Construction Budget SF424C Instructions
View the file
Other versions and copies of SF 424C
Show all 20
Who attaches SF 424C
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Number: 4040-0008 1 OMB Expiration Date: 02/28/2022
Grants.gov Form Instructions Form Identifiers Information
Agency Owner Grants.gov
Form Name Budget Information for Construction Programs (SF-424C) V2.0
OMB Number 4040-0008
OMB Expiration Date 02/28/2022
Form Field Instructions Field Item Field Name Required or
Optional Information
1. Administration and legal expenses
a. Total Cost of Administrative and legal expenses
b. Costs Not Allowable for Participation in Administration and Legal Expenses
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
2. Land, structures, rights-of-way, appraisals, etc.
a. Total Cost of Land, structures, rights-of-way, appraisals, etc.
b. Costs Not Allowable for Participation in Land, structures, rights-of-way, appraisals, etc.
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
3. Relocation expenses and payments
a. Total Cost of Relocation expenses and payments
b. Costs Not Allowable for Participation in Relocation expenses and payments
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
4. Architectural and engineering fees
a. Total Cost of Architectural and engineering fees
b. Costs Not Allowable for Participation in Architectural and engineering fees
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
OMB Number: 4040-0008 2
Field Item Field Name Required or Optional
Information
5. Other architectural and engineering fees
a. Total Cost of Other Architectural and engineering fees
b. Costs Not Allowable for Participation in Other Architectural and engineering fees
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
6. Project inspection fees
a. Total Cost of Project inspection fees
b. Costs Not Allowable for Participation in Project Inspection fees
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
7. Site work a. Total Cost of Site work
b. Costs Not Allowable for Participation in Site work
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
8. Demolition and removal
a. Total Cost of Demolition and removal
b. Costs Not Allowable for Participation in Demolition and removal
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
9. Construction a. Total Cost of Construction
b. Costs Not Allowable for Participation in Construction
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
10. Equipment a. Total Cost of Equipment
b. Costs Not Allowable for Participation in Equipment
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
OMB Number: 4040-0008 3
Field Item Field Name Required or Optional
Information
11. Miscellaneous a. Total Cost of Miscellaneous
b. Costs Not Allowable for Participation in Miscellaneous
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
12. SUBTOTAL
(sum of lines 1- 11)
a. Sum of lines 1-11 for Total Costs
b. Sum of lines 1-11 for Costs Not
Allowable for Participation
c. Sum of lines 1-11 for Total Allowable
Costs (Columns a-b) Calculated automatically if submitted via Grants.gov
13. Contingencies a. Total Cost of Contingencies
b. Costs Not Allowable for Participation in Contingencies
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
14. SUBTOTAL a. Sum of lines 12-13 for Total Cost
b. Sum of lines 12-13 for Costs Not
Allowable for Participation
c. Sum of lines 12-13. Calculated automatically if submitted via Grants.gov
15. Project (program income)
a. Total Cost of Project (program) income
b. Costs Not Allowable for Participation in Project (program) income
c. Total Allowable Costs (Columns a-b).
Calculated automatically if submitted via Grants.gov
16. TOTAL
PROJECT
COSTS
(subtract #15 from #14)
a. Total Cost of Total Project Costs
b. Total of Costs Not Allowable for
Participation
c. Total Allowable Costs Calculated automatically if submitted via Grants.gov
OMB Number: 4040-0008 4
Field Item Field Name Required or Optional
Information
17. Federal assistance requested, calculate as follows:
(Consult Federal agency for Percentage share.)
Enter eligible costs from line 16c. Multiply x Federal percentage share %.