv.50L.M
C.3(4x120)mm2, Cu, XLPE/PVC, 0.6/1kV, 4CL.M
From Transformer to Fire Pump ATS10L.M
From ATS‐Apart. (Junction Box1) to ATS7L.M
From ATS‐Serv. (Junction Box2) to ATS‐Fire Pump11L.M
Fire Pump From Fire Pump ATS to Fire Pump65L.M
From SDB‐Serv. to MCC PNL56L.M
C.4(4x120)mm2, Cu, PVC/PVC, 0.6/1kV, 4C
From MDB to PFC Panel10L.M
From SDB‐Serv. to Elev. PNL56L.M
C.5(4x50)mm2, Cu, PVC/PVC, 0.6/1kV, 4C
From SDB‐Serv. to LPP‐G1 Panel8L.M
From SDB‐Serv. LPP‐G2 PNL77L.M
From SDB‐Serv. LPP‐M.P.R. PNL22L.M
C.6(4x6)mm2, Cu, PVC/PVC, 0.6/1kV, 4C
From SDB‐Serv. to LPP‐Sec.R. Panel33L.M
C.7120mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From Transformer to MDB10L.M
C.895mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From Generator1 to ATS‐Apart. (Junction Box1).21L.M
From Generator2 to ATS‐Serv. (Junction Box2)17L.M
From ATS‐Apart. to SDB‐Apart.17L.M
From ATS‐Serv. to SDB‐Serv.17L.M
C.970mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From MDB to PFC Panel10L.M
From MDB to ATS‐Apart. (Junction Box3)17L.M
From ATS‐Apart. to ATS‐Serv. (Junction Box2)7L.M
From ATS‐Apart. (Junction Box1) to ATS‐Serv.7L.M
From ATS‐Apart. (Junction Box3) to ATS‐Serv.7L.M
C.1025mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From Transformer to Fire Pump ATS10L.M
From ATS‐Apart. (Junction Box1) to ATS‐Fire Pump7L.M
From ATS‐Serv. (Junction Box2) to ATS‐Fire Pump11L.M
From Fire Pump ATS to Fire Pump65L.M
From SDB‐Serv. to MCC PNL56L.M
C.1116mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From SDB‐Serv. to Elev. PNL56L.M
C.1210mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From SDB‐Serv. to LPP‐G1 Panel8L.M
From SDB‐Serv. LPP‐G2 PNL77L.M
From SDB‐Serv. LPP‐M.P.R. PNL22L.M
C.136mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From SDB‐Serv. to LPP‐Sec.R. Panel33L.M
Apartment Cables (Add/Alternate)
C.14(4x35)mm2, Cu, PVC/PVC, 0.6/1kV, 4C
From SDB‐Apart. to Apartment Panel2200L.M
C.1510mm2, Cu, PVC, Green/Yellow, 0.6/1kV, 1C, Protective Earth (PE) Cable
From SDB‐Apart. to Apartment Panel2200L.M
DLighting Fixture
Supply, install, connect ,commission and test the lighting fixtures complete with lamps, electronic ballasts and including all necessary accessories and ancillary works required to complete the work as per the drawings and specifications.

Submit data for approval including, but not limited to, the following:

1‐ Detailed literature on each fixture, lamp and control gear including Manufacturer's name, catalogue number, rating, material specification, overall dimensions, operating characteristics and principles.

2‐ Details of changes to standard fixtures for adaptation to condition of installation and to the specification.

3‐ Photometric data for lighting calculations including polar light distribution curves, coefficient of utilization, glare, classification, efficiency, depreciation factors etc.

4‐ Dimensions of fixtures.

5‐ Certified results of laboratory tests for fixtures and lamps for photometric performance.

6‐ Emergency lighting unit battery and charger, if specified.

7‐ Fluorescent and high‐intensity‐discharge ballasts.

8‐ Types of lamps.

Manufacturer: El‐Sewedy or approved equal D.1 Surface/Wall mounted Luminaire with 2x36 W fluorescent lamps, equipped with HF electronic ballast, shock, dust, weather proof, IP66.

Body: made of non corrosive, moisture and acid proof.

