The file's text, extracted by GovTribe without its formatting.
Instructions
| Workbook Information/Instructions: |
| 1. All information in this workbook is notional and is for demostration purposes only. |
| 2. All Formulas are preliminary and Offeror should provide accurate formulas based on offeror's modification of workbook. |
| 3. Offeror is not required to use this workbook, this is provided to assist in populating Section B Schedule of Supplies or Services. |
| 4. Read all instructions, notes, and references contained within individual worksheets and Section B of solicitation. |
| 5. Prices, hours, and percentages contained in this workbook are to demonstrate methodogly only and do not reflect actual prices or costs. |
Manning Matrix Instructions: Fill in all Green shaded cells. Additional Labor Categories may be added.
Manning matrix shall be same as developed and provided in the technical proposal
| PTR Manning Matrix | | | | | | | | | | | | | |
| | | | | Bombing & Gunnery | | | | | | Electronic Combat | | |
| Labor Category | SCA Labor Category Title | SCA/CBA Position | Shift | Special Certifications (SOW 1.9.3.2, 2.1.10, 2.5.1 & 3.6) | Avon Park | Dare County | Grand Bay | Holloman | Mountain Home | Poinsett | Belle Fourche | Poinsett | Snyder |
| Labor Category 1 | | | | | 6 | 7 | 5 | 13 | 9 | 4 | 12 | 15 | 14 |
| Labor Category 2 | | | | | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Labor Category 3 | | | | | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Labor Category 4 | | | | | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Labor Category 5 | | | | | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Labor Category 6 | | | | | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
Total 11 12 10 18 14 9 17 20 19
Transition
| Instructions: | Provide Detail and Price information for Transition requirements in GREEN shaded cells. |
| Additional rows may be inserted. |
Detail Pricing for CONUS transition
| CONUS | |
| Requirement | Price |
| Example…"Program Management" | |
| Example…"Quality Management" | |
| Example…"Site Manager" | |
| Example…"Technician III" | |
| Example…"Airfare" | |
| Example…"Car Rental" | |
| Example…"Per Diem | |
CONUS Transition total $0
Escalation Instructions: Provide an escalation percentage for each year in the Green shaded cells.
Escalation rates listed below are for demonstration purposes only.
| Indirect Rate | Base Year | Option 1 | Option 2 | Option 3 | Option 4 | Extension Option |
| Escalation | 0.00% | 2.60% | 2.70% | 2.80% | 2.90% | 3.00% |
Site Detail
| Instructions: | Insert Labor Categories from Manning Matrix Tab for each section. |
| Fill in all Green shaded cells for Program Management Manning numbers and Hours for all |
| Identify any proposed Other Direct Costs (ODC's) and fill in all Green shaded cells for all listed ODC's. Additional ODC's may be added. |
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Program Management | | | | | Program Management | | | | | Program Management | | | | | Program Management | | | | | Program Management | | | | | Program Management | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 1 | 960 | 35.00 | 33,600.00 | Labor Category 1 | 1 | 1920 | 35.84 | 68,812.80 | Labor Category 1 | 1 | 1920 | 36.73 | 70,521.60 | Labor Category 1 | 1 | 1920 | 37.68 | 72,345.60 | Labor Category 1 | 1 | 1920 | 38.69 | 74,284.80 | Labor Category 1 | 1 | 960 | 39.77 | 38,179.20 |
| Labor Category 2 | 1 | 960 | 36.00 | 34,560.00 | Labor Category 2 | 1 | 1920 | 36.87 | 70,790.40 | Labor Category 2 | 1 | 1920 | 37.79 | 72,556.80 | Labor Category 2 | 1 | 1920 | 38.77 | 74,438.40 | Labor Category 2 | 1 | 1920 | 39.81 | 76,435.20 | Labor Category 2 | 1 | 960 | 40.92 | 39,283.20 |
| Labor Category 3 | 1 | 960 | 37.00 | 35,520.00 | Labor Category 3 | 1 | 1920 | 37.89 | 72,748.80 | Labor Category 3 | 1 | 1920 | 38.84 | 74,572.80 | Labor Category 3 | 1 | 1920 | 39.85 | 76,512.00 | Labor Category 3 | 1 | 1920 | 40.92 | 78,566.40 | Labor Category 3 | 1 | 960 | 42.07 | 40,387.20 |
| Labor Category 4 | 1 | 960 | 38.00 | 36,480.00 | Labor Category 4 | 1 | 1920 | 38.32 | 73,574.40 | Labor Category 4 | 1 | 1920 | 38.66 | 74,227.20 | Labor Category 4 | 1 | 1920 | 39.02 | 74,918.40 | Labor Category 4 | 1 | 1920 | 39.40 | 75,648.00 | Labor Category 4 | 1 | 960 | 39.81 | 38,217.60 |
| 4 | 140,160.00 | | 4 | 285,926.40 | | 4 | 291,878.40 | | 4 | 298,214.40 | | 4 | 304,934.40 | | 4 | 156,067.20 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 150,660.00 Total 296,426.40 Total 302,378.40 Total 308,714.40 Total 315,434.40 Total 157,117.20
