Section M_Evaluation Factors for Award.pdf
PDF 309 KB Posted
- Solicitation number
- FA489025R0006
About this file
This document is Section M - Evaluation Factors for Award for Solicitation FA489025R0006, which outlines the government's methodology for evaluating proposals for Operations, Maintenance, and Support (OM&S) of Air Combat Command (ACC) Primary Training Ranges. The source selection will use a tradeoff process where technical factors are significantly more important than price, with Technical Subfactor D being the primary trade-off consideration. The government will conduct a two-step evaluation process: first assessing technical and price proposals, then determining whether to award with or without discussions.
Key evaluation details include an Acceptable/Unacceptable rating for Subfactors A, B, and C, with a combined technical/risk rating for Subfactor D. Proposals must demonstrate facility clearance, an effective transition strategy, relevant technical experience, and comprehensive program management capabilities. The solicitation is set aside 100% for small businesses, with a total anticipated contract period including a 60-day transition, nine-month base period, and four one-year option periods. The government intends to award a single Firm Fixed Price contract, with proposal submissions due by 1 September 2025 and anticipated award date of 12 January 2026.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation FA489025R0006
SECTION M - EVALUATION FACTORS FOR AWARD
M-1. BASIS FOR CONTRACT AWARD
M-1.1. This competitive best value source selection is conducted using the tradeoff source selection process in accordance with Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation, Department of Defense (DoD) Source Selection Procedures effective 20 August 2022, and Department of the Air Force Federal Acquisition Regulation (DAFFARS) Mandatory Procedures (MP) 5315.3 for Source Selection effective 16 October 2024. The Government will award one contract resulting from this solicitation to the responsible (IAW FAR Part 9) offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
M-1.2. The Government will utilize evaluation methodology that permits a trade-off between technical and price factors.
Technical is significantly more important than price. Technical Subfactor D is the only Subfactor included in the Trade-off. This may result in an award being made to a higher rated, higher priced offeror where the decision is consistent with the evaluation factors and the Source Selection Authority (SSA) determines that the technical superiority of the higher priced offeror outweighs the price difference. The Government reserves the right to award to other than the lowest proposed price. While the technical factor is determined to be significantly more important than price, price will contribute to the award decision. The greater the equality of proposals for technical factor, the more important price becomes in selecting the best value for the Government.
M-1.3. The Government will evaluate the minimum number of proposals for efficiency and to maintain adequate competition, as specified in this section. Upon receipt of the Technical and Price proposals, the Government will follow a two (2) step process as outlined below:
Step 1: Factor Evaluations. The Government will evaluate proposals as follows:
Technical Evaluation. The Government will evaluate the technical proposals of Offerors as specified in paragraph M-2.1.
Price Evaluation. The Government will evaluate the price proposals of Offerors as specified in paragraph M-2.2. Technically Unacceptable proposals may not be evaluated for price.
Step 2: Government Determinations. At the conclusion of Step 1, the Government reserves the right to award without discussions but may conduct discussions if the Government determines it is in the Government’s best interest. The Government may make a final determination as to whether the offeror’s proposal is "Acceptable" or "Unacceptable" based on the initial proposal submitted. Therefore, offerors are advised to submit proposals that are fully and clearly acceptable without additional information required. If the Government elects to open discussions, the competitive range may include proposals rated as “Unacceptable” at the sole discretion of the Government.
M-1.4. The Government contemplates award of one contract resulting from this solicitation. However, the Government reserves the right not to award a contract, depending on the acceptability of proposal(s) submitted and the availability of funds.
M-1.5. Per FAR Clause 52.215-1(f)(4), the Government intends to award without discussions. The Government may make a final determination as to whether the offeror’s proposal is the best value solely based on the initial proposal as submitted. Accordingly, offerors are advised to submit initial proposals that are fully and clearly acceptable without additional information. Should the SSA determine that discussions are necessary, a competitive range determination will be made prior to conducting discussions. This range will be comprised of the most highly rated proposals based on the ratings of all tradeoff factors. The competitive range may include lesser rated proposals at the sole discretion of the Government.
M-1.5.1. The Contracting Officer will notify Offerors in writing if their proposals are excluded from the competitive range or otherwise eliminated from the competition in accordance with FAR 15.503(a). That notice shall state the basis for the determination and that a proposal revision will not be considered.
M-1.5.2. Evaluation Notices (EN) will be issued to Offerors in the Competitive Range. Formal responses to ENs and final proposal revisions (FPR) will be considered in making the source selection decision for award.
