SEI Performance Work Statement (Amended).docx

DOCX document 969 KB Posted

Attached to
Systems Engineering & Integration Solicitation Federal contract opportunity
Solicitation number
FA8629-22-R-5031
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Systems Engineering & Integration Solicitation, newest first.
File Type Posted
SEI - Section L (Amended V2).pdf PDF
SEI - Section L Attachment 9 - Sample Task Orders (Amended V2).pdf PDF
SEI - Section L Attachment 8 - Special Warfare SEI CWBS and Dictionary (Amended).pdf PDF
SEI - Section L Attachment 8 - Special Warfare SEI CWBS and Dictionary (Amended).docx DOCX document
SEI - Section L Attachment 9 - Sample Task Orders (Amended V2).docx DOCX document
SEI - Section L Attachment 5 - Cost Format (Amended V2).xlsx XLSX spreadsheet
RFP Questions from Vendors 20 May 2022.xlsx XLSX spreadsheet
SEI - Section L (Amended V2).docx DOCX document
SEI - Section L Attachment 1 - Proposal CRM (Amended).docx DOCX document
SEI - Section L Attachment 5 - Cost Format (Amended).xlsx XLSX spreadsheet
SEI - Section L (Amended).docx DOCX document
RFP Questions from Vendors 9 May 22.xlsx XLSX spreadsheet
SEI - Section L Attachment 7 - Past Performance Questionnaire (Amended).pdf PDF
SEI - Section L Attachment 9 - Sample Task Orders (Amended).docx DOCX document
SEI - Section L Attachment 4 - Model Contract (Amended).pdf PDF
SEI - Section L Attachment 6 - Past Performance Information Tool Instructions (Amended).pdf PDF
SEI - Section M (Amended).docx DOCX document
SEI - Section L Attachment 7 Past Performance Questionnaire - 25 April Amended.pdf PDF
SEI Section L - 19 Apr 2022.pdf PDF
SEI - Section L Attachment 3 - Primary DACAS Tactical Data Networks.pdf PDF
SEI - Section L Attachment 6 - Past Performance Information Tool Instructions.pdf PDF
SEI Section L Attachment 7 Past Performance Questionnaire.pdf PDF
SEI - Section M.pdf PDF
SEI RFP DD 254 Signed.pdf PDF
SEI Section L Attachment 4 Model Contract.pdf PDF
SEI - Section L Attachment 8 - Special Warfare SEI CWBS and Dictionary.pdf PDF
SEI Section L Attachment 2 GFP.xlsx XLSX spreadsheet
SEI - Performance Work Statement.pdf PDF
SEI - CDRLs Package.pdf PDF
SEI - Section L Attachment 1 Proposal CRM.pdf PDF
SEI - Section L Attachment 5 - Cost Format.xlsx XLSX spreadsheet
SEI - Section L Attachment 9 - Sample Task Orders.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8629-22-R-5031

6 May 2022

SPECIAL WARFARE PROGRAM OFFICE

SYSTEMS ENGINEERING AND INTEGRATION (SE&I)

PERFORMANCE WORK STATEMENT (PWS)

4 Apr 2022

Revision: 1

Prepared by Special Warfare Branch ISR/SOF Directorate Wright-Patterson Air Force Base

Page Intentionally Left Blank

REVISION
PWS CHANGE ACTIVITY
DATE

Table of Contents

1.0PROGRAM OVERVIEW7
1.1 Scope7
1.2 Background8
2.0 APPLICABLE DOCUMENTS8
3.0 REQUIREMENTS/DESCRIPTION OF SERVICES11
3.1 Program Management11
3.1.1 Key Personnel11
3.1.1.1 Technical Integration Lead12
3.1.1.2 Software Developer Lead12
3.1.1.3 Training Staff13
3.1.1.4 Cyber-Security Lead13
3.1.1.5 Key Personnel Substitution14
3.1.2 Subcontractor Management14
3.1.3 Associate Contractor Agreements (ACA)14
3.1.4 Non-Disclosure Agreements (NDAs)16
3.1.5 Quality Management17
3.1.6 Program Management Plan (PMP)17
3.1.7 Risk Management17
3.1.8 Integrated Master Schedule (IMS)17
3.1.9 Post Award Conference (PAC)18
3.1.10 Program Management Reviews (PMRs)18
3.1.11 Monthly Status Report18
3.1.12 Program Management Meetings18
3.1.13 Finance19
3.2 Lifecycle Systems Engineering19
3.2.1 Technology Transition19
3.2.2 Functional Baseline20
3.2.3 Product Baseline21
3.2.4 Operational Safety, Suitability, and Effectiveness (OSS&E)21
3.2.5 Technical Management21
3.2.6 Interoperability22
3.2.7 Studies and Analysis22
3.2.7.1 Market research in support of SWAK modernization22
3.2.7.2 Analyses22
3.3 Software Development23
3.3.1 Software Design and Development23
3.3.2 Software Product Continuous Development24
3.3.3 Development of New Software Suite Core24
3.3.4 Software Change Request25
3.4 Systems Integration25
3.4.1 Integration of New Capabilities to SWAK25
3.4.2 Human Systems Integration (HSI)25
3.5 Buy, Try, Adapt, Decide26
3.6 Configuration and Data Management27
3.6.1 Configuration Management (CM)27
3.6.2 Engineering Change Proposal (ECP)/Contract Change Proposal (CCP)27
3.6.3 Request for Variance (RFV)28
3.6.4 Deficiency Reporting (DR)28
3.6.5 Data Management28
3.7 Cybersecurity29
3.8 Program Protection and Security31
3.8.1 Secure Internet Protocol Router Network (SIPRNet)32
3.8.2 Program Protection Planning32
3.8.3 Information Security33
3.8.4 Operational Security35
3.8.5 Anti-Tamper (AT)35
3.8.6 Supply Chain Risk Management (SCRM) and Counterfeit Prevention35
3.8.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS)37
3.8.8 Software Assurance37
3.9 Test and Evaluation (T&E)37
3.10 Training Delivery Services38
3.10.1 Training Guidance38
3.10.1.1 New Equipment Training (NET)39
3.10.2 Refresher or Part Task Training39
3.10.3 Just-in-Time (JIT) Training40
3.10.4 Instructor Qualification Standards40
3.10.5 Training Device Integration40
3.11 Procurement40
3.11.1 SWAK End User Device Procurement41
3.11.2 Licenses41
3.12 Transition-Out Services41
3.13 Customer Support41
3.13.1 Product Support Coordination with ICP41
3.13.2 Technical Support42
3.13.3 Field Service Representatives (FSRs)42
3.13.4 Support to TACP Innovation Cells43
3.14 Product Support Services43
3.14.1 Transportation and Shipping43
3.14.2 Support Equipment44
3.14.3 Item Unique Identifier/Identification (IUID)44
3.15 Exercises and Demonstrations44
3.16 Travel44
3.17 Government Property (GP)45
3.17.1 Government Furnished Property (GFP)45
3.18 System Safety and Environment, Safety, and Occupational Health (ESOH)45
3.18.1 System Safety45
3.18.2 Subsystem Hazard Analysis (SSHA)46
3.18.3 Hazardous Materials46
3.19 Foreign Military Sales (FMS)46
4.0 MEETINGS46
Attachment 1 SE&I Meetings47
Attachment 2 Training and FSR Locations48
ACRONYM LIST51

