SDF Ticketing Improvements_Table_of_Contents.pdf
PDF 714 KB Posted
- Attached to
- SDF Ticketing Improvements
- Solicitation number
- 7611
- Issued by
- Jefferson County, Kentucky
About this file
This document is a Table of Contents for the SDF Ticketing Improvements project at Louisville Muhammad Ali International Airport in Louisville, Kentucky. The project encompasses selective demolition and renovation of the Departures Ticket Hall at the airport. The Table of Contents indicates the document structure and organization of project specifications, drawings, and requirements that would guide contractors through the scope of work, technical specifications, and project deliverables necessary for bid preparation and project execution.
The specific details regarding pricing terms, contract duration, bid submission deadlines, site visit schedules, pre-bid meetings, and funding sources are not contained within this Table of Contents document itself, as it serves solely to outline the contents and organization of the broader project documentation package rather than providing substantive contract terms or administrative details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS FOR:
SDF TICKETING
LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT
LOUISVILLE REGIONAL AIRPORT AUTHORITY
700 ADMINISTRATION DRIVE
LOUISVILLE, KENTUCKY
DATE: May 2 , 2026
LRAA Project Number: C25S08
LRAA C25S08
- 1 -
TABLE OF CONTENTS
VOLUME 1
INVITATION TO BID ..............................................................................................................I-1-3
GENERAL CONDITIONS
Section 10 Definition of Terms .............................................................................................. GC-1 Section 20 Bid Requirements and Conditions ........................................................................ GC-8 Section 30 Award & Execution of Contract ........................................................................... GC-12 Section 40 Scope of Work ...................................................................................................... GC-15 Section 50 Control of Work .................................................................................................... GC-23 Section 60 Control of Materials .............................................................................................. GC-27 Section 70 Legal Relations and Responsibility to Public........................................................ GC-26 Section 80 Execution and Progress ......................................................................................... GC-33 Section 90 Measurement and Payment .................................................................................. GC-40
SPECIAL CONDITIONS
Section I: General
1. Indemnification and Insurance ....................................................................................... SC-1
2. Pre-construction Conference .......................................................................................... SC-2
3. Construction Progress Schedule .................................................................................... SC-3
4. Contract Time. ................................................................................................................ SC-3
5. Liquidated Damages ...................................................................................................... SC-3
6. Warranty ........ ................................................................................................................ SC-3
7. Subcontractors ................................................................................................................ SC-4
8. Notice of Labor Disputes ............................................................................................... SC-4
9. Access to Airport Restricted Areas and Construction Limits ....................................... SC-5
10. Mobilization, Access and Safety ................................................................................... SC-7
11. Contractor's Storage Area .............................................................................................. SC-7
12. Protection and Repair of Existing Power and Control Cables ...................................... SC-8
13. Independent Contractor Status ....................................................................................... SC-8
14. Kentucky Derby Shutdown............................................................................................. SC-9
15. Pre-Construction Approvals............................................................................................ SC-9
16. As-Built Drawings .......................................................................................................... SC-10
17. Safety Plan ..... ................................................................................................................ SC-11