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Dare County B&G, NC | | | | | Dare County B&G, NC | | | | | Dare County B&G, NC | | | | | Dare County B&G, NC | | | | | Dare County B&G, NC | | | | | Dare County B&G, NC | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 7 | 960 | 25.10 | 168,672.00 | Labor Category 1 | 7 | 1920 | 25.68 | 345,139.20 | Labor Category 1 | 7 | 1920 | 26.30 | 353,472.00 | Labor Category 1 | 7 | 1920 | 26.96 | 362,342.40 | Labor Category 1 | 7 | 1920 | 27.66 | 371,750.40 | Labor Category 1 | 7 | 960 | 28.41 | 190,915.20 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.79 | 49,516.80 | Labor Category 2 | 1 | 1920 | 26.41 | 50,707.20 | Labor Category 2 | 1 | 1920 | 27.07 | 51,974.40 | Labor Category 2 | 1 | 1920 | 27.77 | 53,318.40 | Labor Category 2 | 1 | 960 | 28.52 | 27,379.20 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.89 | 49,708.80 | Labor Category 3 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 3 | 1 | 1920 | 27.18 | 52,185.60 | Labor Category 3 | 1 | 1920 | 27.88 | 53,529.60 | Labor Category 3 | 1 | 960 | 28.63 | 27,484.80 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 12 | 290,496.00 | | 12 | 592,896.00 | | 12 | 605,587.20 | | 12 | 619,065.60 | | 12 | 633,350.40 | | 12 | 324,336.00 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 300,996.00 Total 603,396.00 Total 616,087.20 Total 629,565.60 Total 643,850.40 Total 325,386.00
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Mt Home B&G, ID | | | | | Mt Home B&G, ID | | | | | Mt Home B&G, ID | | | | | Mt Home B&G, ID | | | | | Mt Home B&G, ID | | | | | Mt Home B&G, ID | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 9 | 960 | 25.10 | 216,864.00 | Labor Category 1 | 9 | 1920 | 25.68 | 443,750.40 | Labor Category 1 | 9 | 1920 | 26.30 | 454,464.00 | Labor Category 1 | 9 | 1920 | 26.96 | 465,868.80 | Labor Category 1 | 9 | 1920 | 27.66 | 477,964.80 | Labor Category 1 | 9 | 960 | 28.41 | 245,462.40 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.79 | 49,516.80 | Labor Category 2 | 1 | 1920 | 26.41 | 50,707.20 | Labor Category 2 | 1 | 1920 | 27.07 | 51,974.40 | Labor Category 2 | 1 | 1920 | 27.77 | 53,318.40 | Labor Category 2 | 1 | 960 | 28.52 | 27,379.20 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.89 | 49,708.80 | Labor Category 3 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 3 | 1 | 1920 | 27.18 | 52,185.60 | Labor Category 3 | 1 | 1920 | 27.88 | 53,529.60 | Labor Category 3 | 1 | 960 | 28.63 | 27,484.80 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 14 | 338,688.00 | | 14 | 691,507.20 | | 14 | 706,579.20 | | 14 | 722,592.00 | | 14 | 739,564.80 | | 14 | 378,883.20 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 349,188.00 Total 702,007.20 Total 717,079.20 Total 733,092.00 Total 750,064.80 Total 379,933.20
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Grand Bay B&G, GA | | | | | Grand Bay B&G, GA | | | | | Grand Bay B&G, GA | | | | | Grand Bay B&G, GA | | | | | Grand Bay B&G, GA | | | | | Grand Bay B&G, GA | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 5 | 960 | 25.10 | 120,480.00 | Labor Category 1 | 5 | 1920 | 25.63 | 246,048.00 | Labor Category 1 | 5 | 1920 | 26.25 | 252,000.00 | Labor Category 1 | 5 | 1920 | 26.91 | 258,336.00 | Labor Category 1 | 5 | 1920 | 27.61 | 265,056.00 | Labor Category 1 | 5 | 960 | 28.36 | 136,128.00 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.73 | 49,401.60 | Labor Category 2 | 1 | 1920 | 26.35 | 50,592.00 | Labor Category 2 | 1 | 1920 | 27.01 | 51,859.20 | Labor Category 2 | 1 | 1920 | 27.71 | 53,203.20 | Labor Category 2 | 1 | 960 | 28.46 | 27,321.60 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.84 | 49,612.80 | Labor Category 3 | 1 | 1920 | 26.46 | 50,803.20 | Labor Category 3 | 1 | 1920 | 27.12 | 52,070.40 | Labor Category 3 | 1 | 1920 | 27.82 | 53,414.40 | Labor Category 3 | 1 | 960 | 28.57 | 27,427.20 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 10 | 242,304.00 | | 10 | 493,593.60 | | 10 | 503,884.80 | | 10 | 514,828.80 | | 10 | 526,425.60 | | 10 | 269,433.60 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 252,804.00 Total 504,093.60 Total 514,384.80 Total 525,328.80 Total 536,925.60 Total 270,483.60
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Avon Park B&G, FL | | | | | Avon Park B&G, FL | | | | | Avon Park B&G, FL | | | | | Avon Park B&G, FL | | | | | Avon Park B&G, FL | | | | | Avon Park B&G, FL | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 6 | 960 | 25.10 | 144,576.00 | Labor Category 1 | 6 | 1920 | 25.68 | 295,833.60 | Labor Category 1 | 6 | 1920 | 26.30 | 302,976.00 | Labor Category 1 | 6 | 1920 | 26.96 | 310,579.20 | Labor Category 1 | 6 | 1920 | 27.66 | 318,643.20 | Labor Category 1 | 6 | 960 | 28.41 | 163,641.60 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.79 | 49,516.80 | Labor Category 2 | 1 | 1920 | 26.41 | 50,707.20 | Labor Category 2 | 1 | 1920 | 27.07 | 51,974.40 | Labor Category 2 | 1 | 1920 | 27.77 | 53,318.40 | Labor Category 2 | 1 | 960 | 28.52 | 27,379.20 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.89 | 49,708.80 | Labor Category 3 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 3 | 1 | 1920 | 27.18 | 52,185.60 | Labor Category 3 | 1 | 1920 | 27.88 | 53,529.60 | Labor Category 3 | 1 | 960 | 28.63 | 27,484.80 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 11 | 266,400.00 | | 11 | 543,590.40 | | 11 | 555,091.20 | | 11 | 567,302.40 | | 11 | 580,243.20 | | 11 | 297,062.40 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 276,900.00 Total 554,090.40 Total 565,591.20 Total 577,802.40 Total 590,743.20 Total 298,112.40
