SF424C_2_0-V2.0.pdf

PDF 2 MB Posted

Attached to
FY 2023 Disaster Supplemental Federal grant opportunity
Opportunity number
EDA-DISASTER-2023
Issued by
Department of Commerce Economic Development Administration

About this file

SF424C

View the file

Other files for this federal grant opportunity

Other files attached to FY 2023 Disaster Supplemental, newest first.
File Type Posted
SFLLL_2_0-V2.0.pdf PDF
SF424D-V1.1.pdf PDF
SF424A-V1.0.pdf PDF
SF424_4_0-V4.0.pdf PDF
ED_900F_1_1-V1.1.pdf PDF
ED_900E_1_1-V1.1.pdf PDF
ED_900D_1_1-V1.1.pdf PDF
ED_900C_1_2-V1.2.pdf PDF
ED_900B_2_1-V2.1.pdf PDF
ED_900_GA_1_2-V1.2.pdf PDF
CD511-V1.1.pdf PDF
BudgetNarrativeAttachments_1_2-V1.2.pdf PDF
07_Environmental-Narrative-Template-and-Application-Certification-Clause.docx DOCX document
FY23 EDA Disaster Supplemental NOFO.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.

For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.

SF424C_2_0

win2k D:20061115102127- 05'00' D:20061115102127- 05'00' OMB Number: 4040-0008 Expiration Date: 02/28/2025 BUDGET INFORMATION - Construction Programs NOTE: Certain Federal assistance programs require additional computations to arrive at the Federal share of project costs eligible for participation. If such is the case, you will be notified.

COST CLASSIFICATION

a. Total Cost

FEDERAL FUNDING

b. Costs Not Allowable for Participation

c. Total Allowable Costs (Columns a-b)

1. Administrative and legal expenses

2. Land, structures, rights-of-way, appraisals, etc.

3. Relocation expenses and payments

4. Architectural and engineering fees

5. Other architectural and engineering fees

6. Project inspection fees

7. Site work

8. Demolition and removal

9. Construction

10. Equipment

11. Miscellaneous

12. SUBTOTAL (sum of lines 1-11)

14. SUBTOTAL

15. Project (program) income

17. Federal assistance requested, calculate as follows:

(Consult Federal agency for Federal percentage share.)

Enter the resulting Federal share.

16. TOTAL PROJECT COSTS (subtract #15 from #14)

13. Contingencies Enter eligible costs from line 16c Multiply X

Mandatory:
ViewBurdenStatement:
TextField1:
1. a: Total Cost of Administrative and legal expenses:
1. b: Costs Not Allowable for Participation in Administrative and legal expenses:
1. c: Total Allowable Costs (Columns a-b) of Administrative and legal expenses. This is a calculated field.:
2. a: Total Cost of Land, structures, rights-of-way, appraisals, etc.:
2. b: Costs Not Allowable for Participation in Land, structures, rights-of-way, appraisals, etc.:
2. c: Total Allowable Costs (Columns a-b) of Land, structures, rights-of-way, appraisals, etc. This is a calculated field.:
3. a: Total Cost of Relocation expenses and payments:
3. b: Costs Not Allowable for Participation in Relocation expenses and payments:
3. c: Total Allowable Costs (Columns a-b) of Relocation expenses and payments. This is a calculated field.:
4. a: Total Cost of Architectural and engineering fees:
4. b: Costs Not Allowable for Participation in Architectural and engineering fees:
4. c: Total Allowable Costs (Columns a-b) of Architectural and engineering fees. This is a calculated field.:
5. a: Total Cost of Other architectural and engineering fees:
5. b: Costs Not Allowable for Participation in Other architectural and engineering fees:
5. c: Total Allowable Costs (Columns a-b) of Other architectural and engineering fees. This is a calculated field.:
6. a: Total Cost of Project inspection fees:
6. b: Costs Not Allowable for Participation in Project inspection fees:
6. c: Total Allowable Costs (Columns a-b) of Project inspection fees. This is a calculated field.:
7. a: Total Cost of Site work:
7. b: Costs Not Allowable for Participation in Site work:
7. c: Total Allowable Costs (Columns a-b) of Site work. This is a calculated field.:
8. a: Total Cost of Demolition and removal:
8. b: Costs Not Allowable for Participation in Demolition and removal:
8. c: Total Allowable Costs (Columns a-b) of Demolition and removal. This is a calculated field.:
9. a: Total Cost of Construction:
9. b: Costs Not Allowable for Participation in Construction:
9. c: Total Allowable Costs (Columns a-b) of Construction. This is a calculated field.:
10. a: Total Cost of Equipment:
10. b: Costs Not Allowable for Participation in Equipment:
10. c: Total Allowable Costs (Columns a-b) of Equipment. This is a calculated field.:
11. a: Total Cost of Miscellaneous:
11. b: Costs Not Allowable for Participation in Miscellaneous:
11. c: Total Allowable Costs (Columns a-b) of Miscellaneous. This is a calculated field.:
12. a: Subtotal (sum of lines 1-11) of Total Cost. This is a calculated field.:
12. b: Subtotal (sum of lines 1-11) of Costs Not Allowable for Participation. This is a calculated field.:
12. c: Subtotal (sum of lines 1-11) of Total Allowable Costs (Columns a-b). This is a calculated field.:
13. a: Total Cost of Contingencies:
13. b: Costs Not Allowable for Participation in Contingencies:
13. c: Total Allowable Costs (Columns a-b) of Contingencies. This is a calculated field.:
14. a: Subtotal of Total Cost. This is a calculated field.:
14. b: Subtotal of Costs Not Allowable for Participation. This is a calculated field.:
14. c: Subtotal of Total Allowable Costs (Columns a-b). This is a calculated field.:
15. a: Total Cost of Project (program) income:
15. b: Costs Not Allowable for Participation in Project (program) income:
15. c: Total Allowable Costs (Columns a-b) of Project (program) income. This is a calculated field.:
16. a: Total Project Costs (subtract #15 from #14) of Total Cost. This is a calculated field.:
16. c: Total Project Costs (subtract #15 from #14) of Total Allowable Costs (Columns a-b). This is a calculated field.:
16. b: Total Project Costs (subtract #15 from #14) of Costs Not Allowable for Participation. This is a calculated field.:
Federal percentage share: Consult Federal agency for Federal percentage share:
17. c: Federal Funding Share. This is a calculated field.:
TextField2:
XDPFirstField:

File details come from the government source that posted it. Updated .