M-1.5.3. Final Proposal Revisions (FPRs) will be requested from each offeror in the competitive range at the conclusion of discussions. Any revision or non-concurrence to contract terms and conditions submitted in the submitted FPR may not be subject to further discussion or negotiation. This provision is not intended to restrict the offeror’s opportunity to revise figures (e.g., prices, discounts, percentages, rates, etc.); rather, it is intended to preclude any misunderstandings by the Government which could result if new or revised terms and conditions are submitted in the FPR that have not been fully disclosed, discussed, and understood during discussions. Hence, such new or revised terms and conditions are not solicited and, if submitted in the FPR, may render the offer unacceptable to the Government.
M-2. EVALUATION FACTORS.
M-2.1. FACTOR 1 - TECHNICAL
M-2.1.1. Offerors’ proposals shall demonstrate a comprehensive understanding of the nature and scope of work required. The focus of the Technical Rating is on the offeror’s ability to satisfactorily meet the evaluation criteria identified within each subfactor and subfactor aspect. The Government will not search for data to cure problems or address inconsistencies in an offeror’s proposal. Technical will be rated using a methodology of Acceptable/Unacceptable Ratings for Subfactors A, B, and C; and combined technical/risk rating for Subfactor D per paragraph 3.1.2.2. of DoD Source Selection Procedures dated 20 August 2022. Technical ratings will be assessed at the subfactor level; an overall factor-level rating will not be assigned. A proposal receiving an Unacceptable rating for Factor A will not be further evaluated and is not eligible for award. Proposals receiving an Unacceptable rating for Factors B or C may not receive further evaluation. Finally, proposals rated Unacceptable in Factor D are not awardable and may not be included in the competitive range.
M-2.1.1.1. Acceptable/Unacceptable Ratings. The Government will evaluate Factors A, B, and C using a rating of Acceptable or Unacceptable. All criteria in each factor must be met to receive an Acceptable rating.
M-2.1.1.2. Technical Rating. Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table 1 and the risk descriptions set forth in Table 2. The combined technical/risk rating in Table 1 includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, and deficiencies in determining technical ratings. In conducting the assessment, the Government will also consider the information provided in the proposal as to how the offeror will manage and mitigate risk. Subfactor D shall be assigned a combined technical/risk rating as shown below in Tables 1 and 2. The technical rating evaluates the quality of the offeror's technical solution for meeting the Government's requirements. If an offeror's proposal demonstrates a material failure to meet a Government requirement, this is a deficiency in the offeror's proposal resulting in a Red/Unacceptable rating and the proposal is not awardable. The severity of the deficiency will determine if the offeror will be able to correct the deficiency through discussions. To be eligible for award, all Subfactors must receive a minimum color rating of "Green/Acceptable." Table 3 further defines terminology contained within Tables 1 and 2.
Table 1 - Combined Technical/Risk Rating Method
Color Rating Description Blue Outstanding Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.
Table 2 - Technical Risk Rating
Adjectival Rating Description Low Proposal may contain weakness/weaknesses which have low potential to cause disruption of schedule, increased cost, or degradation of performance. Normal contractor emphasis and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may have a moderate potential to cause disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome any difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to have high potential to cause significant disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will unlikely be able to overcome any difficulties.
Unacceptable Proposal contains a deficiency or a combination of significant weaknesses that causes an unacceptable level of risk of unsuccessful performance.
Table 3 – Technical Evaluation Descriptors
Terminology Definition
Significant Strength
An aspect of an Offeror’s proposal with appreciable merit or will exceed specified performance or capability requirements to the considerable advantage of the
Government during contract performance.
Strength An aspect of an offeror's proposal with merit or will exceed specified performance or capability requirements to the advantage of the Government during contract performance.
Weakness A flaw in the proposal that increases the risk of unsuccessful contract performance.
See FAR 15.001.
Significant Weaknesses
A flaw that appreciably increases the risk of unsuccessful contract performance. See
FAR 15.001.
Uncertainty Any aspect of a non-cost/price factor proposal for which the intent of the offer is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
Deficiency A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
M-2.1.2. Subfactor A: Facility Clearance. The Government will verify that the proposals received have a Secret Facility Clearance. Offerors (to include subcontractors, teaming partners, or joint venture partners) shall provide a copy of active facility clearance at time of proposal submission that shows the Cage Code for which the clearance is approved and that will be used for the purpose of this award. The submission(s) will be validated through review of information in the National Industrial Security System (NISS). The proposal of an Offeror, to include subcontractors, teaming partners, or joint venture partners, that does not have the required clearance at the time of proposal submission will not be further evaluated beyond Factor 1 - Technical, Subfactor A and is not eligible for award.