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Poinsett EC, SC | | | | | Poinsett EC, SC | | | | | Poinsett EC, SC | | | | | Poinsett EC, SC | | | | | Poinsett EC, SC | | | | | Poinsett EC, SC | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 15 | 960 | 25.10 | 361,440.00 | Labor Category 1 | 15 | 1920 | 25.68 | 739,584.00 | Labor Category 1 | 15 | 1920 | 26.30 | 757,440.00 | Labor Category 1 | 15 | 1920 | 26.96 | 776,448.00 | Labor Category 1 | 15 | 1920 | 27.66 | 796,608.00 | Labor Category 1 | 15 | 960 | 28.41 | 409,104.00 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.79 | 49,516.80 | Labor Category 2 | 1 | 1920 | 26.41 | 50,707.20 | Labor Category 2 | 1 | 1920 | 27.07 | 51,974.40 | Labor Category 2 | 1 | 1920 | 27.77 | 53,318.40 | Labor Category 2 | 1 | 960 | 28.52 | 27,379.20 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.89 | 49,708.80 | Labor Category 3 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 3 | 1 | 1920 | 27.18 | 52,185.60 | Labor Category 3 | 1 | 1920 | 27.88 | 53,529.60 | Labor Category 3 | 1 | 960 | 28.63 | 27,484.80 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 20 | 483,264.00 | | 20 | 987,340.80 | | 20 | 1,009,555.20 | | 20 | 1,033,171.20 | | 20 | 1,058,208.00 | | 20 | 542,524.80 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 493,764.00 Total 997,840.80 Total 1,020,055.20 Total 1,043,671.20 Total 1,068,708.00 Total 543,574.80
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Poinsett B&G, SC | | | | | Poinsett B&G, SC | | | | | Poinsett B&G, SC | | | | | Poinsett B&G, SC | | | | | Poinsett B&G, SC | | | | | Poinsett B&G, SC | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 4 | 960 | 25.10 | 96,384.00 | Labor Category 1 | 4 | 1920 | 25.63 | 196,838.40 | Labor Category 1 | 4 | 1920 | 26.25 | 201,600.00 | Labor Category 1 | 4 | 1920 | 26.91 | 206,668.80 | Labor Category 1 | 4 | 1920 | 27.61 | 212,044.80 | Labor Category 1 | 4 | 960 | 28.36 | 108,902.40 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.73 | 49,401.60 | Labor Category 2 | 1 | 1920 | 26.35 | 50,592.00 | Labor Category 2 | 1 | 1920 | 27.01 | 51,859.20 | Labor Category 2 | 1 | 1920 | 27.71 | 53,203.20 | Labor Category 2 | 1 | 960 | 28.46 | 27,321.60 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.84 | 49,612.80 | Labor Category 3 | 1 | 1920 | 26.46 | 50,803.20 | Labor Category 3 | 1 | 1920 | 27.12 | 52,070.40 | Labor Category 3 | 1 | 1920 | 27.82 | 53,414.40 | Labor Category 3 | 1 | 960 | 28.57 | 27,427.20 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 9 | 218,208.00 | | 9 | 444,384.00 | | 9 | 453,484.80 | | 9 | 463,161.60 | | 9 | 473,414.40 | | 9 | 242,208.00 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 228,708.00 Total 454,884.00 Total 463,984.80 Total 473,661.60 Total 483,914.40 Total 243,258.00
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Holloman B&G, NM | | | | | Holloman B&G, NM | | | | | Holloman B&G, NM | | | | | Holloman B&G, NM | | | | | Holloman B&G, NM | | | | | Holloman B&G, NM | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 13 | 960 | 25.10 | 313,248.00 | Labor Category 1 | 13 | 1920 | 25.68 | 640,972.80 | Labor Category 1 | 13 | 1920 | 26.30 | 656,448.00 | Labor Category 1 | 13 | 1920 | 26.96 | 672,921.60 | Labor Category 1 | 13 | 1920 | 27.66 | 690,393.60 | Labor Category 1 | 13 | 960 | 28.41 | 354,556.80 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.79 | 49,516.80 | Labor Category 2 | 1 | 1920 | 26.41 | 50,707.20 | Labor Category 2 | 1 | 1920 | 27.07 | 51,974.40 | Labor Category 2 | 1 | 1920 | 27.77 | 53,318.40 | Labor Category 2 | 1 | 960 | 28.52 | 27,379.20 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.89 | 49,708.80 | Labor Category 3 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 3 | 1 | 1920 | 27.18 | 52,185.60 | Labor Category 3 | 1 | 1920 | 27.88 | 53,529.60 | Labor Category 3 | 1 | 960 | 28.63 | 27,484.80 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 18 | 435,072.00 | | 18 | 888,729.60 | | 18 | 908,563.20 | | 18 | 929,644.80 | | 18 | 951,993.60 | | 18 | 487,977.60 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 445,572.00 Total 899,229.60 Total 919,063.20 Total 940,144.80 Total 962,493.60 Total 489,027.60
