SETA Pre-solicitation QA Final.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- 844 CG SYSTEMS ENGINEERING and TECHNICAL ASSISTANCE (SETA) Follow-On Federal contract opportunity
- Solicitation number
- FA701424R0005
About this file
This document contains questions and answers related to a solicitation for Systems Engineering and Technical Assistance (SETA) follow-on support services. The incumbent contractor is CDO Technologies under contract FA701419DA067. The solicitation will be a 100% small business set-aside issued by the Department of the Air Force Headquarters District of Washington for contract number FA701424R0005. Services required include program management, operations and maintenance, and small and medium IT projects. Pricing will be fixed-price for labor with materials and travel as plug-in amounts. The North American Industry Classification System code is 541513. Offerors should submit pricing by task area and labor categories in Attachment 3 with optional additional tabs and escalation rates. Past performance questionnaires will only be required when Contractor Performance Assessment Reporting System reports are unavailable.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QA
| SETA Follow-On Q&A | |||
| N | Reference | Question/comment | Answer |
| 1 | N/A | Who is the incumbent contractor supporting solicitation FA701424RXXXX currently | Incumbent contractor supporgint the current SETA effort is CDO Technologies (CAGE: 04ZD8) on FA701419DA067. |
| 2 | N/A | Due to the varied nature of technical requirements in the solicitation that may require teaming across multiple subcontractors, would the government consider increasing the number of allowed subcontractor past performance submissions? | Section L, L.2.2. first paragraph was revised to reflect maximum of three (3) contracts for major subcontractors. PMO no comment |
| 3 | SF 1449, Block 10 | At least the two previous RFPs for the SETA requirement were competed using the NETCENTS contract vechicles and were small business set-aside. The NETCENTS NAICS code was 517311 with a company size standard of 1500 employees which is now 517111. Changing the NAICS code to and awarding to companies with under $37M size standard would introduce risk to AFDW as smaller companies often lack the financial resources to finance large equipment purchases and projects historically acquired on the SETA contract. Given the historical NAICS code precedent and financial risk potentially introduced, would the government consider changing the NAICS code to 517111? This change would ensure the contract was awarded to a company with the financial resources to complete most large equipment purchanses and projects while AFDW continues to receive small business credit | The Government has reviewed the scope of the requirement and determined the NAICS code 541513 best describes the principal purpose of the services being acquired IAW FAR 19.102(b). |
| 4 | Section B Supplies or Services & Prices or Cost page 3 of 61, Item X001 | The CLIN X001 description is Labor (PMO, O&M, small & Medium Projects. There is no mention of small or medium projects in the PWS. What is the definition of small and medium projects? How are they to be priced in an FFP CLIN? | Small/medium constitute modification to the existing systems. Small projects can be perform at the work center level and medium projects is outside the work center capabilities. FFP will be depending on the medium project. |
| 5 | N/A | Do you want the completed SF included? If yes, which volume? | Yes, please include the completed SF1449 as part of Volume III - Price. |
| 6 | N/A | Do you want the Supplies or Services Schedule B included? If yes, which volume? | Yes, please include the completed SF1449 as part of Volume III - Price. |
| 7 | N/A | Do you want the Reps and Certs included and if yes, which volume? | If the offeror's Reps and Certs are current on SAM.gov then the offeror does not need to include them, if not please include them in Section K |
| 8 | 2.0 Task Descriptions, Page 4, Lines 261-265 | The Government may direct a project that meets the definition of a large project to be completed within the work performed under an annual task order without issuing a separate task order at the sole discretion of the Government. Does this statement mean that CLIN X002 will be added to an annual Task Order, or does this mean it needs to be completed within CLIN X001? If X001, will the price be added to X001 as a modification? | Not unless the FTE requirement changes |
| 9 | N/A | What is the definition of surge? Is it overtime or adding personnel for a short/defined period of time? What CLIN is surge to be priced under? | Note: CLIN 0002 will take care of surge/MES, but CLINs X0002 (Large Project, surge/MES), X003 (Material/ODCs), X004 (Travel/Training) are "plug-in" amount (government provide the ceiling amounts), so offeror will not have to propose surge labor price. |
| 10 | Attachment 3, Column E | Is Fee also to be included in the additional costs? If not, where is fee to be included? | Attachment 3 has been revised to include profit in column E in each tab (worksheet) |