Section II: Wage and Labor Requirements
1. Minimum Wages (Intentionally Left Blank).................................................................. SC-15
2. Withholding.... (Intentionally Left Blank) ...................................................................... SC-15
3. Payrolls and Basic Records (Intentionally Left Blank) ................................................. SC-15
4. Apprentices, Trainees, and Helpers (Intentionally Left Blank) .................................... SC-15
5. Compliance with Copeland Act Requirements (Intentionally Left Blank) ................... SC-15
- 2 -
LRAA C25S08
Section III: Equal Employment Opportunity, Nondiscrimination, and Affirmative Action Requirements
1. Equal Employment Opportunity Clause (Intentionally Left Blank).............................. SC-17
2. Standard Federal Equal Employment Opportunity
Construction Contract Specifications (Intentionally Left Blank)................................ SC-17
3. Notices to be Posted (Intentionally Left Blank) ............................................................. SC-17
4. General Civil Rights Provisions...................................................................................... SC-17
5. Title VI Assurances......................................................................................................... SC-17
6. Title VI List of Pertinent Nondiscrimination Authorities ……........................................ SC-16
7. Notice of Requirement for Affirmative Action (ILB) ………………………................... SC-19
8. Affirmative Action Plan (Intentionally Left Blank)....................................................... SC-19
9. Required Reports (ILB)……………………................................................................. SC-19
10. Requirement for Certification of Non-Segregated Facilities (Intentionally Left Blank)...... SC-19
Section IV: Disadvantaged Business Enterprise Program
1. Definition ...... ................................................................................................................ SC-20
2. Policy ............. ................................................................................................................ SC-20
3. DBE Obligation .............................................................................................................. SC-20
4. Contract Assurance......................................................................................................... SC-20
5. Prompt Payment.............................................................................................................. SC-20
6. Subcontract Clause.......................................................................................................... SC-20
7. DBE Participation Goals ................................................................................................ SC-20
8. Available DBEs .............................................................................................................. SC-20
9. Bidder's Required Submission ....................................................................................... SC-20
10. Goals............... ................................................................................................................ SC-20
11. Bid Information Submitted as a Matter of Responsiveness ........................................... SC-20
Section V: Miscellaneous Requirements
1. Consent to Assignment...................................................................................................SC-21
2. Convict Labor ................................................................................................................ SC-21
3. Veterans Preference (Intentionally Left Blank).............................................................. SC-21
4. Subcontracts .. ................................................................................................................ SC-21
5. Clean Air and Water Pollution Control Requirements for All Construction Contracts and Subcontracts Exceeding $100,000 (Intentionally Left Blank) .................................... SC-21
LRAA C25S08
6. Contract Termination; Debarment (Intentionally Left Blank) ....................................... SC-15
7. Compliance with Davis-Bacon and Related Act Requirements (Intentionally Left Blank) SC-15
8. Disputes Concerning Labor Standards (Intentionally Left Blank)................................. SC-15
9. Certification of Eligibility (Intentionally Left Blank) ................................................... SC-15
10. Overtime Requirement ................................................................................................... SC-15
11. Violations: Liability for Unpaid Wages; Liquidated Damages..................................... SC-15