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Belle Fourche EWS, WY | | | | | Belle Fourche EWS, WY | | | | | Belle Fourche EWS, WY | | | | | Belle Fourche EWS, WY | | | | | Belle Fourche EWS, WY | | | | | Belle Fourche EWS, WY | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 12 | 960 | 25.10 | 289,152.00 | Labor Category 1 | 12 | 1920 | 25.63 | 590,515.20 | Labor Category 1 | 12 | 1920 | 26.25 | 604,800.00 | Labor Category 1 | 12 | 1920 | 26.91 | 620,006.40 | Labor Category 1 | 12 | 1920 | 27.61 | 636,134.40 | Labor Category 1 | 12 | 960 | 28.36 | 326,707.20 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.73 | 49,401.60 | Labor Category 2 | 1 | 1920 | 26.35 | 50,592.00 | Labor Category 2 | 1 | 1920 | 27.01 | 51,859.20 | Labor Category 2 | 1 | 1920 | 27.71 | 53,203.20 | Labor Category 2 | 1 | 960 | 28.46 | 27,321.60 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.84 | 49,612.80 | Labor Category 3 | 1 | 1920 | 26.46 | 50,803.20 | Labor Category 3 | 1 | 1920 | 27.12 | 52,070.40 | Labor Category 3 | 1 | 1920 | 27.82 | 53,414.40 | Labor Category 3 | 1 | 960 | 28.57 | 27,427.20 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 20 | 410,976.00 | | 20 | 838,060.80 | | 20 | 856,684.80 | | 20 | 876,499.20 | | 20 | 897,504.00 | | 20 | 460,012.80 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 421,476.00 Total 848,560.80 Total 867,184.80 Total 886,999.20 Total 908,004.00 Total 461,062.80
| Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | | Pricing Summary | | | | |
| Base Year | | | | | Option 1 | | | | | Option 2 | | | | | Option 3 | | | | | Option 4 | | | | | Extension Option | | | | |
| Snyder EWS, TX | | | | | Snyder EWS, TX | | | | | Snyder EWS, TX | | | | | Snyder EWS, TX | | | | | Snyder EWS, TX | | | | | Snyder EWS, TX | | | | |
| Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Base | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 1 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 2 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 3 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Option 4 | Labor | Manning Matrix | Hours | Burdened Labor Rate | Total Labor - Extension Option |
| Labor Category 1 | 14 | 960 | 25.10 | 337,344.00 | Labor Category 1 | 14 | 1920 | 25.68 | 690,278.40 | Labor Category 1 | 14 | 1920 | 26.30 | 706,944.00 | Labor Category 1 | 14 | 1920 | 26.96 | 724,684.80 | Labor Category 1 | 14 | 1920 | 27.66 | 743,500.80 | Labor Category 1 | 14 | 960 | 28.41 | 381,830.40 |
| Labor Category 2 | 1 | 960 | 25.20 | 24,192.00 | Labor Category 2 | 1 | 1920 | 25.79 | 49,516.80 | Labor Category 2 | 1 | 1920 | 26.41 | 50,707.20 | Labor Category 2 | 1 | 1920 | 27.07 | 51,974.40 | Labor Category 2 | 1 | 1920 | 27.77 | 53,318.40 | Labor Category 2 | 1 | 960 | 28.52 | 27,379.20 |
| Labor Category 3 | 1 | 960 | 25.30 | 24,288.00 | Labor Category 3 | 1 | 1920 | 25.89 | 49,708.80 | Labor Category 3 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 3 | 1 | 1920 | 27.18 | 52,185.60 | Labor Category 3 | 1 | 1920 | 27.88 | 53,529.60 | Labor Category 3 | 1 | 960 | 28.63 | 27,484.80 |
| Labor Category 4 | 1 | 960 | 25.40 | 24,384.00 | Labor Category 4 | 1 | 1920 | 25.72 | 49,382.40 | Labor Category 4 | 1 | 1920 | 26.06 | 50,035.20 | Labor Category 4 | 1 | 1920 | 26.42 | 50,726.40 | Labor Category 4 | 1 | 1920 | 26.80 | 51,456.00 | Labor Category 4 | 1 | 960 | 27.21 | 26,121.60 |
| Labor Category 5 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 5 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 5 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 5 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 5 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 5 | 1 | 960 | 27.31 | 26,217.60 |
| Labor Category 6 | 1 | 960 | 25.50 | 24,480.00 | Labor Category 6 | 1 | 1920 | 25.82 | 49,574.40 | Labor Category 6 | 1 | 1920 | 26.16 | 50,227.20 | Labor Category 6 | 1 | 1920 | 26.52 | 50,918.40 | Labor Category 6 | 1 | 1920 | 26.90 | 51,648.00 | Labor Category 6 | 1 | 960 | 27.31 | 26,217.60 |
| 19 | 459,168.00 | | 19 | 938,035.20 | | 19 | 959,059.20 | | 19 | 981,408.00 | | 19 | 1,005,100.80 | | 19 | 515,251.20 |
| FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | | FFP ODC's | | |
| Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 10,000.00 | Identify | | 1,000.00 |
| Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 500.00 | Identify | | 50.00 |
| Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 10,500.00 | Total FFP ODC's | | 1,050.00 |
Total 469,668.00 Total 948,535.20 Total 969,559.20 Total 991,908.00 Total 1,015,600.80 Total 516,301.20
Detail Labor Rates
| Instructions: | Insert Labor Categories from Manning Matrix Tab for each section |
| Insert SCA/CBA Position Status from Manning Matrix Tab for each section |
| Insert Proposed Hourly Rate for each section |
| Insert Indirect/Profit for each section |
Provide fully burdened labor rates for all SCA/CBA position at each site for base year and all option years to include the base rate and all indirect burdens and profit that create the fully burdened rate.