1.0 PROGRAM OVERVIEW

1.1 Scope

This Performance Work Statement (PWS) defines the requirements for services required by the Air Force Life Cycle Management Center (AFLCMC) Intelligence, Surveillance, Reconnaissance and Special Operations Forces Directorate (ISR/SOF), Special Warfare (SW) Branch (AFLCMC/WISN), located at Wright-Patterson Air Force Base (WPAFB), Ohio (hereafter referred to as the Government). The Contractor will function as a single focal point to provide Systems Engineering and Integration (SE&I) support for the Special Warfare Acquisition Growth and Refresh (SWAGR), Guardian Angel (GA) and TACP Modernization (dismount solution only) programs. Customers of this effort: there are approximately 3,500 USAF SW operators assigned to Air Combat Command ACC/GA, ACC/TACP, Air Force Special Operations Command (AFSOC)/Special Tactics (ST), and Air Education & Training Command (AETC)/ Special Warfare Training Wing (SWTW). In addition to supporting the USAF, the SE&I contract will also provide support to SW Branch Foreign Military Sales (FMS) cases. The primary deliverable of this contract is services required to develop and sustain the system-of-systems known as the Special Warfare Assault Kit (SWAK).

The general requirements for this PWS include the following:

· Program Management support

· Software Development services

· Lifecycle Systems Engineering support

· Systems Integration support

· Support for the Buy, Try, Adapt, Decide process (limited procurement of end-items)

· Configuration and Data Management support

· Cybersecurity support

· Program Protection and Security support

· Test and Evaluation support

· Training services

· Engineering Studies and Analysis

· Customer Support services to include support to TACP innovation cells

· Limited Product Support services

· Exercise and Demonstration support

· Travel

· EUD and software license procurement

· Management of Government Furnished Property

· System Safety and Environment, Safety and Occupational Health services

· Foreign Military Sales support

· Government meeting support

· Transition-Out services

1.2 Background

Since 2015, SWAK have been developed and delivered primarily via two contracts, known as Machine to machine (software development) (M2M) and Operational Control System (OCS). This contract establishes a follow-on M2M software development capability as well as responsibility to integrate body-worn power and data management components, radios, and other peripherals that connect to the kit and fall within the SWAK cyber-security boundary. The SE&I contract will include procurement of End User Devices, and limited quantities of other components to support integration and assessments. Full production and fielding quantities of most radios and peripherals will be procured by other contracts after initial integration.

Requirements: The Battlefield Air Operations (BAO) Family of Systems (FoS) Capabilities Development Document (CDD) was validated in 2018, further expanding the scope of the AFSOC requirement to other AFSOC Special Tactics career fields beyond just JTAC roles, introducing new requirements for both the SWAK and other mission equipment. ACC-authored AF Form 1067s (requirements documents) for GA and TACP will also drive activity on this contract.

Prior efforts developed a Windows-based body-worn kit until 2016, then transitioned to an Android-based kit in 2017 using the Android-based TAK software core as the development and deployment platform (ATAK). Future requirements could include either transition to another operating system, or development between ATAK and other operating systems.

2.0 APPLICABLE DOCUMENTS

Applicable documents of the date shown form a part of this PWS to the extent specified herein. If no specific issue or revision level is noted, the latest issue or revision level in effect at the time of contract award applies. In the event of a conflict between the documents referenced herein and the contents of this PWS, the contents of the PWS shall be considered the superseding requirement. Sub-tier documents referenced within the cited documents shall not be applicable to this PWS unless the sub-tier documents are specifically referenced within this PWS or otherwise noted. Sub-tier documents may be used for guidance only.

Document #
Revision
Date
Title
Paragraph Reference

Air Force Instructions

AFI 16-1403

5-Oct-2021
Controlled Unclassified Information (CUI)
3.8.3
AFI 36-2670
DAFGM

2020-03

12-Oct-2021
Total Force Development
3.10.1

AETCI 36-2651

12-Apr-2021
Basic Military and Technical Training
3.10.1

AFI 61-101

14-Mar-2013
Management of Science and Technology
3.2.1
AFMCI 63-1201
AFMCGM

2021-01

21-Jul-2021
Implementing Operational Safety Suitability and Effectiveness (OSS&E) and Life Cycle Systems Engineering (LCSE)
3.2.4
AFI 91-202
AFGM

2021-01

15-Apr-2021
The US Air Force Mishap Prevention Program
3.18.1

Air Force Manuals

AFMAN 17-1303

12-May-2020
Air Force Cybersecurity Workforce Improvement Program
3.1.1.4

AFMAN 33-302

27-Apr-2018
Freedom of Information Act Program
3.8.3

Air Force Pamphlets

AFPAM 63-113

17-Oct-2013
Program Protection Planning for Life Cycle Management
3.8

DoD Directives

DoD Directive 5230.25
Change 2
15-Oct-2018
Withholding of Unclassified Technical Data from Public Disclosure
3.8.3

DoD Directive 8140.01

5-Oct-2020
Cyberspace Workforce Management
3.7

DoD Manuals

DoD Instruction 3200.14 Volume 1

Change 2
15-Oct-2018
Principles and Operational Parameters of the DoD Scientific and Technical Information Program (STIP)
3.8.3