| 11 | L.2.3 LH rates shall be honored for the duration of the Task Order (TO) Period of Performance (POP). Any surge labor hour rates shall not exceed the labor hour rates negotiated for this Task Order. | Are surge labor hour rates not to exceed the LH rates referenced in the preceding sentence - meaning the labor hour rates used to establish the pricing for CLIN X001? Or are surge labor categories and rates being established for another CLIN, and if for another CLIN, which CLIN? | Same response as Q9. |
| 12 | M.1.2.2.3 Quality. | How will eSRS be used for evaluating quality? Small business are not required to maintain subcontracting plans and thus are not required to report in eSRS. | Section M, paragraph M.1.2.3. removed eSRS reference. |
| 13 | M.1.2.3. a - Profit is not to be included in the burden rate | If profit isn't included in the burden rate in Attachment 3 Column E, then where is it included and how is the price for CLIN X001 which includes profit shown in the proposal? Only in schedule B? | Same response as Q10 |
| 14 | Paragraph 2.0, line 234 | What is the correct reference for where minimum required skill levels are outlined? |
| Paragraph 4.3 is referenced on line 234 of the PWS, but there is no paragraph 4.3 in the document. Skill levels are outlined in the Qualification Roster in Appendix C. | Changed the reference 4.3 to Appendix C on line 234. | |||
| 15 | Paragraph 2.3.1.1.5, line 492 | This paragraph is in the Inside Plant (ISP) section, but refers the Outside Plant (OSP) in this paragraph. Was this entered in error? | Correction changed OSP to ISP on line 492. | |
| 16 | Paragraph 2.3.2.1.5 | Is pricing for the equipment part of CLIN X001 or CLIN X003? | CLIN X003 Materials/ODCs | |
| 17 | Paragraph 4.0, list of deliverables, Sequence Number A081 Quality Assurance Plan | What are the correct draft and final delivery dates for the Quality Assurance Plan? | The draft plan delivery date and the finalized delivery date are both 30 days after award. | |
| 18 | Paragraph 6.1.2, line 894 | What is the correct PWS references for LAN Engineering and Voice Systems? |
| Paragraphs 2.1.3 is currently referenced for LAN Engineering and 2.1.6 is currently referenced for Voice Systems. | Correction made by changing references 2.1.3 to 2.1.2 and 2.1.6 to 2.1.5. | |||
| 19 | Paragraph 6.1.5 | Is the leasing price for the vehicles part of CLIN X001 or CLIN X003? | Leasing vehicles are inclusive of CLIN X003 | |
| 20 | Paragraph 6.7.1 | What is the correct PWS task references for the three Network infrastructure tasks listed under 2.1? |
| Paragraphs "2.1.2 PDS, sub-paragraph 2.1.2.3" should read "2.1.1 PDS, sub-paragraph 2.1.1.3" and "2.1.3 LAN Engineering, sub-paragraphs 2.1.3.3, 2.1.3.9, and 2.1.3.11" should read "2.1.2 LAN Engineering, sub-paragraphs 2.1.2.3, 2.1.2.9, and 2.1.2.11", and "2.1.6 LAN Voice Systems Maintenance and Sustainment, sub-paragraphs 2.1.6.3 and 2.1.6.11" should read "2.1.5 LAN Voice Systems Maintenance and Sustainment, sub-paragraphs 2.1.5.3 and 2.1.5.11". | The correct task references are PWS para 2.1.1, 2.1.2, and 2.1.5. Further, additional comments/corrections have been noted and completed. | ||
| 21 | Paragraph 6.7.1, line 1068 | What is the correct PWS task reference for UPS Support? |
| Paragraph "2.4.3 UPS Support, Sub-paragraph 2.4.2.4" should read "2.4.2 UPS Support, Sub-paragraph 2.4.2.4" | The correct PWS Task reference is 2.4.2. Further, additional comments/corrections have been noted and completed. | |||
| 22 | Appendix C | What labor category in Appendix C is intended to be used for the Protected Distribution System (PDS) tasks in 2.1.1 or was this omitted in error? Task 2.1.1 is not referenced in Appendix C. | Created Network Specialist (PDS) in Appendix C. | |
| 23 | Appendix C | What labor category in Appendix C is intended to be used for the Telephone Systems Support tasks in 2.1.3 or was this omitted in error? Task 2.1.3 is not referenced in Appendix C. | Created Legacy Telephone Technician in Appendix C. | |
| 24 | Paragraph 6.4 Transition-In Plan | This Plan is not required until the Kickoff meeting. However, should it be included in the Pricing for CLIN 0001? | Yes | |
| 25 | Paragraph 6.13 Place of Performance | For pricing CLINs X001, what will the breakout be between Contractor Site work and Government Site work? | 100 percent Government work site unless telework approve | |
| 26 | Appendix C Labor Qualifications Roster | Are these the only labor categories to be used in pricing? | No, these are not the only labor categories to be used in pricing. It is up to the Offeror to determine the labor categories needed to accomplish the requirements of the PWS. | |
| 27 | L.1.1.8 Cross Reference Matrix | Which Volume should contain the Cross Reference Matrix? | Volume IV, Administrative Submissions | |
| 28 | L.2.3 Paragraph 1 | "The pricing information submitted should fully support the PWS requirements for each major function element specified in the PWS." What are the "major functional elements," and does this mean the Government wants pricing by PWS major functional element? | Major function are defined in the task elements | |
| 29 | L.2.3 Paragraph 1 | Is the Government requesting a Cost Narrative to support "…completeness and reasonableness of…proposed prices"? | Attachment 4 (Addendum to FAR 52.212-1, Instruction to Offerors) Section 2.3. has been revised to read "Price Proposal (Narrative)" instead of "Cost Narrative." | |