Diffuser: made from impact acrylic to be dust, moisture and acid proof.11EA
D.2Ditto but equiped with Batteries (Capable for duration at least 1hr. fully equipped with charging circuit )9EA
D.3Exit sign ‐ Dangled

230V, 50Hz, with 2x8W Lamp.

Printed Legend (Not self‐adhesive legend). Equipped with Battery and charger for 1 Hour. Non Maintained Mode and without Reset Mode.2EA
D.4Ditto but wall mounted.4EA
ELighting Switches
Supply, install, connect ,commission and test the lighting switches complete with all necessary accessories and ancillary works required to complete the work as per the drawings and specifications.

General: Quick made, Quick‐break type wiyh silver alloy contacts in arc resisting molded base, with toggle, rocker or plug type connectors where specifically approved, for inductive or resistive, loads, up to full rated capacity, & arranged for side/or back connection.

General Lighting Switch: 16A, 250V, AC, Rocker operated, grid switch with white PVC Plate, for indoor installations in general areas or special finish as per architectural requirements.

Manufacturer: Legrand, Bticino or approved equal

E.1One Way One Gang Switch.3EA
FPower Outlets
Supply, install, connect ,commission and test the sockets including all necessary accessories and ancillary works required to complete the work as per the drawings and specifications.

Generally: Injection molded plastic base with self‐ adjusting, non‐expanding contacts to prevent, permanent distortion,, arranged for side and/or back connection & with screw terminals accepting at least three parallel branch‐circuit wires (General purpose socket outlets are to confirm to VDE German Standard).

Manufacturer: Legrand, Bticino, or approved equal

F.1Electrical Switch equipped with Short Circuit & Over current Protection, 1Phase, 220V, 25A, 2 Poles (Ph.+N).6EA
F.2Standard German Single Socket outlet, Single phase, two wires, for plug with 3 mm round pins at 19mm centers and with side earthing in accordance with
German Standard, rated 16A, 250V, AC, with colored plate & shatter type.7EA
GLighting and Power Outlets Circuits

(Lighting/Fused Disconnect Switches) Supply, install, connect, Commission and test lighting and power outlets. The item includes wiring, junction box, Rigid Heavy Guage PVC Conduit , flexible conduit, glands, conduit fittings and all necessary accessories and ancillary works required to complete the work as per the drawings and specifications.

Metal Conduit: EMT (For any exposed conduit) Material: Hot galvanized, high impact and high temperature resistance, flame retardant, anti‐corrosion, anti‐abrasion.

Assembly: Conduits, boxes and accessories are to be assembled by cementing, using Manufacturer's recommended products and appropriate connectors or spouts.

Flexible Metal Conduit: EMT (For any exposed conduit) Material: Flame retardant, heat resistant, high resistance to impact, ribbed on circumference for flexibility.

Manufacturer: Marshall‐tuffles (England), Decoduct (UAE/England), whetland or approved equal

G.1Lighting Circuit 3x3 mm2 Cu., PVC5Circuits
G.2MCB Circuit 3x4 mm2, Cu., PVC3Circuits
G.3Sockets Circuit 3x4 mm2 Cu., PVC2Circuits
HCable Ladder
Supply, install, commission and test hot dip mild steel cable and shall be galvanized after fabrication, thickness is not less than 1.5 mm, Rungs shall be welded to the ladder profiles. Rung width shall not be less than 30 mm, and center distance between rungs shall not exceed 250 mm. Cables shall be prevented from falling off the ladder system by 50 mm high edges along the whole length of the ladder. Rungs (transverse members) must be attached to the side rails by welding. The item includes cover if any, elbows, tees, croosses, support, fixation, earthing accessories, and all other necessary accessories and ancillary works required for complete the work as per the drawing and specification.

Submit drawings for approval including, but not limited to, the following: Designate components and accessories, including clamps, brackets, hanger rods, splice‐plate connectors, expansion‐joint assemblies, straight lengths, fittings and earthing connections.

Manufacturer: EMECO, EGYTRAY, NTT AL‐Tawakol or approved equal

H.1Supplying and installation of cable ladder 500x10 mm.
From Transformer to MDB5L.M
IRaceway
Metal Conduit: EMT

Material: Hot galvanized, high impact and high temperature resistance, flame retardant, anti‐corrosion, anti‐abrasion.