12. Withholding for Unpaid Wages and Liquidated Damages (Intentionally Left Blank) . SC-15
13. Working Conditions ....................................................................................................... SC-16
14. Fair Labor Standards Act ................................................................................................ SC-16
15. Subcontracts (Intentionally Left Blank) ......................................................................... SC-16
-3 -
TECHNICAL SPECIFICATIONS
Bid Form .................................................................................................................... . BF-1-7
Bidder's Experience and Qualifications Questionnaire .............................................................. Q-1-8
Contract ............... ................................................................................................................ C-1-8
ATTACHMENTS
Disclosure of Lobbying Activities (Intentionally Left Blank) ...................................... Attachment #1
Work Alteration Cost Analysis .................................................................................... Attachment #2
Contractor Guide ......................................................................................................... Attachment #3
Sworn Statement of Final Payment .............................................................................. Attachment #4
Release and Waiver of Lien ......................................................................................... Attachment #5
Subcontractor or Vendor Release of Lien for Progress Payment ................................................................................................... Attachment #6
Contract Bid Question and Answer Form .................................................................... Attachment #7
Bid Bond… ................................................................................................................. Attachment #8
Performance Bond ....................................................................................................... Attachment #9
Payment Bond… ......................................................................................................... Attachment #10
Monthly Utilization (257) Report Form (Intentionally Left Blank) ............................... Attachment #11
Payment Request Form ............................................................................................... Attachment #12
Sample Insurance Certificates ...................................................................................... Attachment #13
Form W9 Request for Taxpayer Identification Number and Certification ..................... Attachment# 14
-4 -
VOLUME 2
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 Summary 01 21 00 Allowances 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 60 00 Product Requirements 01 73 00 Execution 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training
DIVISION 02 – EXISTING CONDITIONS
02 41 19 Selective Structure Demolition
DIVISION 05 – METALS
05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 70 00 Decorative Metal
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry 06 41 00 Architectural Wood Casework 06 61 19 Quartz Surfacing Fabrications
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 81 00 Applied Fireproofing 07 84 00 Firestopping 07 90 00 Joint Protection 07 95 00 Expansion Control
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 71 00 Door Hardware 08 81 13 Decorative Glass Glazing
DIVISION 09 – FINISHES
09 21 16 Gypsum Board Assemblies 09 30 00 Tile 09 51 13 Acoustical Panel Ceilings 09 65 00 Resilient Flooring 09 66 23 Resinous Matrix Terrazzo 09 68 13 Carpet Tile 09 70 00 Wall Finishes 09 90 00 Painting and Coating
-5 -
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 10 44 00 Fire Protection Specialties
DIVISION 11 – EQUIPMENT
11 21 43 Weighing and Wrapping Equipment
DIVISION 12 – FURNISHINGS
12 36 19 Wood Countertops
DIVISIONS 15 TO 20 – NOT USED
VOLUME 3
DIVISION 21 – FIRE PROTECTION
21 05 00 Common Work Results For Fire Suppression 21 05 23 General Duty Valves For Water-Based Fire-Suppression Piping 21 05 29 Hangers And Supports For Fire Supression Piping And Equipment 21 05 53 Identification For Fire Supression Piping And Equipment 21 10 00 Water-Based Fire Suppression Systems 21 22 00 Clean Agent Fire-Extinguishing Systems
DIVISION 22 – PLUMBING
22 05 00 Common Work Results for Plumbing 22 05 23 General Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing, Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 11 16 Domestic Water Piping 22 13 16 Sanitary Waste and Vent Piping 22 33 00 Electric, Domestic-Water Heater
DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 00 Common Work Results for HVAC 23 05 23 General Duty Valves for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, And Balancing For HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 08 00 Commissioning of HVAC 23 21 13 Hydronic Piping 23 21 16 Hydronic Piping Specialties 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories 23 36 00 Air Terminal Units 23 37 13 Air Grilles, Registers, And Diffusers 23 81 46 Water-Source Unitary Heat Pumps
DIVISION 24 – NOT USED
-6 -
DIVISION 25 – INTEGRATED AUTOMATION
25 05 00 Common Work Results for Integrated Automation 25 10 00 Integrated Automation Network Equipment 25 31 00 Integrated Automation Instrumentation and Terminal Devices 25 90 00 Integrated Automation Control Sequences
DIVISION 26 – ELECTRICAL
26 05 19 Low-Voltage Electrical Power Conductors And Cables 26 05 20 Hangers and Supports
26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33.13 Conduits for Electrical Systems 26 05 33.16 Boxes and Covers for Electrical Systems 26 05 53 Identification for Electrical Systems 26 22 13 Low-Voltage Distribution Transformers 26 24 16 Panelboards 26 27 26 Wiring Devices 26 50 00 Lighting
DIVISION 27 – COMMUNICATIONS
27 00 00 Communications General Requirements 27 05 05 Selective Telecommunications Demolition 27 05 26 Grounding and Bonding for Communications Systems 27 05 28 Pathways for Communications Systems 27 05 29 Hangers and Supports for Communications Systems 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and Cabling 27 05 53 Identification for Communications Systems 27 11 00 Communications Room Equipment 27 11 26 Communications Power Distribution Units 27 13 13 Communications Copper Backbone Cabling 27 13 23 Communications Optical Fiber Backbone Cabling 27 15 13 Communications Copper Horizontal Cabling 27 33 53 Uninterruptible Power Supply 27 40 01 MUFIDs - Extension of Existing 27 51 16 Public Address System
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 00 00 Electronic Safety and Security General Requirements 28 05 13 Conductors and Cables for Electronic Security 28 13 00 Access Control Software and Database Management 28 15 00 Access Control Hardware Devices 28 21 00 Video Surveillance Hardware 28 23 00 Video Management System 28 31 00 Fire Alarm and Detection
DIVISION 29-33– NOT USED
DIVISION 34 – TRANSPORTATION
34 77 39.01 Baggage Handling System Vasic Requirements 34 77 39.05 Baggage Handling System Equipment Metal Fabrications 34 77 39.09 Baggage Handling System Equipment Painting and Protective Coatings 34 77 39.19 Baggage Handling System Conveying Equipment 34 77 39.23 Baggage Handling System Electrical Requirements 34 77 39.24 Baggage Handling System Controls and Instrumentation 34 77 39.25 Baggage Handling System Sequence of Operation 34 77 39.28 Baggage Handling System Commissioning
LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT
LOUISVILLE REGIONAL AIRPORT AUTHORITY
700 ADMINISTRATION DRIVE
LOUISVILLE, KENTUCKY
Louisville Regional Airport Authority 08 May 2026 Ticketing Renovation Issued for Bid
Alliiance 00 01 10-1 Table of Contents Comm. No. 2024054-03
SECTION 00 01 10
TABLE OF CONTENTS
VOLUME 1
INVITATION TO BID
GENERAL CONDITIONS
Section 10 Definition of Terms Section 20 Bid Requirements and Conditions Section 30 Award & Execution of Contract Section 40 Scope of Work Section 50 Control of Work Section 60 Control of Materials Section 70 Legal Relations and Responsibility to Public Section 80 Prosecution and Progress Section 90 Measurement and Payment
SPECIAL CONDITIONS
Section I General Section II Wage and Labor Requirements Section III Equal Employment Opportunity, Nondiscrimination, and Affirmative Action Requirements Section IV Disadvantaged Business Enterprise Program Section V Miscellaneous Requirements
TECHNICAL SPECIFICATIONS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 01 Title and Certification 00 01 10 Table of Contents
VOLUME 2
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 21 00 Allowances 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 60 00 Product Requirements 01 73 00 Execution 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training
DIVISION 02 EXISTING CONDITIONS
02 41 19 Selective Structure Demolition
Alliiance 00 01 10-2 Table of Contents
DIVISION 05 METALS
05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 70 00 Decorative Metal
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry 06 41 00 Architectural Wood Casework 06 61 19 Quartz Surfacing Fabrications
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 81 00 Applied Fireproofing 07 84 00 Firestopping 07 90 00 Joint Protection 07 95 00 Expansion Control
DIVISION 08 OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 71 00 Door Hardware 08 81 13 Decorative Glass Glazing
DIVISION 09 FINISHES
09 21 16 Gypsum Board Assemblies 09 30 00 Tile 09 51 13 Acoustical Panel Ceilings 09 65 00 Resilient Flooring 09 66 23 Resinous Matrix Terrazzo 09 68 13 Carpet Tile 09 70 00 Wall Finishes 09 90 00 Painting and Coating
DIVISION 10 SPECIALTIES