| FFP Pricing Table - Base Period - Program Management | | | | | | | FFP Pricing Table - Base Period - Dare County | | | | | | | FFP Pricing Table - Base Period - Mt Home | | | | | | | FFP Pricing Table - Base Period - Grand Bay | | | | | | | FFP Pricing Table - Base Period - Avon Park | | | | | | | FFP Pricing Table - Base Period - Poinsett EC | | | | | | | FFP Pricing Table - Base Period - Poinsett B&G | | | | | | | FFP Pricing Table - Base Period - Holloman |
| SCA/CBA Labor Category | Location | SCA/CBA Position | Base Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CAB Labor Category | Location | SCA/CBA Position | Base Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Base Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Base Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Base Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Base Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Base Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category |
| | | | 0.00% | | | | | | | 0.00% | | | | | | | 0.00% | | | | | | | 0.00% | | | | | | | 0.00% | | | | | | | 0.00% | | | | | | | 0.00% | | | |
| Labor Category 1 | Program Management | No | 20.00 | 20.00 | 15.00 | 35.00 | Labor Category 1 | Dare County | No | 10.10 | 10.10 | 15.00 | 25.10 | Labor Category 1 | Mt Home | No | 10.10 | 10.10 | 15.00 | 25.10 | Labor Category 1 | Grand Bay | No | 10.10 | 10.10 | 15.00 | 25.10 | Labor Category 1 | Avon Park | No | 10.10 | 10.10 | 15.00 | 25.10 | Labor Category 1 | Poinsett EC | No | 10.10 | 10.10 | 15.00 | 25.10 | Labor Category 1 | Poinsett B&G | No | 10.10 | 10.10 | 15.00 | 25.10 | Labor Category 1 |
| Labor Category 2 | Program Management | No | 21.00 | 21.00 | 15.00 | 36.00 | Labor Category 2 | Dare County | No | 10.20 | 10.20 | 15.00 | 25.20 | Labor Category 2 | Mt Home | No | 10.20 | 10.20 | 15.00 | 25.20 | Labor Category 2 | Grand Bay | No | 10.20 | 10.20 | 15.00 | 25.20 | Labor Category 2 | Avon Park | No | 10.20 | 10.20 | 15.00 | 25.20 | Labor Category 2 | Poinsett EC | No | 10.20 | 10.20 | 15.00 | 25.20 | Labor Category 2 | Poinsett B&G | No | 10.20 | 10.20 | 15.00 | 25.20 | Labor Category 2 |
| Labor Category 3 | Program Management | No | 22.00 | 22.00 | 15.00 | 37.00 | Labor Category 3 | Dare County | No | 10.30 | 10.30 | 15.00 | 25.30 | Labor Category 3 | Mt Home | No | 10.30 | 10.30 | 15.00 | 25.30 | Labor Category 3 | Grand Bay | No | 10.30 | 10.30 | 15.00 | 25.30 | Labor Category 3 | Avon Park | No | 10.30 | 10.30 | 15.00 | 25.30 | Labor Category 3 | Poinsett EC | No | 10.30 | 10.30 | 15.00 | 25.30 | Labor Category 3 | Poinsett B&G | No | 10.30 | 10.30 | 15.00 | 25.30 | Labor Category 3 |
| Labor Category 4 | Program Management | Yes | 23.00 | 23.00 | 15.00 | 38.00 | Labor Category 4 | Dare County | Yes | 10.40 | 10.40 | 15.00 | 25.40 | Labor Category 4 | Mt Home | Yes | 10.40 | 10.40 | 15.00 | 25.40 | Labor Category 4 | Grand Bay | Yes | 10.40 | 10.40 | 15.00 | 25.40 | Labor Category 4 | Avon Park | Yes | 10.40 | 10.40 | 15.00 | 25.40 | Labor Category 4 | Poinsett EC | Yes | 10.40 | 10.40 | 15.00 | 25.40 | Labor Category 4 | Poinsett B&G | Yes | 10.40 | 10.40 | 15.00 | 25.40 | Labor Category 4 |
| | | | | | | Labor Category 5 | Dare County | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 5 | Mt Home | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 5 | Grand Bay | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 5 | Avon Park | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 5 | Poinsett EC | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 5 | Poinsett B&G | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 5 |
| | | | | | | Labor Category 6 | Dare County | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 6 | Mt Home | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 6 | Grand Bay | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 6 | Avon Park | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 6 | Poinsett EC | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 6 | Poinsett B&G | Yes | 10.50 | 10.50 | 15.00 | 25.50 | Labor Category 6 |
| FFP Pricing Table - Option 1 - Program Management | | | | | | | FFP Pricing Table - Option 1 - Dare County | | | | | | | FFP Pricing Table - Option 1 - Mt Home | | | | | | | FFP Pricing Table - Option 1 - Grand Bay | | | | | | | FFP Pricing Table - Option 1 - Avon Park | | | | | | | FFP Pricing Table - Option 1 - Poinsett EC | | | | | | | FFP Pricing Table - Option 1 - Poinsett B&G | | | | | | | FFP Pricing Table - Option 1 - Holloman |
| SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CAB Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category |