DoD Manual 3200.14 Volume 2

Change 2
15-Oct-2018
Principles and Operational Parameters of the DoD Scientific and Technical Information Program (STIP)
3.8.3
DoD Manual 5010.12
Change 1
31-Aug-2018
Procedures for the Acquisition and Management of Technical Data
3.8.3

DoD Manual 5200.01 Volume 1

Change 2
28-Jul-2020
DoD Information Security Program: Overview, Classification, and Declassification
3.8.3

DoD Manual 5200.01 Volume 2

Change 4
28-Jul-2020
DoD Information Security Program: Marking of Information
3.8.3

DoD Manual 5200.01 Volume 3

Change 3
28-Jul-2020
DoD Information Security Program: Protection of Classified Information
3.8.3
DoD Manual 5200.02
Change 1
29-Oct-2020
Procedures for the DoD Personnel Security Program (PSP)
3.8.3
DoD 5200.08-R
Change 2
19-Oct-2020
Physical Security Program
3.8.4

DoD Manual 5400.07

25-Jan-2017
DoD Freedom Of Information Act (FOIA) Program
3.8.3
DoD 8570.01-M
Change 4
10-Nov-2015
Information Assurance Workforce Improvement Program
3.1.1.4, 3.7

DoD Instructions

CJCS Instruction 3900.01D
15-Dec-2021
14-May-2015
Position (Point and Area) Reference Procedures
3.2.2
DoD Instruction 2040.02
Change 1
31-Jul-2017
International Transfers of Technology, Articles, and Services
3.8.3

DoD Instruction 5200.48

6-Mar-2020
Controlled Unclassified Information (CUI)
3.8.3
DoD Instruction 5230.24
Change 3
15-Oct-2018
Distribution Statements on Technical Documents
3.8.3
DoD Instruction 5230.28
Change 1
31-Aug-2018
Policy for Low Observable (LO) and Counter Low Observable (CLO) Programs
3.8.5
DoD Instruction 8320.04
Change 3
27-Aug-2019
IUID Standards for Tangible Personal Property
3.14.3
DoD Instruction 8330.01
Change 2
11-Dec-2019
Interoperability of Information Technology (IT), Including National Security Systems (NSS)
3.2.2
DoD Instruction 8510.01
Change 3
29-Dec-2020
Risk Management Framework (RMF) for DoD Information Technology (IT)
3.7

DoD Instruction 8582.01

9-Dec-2019
Security of Non-DOD Information Systems Processing Unclassified Nonpublic DOD Information
3.8.3

Other

DACAS TTP

Digitally Aided Close Air Support (DACAS) Joint Test Tactics, Techniques, and Procedures (TTPs)
3.2.2

DFARS

Defense Federal Acquisition Regulation Supplement
Various
DISN CPG
Version 5.1
May 2016
DISA Defense Information System Network (DISN) Connection Process Guide (CPG)
3,8,1

FAR

Federal Acquisition Regulation
Various

MIL‐HDBK‐61B

7-Apr-2020
Configuration Management Guidance
3.6.1
MIL-STD-188/220D
Change 1
23-Jun-2008
Ch 1 Military Standards: Interoperability Standard for Digital Message Transfer Device Subsystems
3.2.2

MIL-STD-882E

11-May-2012
Department of Defense Standard Practice, System Safety
3.18.1, 3.18.3

MIL-STD-1472H

15-Sep-2020
Department of Defense Design Criteria Standard: Human Engineering
3.18.1

MIL-STD-2045/47001E

1-Feb-2021
Department of Defense Interface Standard Connectionless Data Transfer Application Layer Standard
3.2.2
MIL-STD-2073-1E
Change 4
2-Apr-2019
Department of Defense, Standard Practice for Military Packaging
3.14.1
MIL-STD-2525D
Change 1
10-Jun-2014
Joint Military Symbology
3.2.2

MIL-STD-6016G

Change 2
2-Nov-2006
Department of Defense Interoperability Standard Tactical Data Link (TDL) Link 16 Message Standard
3.2.2

MIL-STD-6017E

Change 1
2-Nov-2006
Department of Defense Interoperability Standard Variable Message Format (VMF) Message Standard
3.2.2

NISPOM Rule 32 CFR Part 117

24-Feb-2021
National Industrial Security Program Operating Manual 32 Code of Federal Regulation Part 117
3.8.3
NIST Special Publication 800-37
Revision 2
20-Dec-2018
Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy
3.7
NIST Special Publication 800-53
Revision 5
10-Dec-2020
Security and Privacy Controls for Information Systems and Organizations
3.7, 3.8.2, 3.8.6

NIST Special Publication 800-160 Volume 1

21-Mar-2018
Systems Security Engineering: Considerations for a Multidisciplinary Approach in the Engineering of Trustworthy Secure Systems
3.7

NIST Special Publication 800-161

8-Apr-2015
Supply Chain Risk Management Practices for Federal Information Systems and Organizations
3.8.2, 3.8.6
NIST Special Publication 800-171
Revision 2
28-Jan-2021
Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations
3.8.3
National Aerospace Standard (NAS) 411
4th Edition
30-Sep-2020
Hazardous Materials Management Program
3.18.3
STANAG 3733
Edition A
18-Jun-2020
Laser Pulse Repetition Frequencies Used for Target Designation and Weapon Guidance
3.2.2

TO 00-35D-54

1-Sep-2015
USAF Deficiency Reporting, Investigation, and Resolution
3.6.4

3.0 REQUIREMENTS/DESCRIPTION OF SERVICES

3.1 Program Management

The Contractor shall provide Program Management support to fully sustain (Software), manage, and modernize the existing SWAK. The Contractor shall lead the development and deployment of additional capabilities as directed by the Government. The Contractor shall manage training delivery, procurement, customer/technical support and product support for SWAK.

3.1.1 Key Personnel

The following are the minimum personnel who shall be designated as “key”. The Government desires that Key Personnel be assigned for the duration of the Task Order.

· Technical Integration Lead

· Lead Software Developer

· Training Lead

· Cyber-Security Lead Desired attributes for all key personnel include:

· Able to work in an environment of continuous change and short deadlines,

· Excellent customer service and communications skills both verbal and written,

· Experience with continuous process improvement practices.

3.1.1.1 Technical Integration Lead

· The Technical Integration Lead shall meet the following minimum qualifications:

· Minimum 8 years managing complex integration efforts

· PMP or equivalent Certification

· The Contractor shall identify a Technical Integration Lead to serve as the key authority to manage the Integration tasks and processes identified in the PWS.