10 26 00 Wall and Door Protection 10 44 00 Fire Protection Specialties
DIVISION 11 EQUIPMENT
11 21 43 Weighing and Wrapping Equipment
DIVISION 12 FURNISHINGS
12 36 19 Wood Countertops
DIVISIONS 15 TO 20 NOT USED
Alliiance 00 01 10-3 Table of Contents
VOLUME 3
DIVISION 21 FIRE PROTECTION
21 05 00 Common Work Results For Fire Suppression 21 05 23 General Duty Valves For Water-Based Fire-Suppression Piping 21 05 29 Hangers And Supports For Fire Supression Piping And Equipment 21 05 53 Identification For Fire Supression Piping And Equipment 21 10 00 Water-Based Fire Suppression Systems 21 22 00 Clean Agent Fire-Extinguishing Systems
DIVISION 22 PLUMBING
22 05 00 Common Work Results for Plumbing 22 05 23 General Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing, Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 11 16 Domestic Water Piping 22 13 16 Sanitary Waste and Vent Piping 22 33 00 Electric, Domestic-Water Heater
DIVISION 23 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 00 Common Work Results for HVAC 23 05 23 General Duty Valves for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, And Balancing For HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 08 00 Commissioning of HVAC 23 21 13 Hydronic Piping 23 21 16 Hydronic Piping Specialties 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories 23 36 00 Air Terminal Units 23 37 13 Air Grilles, Registers, And Diffusers 23 81 46 Water-Source Unitary Heat Pumps
DIVISION 24 NOT USED
DIVISION 25 INTEGRATED AUTOMATION
25 05 00 Common Work Results for Integrated Automation 25 10 00 Integrated Automation Network Equipment 25 31 00 Integrated Automation Instrumentation and Terminal Devices 25 90 00 Integrated Automation Control Sequences
DIVISION 26 ELECTRICAL
26 05 19 Low-Voltage Electrical Power Conductors And Cables 26 05 20 Hangers and Supports
Alliiance 00 01 10-4 Table of Contents
26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33.13 Conduits for Electrical Systems 26 05 33.16 Boxes and Covers for Electrical Systems 26 05 53 Identification for Electrical Systems 26 22 13 Low-Voltage Distribution Transformers 26 24 16 Panelboards 26 27 26 Wiring Devices 26 50 00 Lighting
DIVISION 27 COMMUNICATIONS
27 00 00 Communications General Requirements 27 05 05 Selective Telecommunications Demolition 27 05 26 Grounding and Bonding for Communications Systems 27 05 28 Pathways for Communications Systems 27 05 29 Hangers and Supports for Communications Systems 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and Cabling 27 05 53 Identification for Communications Systems 27 11 00 Communications Room Equipment 27 11 26 Communications Power Distribution Units 27 13 13 Communications Copper Backbone Cabling 27 13 23 Communications Optical Fiber Backbone Cabling 27 15 13 Communications Copper Horizontal Cabling 27 33 53 Uninterruptible Power Supply 27 40 01 MUFIDs - Extension of Existing 27 51 16 Public Address System
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 00 00 Electronic Safety and Security General Requirements 28 05 13 Conductors and Cables for Electronic Security 28 13 00 Access Control Software and Database Management 28 15 00 Access Control Hardware Devices 28 21 00 Video Surveillance Hardware 28 23 00 Video Management System 28 31 00 Fire Alarm and Detection
DIVISION 29-33 NOT USED
DIVISION 34 TRANSPORTATION
34 77 39.01 Baggage Handling System Vasic Requirements 34 77 39.05 Baggage Handling System Equipment Metal Fabrications 34 77 39.09 Baggage Handling System Equipment Painting and Protective Coatings 34 77 39.19 Baggage Handling System Conveying Equipment 34 77 39.23 Baggage Handling System Electrical Requirements 34 77 39.24 Baggage Handling System Controls and Instrumentation 34 77 39.25 Baggage Handling System Sequence of Operation
END OF SECTION
LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT
LOUISVILLE REGIONAL AIRPORT AUTHORITY
700 ADMINISTRATION DRIVE
LOUISVILLE, KENTUCKY
Alliiance 00 01 10-1 Table of Contents
SECTION 00 01 10
TABLE OF CONTENTS
VOLUME 1
INVITATION TO BID
GENERAL CONDITIONS
Section 10 Definition of Terms Section 20 Bid Requirements and Conditions Section 30 Award & Execution of Contract Section 40 Scope of Work Section 50 Control of Work Section 60 Control of Materials Section 70 Legal Relations and Responsibility to Public Section 80 Prosecution and Progress Section 90 Measurement and Payment
SPECIAL CONDITIONS
Section I General Section II Wage and Labor Requirements Section III Equal Employment Opportunity, Nondiscrimination, and Affirmative Action Requirements Section IV Disadvantaged Business Enterprise Program Section V Miscellaneous Requirements
TECHNICAL SPECIFICATIONS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 01 Title and Certification 00 01 10 Table of Contents
VOLUME 2
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 21 00 Allowances 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 60 00 Product Requirements 01 73 00 Execution 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training
