3/15/2022 12:57:09 PM CDT CDRL Table of Contents SWAK SE&I
CONTRACT #:
CONTRACTOR:
SET NAME: SWAK SE and I SYSTEM ITEM: SWAK Systems Engineering and Integration
PROGRAM: BA_GA
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
A001 AFLCMC/WISN DI-MGMT-81797 PWS para 3.1.6
Program Management Plan
A002 AFLCMC/WISN DI-ADMN-81249C PWS paras 3.1.7, 3.1.9, 3.1.10, 3.2.5
Meeting Agenda
A003 AFLCMC/WISN DI-ADMN-81250C/T PWS paras 3.1.7, 3.1.9, 3.1.10, 3.2.5
Meeting Minutes
A004 AFLCMC/WISN DI-ADMN-81373/T PWS paras 3.1.7, 3.1.9, 3.1.10, Presentation Material 3.2.5, 3.5
A005 AFLCMC/WISN DI-MISC-80508B PWS paras 3.1.7, 3.1.10, 3.2.7.1, Technical Report – Study/Services 3.5
OUA Report
A006 AFLCMC/WISN DI-MGMT-81861C/T PWS para 3.1.8
Integrated Program Management Data and Analysis Report
(IPMDAR)
A007 AFLCMC/WISN DI-MGMT-80368A/T PWS paras 3.1.11, 3.13.2, 3.14.1
Status Report
A008 AFLCMC/WISN DI-MGMT-81468A PWS para 3.1.13
Contract Funds Status Report (CFSR)
A009 AFLCMC/WISN DI-SESS-82176 PWS paras 3.2.2, 3.2.3, 3.3.1
Software Architecture Description (SWARD)
A010 AFLCMC/WISN DI-SESS-81000F PWS paras 3.2.3, 3.6.2, 3.6.5
Product Engineering Design Data and Associated Lists
A011 AFLCMC/WISN DI-IPSC-81442A PWS paras 3.2.3, 3.3.1, 3.4.1
Software Version Description (SVD)
A012 AFLCMC/WISN DI-IPSC-81435B PWS paras 3.2.3, 3.3.1
Software Design Description (SDD)
A013 AFLCMC/WISN DI-MGMT-81453B PWS paras 3.2.4, 3.6.5
Data Accession List (DAL)
A014 AFLCMC/WISN DI-IPSC-81427B PWS paras 3.3.1, 3.8.7
Software Development Plan (SDP)
A015 AFLCMC/WISN DI-SESS-80858D/T PWS paras 3.3.1, 3.6.1, 3.6.5
Supplier’s Configuration Management Plan
A016 AFLCMC/WISN DI-IPSC-81436A PWS paras 3.3.1, 3.4.1
Interface Design Description (IDD)
A017 AFLCMC/WISN DI-NDTI-80566A PWS paras 3.3.1, 3.9
Test Plan
A018 AFLCMC/WISN DI-ILSS-80872/T PWS paras 3.3.1, 3.10.1.1, 3.10.2, 3.10.3
Training Materials
A019 AFLCMC/WISN DI-SESS-80639E PWS para 3.6.2
Engineering Change Proposal (ECP)
A020 AFLCMC/WISN DI-ADMN-81401C PWS para 3.6.2
Contract Change Proposal (CCP)
A021 AFLCMC/WISN DI-SESS-80642E PWS para 3.6.2
Notice of Revision (NOR)
A022 AFLCMC/WISN DI-SESS-80640E PWS para 3.6.3
Request for Variance (RFV)
A023 AFLCMC/WISN DI-PSSS-81535A/T PWS para 3.6.4
Deficiency Report (DR)
A024 AFLCMC/WISN DI-IPSC-82252A PWS paras 3.7, 3.8.1
Software Vulnerability Assessment Report (SVAR)
A025 AFLCMC/WISN DI-MGMT-81826D/T PWS paras 3.8.1, 3.8.4
F/A-18 and EA-18 Aircraft/System Program Protection Implementation Plan
A026 AFLCMC/WISN DI-MGMT-82256 PWS para 3.8.5
Supply Chain Risk Management (SCRM) Plan
A027 AFLCMC/WISN DI-MISC-81832 PWS para 3.8.5
Counterfeit Prevention Plan
A028 AFLCMC/WISN DI-NDTI-80809B PWS para 3.9
Test/Inspection Report
A029 AFLCMC/WISN DI-MISC-81459B/T PWS paras 3.10.1.1, 3.10.2, 3.10.3
Syllabus
A030 AFLCMC/WISN DI-MISC-81943 PWS paras 3.10.1.1, 3.10.2, 3.10.3, 3.16
Trip/Travel Report
A031 AFLCMC/WISN DI-MGMT-81945 PWS para 3.12
Phase-Out Transition Plan
A032 AFLCMC/WISN DI-MGMT-81238/T PWS para 3.13.3
Contract Field Service Report
A033 AFLCMC/WISN DI-SAFT-80102C/T PWS paras 3.18.1, 3.18.3