· The Technical Integration Lead shall provide oversight on Integration testing and evaluation, analyzing issues and deficiencies to improve operational processes and issuing recommendations for improvement.

· The Technical Integration Lead shall work closely with technical personnel and apply project management procedures to ensure completion of system and performance requirements.

· It is desirable that the Technical Integration Lead possess the following skills and attributes:

· Successfully integrated projects of similar size and scope,

· Adept at evaluating and resolving difficulties and constraints in implementing complex solutions within Government networks, both CONUS and OCONUS,

· Management and project task coordination, in programs similar in size and scope referenced under this PWS, for employees of various labor categories and skills,

· Experience in presenting material to senior Government officials,

· Demonstrated skill in managing projects within estimated cost while delivering on schedule,

· Knowledge of Capability Maturity Model Integration (CMMI) Level III best practices,

· Demonstrated knowledge of implementing project management principles.

3.1.1.2 Software Developer Lead

· The Software Developer Lead shall meet the following minimum qualifications:

· Minimum 8 years of software development experience

· Minimum 3 years leading a software development team

· It is desirable that the Software Developer Lead possess the following skills and attributes:

· Successfully integrated software applications of similar size and scope,

· Adept at evaluating and resolving difficulties and constraints in implementing complex solutions within Government networks, both CONUS and OCONUS,

· Demonstrated knowledge and ability to manage, coordinate, and facilitate a team's effort in configuring and maintaining a DoD hosted application effectively and efficiently while adhering to DoD Policy and within the constraints of its operational environment such as the DIACAP Certification and Accreditation process,

· Demonstrated knowledge of IT transformation practices similar to requirements of the solicitation,

· Up-to-date knowledge of current and emerging network and infrastructure technologies,

· Experience in presenting material to senior Government officials,

· Knowledge of Capability Maturity Model Integration (CMMI) Level III best practices,

· Knowledge of Information Technology Infrastructure Library (ITIL) best practices,

· Knowledge of industry and Government best practices, and

· Experience in communicating IT issues; i.e. Data Warehouse, Infrastructure, Software.

· Certified SAFe 5 Agilist or similar certification

· Certified Scrum Master (CSM) or similar certification

· SAFe DevOps Practitioner (SDP)

· SAFe Product Manager/Product Owner (SAFe PM/PO)

· In-depth knowledge of ATAK and TAK Enterprise development

3.1.1.3 Training Staff

· The Training Staff shall meet the requirements outlined in paragraph 3.10.4.

3.1.1.4 Cyber-Security Lead

· The Cyber-Security Lead shall meet the following minimum qualifications:

· Minimum 5 years of Information Systems Security Manager (ISSM) or Information Systems Security Engineer (ISSE) experience

· Minimum 3 years of Risk Management Framework (RMF) for IT enterprise networks and/or Platform Information Technology (PIT) systems experience

· Information Assurance Manager (IAM) or Information Assurance Technical (IAT) Level II Cybersecurity Certification, IAW AFMAN 17-1303, Air Force Cybersecurity Workforce Improvement Program, paragraphs 2.20, 5.6.5, 5.8, 6.7 and DoD 8570.01-M, Information Assurance Workforce Improvement Program, paragraphs C3.4, C3.5, C4.4, C4.5

· Capable of leading/accomplishing all Cyber-related tasks in PWS paragraph 3.7

· It is desirable that the Cyber-Security Lead possess the following skills, attributes and certifications:

· Knowledge/experience in implementing DevSecOps best practices

· IAM and IAT Level III Cybersecurity Certification, IAW AFMAN 17-1303, Air Force Cybersecurity Workforce Improvement Program, paragraphs 2.20, 5.6.5, 5.8, 6.7 and DoD 8570.01-M, Information Assurance Workforce Improvement Program, paragraphs C3.4, C3.5, C4.4, C4.5

· Experience in Information Technology (IT) networking and systems engineering

· Capability to collaborate across multiple disciplines and communicate cybersecurity status with senior leadership and team stakeholders

· Experience evaluating cybersecurity test reports and developing technical mitigations to develop Plans of Action and Milestones (POAMs)

3.1.1.5 Key Personnel Substitution

The Contractor shall provide personnel possessing the skills, knowledge, clearances and training to satisfactorily support SE&I contract capabilities. The contractor shall not replace any personnel designated by either the Government or the contractor as Key Personnel without the written concurrence of the CO. Prior to utilizing any personnel other than personnel specified in proposals in response to a TOR, the contractor shall notify the Government CO of the existing TO. This notification shall be no later than 14 calendar days in advance of any proposed substitution and shall include justification (including resume(s) and labor category of proposed substitution(s)) in sufficient detail to permit evaluation of the impact on TO performance. Substitute personnel qualifications must meet the requirements as defined in this PWS. If the Government CO determines that the proposed substitute personnel is unacceptable, or that the reduction of effort would be so substantial as to impair the successful performance of the work under the TO, the contractor may be subject to default action as prescribed by FAR 52.249-6 Termination (Cost Reimbursement) or FAR 52.249-8, Default (Fixed-Price Supply and Service). The Government reserves the right to evaluate the qualifications of all proposed substitutions of Key Personnel, and the Contracting Officer (CO) retains the sole authority to accept or reject any substitutions proffered by the contractor.

3.1.2 Subcontractor Management

The Contractor shall ensure that all tiers of subcontracts contain language that ensures compliance with all applicable requirements stated in this PWS. The Contractor shall inform of and invite the Government to all major supplier technical reviews.

3.1.3 Associate Contractor Agreements (ACA)

The Contractor shall enter into ACAs for any portion of the contract requiring joint participation with the Contractors identified in support of SE&I contract. The agreements shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the performance of the SE&I contract. The agreements shall ensure the greatest degree of cooperation for SE&I while fulfilling the terms of the contract.

ACAs shall include the following information:

· Identify all associate Contractors and their relationships

· Identify the program involved and relevant Government contracts of associate Contractors

· Description of the associate Contractor interfaces by general subject matter

· Specify the categories of information to be exchanged or support to be provided

· Identify potential conflicts between relevant Government contracts and the ACA including agreements on protection of proprietary data and restrictions on employees

· Include expiration date (or event) of the ACA A copy of the agreement shall be provided to the CO for review before execution of the document by the cooperating Contractors.