| 30 | L.2.3 Paragraph 2 | Should the requested rate table be 1) included as a separate tab in the Attachment 3 Pricing Workbook, 2) provided as a separate workbook, or 3) included as part of a cost narrative? | Attachment 4 (Addendum to FAR 52.212-1, Instruction to Offerors) Section 2.3 paragraph 2 has been removed in reference to the rates table. | |
| 31 | L.2.3 Paragraph 3 | Does this paragraph mean the Government is requesting a regular hourly rate and an overtime hourly rate for each labor category? | RFP Attachment 3, Price Proposal template, has been revised to remove the entries for overtime hourly rates. | |
| 32 | L.2.3 | If using subcontractors, what is the Government requesting to support "…completeness and reasonableness of…proposed prices"? | If using subcontractor(s), on Attachment 3 - Price Proposal template, under CLIN X001 (Labor), at minimum, please indicate if the proposed labor category is a subcontractor labor (Column A), PWS Task Area (Column B), Estinated Hours (Column C), Proposed Rate (fully burdened rate, Column F) and Total Proposed (Column G) for each proposed labor category. If the Unburdened Rate (Column D) and additional cost (Column E) information are not provided in the prime offeror's Price proposal, Subcontractor shall submit the information directly to the Government Points of Contact identified in this RFP by the submission due date/time. Subcontractor proposal information not received by the closing date and time may result in an entire proposal elimination for consideration. | |
| 33 | L.2.3 | If using subcontractors, may the subcontractors submit any proprietary information to support "…completeness and reasonableness of…proposed prices" directly to the Government? | Yes, please see Q.32 | |
| 34 | Column E "Additional Costs" | Will the Government be requesting a breakout of the elements within this column? (For example, Fringe, OH, G&A, and Fee) | No. See response on Q31. | |
| 35 | Entire workbook | Where should annual escalation be entered in this workbook? | Annual escalation can be entered as part of the offeror's Excel cell formul on Attachment 3 - Price Proposal template. | |
| 36 | Entire workbook | May rows and/or columns be added to the existing tabs to provide identifying information (proposers name, etc.) or to more clearly support the pricing? | Yes, rows and/or columns may be added to the existing tabs to provide identifying information or to more clearly support the pricing. | |
| 37 | Entire workbook | May additional tabs be added to the workbook to fully support the pricing? | Yes, additional tabs may be added to the workbook to fully support the pricing. | |
| 38 | All | Would the government consider providing a LOE for the requirements, enabling bidders to submit comparable, competitive pricing and offering the government the best opportunity for fair evaluation? | Yes, the gov't would considered providing a LOE but a template is needed | |
| 39 | All | Has the Government identified a contract vechicle for this solicitation? | Yes, we will be establishing an internal contract vehicle. (Single Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract) | |
| 40 | All | In accordance with 13 C.F.R. § 121.404(a)(1)(ii), a company's size status is determined at the time it submitted its initial offer based on the size standard for each GSA Multiple Award Schedule SINs. Will the Goverment require vendors to recertify as a small business? | This is an internal Single Award IDIQ (at AFDW/PK level) and Task Orders to be issued under the IDIQ contract, not GSA Multiple Award Schedule. | |
| 41 | PWS 2.1.3.6 | Section 2.1.3.6 addresses the identification and migration of legacy POTS devices to an IP based solution. What percentage of the existing telephone infrastructure has been migrated to IP, and is there an expected timeline for a full migration to be completed (if applicable)? | 95 percent VoIP on JBA and 45 percent on JBAB to meet DoD CIO March 2025 mandate | |
| 42 | PWS 2.1.2 | How does the work referenced in PWS 2.1.2 differerntiate from the O&M currently being conducted by the 744CS and 794CS contractor teams as part of the exising AFNCR-ITS contract? | Local Area Network (LAN) Engineering support services was removed. | |
| 43 | L.2.2 | Would the Government confirm the intent is to use Attachment 6, Past Performance Questionnaire, only when CPARS reports are not available for submission? | Yes, Past Performance Questionnaire(s) are required only when CPARS reports are not available for submission. Please reference Section 2.2 paragraph 3 | |
| 44 | M.1.2 | The relative weight of the evaluation factors balances Past Performance and Price, as well as the two components within the Technical Factor; however, Factor 1 (Technical) is not weighted against Factors 2 and 3. Does the Government intend to include Factor 1 in the weighting of the evaluation factors? | No. Factor I (Technical) including its two Subfactors 1 and 2 will be evaluated as Acceptable/Unacceptable basis, and not weighted. | |
| 45 | All | The SAM notice released on 5 October 2023 states "This requirement will be a total 100 % Small Business set-aside." Does this apply only to prime bidders? | Yes |