| | | | 2.60% | | | | | | | 2.60% | | | | | | | 2.60% | | | | | | | 2.10% | | | | | | | 2.60% | | | | | | | 2.60% | | | | | | | 2.10% | | | |
| Labor Category 1 | Program Management | No | 20.00 | 20.52 | 15.32 | 35.84 | Labor Category 1 | Dare County | No | 10.10 | 10.36 | 15.32 | 25.68 | Labor Category 1 | Mt Home | No | 10.10 | 10.36 | 15.32 | 25.68 | Labor Category 1 | Grand Bay | No | 10.10 | 10.31 | 15.32 | 25.63 | Labor Category 1 | Avon Park | No | 10.10 | 10.36 | 15.32 | 25.68 | Labor Category 1 | Poinsett EC | No | 10.10 | 10.36 | 15.32 | 25.68 | Labor Category 1 | Poinsett B&G | No | 10.10 | 10.31 | 15.32 | 25.63 | Labor Category 1 |
| Labor Category 2 | Program Management | No | 21.00 | 21.55 | 15.32 | 36.87 | Labor Category 2 | Dare County | No | 10.20 | 10.47 | 15.32 | 25.79 | Labor Category 2 | Mt Home | No | 10.20 | 10.47 | 15.32 | 25.79 | Labor Category 2 | Grand Bay | No | 10.20 | 10.41 | 15.32 | 25.73 | Labor Category 2 | Avon Park | No | 10.20 | 10.47 | 15.32 | 25.79 | Labor Category 2 | Poinsett EC | No | 10.20 | 10.47 | 15.32 | 25.79 | Labor Category 2 | Poinsett B&G | No | 10.20 | 10.41 | 15.32 | 25.73 | Labor Category 2 |
| Labor Category 3 | Program Management | No | 22.00 | 22.57 | 15.32 | 37.89 | Labor Category 3 | Dare County | No | 10.30 | 10.57 | 15.32 | 25.89 | Labor Category 3 | Mt Home | No | 10.30 | 10.57 | 15.32 | 25.89 | Labor Category 3 | Grand Bay | No | 10.30 | 10.52 | 15.32 | 25.84 | Labor Category 3 | Avon Park | No | 10.30 | 10.57 | 15.32 | 25.89 | Labor Category 3 | Poinsett EC | No | 10.30 | 10.57 | 15.32 | 25.89 | Labor Category 3 | Poinsett B&G | No | 10.30 | 10.52 | 15.32 | 25.84 | Labor Category 3 |
| Labor Category 4 | Program Management | Yes | 23.00 | 23.00 | 15.32 | 38.32 | Labor Category 4 | Dare County | Yes | 10.40 | 10.40 | 15.32 | 25.72 | Labor Category 4 | Mt Home | Yes | 10.40 | 10.40 | 15.32 | 25.72 | Labor Category 4 | Grand Bay | Yes | 10.40 | 10.40 | 15.32 | 25.72 | Labor Category 4 | Avon Park | Yes | 10.40 | 10.40 | 15.32 | 25.72 | Labor Category 4 | Poinsett EC | Yes | 10.40 | 10.40 | 15.32 | 25.72 | Labor Category 4 | Poinsett B&G | Yes | 10.40 | 10.40 | 15.32 | 25.72 | Labor Category 4 |
| | | | | | | Labor Category 5 | Dare County | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 5 | Mt Home | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 5 | Grand Bay | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 5 | Avon Park | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 5 | Poinsett EC | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 5 | Poinsett B&G | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 5 |
| | | | | | | Labor Category 6 | Dare County | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 6 | Mt Home | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 6 | Grand Bay | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 6 | Avon Park | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 6 | Poinsett EC | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 6 | Poinsett B&G | Yes | 10.50 | 10.50 | 15.32 | 25.82 | Labor Category 6 |
| FFP Pricing Table - Option 2 - Program Management | | | | | | | FFP Pricing Table - Option 2 - Dare County | | | | | | | FFP Pricing Table - Option 2 - Mt Home | | | | | | | FFP Pricing Table - Option 2 - Grand Bay | | | | | | | FFP Pricing Table - Option 2 - Avon Park | | | | | | | FFP Pricing Table - Option 2 - Poinsett EC | | | | | | | FFP Pricing Table - Option 2 - Poinsett B&G | | | | | | | FFP Pricing Table - Option 2 - Holloman |
| SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category |
| | | | 2.70% | | | | | | | 2.70% | | | | | | | 2.70% | | | | | | | 2.70% | | | | | | | 2.70% | | | | | | | 2.70% | | | | | | | 2.70% | | | |
| Labor Category 1 | Program Management | No | 20.52 | 21.07 | 15.66 | 36.73 | Labor Category 1 | Dare County | No | 10.36 | 10.64 | 15.66 | 26.30 | Labor Category 1 | Mt Home | No | 10.36 | 10.64 | 15.66 | 26.30 | Labor Category 1 | Grand Bay | No | 10.31 | 10.59 | 15.66 | 26.25 | Labor Category 1 | Avon Park | No | 10.36 | 10.64 | 15.66 | 26.30 | Labor Category 1 | Poinsett EC | No | 10.36 | 10.64 | 15.66 | 26.30 | Labor Category 1 | Poinsett B&G | No | 10.31 | 10.59 | 15.66 | 26.25 | Labor Category 1 |
| Labor Category 2 | Program Management | No | 21.55 | 22.13 | 15.66 | 37.79 | Labor Category 2 | Dare County | No | 10.47 | 10.75 | 15.66 | 26.41 | Labor Category 2 | Mt Home | No | 10.47 | 10.75 | 15.66 | 26.41 | Labor Category 2 | Grand Bay | No | 10.41 | 10.69 | 15.66 | 26.35 | Labor Category 2 | Avon Park | No | 10.47 | 10.75 | 15.66 | 26.41 | Labor Category 2 | Poinsett EC | No | 10.47 | 10.75 | 15.66 | 26.41 | Labor Category 2 | Poinsett B&G | No | 10.41 | 10.69 | 15.66 | 26.35 | Labor Category 2 |
