ED_900D_1_1-V1.1.pdf
PDF 142 KB Posted
- Attached to
- FY 2023 Disaster Supplemental Federal grant opportunity
- Opportunity number
- EDA-DISASTER-2023
About this file
ED 900D
View the file
Other files for this federal grant opportunity
| File | Type | Posted |
|---|---|---|
| SFLLL_2_0-V2.0.pdf | ||
| SF424D-V1.1.pdf | ||
| SF424C_2_0-V2.0.pdf | ||
| SF424A-V1.0.pdf | ||
| SF424_4_0-V4.0.pdf | ||
| ED_900F_1_1-V1.1.pdf | ||
| ED_900E_1_1-V1.1.pdf | ||
| ED_900C_1_2-V1.2.pdf | ||
| ED_900B_2_1-V2.1.pdf | ||
| ED_900_GA_1_2-V1.2.pdf | ||
| CD511-V1.1.pdf | ||
| BudgetNarrativeAttachments_1_2-V1.2.pdf | ||
| 07_Environmental-Narrative-Template-and-Application-Certification-Clause.docx | DOCX document | |
| FY23 EDA Disaster Supplemental NOFO.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.
For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.
ED-900D Design and Engineering D:20060519172049- 04'00' D:20060519173626- 04'00' ..\..\Unknown.png EDA Logo OMB Number: 0610-0094Expiration Date: 10/31/2024 ED-900D – Requirements for Design and Engineering Assistance When the primary purpose of the EDA investment is to accomplish only the design and engineering work required for the construction of a complex and/or environmentally sensitive project, this form must be completed. EDA will award grants for design and engineering work only when there is a reasonable expectation that construction of the project can and will begin soon after the completion of design and engineering. EDA’s funding of the project for the design and engineering work does not in any way obligate EDA to fund construction of the project. See 13 C.F.R. § 305.4.
Note: Prior to beginning final design activities, the Applicant may be required to provide EDA with the documentation EDA determines is necessary to complete its National Environmental Policy Act (NEPA) analysis.
Insert the description of the project.
3. Estimate how many months will be required for the design and engineering work to be completed. Include the number of months needed to obtain all the applicable permits and approvals from state and federal regulatory authorities (such as the Environmental Protection Agency, U.S. Army Corps of Engineers, etc).
5. Estimate how many months will be required after the design and engineering work is completed for the project’s construction phase to begin, including the timeframe required to obtain the construction funds for the project if applicable.
| Mandatory: |
| XDPFirstField: |
| Project Description: Insert the project description from Section B.1. of the ED-900GA. This field is required.: |
| Design and Engineering Work: Explain the reasons why the design and engineering work needs to be completed as a separate project. This field is required.: |
| Months Required for Work to be Completed: Estimate how many months will be required for the design and engineering work to be completed. This field is required.: |
| Method of Funding: Describe the proposed method of financing and funding sources that will be used to finance the construction of the project upon completion of the design and engineering work. This field is required.: |
| Months Required After Work is Completed: Estimate how many months will be required after the design and engineering work is completed. This field is required.: |
| LastField: |
File details come from the government source that posted it. Updated .