DIVISION 02 EXISTING CONDITIONS
02 41 19 Selective Structure Demolition
Alliiance 00 01 10-2 Table of Contents
DIVISION 05 METALS
05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 70 00 Decorative Metal
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry 06 41 00 Architectural Wood Casework 06 61 19 Quartz Surfacing Fabrications
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 81 00 Applied Fireproofing 07 84 00 Firestopping 07 90 00 Joint Protection 07 95 00 Expansion Control
DIVISION 08 OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 71 00 Door Hardware 08 81 13 Decorative Glass Glazing
DIVISION 09 FINISHES
09 21 16 Gypsum Board Assemblies 09 30 00 Tile 09 51 13 Acoustical Panel Ceilings 09 65 00 Resilient Flooring 09 66 23 Resinous Matrix Terrazzo 09 68 13 Carpet Tile 09 70 00 Wall Finishes 09 90 00 Painting and Coating
DIVISION 10 SPECIALTIES
10 26 00 Wall and Door Protection 10 44 00 Fire Protection Specialties
DIVISION 11 EQUIPMENT
11 21 43 Weighing and Wrapping Equipment
DIVISION 12 FURNISHINGS
12 36 19 Wood Countertops
DIVISIONS 15 TO 20 NOT USED
Alliiance 00 01 10-3 Table of Contents
VOLUME 3
DIVISION 21 FIRE PROTECTION
21 05 00 Common Work Results For Fire Suppression 21 05 23 General Duty Valves For Water-Based Fire-Suppression Piping 21 05 29 Hangers And Supports For Fire Supression Piping And Equipment 21 05 53 Identification For Fire Supression Piping And Equipment 21 10 00 Water-Based Fire Suppression Systems 21 22 00 Clean Agent Fire-Extinguishing Systems
DIVISION 22 PLUMBING
22 05 00 Common Work Results for Plumbing 22 05 23 General Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing, Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 11 16 Domestic Water Piping 22 13 16 Sanitary Waste and Vent Piping 22 33 00 Electric, Domestic-Water Heater
DIVISION 23 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 00 Common Work Results for HVAC 23 05 23 General Duty Valves for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, And Balancing For HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 08 00 Commissioning of HVAC 23 21 13 Hydronic Piping 23 21 16 Hydronic Piping Specialties 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories 23 36 00 Air Terminal Units 23 37 13 Air Grilles, Registers, And Diffusers 23 81 46 Water-Source Unitary Heat Pumps
DIVISION 24 NOT USED
DIVISION 25 INTEGRATED AUTOMATION
25 05 00 Common Work Results for Integrated Automation 25 10 00 Integrated Automation Network Equipment 25 31 00 Integrated Automation Instrumentation and Terminal Devices 25 90 00 Integrated Automation Control Sequences
DIVISION 26 ELECTRICAL
26 05 19 Low-Voltage Electrical Power Conductors And Cables 26 05 20 Hangers and Supports
Alliiance 00 01 10-4 Table of Contents
26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33.13 Conduits for Electrical Systems 26 05 33.16 Boxes and Covers for Electrical Systems 26 05 53 Identification for Electrical Systems 26 22 13 Low-Voltage Distribution Transformers 26 24 16 Panelboards 26 27 26 Wiring Devices 26 50 00 Lighting
DIVISION 27 COMMUNICATIONS
27 00 00 Communications General Requirements 27 05 05 Selective Telecommunications Demolition 27 05 26 Grounding and Bonding for Communications Systems 27 05 28 Pathways for Communications Systems 27 05 29 Hangers and Supports for Communications Systems 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and Cabling 27 05 53 Identification for Communications Systems 27 11 00 Communications Room Equipment 27 11 26 Communications Power Distribution Units 27 13 13 Communications Copper Backbone Cabling 27 13 23 Communications Optical Fiber Backbone Cabling 27 15 13 Communications Copper Horizontal Cabling 27 33 53 Uninterruptible Power Supply 27 40 01 MUFIDs - Extension of Existing 27 51 16 Public Address System
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 00 00 Electronic Safety and Security General Requirements 28 05 13 Conductors and Cables for Electronic Security 28 13 00 Access Control Software and Database Management 28 15 00 Access Control Hardware Devices 28 21 00 Video Surveillance Hardware 28 23 00 Video Management System 28 31 00 Fire Alarm and Detection
DIVISION 29-33 NOT USED
DIVISION 34 TRANSPORTATION
34 77 39.01 Baggage Handling System Vasic Requirements 34 77 39.05 Baggage Handling System Equipment Metal Fabrications 34 77 39.09 Baggage Handling System Equipment Painting and Protective Coatings 34 77 39.19 Baggage Handling System Conveying Equipment 34 77 39.23 Baggage Handling System Electrical Requirements 34 77 39.24 Baggage Handling System Controls and Instrumentation 34 77 39.25 Baggage Handling System Sequence of Operation
END OF SECTION
| Toc |
| Toc 2 |
| Toc 3 |
File details come from the government source that posted it. Updated .