SF424C_2_0-V2.0.pdf

PDF 85 KB Posted

Attached to
Assistance to High Energy Cost Communities Federal grant opportunity
Opportunity number
RD-RUS-HECG20
Issued by
Department of Agriculture

About this file

SF 424C

View the file

Other files for this federal grant opportunity

Other files attached to Assistance to High Energy Cost Communities, newest first.
File Type Posted
PKG00258608-instructions.pdf PDF
HECG FY2020 Application Guide as published Feb 27 2020.pdf PDF
FY20 HECGP FOA.pdf PDF
HECG Environmental Questionnaire 2020.pdf PDF
RD Form RD 400-1.pdf PDF
RUS Form 266 Assurance Agreement Civil Rights.pdf PDF
AD3030_Representations_Corporate Applicants_v2_final.pdf PDF
SFLLL_1_2-V1.2.pdf PDF
SF424D-V1.1 Exp Feb 28 2022.pdf PDF
SF424A-V1.0 Exp Feb 28 2022.pdf PDF
SF424_2_1-V2.1.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

SF424C_2_0

win2k D:20061115102127- 05'00' D:20061115102127- 05'00' OMB Number: 4040-0008 Expiration Date: 02/28/2022 BUDGET INFORMATION - Construction Programs NOTE: Certain Federal assistance programs require additional computations to arrive at the Federal share of project costs eligible for participation. If such is the case, you will be notified.

COST CLASSIFICATION

a. Total Cost

FEDERAL FUNDING

b. Costs Not Allowable for Participation

c. Total Allowable Costs (Columns a-b)

1. Administrative and legal expenses

2. Land, structures, rights-of-way, appraisals, etc.

3. Relocation expenses and payments

4. Architectural and engineering fees

5. Other architectural and engineering fees

6. Project inspection fees

7. Site work

8. Demolition and removal

9. Construction

10. Equipment

11. Miscellaneous

12. SUBTOTAL (sum of lines 1-11)

14. SUBTOTAL

15. Project (program) income

17. Federal assistance requested, calculate as follows:

(Consult Federal agency for Federal percentage share.)

Enter the resulting Federal share.

16. TOTAL PROJECT COSTS (subtract #15 from #14)

13. Contingencies Enter eligible costs from line 16c Multiply X

Mandatory:
ViewBurdenStatement:
TextField1:
1. a: Total Cost of Administrative and legal expenses:
1. b: Costs Not Allowable for Participation in Administrative and legal expenses:
1. c: Total Allowable Costs (Columns a-b) of Administrative and legal expenses. This is a calculated field.:
2. a: Total Cost of Land, structures, rights-of-way, appraisals, etc.:
2. b: Costs Not Allowable for Participation in Land, structures, rights-of-way, appraisals, etc.:
2. c: Total Allowable Costs (Columns a-b) of Land, structures, rights-of-way, appraisals, etc. This is a calculated field.:
3. a: Total Cost of Relocation expenses and payments:
3. b: Costs Not Allowable for Participation in Relocation expenses and payments:
3. c: Total Allowable Costs (Columns a-b) of Relocation expenses and payments. This is a calculated field.:
4. a: Total Cost of Architectural and engineering fees:
4. b: Costs Not Allowable for Participation in Architectural and engineering fees:
4. c: Total Allowable Costs (Columns a-b) of Architectural and engineering fees. This is a calculated field.:
5. a: Total Cost of Other architectural and engineering fees:
5. b: Costs Not Allowable for Participation in Other architectural and engineering fees:
5. c: Total Allowable Costs (Columns a-b) of Other architectural and engineering fees. This is a calculated field.:
6. a: Total Cost of Project inspection fees:
6. b: Costs Not Allowable for Participation in Project inspection fees:
6. c: Total Allowable Costs (Columns a-b) of Project inspection fees. This is a calculated field.:
7. a: Total Cost of Site work:
7. b: Costs Not Allowable for Participation in Site work:
7. c: Total Allowable Costs (Columns a-b) of Site work. This is a calculated field.:
8. a: Total Cost of Demolition and removal:
8. b: Costs Not Allowable for Participation in Demolition and removal:
8. c: Total Allowable Costs (Columns a-b) of Demolition and removal. This is a calculated field.:
9. a: Total Cost of Construction:
9. b: Costs Not Allowable for Participation in Construction:
9. c: Total Allowable Costs (Columns a-b) of Construction. This is a calculated field.:
10. a: Total Cost of Equipment:
10. b: Costs Not Allowable for Participation in Equipment:
10. c: Total Allowable Costs (Columns a-b) of Equipment. This is a calculated field.:
11. a: Total Cost of Miscellaneous:
11. b: Costs Not Allowable for Participation in Miscellaneous:
11. c: Total Allowable Costs (Columns a-b) of Miscellaneous. This is a calculated field.:
12. a: Subtotal (sum of lines 1-11) of Total Cost. This is a calculated field.:
12. b: Subtotal (sum of lines 1-11) of Costs Not Allowable for Participation. This is a calculated field.:
12. c: Subtotal (sum of lines 1-11) of Total Allowable Costs (Columns a-b). This is a calculated field.:
13. a: Total Cost of Contingencies:
13. b: Costs Not Allowable for Participation in Contingencies:
13. c: Total Allowable Costs (Columns a-b) of Contingencies. This is a calculated field.:
14. a: Subtotal of Total Cost. This is a calculated field.:
14. b: Subtotal of Costs Not Allowable for Participation. This is a calculated field.:
14. c: Subtotal of Total Allowable Costs (Columns a-b). This is a calculated field.:
15. a: Total Cost of Project (program) income:
15. b: Costs Not Allowable for Participation in Project (program) income:
15. c: Total Allowable Costs (Columns a-b) of Project (program) income. This is a calculated field.:
16. a: Total Project Costs (subtract #15 from #14) of Total Cost. This is a calculated field.:
16. c: Total Project Costs (subtract #15 from #14) of Total Allowable Costs (Columns a-b). This is a calculated field.:
16. b: Total Project Costs (subtract #15 from #14) of Costs Not Allowable for Participation. This is a calculated field.:
Federal percentage share: Consult Federal agency for Federal percentage share:
17. c: Federal Funding Share. This is a calculated field.:
TextField2:
XDPFirstField:

File details come from the government source that posted it.