Assembly: Conduits, boxes and accessories are to be assembled by threaded ends, threaded fittings and locknuts, using Manufacturer's recommended products and appropriate connectors or spouts.

Flexible Metal Conduit: EMT Material: Flame retardant, heat resistant, high resistance to impact, ribbed on circumference for flexibility.

Unused Conduits:

Remove of all surface mounted abandoned conduits, wire and cables in the electric substation.

Manufacturer: whetland or approved equal

I.1Supplying and installation of (RGS) 4 inches
Sleeve Between Transformer Room and Power Room2L.M
From MDB to ATS‐Apart18L.M
ATS‐Apart. To SDB‐Apart.15L.M
ATS‐Serv. To SDB‐Serv.17L.M
ATS‐Apart.to ATS‐Serv.20L.M
I.2Supplying and installation of (EMT) 3 inchesL.M
From MDB to Fire Pump ATS5L.M
From ATS‐Apart. to Fire Pump ATS5L.M
From ATS‐Serv. to Fire Pump ATS3L.M
From MDB to PFC Panel3L.M
I.3Supplying and installation of (EMT) 2 inchesL.M
From SDB‐Serv. to LPP‐G1 Panel5L.M
From SDB‐Serv. to LPP‐G2 PNL7L.M
From SDB‐Serv. to LPP‐M.P.R. PNL20L.M
I.4Supplying and installation of (EMT) 1 inchesL.M
From SDB‐Serv. to LPP‐Sec.R. Panel33L.M
JEarthing Systems
Supply, install, connect, commission and test earthing systems using copper earthing rods in ground pits as listed below with earthing resistance as indicated. The item includes connection copper cables, test links, equalizer bars and connections to steel structure, transformers, panels boards, MV equipment and also includes all other necessary accessories and ancillary works required to complete the work as per the drawings and specifications.

Manufacturer: Furse, Wallis, Erico or approved equal J.1 Earthing System (multiple or single pit) at least 15m away from all other earthing pits, 1 Ohms or less, for earthing of MV RMU. Earthing System (multiple or single pit), 2 Ohm or less, for earthing of for Transformer & Generators Neutral Points. 1 LS

&LHousing Compounds Electric Upgrade Project Maadi 11/11 Compound&R&P

Summary 11-11

Housing Compounds Electric Upgrade Project
Maadi 11/11 Compound
Summary - Breakdown of Proposal Prices
Div.DescriptionUnitQtyUnit Cost L.ETotal Cost L.E
Div 01General Requirements
AMobilization, De-mobilization, Temporary facilities, Scaffolding, Material and equipment handling and storage, Safety Program, and other Division -1- compliance expensesl.s1
Subtotal for Division -1-
Div.09Finishes
BAll civil work associated with the project to include plaster, paint and epoxy painting for floors and other civil work items shown on drawings.l.s1
Subtotal for Division -9-
Div.26Electric Work
APower Supply Equipment (completed by others)00
BDistribution Boards and Electrical Panels
CPower Cables
DLighting Fixture
ELighting Switches
FPower Outlets
GLighting and Power Outlets Circuits
HCable Ladder
IRaceway
JEarthing Systems
Subtotal for Division -26-
Total All Divisions
Salvage Items
ALow Voltage Switchboard (MDB)
BLow Voltage ATS's (Qty. 2)
CLow Voltage Gen. Panel
DLow Voltage MCC Panel
ELow Voltage LPP‐G1
FLow Voltage LPP‐G2
HConduits & Raceways
JCopper Cables.
Subtotal for Salvage items
Total Price L.E (Salvage items deducted from Total Price)
Equivalent US $
Add/Alternate items
Apartment Cables
NotesSalvage items are items removed under this contract and have a value if sold. The contractor shall propose a price for it.
The total price for the salvage items shall be deducted form the total cost of the project
The above prices includes all required labor , material, overhead, and profit
The total price shall be the total lump-sum price.

&LHousing Compounds Electric Upgrade Project Maadi 11-11 Compound - Summary&R&P