The Contractor is not relieved of any contract requirements or entitled to any adjustments to the contract terms because of a failure to resolve a disagreement with an associate Contractor. Liability for the improper disclosure of any proprietary data contained in or referenced by any agreement shall rest with the parties to the agreement, and not the Government. All cost associated with the agreements are included in the negotiated cost of this contract. Agreements may be amended as required by the Government during the performance of this contract.

The following are associate Contractors with whom agreements may be required:

· Special Warfare Procurement Multiple-Award Contract (MAC) Primes; the SE&I Prime may have to share technical configuration information with MAC Primes for full-rate procurement of SWAK components through the MAC contract.

· Federal Resources, 235-G Log Canoe Cir, Stevensville, MD, 21666-2165, FA8629-20-D-5003

· WS Darley & Co, 325 Spring Lake Dr, Itasca, IL, 60143-2072, FA8629-20-D-5052

· US21, Inc., 2721 Prosperity Ave Ste 300, Fairfax, VA, 22031-4341, FA8629-20-D-5053

· Atlantic Diving Supply, Inc. (d.b.a. ADS, Inc.), 621 Lynnhaven Pkwy Ste 160, Virginia Beach, VA, 23452-7383, FA8629-20-D-5054

· Tactical & Survival Specialties, Inc. (d.b.a. TSSI, Inc.), 3900 Early Rd, Harrisonburg, VA, 22801-9788, FA8629-20-D-5055

· Quantico Tactical, Inc., 9796 Aberdeen Rd, Aberdeen, NC, 28315-7742, FA8629-20-D-5059

· Rapid Response Defense Systems, Inc. (d.b.a RRDS, Inc.), 12 Goodyear Ste 100, Irvine, CA, 92618-3764, FA8629-20-D-5060

· Inventory Control Point (ICP) Primes; the SE&I Prime may need to keep the ICP Prime informed of configuration status and updates to fielded SWAK components and software.

· IAP Worldwide Services, Inc., 7315 N. Atlantic Ave. Cape Canaveral, FL, W15P7T-17-D-0146 Order W15P7T-20-F-0178

· SW Technical Integration Support Center (TISC) Prime; the SE&I Prime may be required to push capability updates to the TISC and the TISC may need to provide technical information for upgrades that are common to the SE&I-developed SWAK system and the TISC-managed SAMS-ESA Kits.

· GDIT-ARMA

· Micro Weather Sensor (this sensor is currently being integrated with SWAK)

· ISI

TABLE 1 – Manufacturers of SWAK Components

Device
Manufacturer
Purpose
Galaxy S7
Samsung
EUD
Galaxy S9 TE
Samsung
EUD
Galaxy Tab Active 2
Samsung
EUD/Training/Mission Planning
Galaxy S20TE
Samsung
EUD
Note 8
Samsung
EUD
FZ-M1 (MK-1 and -2)/CF-19
Panasonic
EUD/Mission Planning
TacROVER-p
L-3
Video Data Link
TacROVER-e
L-3
Video Data Link
Tactical Network ROVER (TNR)
L-3
Video Data Link
AN/PRC-117G
L3Harris
Voice/Data Communications Radio
AN/PRC-152A
L3Harris
Voice/Data Communications Radio
AN/PRC-160
L3Harris
Voice/Data Communications Radio
AN/PRC-161
ViaSat
Voice/Data Communications Radio
AN/PRC-163
L3Harris
Voice/Data Communications Radio
AN/PRC-167
L3Harris
Voice/Data Communications Radio
Microlight RT-1922c
Raytheon
Data Communications Radio
SAASM GPS Receiver
Rockwell Collins (Raytheon)
Data Communications
OCS Kit
Black Diamond Advanced Technologies
Power and Data Management

3.1.4 Non-Disclosure Agreements (NDAs)

The Contractor shall obtain NDAs with all applicable corporate, supplier, and sub-tier vendors with proprietary, restricted, competition sensitive, or any other restricted (e.g. non-foreign disclosure due to public law) data that will be used or accessed during the execution of this contract.

3.1.5 Quality Management

The Contractor shall possess a SCAMPI Class B Appraisal for software development of Capability Maturity Model Integration (CMMI) Level 3 or better, or an equivalent. The Contractor shall demonstrate compliance with a quality management system using ISO 9001 (2015) or an equivalent.

3.1.6 Program Management Plan (PMP)

The Contractor shall develop a Program Management Plan (PMP) to use as a foundation for information and resource planning. The Contractor shall keep the PMP current and electronically accessible to the Government at all times. (A001, DI-MGMT-81797 “Program Management Plan”)

3.1.7 Risk Management

The Contractor shall ensure that risk management processes cover programmatic, cost, schedule, and technical risks and opportunities. The Risk Management Program shall manage SE&I contract risks; identify, track, and report risks; and develop risk reduction plans for SE&I efforts.

The Contractor shall work in conjunction with the Government to identify and analyze risks and report on the status of risk reduction efforts and monitoring plans that include steps to mitigate Medium and High Risks. Risks shall be identified in market research reports IAW paragraph 3.2.7 and associated reports. Technical and schedule risks shall be presented at Technical Interchange Meetings, Technology Transition Reviews, Test Readiness Reviews, and Program Management Reviews (PMRs). The projected cost impacts of each risk shall be presented at PMRs in addition to technical and schedule impacts. The Contractor shall include risks assessments and mitigation strategies as part of meeting agendas, briefings and meeting minutes. (A002, DI-ADMN-81249C “Meeting Agenda”; A003, DI-ADMN-81250C/T “Meeting Minutes”; A004, DI-ADMN-81373/T “Presentation Material”; A005, DI-MISC-80508B “Technical Report – Study/Services”)

3.1.8 Integrated Master Schedule (IMS)

The Contractor shall create, manage, and maintain an overall IMS. The Contractor shall maintain and update the IMS to reflect Government approved changes in the Contractor’s detailed execution activities or schedule. The IMS shall include discrete activities of the Contractor. Any changes or updates shall be provided to the Government as they occur to the schedule. Any changes to contractual milestones within the IMS shall be made only after coordination with the Government and at the approval of the CO. (A006, DI-MGMT-81861C/T “Integrated Program Management Data and Analysis Report (IPMDAR)”)