Safety Assessment Report (SAR)
A034 AFLCMC/WISN DI-IPSC-82284 PWS paras 3.2.2, 3.2.3, 3.3.1, 3.4.1
Software/Hardware Design Description (SHDD)
SWAK SE&I
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Program Management Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81797
5. CONTRACT REFERENCE
PWS para 3.1.6
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
SEMIA
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
The Contractor should develop a Program Management Plan (PMP) to use as a foundation for information and resource planning. The Contractor should keep the PMP current and electronically accessible to the Government at all times.
Block 4: Contractor’s format is acceptable.
Block 8: Government approval required and will be done in writing.
Blocks 11 - 13: Initial delivery NLT 15 calendar days from contract start; subsequent updated deliveries semi-annually (two times per year).
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Meeting Agenda
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249C
5. CONTRACT REFERENCE
PWS paras 3.1.7, 3.1.9, 3.1.10, 3.2.5
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: Agenda should be prepared, in coordination with the Government, prior to meetings. Additional submissions may be required for future events. Final agenda requires Government approval, prior to the event. Draft should be submitted NLT five working days prior or as specified by the Program Manager.
AFLCMC/WISN/CM 1 1
15. TOTAL 0 0 1
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Meeting Minutes
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250C/T
5. CONTRACT REFERENCE
PWS paras 3.1.7, 3.1.9, 3.1.10, 3.2.5
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable. DID number DI-ADMN-81250C is tailored as follows:
- Delete 3.a.(3).
Block 8: Initial submission (first required for overall contract) requires Government approval and will be done in writing.
Blocks 10 - 13: Additional submissions may be required for future events. Draft should be submitted NLT five working days after conclusion of the event (to include travel days). The Government should have five working days for review. Final submission should be NLT five working days after Government review.
AFLCMC/WISN/CM 1 1
15. TOTAL 0 0 1
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373/T
5. CONTRACT REFERENCE
PWS paras 3.1.7, 3.1.9, 3.1.10, 3.2.5, 3.5
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: DID number DI-ADMN-81373 is tailored as follows:
- Para 10.1...should be delivered electronically (in common file formats readable by the Government; MS Office products to include MS Project, Adobe, and common video formats).
- Para 10.2...requests for text of narrative in Presentation Material, if required by the Government for clarification or understanding, should be made after the presentation; text of narrative is not required upon initial submission or presentation.
Blocks 10 - 13: Presentation Material should be prepared prior to the meetings. Additional submissions may be required for future events.