M-2.1.3. Subfactor B: Transition Strategy. The offeror’s approach shall provide an effective and executable strategy for transitioning resources and personnel during Phase-In with a logical timeline and realistic milestones (from contract award through performance start date). Any proposal that does not provide an acceptable transition strategy may not be evaluated for Subfactor D IAW M.2.1.1.. and will not be eligible for award. The offeror’s proposal must thoroughly substantiate all of the following:
a. Demonstrates an effective transition strategy with key milestones, a process flow chart, and a proposed timeline for resources during the phase in to prevent an interruption in services.
b. Provides an effective plan for phase-in of trained, qualified personnel required to assume mission responsibilities at contract start which includes key milestones, a process flow chart, and proposed timeline for staffing phase-in at each location to prevent interruption in services to include a transition organizational chart and proposed staffing and timeline for each position and include a contingency plan for replacing personnel during the transition period.
c. Identifies actions to the offeror requires from the Government to perform in order for the offeror to complete its Transition Strategy.
M-2.1.4. Subfactor C: Technical Experience. Any proposal that does not provide evidence of performing similar scope work IAW L-7.4.1.3 for a minimum of 12 months with performance within the last eight (8) years from the issue date of this solicitation may not be evaluated for Subfactor D IAW M.2.1.1.. and will not be eligible for award.
M-2.1.5. Subfactor D: Program Management
M-2.1.5.1. Aspect I – Manning. Proposed approach shall provide successful program management execution and demonstrate complete technical understanding of the requirement by:
a. Providing a site manning matrix using the format provided in Section L Attachment 2 which thoroughly explains how each position will be utilized to meet the technical requirements of the SOW and identifies which resources will be internal or external and how they will be utilized.
b. Provides an organizational chart that depicts the breakdown of all personnel, identifies functional relationships, and shows lines of authority and chain of command to include teaming partners and subcontractors.
c. Identifies proposed key personnel positions, roles, and minimum qualifications for these positions which include the following information: Position/Title, Work Experience (management, supervision, technical), Education, Clearance (Secret), Certifications.
d. Demonstrates a viable approach to maintain the certifications and credentials of proposed key personnel and the key personnel identified at SOW para 1.9.
M-2.1.5.2. Aspect II – Quality Control. Proposed integrated quality approach provides for effective planning, operation, and control of processes and substantiates all of the following:
a. Explains the quality management structure proposed to include personnel authority and responsibility in the form of a tree diagram, the quality policy, quality objectives, and the related documents needed to ensure effective planning, operation and control of the company’s processes.
b. Demonstrates top management commitment/involvement in development, implementation, and continuous improvement of the quality program with an emphasis on customer satisfaction.
c. Discusses its processes for preventive-based monitoring, measurement and analysis, and metrics to ensure conformance to the SOW and the offerors’ Quality program, correction and prevention of recurring discrepancies, and continuous improvement of processes/performance.
d. Describes procedures for testing and accepting the threat and scoring systems assigned to a range, and approach for inspecting the threat and scoring systems, as well as mission scoring and reporting are adequate to meet SOW requirements.
M-2.1.5.3. Aspect III – Contractor Equipment. Proposed approach provides an understanding of performance locations, operating environment and thoroughly substantiates all the following:
a. Provides detailed listing of proposed contractor-owned heavy equipment/vehicles that is technically sufficient to successfully meet SOW requirements.
b. Demonstrates an understanding that current GFE has a limited lifespan and addresses processes for replacement as contractor furnished equipment.
c. Illustrates an understanding of the maintenance requirements of heavy equipment/vehicles at locations with limited local availability of services and discusses its methodology and approach for ensuring required maintenance is completed without disruption to the program.
d. Demonstrates an understanding of operator training required for various SOW tasks and vehicle permit requirements necessary to perform all requirements of the SOW.
M-2.2. FACTOR 2 - PRICE
M-2.2.1. Offerors who receive acceptable or better Technical Subfactor ratings in Factor 1 will be evaluated for Factor 2 - Price.
M-2.2.2. This source selection is conducted with the expectation of adequate price competition to ensure the awarded price is fair and reasonable. Thus, offerors are cautioned to present their best price proposal up front. The offeror’s price proposal shall represent their best effort to respond to the solicitation requirements. The burden of proposal accuracy rests solely with the offeror. Any inconsistency, whether real or apparent between promised performance/technical approach and price, shall be explained in the proposal. Any significant inconsistency, if unexplained, raises a fundamental issue of the offeror’s proposal and may be grounds for the rejection of the proposal.