3.1.9 Post Award Conference (PAC)

The Contractor shall conduct a PAC at the Contractor's facility no later than (NLT) 30 days after contract award. The PAC shall introduce the key participants, identify points of contact and discuss all parties’ understanding of the scope of work. The purpose of this PAC is to ensure a common understanding between the Government and the Contractor of the overall contract requirements for SE&I and incorporate feedback and comments as part of their planning efforts. The documents/information provided shall include, but is not limited to, the following:

· Agenda

· Personnel

· Slides

· Meeting Minutes and Action Items (A002, DI-ADMN-81249C “Meeting Agenda”; A003, DI-ADMN-81250C/T “Meeting Minutes”; A004, DI-ADMN-81373/T “Presentation Material”)

3.1.10 Program Management Reviews (PMRs)

The Contractor shall provide cost, schedule, and performance data to the Government for all task orders and delivery orders issued under this PWS at PMRs. A total of two (2) PMRs shall be held in each contract year. PMRs will typically be conducted at the Contractor’s facility. The Contractor shall be prepared to host virtual PMRs in the event of travel restrictions. The Contractor shall prepare agendas, briefings (to include design documentation) and minutes for the reviews. (A002, DI-ADMN-81249C “Meeting Agenda”; A003, DI-ADMN-81250C/T “Meeting Minutes”; A004, DI-ADMN-81373/T “Presentation Material”; A005, DI-MISC-80508B “Technical Report – Study/Services”) The order of the following PMR topics can be re-arranged at the government’s discretion, as well as the actual topics, but should expect to include:

· Within first 90 days of award

· Kick-off/Initial PMR

· Topics to be covered:

· Risk Management, Program Management, Contracting, Finance, Logistics, Engineering, Cybersecurity, and Tech Transition

3.1.11 Monthly Status Report

The Contractor shall provide a Monthly Status Report (MSR) tailored per CDRL instructions to the SE&I effort. (A007, DI-MGMT-80368A/T “Status Report”)

3.1.12 Program Management Meetings

The Contractor shall participate/facilitate/conduct the meetings detailed below. The Contractor shall provide the appropriate representation for all meetings.

Weekly Teleconference The Contractor shall conduct at least two (2) teleconference with the SWAK PM each week to provide the overall program status and identify any critical issues.

Monthly Status Meeting The Contractor shall facilitate monthly status meetings within the first five (5) business days of each month to provide the Government with status on the following items:

· Overall program status

· Accomplished and planned activities by task area, including any identified issues and risks

· Notification of non-compliance with the software licensing policy

· Synopsis of on-going SWAK capability analysis and problem analysis reports

· Software configuration status

· Schedules and status updates to reflect current milestones

· Status on patches, releases, new versions, upgrades, etc. with Contractor’s IMS and brief content description

· Action items (open and closed within the past month)

· Previous month activities and planned activities by task area This meeting may replace a weekly teleconference.

3.1.13 Finance

The contractor shall submit a Contract Funds Status Report detailing financial execution on all Cost-type efforts. (A008, DI-MGMT-81468A “Contract Funds Status Report (CFSR)”)

3.2 Lifecycle Systems Engineering

The Contractor shall design, develop, integrate, test, deliver, maintain, and modernize the SWAK at the direction of the Government. This includes updating End User Devices (EUDs) to current Maintenance Release installation provided by EUD’s manufacturer.

3.2.1 Technology Transition

The Contractor shall mature, productize and support the fielding activities associated with new hardware and software designated by the Government for inclusion into the current and future generations of SWAK. Any third-party software (open-source, freeware, etc.) that the Contractor intends to utilize/incorporate for the software baseline shall require Government approval. Technology Transition products are typically Android Tactical Assault Kit (ATAK) compatible Plug-Ins and Applications sponsored by the Government as projects via various vehicles under Department of Defense (DoD) Technology Transfer Programs or Air Force Research Laboratory (AFRL) Technology Transition Programs such as Advanced Technology Demonstrations (ATDs). The SW Branch serves as the Transition Agent for multiple AFRL ATDs, as well as Small Business Innovative Research (SBIR) and Rapid Innovation Fund (RIF) in accordance with AFI 61-101, Management of Science and Technology, and AFLCMC/XZ, Guidance Memorandum Technology Transition Planning. These software products are generally higher priority requirements that augment or enhance the full spectrum of SW capabilities, and include the following:

· Mission Planning

· Training

· Tactical Communications

· Mobility

· Infiltration/Exfiltration

· Unmanned Systems

· Target Marking/Designation

· Mobile Weather Systems

· Visual Augmentation

· Personnel Recovery

· Technical Recovery

· Assault Zone Equipment For Technology Transition software products the Guideline Entry Criteria are as follows:

· Fully functional software product developed to a Technology Readiness Level of 4-6

· Software Design Documentation to include software product specifications, software (both source and executable), and any other technical data packages necessary for continued development and modifications to the software

· Product Documentation to include software documentation (architecture, design, requirements, technical, user manuals), test reports (lab performance including comparisons to existing capability, user feedback), and listing of associated hardware

· Relevant cost estimates identified for the product

· Unique security requirements identified for the product

3.2.2 Functional Baseline

The Contractor shall develop and provide configuration documentation to maintain the functional baseline for the currently fielded SWAK to include hardware components and the SWAK Software Suite with associated plugins. The Contractor shall support updates to the SWAK baseline for Battlefield Airman Data Links (BADL), Situational Awareness Data Link (SADL), Variable Message Format (VMF), Link-16 and Combat Net Radio (CNR). The Contractor shall maintain SWAK’s compliance with the following Digitally Aided Close Air Support (DACAS) network standards:

· MIL-STD-188/220D, Ch 1 Military Standards: Interoperability Standard for Digital Message Transfer Device Subsystems

· MIL-STD-2045/47001E, Department of Defense Interface Standard Connectionless Data Transfer Application Layer Standard

· MIL-STD-2525D, Joint Military Symbology

· MIL-STD-6016G, Department of Defense Interoperability Standard Tactical Data Link (TDL) Link 16 Message Standard

· MIL-STD-6017E, Department of Defense Interoperability Standard Variable Message Format (VMF) Message Standard

· STANAG 3733, Laser Pulse Repetition Frequencies Used for Target Designation and Weapon Guidance