| Labor Category 3 | Program Management | No | 22.57 | 23.18 | 15.66 | 38.84 | Labor Category 3 | Dare County | No | 10.57 | 10.86 | 15.66 | 26.52 | Labor Category 3 | Mt Home | No | 10.57 | 10.86 | 15.66 | 26.52 | Labor Category 3 | Grand Bay | No | 10.52 | 10.80 | 15.66 | 26.46 | Labor Category 3 | Avon Park | No | 10.57 | 10.86 | 15.66 | 26.52 | Labor Category 3 | Poinsett EC | No | 10.57 | 10.86 | 15.66 | 26.52 | Labor Category 3 | Poinsett B&G | No | 10.52 | 10.80 | 15.66 | 26.46 | Labor Category 3 |
| Labor Category 4 | Program Management | Yes | 23.00 | 23.00 | 15.66 | 38.66 | Labor Category 4 | Dare County | Yes | 10.40 | 10.40 | 15.66 | 26.06 | Labor Category 4 | Mt Home | Yes | 10.40 | 10.40 | 15.66 | 26.06 | Labor Category 4 | Grand Bay | Yes | 10.40 | 10.40 | 15.66 | 26.06 | Labor Category 4 | Avon Park | Yes | 10.40 | 10.40 | 15.66 | 26.06 | Labor Category 4 | Poinsett EC | Yes | 10.40 | 10.40 | 15.66 | 26.06 | Labor Category 4 | Poinsett B&G | Yes | 10.40 | 10.40 | 15.66 | 26.06 | Labor Category 4 |
| | | | | | | Labor Category 5 | Dare County | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 5 | Mt Home | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 5 | Grand Bay | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 5 | Avon Park | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 5 | Poinsett EC | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 5 | Poinsett B&G | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 5 |
| | | | | | | Labor Category 6 | Dare County | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 6 | Mt Home | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 6 | Grand Bay | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 6 | Avon Park | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 6 | Poinsett EC | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 6 | Poinsett B&G | Yes | 10.50 | 10.50 | 15.66 | 26.16 | Labor Category 6 |
| FFP Pricing Table - Option 3 - Program Management | | | | | | | FFP Pricing Table - Option 3 - Dare County | | | | | | | FFP Pricing Table - Option 3 - Mt Home | | | | | | | FFP Pricing Table - Option 3 - Grand Bay | | | | | | | FFP Pricing Table - Option 3 - Avon Park | | | | | | | FFP Pricing Table - Option 3 - Poinsett EC | | | | | | | FFP Pricing Table - Option 3 - Poinsett B&G | | | | | | | FFP Pricing Table - Option 3 - Holloman |
| SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category |
| | | | 2.80% | | | | | | | 2.80% | | | | | | | 2.80% | | | | | | | 2.80% | | | | | | | 2.80% | | | | | | | 2.80% | | | | | | | 2.80% | | | |
| Labor Category 1 | Program Management | No | 21.07 | 21.66 | 16.02 | 37.68 | Labor Category 1 | Dare County | No | 10.64 | 10.94 | 16.02 | 26.96 | Labor Category 1 | Mt Home | No | 10.64 | 10.94 | 16.02 | 26.96 | Labor Category 1 | Grand Bay | No | 10.59 | 10.89 | 16.02 | 26.91 | Labor Category 1 | Avon Park | No | 10.64 | 10.94 | 16.02 | 26.96 | Labor Category 1 | Poinsett EC | No | 10.64 | 10.94 | 16.02 | 26.96 | Labor Category 1 | Poinsett B&G | No | 10.59 | 10.89 | 16.02 | 26.91 | Labor Category 1 |
| Labor Category 2 | Program Management | No | 22.13 | 22.75 | 16.02 | 38.77 | Labor Category 2 | Dare County | No | 10.75 | 11.05 | 16.02 | 27.07 | Labor Category 2 | Mt Home | No | 10.75 | 11.05 | 16.02 | 27.07 | Labor Category 2 | Grand Bay | No | 10.69 | 10.99 | 16.02 | 27.01 | Labor Category 2 | Avon Park | No | 10.75 | 11.05 | 16.02 | 27.07 | Labor Category 2 | Poinsett EC | No | 10.75 | 11.05 | 16.02 | 27.07 | Labor Category 2 | Poinsett B&G | No | 10.69 | 10.99 | 16.02 | 27.01 | Labor Category 2 |
| Labor Category 3 | Program Management | No | 23.18 | 23.83 | 16.02 | 39.85 | Labor Category 3 | Dare County | No | 10.86 | 11.16 | 16.02 | 27.18 | Labor Category 3 | Mt Home | No | 10.86 | 11.16 | 16.02 | 27.18 | Labor Category 3 | Grand Bay | No | 10.80 | 11.10 | 16.02 | 27.12 | Labor Category 3 | Avon Park | No | 10.86 | 11.16 | 16.02 | 27.18 | Labor Category 3 | Poinsett EC | No | 10.86 | 11.16 | 16.02 | 27.18 | Labor Category 3 | Poinsett B&G | No | 10.80 | 11.10 | 16.02 | 27.12 | Labor Category 3 |
| Labor Category 4 | Program Management | Yes | 23.00 | 23.00 | 16.02 | 39.02 | Labor Category 4 | Dare County | Yes | 10.40 | 10.40 | 16.02 | 26.42 | Labor Category 4 | Mt Home | Yes | 10.40 | 10.40 | 16.02 | 26.42 | Labor Category 4 | Grand Bay | Yes | 10.40 | 10.40 | 16.02 | 26.42 | Labor Category 4 | Avon Park | Yes | 10.40 | 10.40 | 16.02 | 26.42 | Labor Category 4 | Poinsett EC | Yes | 10.40 | 10.40 | 16.02 | 26.42 | Labor Category 4 | Poinsett B&G | Yes | 10.40 | 10.40 | 16.02 | 26.42 | Labor Category 4 |