M-2.2.3. Ratings will not be assigned for Factor 2 – Price. Price analysis will be performed using one or more of the techniques defined in FAR 15.404-1 to ensure the Government receives a fair, reasonable, complete, and balanced price. Offerors whose total overall evaluated price (TOEP) is determined to be unreasonable, unbalanced, or incomplete may not be considered for award.
M-2.2.4. The techniques and procedures described under FAR 15.404-1 will be the primary means of accomplishing the price analysis, including reasonableness. Price reasonableness will be determined based upon comparison of the offerors’ TOEPs. The price of each offeror will be evaluated on the TOEP, which will be determined by totaling all Contract Lines Item Numbers (CLINs) including phase-in period, base year, option years, and fifty percent (50%) of the last option period price to cover the option to extend services IAW FAR Clause 52.217-8. The Government has provided estimates for the cost reimbursable CLINs. All Cost Reimbursable (CR) CLINs are exclusive of indirect rates and profit/fee. Offerors shall include pricing in their proposal for this clause and it shall be calculated at 50% of option year five pricing. Evaluation of the option years shall not obligate the Government to exercise such options.
M-2.2.5. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or understated as indicated by the application of price analysis techniques. Absent any issues related to the stated requirement, unbalanced pricing may pose an unacceptable risk to the government and may be a reason to reject an offeror's proposal.
M-2.2.6. A proposal is complete when all pricing data required in the RFP is provided in the format prescribed in this section and Section 6, Instructions to Offerors. Submission of an incomplete proposal may result in rejection of the proposal.
M-2.2.7. All CR line items represent those expenses to be reimbursed based on actual costs. These line items are not profit bearing, nor do they allow for additional markup (e.g., G&A, handling, OH).
M-2.2.7.1. The government has provided pre-established not to exceed (NTE) amounts for all CR CLINS. These pre-established amounts are to be included in the offeror's proposal and will be evaluated as part of the TOEP.
Additional funding will be obligated to these CLINS if required during contract performance.
M-2.2.8. Offerors shall complete and submit the Schedule of Supplies or Services and Prices or Costs. Offeror shall insert the price elements (unit price and extended total) for all FFP and Optional CLINS for Phase-In, Base Year and all Option Years. For ease of administration, the extended TOTAL should be rounded to whole dollar amounts before they are multiplied by the quantity. The unit price multiplied by the number of units shall equal the extended price of each CLIN. If submitted unit prices are not rounded to the nearest dollar, the Government will round the unit prices to whole dollar amounts at the time of contract award or modification. If the decimal is followed by 5, 6, 7, 8, or 9, the price will be rounded up to the nearest whole dollar. If the decimal is followed by 0, 1, 2, 3, or 4, the price will be rounded down to the nearest whole dollar.
M-2.2.9. Supporting price back-up data is not required at this time. In the event such data is required, an evaluation notice will be issued to the offeror(s) requesting such information, and in a format prescribed by the government.
M-2.2.10. Collective Bargaining Agreements (CBAs). There are multiple CBAs associated with this requirement.
Offerors are cautioned to ensure they apply the correct CBA to the appropriate site in development of their price proposal. The CBAs are in solicitation Attachment 6.
M-2.2.10.1. CBA Rates. Offerors are to use the 1 Feb 2025 labor and fringe rates in development of their price proposal.
M-2.2.10.2. Offerors shall make a statement in the price proposal that they are in compliance with the CBAs.
M-2.2.10.3. Bid and Proposal Costs are not allowed, or for any modification after award for the duration of the contract.
M-2.2.11. Notice on the Use of the SPRS. The RFP, in Section L, DFARS Clauses Incorporated by Reference, includes DFARS provision 252.204-7024, Notice on the Use of the Supplier Performance Risk System (SPRS).
DFARS 204.7603 provides for consideration of price risk and supplier risk if available in SPRS. For any services under this solicitation that do not have an associated Product Service Code (PSC) or Manufacturer CAGE Code with a Part Number or National Item Identification Number (NIIN), then the SPRS Item/Price Risk Report search will not provide any information. Therefore, offerors are advised that the evaluation of Factor 2 cannot utilize the Supplier Performance Risk System and (b) will not obtain nor consider risk assessments as detailed in DFARS 252.204-7024(c). Price evaluation will be conducted as otherwise specified in the RFP.
File details come from the government source that posted it. Updated .