· CJCS Instruction 3900.01D, Position (Point and Area) Reference Procedures

· DoD Instruction 8330.01, Interoperability of Information Technology (IT), Including National Security Systems (NSS)

· DACAS TTP, Digitally Aided Close Air Support (DACAS) Joint Test Tactics, Techniques, and Procedures (TTPs) (A009, DI-SESS-82176 “Software Architecture Description (SWARD)”; A034, DI-IPSC-82284 “Software/Hardware Design Description (SHDD)”)

3.2.3 Product Baseline

The Contractor shall establish and maintain the product baseline for new SWAK components through delivery of a product Technical Data Package (TDP). Technical reviews are required at the beginning and end of a SWAK release cycle in conjunction with quarterly Technical Interchange Meetings (TIMs). (A010, DI-SESS-81000F “Product Engineering Design Data and Associated Lists”; A009, DI-SESS-82176 “Software Architecture Description (SWARD)”; A011, DI-IPSC-81442A “Software Version Description (SVD)”; A012, DI-IPSC-81435B “Software Design Description (SDD)”; A034, DI-IPSC-82284 “Software/Hardware Design Description (SHDD)”)

3.2.4 Operational Safety, Suitability, and Effectiveness (OSS&E) The Contractor shall support the establishment of OSS&E for all SWAK end-items. Establishment shall include supporting the Government’s requirement to prepare OSS&E Baseline Documents for systems/subsystems/end-items prior to initial fielding releases, and/or subsequent modifications, necessary to document the information identified in Appendix 3, Section 3.5 of AFMCI 63-1201, Implementing Operational, Safety, Suitability, and Effectiveness (OSS&E) and Life Cycle Systems Engineering (LCSE). (A013, DI-MGMT-81453B “Data Accession List (DAL)”)

3.2.5 Technical Management

The Contractor shall support or conduct requirements reviews and technical Reviews for any new requirement to include integration efforts to the existing SWAK. Requirements for SWAK are gathered through the following, but not limited to, means:

· Monthly stable build “black box”/functional testing by specific users with advanced access (SMEs, “super-users”, DT/OT entities who reflect the current using community, etc.)

· SWAK User Group Conferences (quarterly – 2x in-person, 2x virtual)

· 1067 Requirements Documents

· Government approved Requirements Work Sheets (RWS) The Contractor shall conduct Technical Interchange Meetings (TIMs) to review issues related to development, integration, testing, and sustainment of the new or modified capability. The Contractor shall be responsible for reviewing, providing scope (cost and schedule) and ability to put the required work on contract. The Contractor may propose holding reviews/meetings in conjunction with PMRs, Integrated Test Team (ITT) meetings, etc. The Contractor shall prepare agendas, briefings (to include design documentation) and minutes for the reviews. Technical baseline documentation shall be reviewed as applicable to each SWAK release cycle (paragraphs 3.2.2. and 3.2.3 above). (A002, DI-ADMN-81249C “Meeting Agenda”; A003, DI-ADMN-81250C/T “Meeting Minutes”; A004, DI-ADMN-81373/T “Presentation Material”)

3.2.6 Interoperability

The Contractor shall ensure SWAK complies with DoD interoperability standards to include maintaining and gaining approval via GiG Technical Guidance Federation (GTG-F) of the system’s architecture models (DoDAF views) throughout the lifecycle.

3.2.7 Studies and Analysis

3.2.7.1 Market research in support of SWAK modernization

The Contractor shall perform market research and studies (as directed by the government) of emerging concepts and technology alternatives to assist in identifying future capabilities for incorporation into SWAK. As a result of these studies, the Contractor shall produce Rough Orders of Magnitude (ROMs) with cost and schedule estimates. The basis for and results of any proposed effort shall be documented in a report. The identification of Trade-Offs and a Risk Assessment shall also be included in the report at program management reviews and as directed. (A005, DI-MISC-80508B “Technical Report – Study/Services”)

3.2.7.2 Analyses

The Contractor shall perform technical and engineering analyses of SW and conventional systems and end items (e.g. COTS/GOTS) technologies and concepts to include recommendations for integration. When alternatives exist, an Analysis of Alternatives shall be performed by the Contractor. Key design considerations are as follows:

· Affordability Analysis

· Size, Weight, and Power (SWAP) Impacts

· Data Rights

· System Safety

· Environment, Safety, and Occupational Health (ESOH)

· Human Systems Integration (HSI)

· Open Systems Architectures

· Program Protection and Cybersecurity

· Reliability and Maintainability

· Critical Safety Item

· Diminishing Manufacturing Sources and Material Shortages (DMSMS)

· Interoperability and Dependency

· Packaging, Handling, Storage, and Transportation

· Technology Readiness

· Manufacturing Readiness

· Spectrum Impact

· Standardization

· Supportability

· Survivability (including CBRN) and Susceptibility

· Net-Ready KPP Compliance

3.3 Software Development

3.3.1 Software Design and Development

The Contractor shall develop, integrate, test and support fielding of Plug-Ins and Applications that are identified for future inclusion into the fielded SWAK Software Suite configuration baseline.

The Contractor shall employ a software development process that:

· Enables rapid iteration

· Requires developers meet with end users, then start small and iterate quickly to deliver useful code

· Accept ~70% solutions in short time (months) and add functionality in future rapid iterations (weeks)

· Creates automated test cases/environments to enable continuous (and secure) integration and deployment to shift testing to the left

· Uses compatible software development platforms that align with the TAK Enterprise’s development community and that permit continuous integration and evaluation

· Allows for purchasing/utilizing existing software where able to the benefit of the Government (e.g., use of Git repos, Jira, Automated Testing tools, Fortify/Coverity, Visual Studio, etc.)

· Uses modern software languages and operating systems (with all patches up-to-date)

· Incorporates Test and Evaluation into the development life cycle to facilitate DevSecOps

· Provides easy and simple access to the Government, for contract deliverables, source code, build tools, test scripts, data

· Uses Open Technology Development (OTD) to incentivize collaboration and transparency, which is consistent with federal source code policy – maximizing use of open standards, open source software and reuse of existing products The Contractor shall support research, development, and maintenance of those software applications that augment, enhance, or support the capabilities of the SWAK Software Suite.