| | | | | | | Labor Category 5 | Dare County | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 5 | Mt Home | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 5 | Grand Bay | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 5 | Avon Park | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 5 | Poinsett EC | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 5 | Poinsett B&G | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 5 |
| | | | | | | Labor Category 6 | Dare County | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 6 | Mt Home | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 6 | Grand Bay | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 6 | Avon Park | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 6 | Poinsett EC | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 6 | Poinsett B&G | Yes | 10.50 | 10.50 | 16.02 | 26.52 | Labor Category 6 |
| FFP Pricing Table - Option 4 - Program Management | | | | | | | FFP Pricing Table - Option 4 - Dare County | | | | | | | FFP Pricing Table - Option 4 - Mt Home | | | | | | | FFP Pricing Table - Option 4 - Grand Bay | | | | | | | FFP Pricing Table - Option 4 - Avon Park | | | | | | | FFP Pricing Table - Option 4 - Poinsett EC | | | | | | | FFP Pricing Table - Option 4 - Poinsett B&G | | | | | | | FFP Pricing Table - Option 4 - Holloman |
| SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category | Location | SCA/CBA Position | Prior Hourly Rate | Hourly Rate Escalated | Indirect Burdens and Profit | Burdened Labor Rate | SCA/CBA Labor Category |
| | | | 2.90% | | | | | | | 2.90% | | | | | | | 2.90% | | | | | | | 2.90% | | | | | | | 2.90% | | | | | | | 2.90% | | | | | | | 2.90% | | | |
| Labor Category 1 | Program Management | No | 21.66 | 22.29 | 16.40 | 38.69 | Labor Category 1 | Dare County | No | 10.94 | 11.26 | 16.40 | 27.66 | Labor Category 1 | Mt Home | No | 10.94 | 11.26 | 16.40 | 27.66 | Labor Category 1 | Grand Bay | No | 10.89 | 11.21 | 16.40 | 27.61 | Labor Category 1 | Avon Park | No | 10.94 | 11.26 | 16.40 | 27.66 | Labor Category 1 | Poinsett EC | No | 10.94 | 11.26 | 16.40 | 27.66 | Labor Category 1 | Poinsett B&G | No | 10.89 | 11.21 | 16.40 | 27.61 | Labor Category 1 |
| Labor Category 2 | Program Management | No | 22.75 | 23.41 | 16.40 | 39.81 | Labor Category 2 | Dare County | No | 11.05 | 11.37 | 16.40 | 27.77 | Labor Category 2 | Mt Home | No | 11.05 | 11.37 | 16.40 | 27.77 | Labor Category 2 | Grand Bay | No | 10.99 | 11.31 | 16.40 | 27.71 | Labor Category 2 | Avon Park | No | 11.05 | 11.37 | 16.40 | 27.77 | Labor Category 2 | Poinsett EC | No | 11.05 | 11.37 | 16.40 | 27.77 | Labor Category 2 | Poinsett B&G | No | 10.99 | 11.31 | 16.40 | 27.71 | Labor Category 2 |
| Labor Category 3 | Program Management | No | 23.83 | 24.52 | 16.40 | 40.92 | Labor Category 3 | Dare County | No | 11.16 | 11.48 | 16.40 | 27.88 | Labor Category 3 | Mt Home | No | 11.16 | 11.48 | 16.40 | 27.88 | Labor Category 3 | Grand Bay | No | 11.10 | 11.42 | 16.40 | 27.82 | Labor Category 3 | Avon Park | No | 11.16 | 11.48 | 16.40 | 27.88 | Labor Category 3 | Poinsett EC | No | 11.16 | 11.48 | 16.40 | 27.88 | Labor Category 3 | Poinsett B&G | No | 11.10 | 11.42 | 16.40 | 27.82 | Labor Category 3 |
| Labor Category 4 | Program Management | Yes | 23.00 | 23.00 | 16.40 | 39.40 | Labor Category 4 | Dare County | Yes | 10.40 | 10.40 | 16.40 | 26.80 | Labor Category 4 | Mt Home | Yes | 10.40 | 10.40 | 16.40 | 26.80 | Labor Category 4 | Grand Bay | Yes | 10.40 | 10.40 | 16.40 | 26.80 | Labor Category 4 | Avon Park | Yes | 10.40 | 10.40 | 16.40 | 26.80 | Labor Category 4 | Poinsett EC | Yes | 10.40 | 10.40 | 16.40 | 26.80 | Labor Category 4 | Poinsett B&G | Yes | 10.40 | 10.40 | 16.40 | 26.80 | Labor Category 4 |
| | | | | | | Labor Category 5 | Dare County | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 5 | Mt Home | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 5 | Grand Bay | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 5 | Avon Park | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 5 | Poinsett EC | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 5 | Poinsett B&G | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 5 |
| | | | | | | Labor Category 6 | Dare County | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 6 | Mt Home | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 6 | Grand Bay | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 6 | Avon Park | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 6 | Poinsett EC | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 6 | Poinsett B&G | Yes | 10.50 | 10.50 | 16.40 | 26.90 | Labor Category 6 |
This is the start of the file's text. The full file is on GovTribe.