Presentation Material should be submitted NLT five working days prior or as specified by the Program Manager.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Technical Report – Study/Services
3. SUBTITLE
OUA Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS paras 3.1.7, 3.1.10, 3.2.7.1, 3.5
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: When requested (by the Government) and as required at Technical Interchange Meetings, Technology Transition Reviews, Test Readiness Reviews, Program Management Reviews, and when required to support the Buy, Try, Adapt, Decide process.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Integrated Program Management Data and Analysis Report
(IPMDAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861C/T
5. CONTRACT REFERENCE
PWS para 3.1.8
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format of native file is acceptable, with Government approval of first submission. Formal submission may be in PDF format; however, the Government may request a copy of the submission in editable MS Project or MS Excel. The Government should provide event descriptions, dependencies, and timelines for activities requiring Contractor support (but, out of the control of the Contractor). DID number DI-MGMT-81861C is tailored as follows:
- Delete all EVM reporting (paras 1.3.2, 1.5 - 1.6.1, 2.1, 2.3.1.1 - 2.3.1.18.1, 2.3.2.1.3 - 2.3.2.5.5, 2.4.1.1.1, 2.4.2.9, 2.4.2.21, 2.4.3.2, 2.5.2.1 - 2.5.2.3, 2.5.3, and all subparas except 2.5.3.2.2 Schedule Variance).
Block 8: Government approval required for the initial submission and will be done in writing.
Blocks 11 - 13: First submittal should be 30 calendar days after contract award. Subsequent submissions should be delivered after the completion of each SWAK software release cycle and as required.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A/T
5. CONTRACT REFERENCE
PWS paras 3.1.11, 3.13.2, 3.14.1
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable. DID number DI-MGMT-80368A is tailored as follows:
- Delete paras 3.2.1.a (second sentence), 3.2.1.c, 3.2.1.e, and 3.2.3.
Block 8: First submission requires Government approval and will be done in writing.
Blocks 11 - 13: First submission due after the first full calendar month of performance. Submissions due the first business day on or after the 15th of each month.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Contract Funds Status Report (CFSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468A
5. CONTRACT REFERENCE
PWS para 3.1.13
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
60DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 8: Initial submittal requires Government approval (to ensure reporting should be by CLIN) and will be done in writing.
Blocks 11 - 13: The first submission is due 60 calendar days after contract award; Contractor's submittal should be via electronic means. Submittal due the 15th calendar day of the month directly following the accounting period closeout of the prior month, and should report the previous monthly fund status. Submit a final report by the 15th calendar day of the month directly following the closeout of the accounting quarter in which the contract is completed and/or terminated. The Contractor should submit an attachment to the CFSR providing accrued expenditure information by CLIN and appropriate funding.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Software Architecture Description (SWARD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-82176
5. CONTRACT REFERENCE
PWS paras 3.2.2, 3.2.3, 3.3.1
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: The SWARD should accurately model activity through various forms (test, informal drawings, and/or diagrams) and record the practice, techniques, and types of representations used by the Software Architecture Contractor. Submissions should be 60 calendar days post SWAK fielded release.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Product Engineering Design Data and Associated Lists
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000F
5. CONTRACT REFERENCE
PWS paras 3.2.3, 3.6.2, 3.6.5
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor or Government's format is acceptable as specified.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: Submission should be once for every plug-in and as needed for updates.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Software Version Description (SVD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81442A
5. CONTRACT REFERENCE
PWS paras 3.2.3, 3.3.1, 3.4.1
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Blocks 10 - 13: The SVD should contain a full description of the system and the software to which it applies. Submission should be one week post CQT for each SWAK cycle.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Software Design Description (SDD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81435B
5. CONTRACT REFERENCE
PWS paras 3.2.3, 3.3.1
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: Submission should be once with every fielded SWAK release.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Data Accession List (DAL)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453B
5. CONTRACT REFERENCE
PWS paras 3.2.4, 3.6.5
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
QRTLY
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N
11. AS OF DATE
90DAC
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable; but, it is requested that the Contractor use a Microsoft Excel spreadsheet for ease of use.
Blocks 10 - 13: First submission should be 90 calendar days after contract award. The Government should request the DAL periodically, to review data items created for the contract and as a reference to request data from the supplier.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81427B
5. CONTRACT REFERENCE
PWS paras 3.3.1, 3.8.7
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
30DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: Submission should be 30 calendar days post contract award.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Supplier’s Configuration Management Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80858D/T
5. CONTRACT REFERENCE
PWS paras 3.3.1, 3.6.1, 3.6.5
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable. DID number DI-SESS-80858D is tailored as follows:
- Replace the word "product" with "system".
Block 8: Government approval required and will be done in writing.
Blocks 10 - 12: The Supplier should submit their SCMP within 30 calendar days after contract award.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Interface Design Description (IDD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81436A
5. CONTRACT REFERENCE
PWS paras 3.3.1, 3.4.1
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable; but, should be created using standard Microsoft Office tools (for ease of evaluation and reviews).
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: The IDD should be developed, when the Developer is tasked to define and record the interface design; the IDD should be used to supplement the SDD as necessary.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80566A
5. CONTRACT REFERENCE
PWS paras 3.3.1, 3.9
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: A draft test plan will be provided 30 calendar days prior to CQT Test Readiness Review (TRR). The Government will provide comments within 14 calendar days of draft receipt. Final is due at
CQT TRR.
AFLCMC/WISN/CM 1 1
15. TOTAL 0 0 1
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER ILSS
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
Training Materials
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80872/T
5. CONTRACT REFERENCE
PWS paras 3.3.1, 3.10.1.1, 3.10.2, 3.10.3
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable. DID number DI-ILSS-80872 is tailored as follows:
- Para 10.1...delete the fifth sentence.
- Para 10.2.1...first sentence, delete "and repair of equipment" and "clinical application"; fourth sentence, change to "Each section may refer the student to other supplemental written or multi-media files or material which should be included in the package".
- Para 10.2.1.1...change to "This section should list all equipment and material required by the student to complete the training, including provided Special Warfare Assault Kit (SWAK) components outlined in the contract".
- Para 10.2.1.4...first sentence, replace "unit" with "equipment".
- Para 10.2.1.5...first sentence, delete "including frequency and tolerances".
- Para 10.2.1.7...delete section.
- Para 10.2.2...delete second sentence; sub-bullet (c.), delete "Test equipment and tools", change to "Software required to detect the malfunction"; sub-bullet (e.), delete bullet.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: The Contractor should submit one electronic copy of the draft training materials to the Government Program Office (Special Warfare), AFLCMC/WISN, NLT five calendar days after completion of CQT for each SWAK software release; and, the final NLT 45 calendar days after changes to the original document and/or software release that will alter operation of the SWAK.
AFLCMC/WISN/CM 1 1
15. TOTAL 0 0 1
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639E
5. CONTRACT REFERENCE
PWS para 3.6.2
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: DD Form 1692 is required as part of the ECP package.
Block 8: Government approval required and will be done in writing.
Blocks 10 - 13: As required.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
Contract Change Proposal (CCP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81401C
5. CONTRACT REFERENCE
PWS para 3.6.2
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 8: Government approval required and will be done in writing.
Blocks 11 - 13: Non-technical contract changes should be submitted as a CCP. The Contractor should prepare CCPs, as requested by the PCO.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
SWAK Systems Engineering and Integration
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A021
2. TITLE OF DATA ITEM
Notice of Revision (NOR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80642E
5. CONTRACT REFERENCE
PWS para 3.6.2
6. REQUIRING OFFICE
AFLCMC/WISN
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor’s format is acceptable.
Blocks 10 - 13: The Contractor should submit a NOR, to accompany any Class II ECP documentation change.
AFLCMC/WISN/CM 1
15. TOTAL 0 1 0
G. PREPARED BY
huger.india.r.1264513282 Senior, Configuration Manager
H. DATE
2021/10/06
I. APPROVED BY
Todd E. Depoy Chief, Special Warfare Branch
J. DATE
2022/01/25
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.