The Contractor shall update or provide system, test, and user documentation for the SWAK Software Suite. The Contractor shall provide the appropriate documentation for each application within the SWAK Software Suite or as an overarching document where applicable. The Contractor shall identify during the planning stages for each software release when all or some of the documents will require updates based on changes made to the baseline in that release. The required documentation shall include the following:

· Software Development Plan (SDP)

· Supplier’s Configuration Management Plan (SCMP)

· Software Architecture Description (SWARD)

· Interface Design Description IDD

· Software Version Description (SVD)

· Software/Hardware Design Description (SHDD)

· Test Plan

· User guides

· Training guides The Contractor shall maintain the current configuration baseline that preserves the integrity of the SWAK Software Suite. The Contractor’s processes shall be tailored based upon program requirements and in collaboration with the Government’s stated requirements.

The Contractor shall track all source code, and external dependencies of the source code, in a versioning system. The Contractor shall be able to recall the source code and its dependencies for any previous installation version. The Contractor shall track deficiencies, modifications and enhancements made to the SWAK Software Suite applications to account for software installation version differences. (A014, DI-IPSC-81427B “Software Development Plan (SDP)”; A015, DI-SESS-80858D/T “Supplier’s Configuration Management Plan”; A009, DI-SESS-82176 “Software Architecture Description (SWARD)”; A016, DI-IPSC-81436A “Interface Design Description (IDD)”; A011, DI-IPSC-81442A “Software Version Description (SVD)”; A012, DI-IPSC-81435B “Software Design Description (SDD)”; A017, DI-NDTI-80566A “Test Plan”; A018, DI-ILSS-80872/T “Training Materials”; A034, DI-IPSC-82284 “Software/Hardware Design Description (SHDD)”)

3.3.2 Software Product Continuous Development

The Contractor shall maintain (to include bug tracking, repair and testing) the currently fielded SWAK Software Suite and its associated Plug-ins. The SWAK Software Suite shall function on current SWAK operational hardware and support potential next-generation hardware platforms. The Government will provide the Contractor with requirements which shall be developed within the multi-point release schedule (expected quarterly releases – 2 Engineering releases and 2 Fielded releases annually) derived from the SW Requirements Working Groups with the using Commands. All changes to the fielded SWAK Software Suite shall be approved by the Government.

3.3.3 Development of New Software Suite Core

At the direction of the Government, the Contractor shall develop a new Software Suite Core in support of emerging needs of the SW using Commands, modernization of the SWAK, and modernization of the infrastructure and networks implemented to support the SWAK. The Government will provide the Contractor with requirements to perform research, development, design, testing and fielding of a new software core to support an operating system different than the existing operating system used with the SWAK Software Suite (for example, SWAK previously transitioned from Windows OS to Android OS).

3.3.4 Software Change Request

The contractor shall document all government approved SCR’s using a proposed Agile Methodology.

3.4 Systems Integration

3.4.1 Integration of New Capabilities to SWAK

The Contractor shall integrate software applications, systems, subsystems, and components into the SWAK at the direction of the Government. The integration shall include all activities required to preserve the compatibility and interoperability identified in the applicable SWAK drawings, Department of Defense Architecture Framework (DoDAF) architectures, and the cyber security Authority to Operate (ATO). The Contractor shall coordinate with Original Equipment Manufacturer(s) (OEMs) when products procured from those sources require integration with the SWAK. The Contractor shall deliver an IDD and SVD to facilitate successful integration. (A016, DI-IPSC-81436A “Interface Design Description (IDD)”; A011, DI-IPSC-81442A “Software Version Description (SVD)”; A034, DI-IPSC-82284 “Software/Hardware Design Description (SHDD)”) The contractor shall develop and implement a Development-Security-Operations (DevSecOps) methodology for the SWAK in accordance with commercial and DoD best practices to support the evolution of software development and systems integration processes for Assessment and Authorization (A&A). This requires supporting the transition from existing “As-Is” SWAK system development processes, to a “To-Be” DevSecOps approach to implement repeatable processes and enable continuous A&A objectives. The contractor shall align DevSecOps processes with multiple, external system development programs (i.e. software and hardware). This includes but is not limited to BADL software development, ATAK software updates from the TAK Product Center, multiple SBIRS and AFRL projects that require integration of hardware or software plug-ins with SWAK, and the MDM/MCM Cloud 1 servers that hosts the SWAK software. In conjunction with DevSecOps processes, the contractor shall support digital engineering initiatives—utilizing risk assessment tools provided by the SW Branch and the Authorizing Official (AO) office—to support continuous assessment and monitoring IAW the Risk Management Framework (RMF). The DevSecOps methodology shall be utilized to maintain the existing SWAK ATO and documentation to support system updates/modifications, as well as to support future SWAK ATO cybersecurity risk assessments.

All integration activities shall be identified in the PMP, IAW Section 3.1.6 of the respective progress for all integration activities shall be identified and updated in the IMS, IAW Section 3.1.8 of this PWS. Upon request, the Contractor shall furnish evidence that supports cyber-security risk assessments and effective program protection IAW sections 3.7 and 3.8 of this PWS.

3.4.2 Human Systems Integration (HSI)

The Contractor shall consider HSI impacts during program planning, design, and system modifications to optimize system performance and total ownership costs. The Contractor shall obtain approval from the Government prior to implementing design features with HSI impacts to ensure the system can be operated and maintained to provide the user with the ability to complete the respective mission sets. The contractor shall modernize SWAK to improve capability and operational suitability within the constraints of body-worn equipment and dismounted operating environments.

3.5 Buy, Try, Adapt, Decide

The Contractor shall support the Government in the Buy, Try, Adapt, Decide process. This process is unique to the SW Branch, with the objective to expeditiously determine if a commercially available item can meet a specific operational need of the warfighter when a solution is not currently fielded. For AFSOC ST-specific solutions, the Buy-Try-Adapt-Decide process may be coordinated by the Government through the SW TISC.

The “Buy” segment of the process requires the procurement of a COTS item in low quantity by the Contractor IAW section 3.18 of this PWS. As determined by the Government, the quantity procured shall serve to adequately support assessment of the COTS item’s performance against the requirements identified by the Government.

The “Try” segment refers to an Operational Utility Assessment (OUA), appropriately scaled, to characterize the performance of the COTS item against the Key Performance Parameters/Key System Attributes (KPPs/KSAs) established by the Government. As determined by the Government, OUAs shall include SW user representatives who will employ Tactics, Techniques, and Procedures (TTPs) consistent with the mission set for which the COTS item is intended.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .