Section 00 01 10 Table of Contents.pdf
PDF 97 KB Posted
- Attached to
- Y1DA--BLDG 500 Lighting Controls Design Build Federal contract opportunity
- Solicitation number
- 36C10F21R0035
About this file
This document contains a solicitation for a design-build construction project. The Department of Veterans Affairs, Office of Construction and Facilities Management, West Region in Palo Alto, California is seeking proposals for Solicitation Number 36C10F21R0035 to provide design and construction services for a lighting control system retrofit at Building 500 at the VA Palo Alto Healthcare Facility. The project magnitude is between $5 million to $10 million and will be set aside for a 100% Total Service-Disabled Veteran-Owned Small Business. Offerors must be registered in SAM.gov with a DUNS number and verified in VIP.gov if claiming SDVOSB or VOSB status. The successful offeror will have 150 calendar days from notice to proceed to complete both design and construction. Proposals are due in two phases and will be evaluated using best value tradeoff. The point of contact for questions is provided.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Medical Center, Palo Alto, California
Solicitation No. 36C10F21R0035
Centers for Ambulatory Care, Polytrauma & Blind Rehabilitation
Building 500 Lighting Control System Retrofit – Design Build
DESIGN BUILD DOCUMENT
4 JUNE 2021 00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets
00 11 21 Request for Proposal to Design Build
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements
01 32 16.16 Network Analysis Schedules (Design-Build Only)
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 Reference Standards
01 45 00 Quality Control
01 74 19 Construction Waste Management
01 91 00 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping
07 92 00 Joint Sealants
DIVISION 09 – FINISHES
09 91 00 Painting
DIVISION 26 – ELECTRICAL
26 00 00 Design Criteria
26 05 11 General Requirements
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 08 00 Commissioning of Electrical Systems
26 09 23 Lighting Controls
26 27 26 Wiring Devices
26 51 00 Interior Lighting
File details come from the government source that posted it. Updated .