This is Addendum Number 2 to contract documents for the SDF Ticketing Improvements project issued by the Louisville Regional Airport Authority for the renovation of the Departures Ticket Hall at Louisville Muhammad Ali International Airport in Louisville, Kentucky. The addendum extends the bid period to June 30, 2026 at 10:00 AM and revises the project completion date from April 29, 2027 to April 29, 2029. Significant specification and drawing changes include revisions to hollow metal doors and frames, addition of metal lockers (30 total 3-tier units), modifications to weighing and wrapping equipment specifications, updates to communications room equipment with deletion of 2-post racks and addition of 4-post racks, and complete revision of multi-use flight information display systems requirements with deletion of all DDC and software requirements. Drawing revisions address temporary ticket counter and scale layout, addition of temporary construction elements including doors for bag portering, reconfiguration of temporary breakrooms and offices with new amenities, and updates to communications room floor plans and rack elevations.

The addendum modifies liquidated damages clarifications and updates multiple technical specifications across sections including hollow metal doors and frames, metal lockers, weighing equipment with standard 24"x24" temporary scales, communications room equipment with specific rack and cabinet requirements, and flight information display systems. Project phasing is organized into multiple phases with temporary conditions to support ongoing airport operations, including provisions for temporary ticket counters with scales, temporary breakrooms with appliances and lockers, temporary offices with power and data, and temporary wall systems. The contractor is responsible for coordinating work with airport operations to minimize disruption, providing detailed installation schedules, maintaining system uptime of 99.99 percent during the warranty period, and delivering complete documentation including as-built drawings and operation manuals upon project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER 2

SDF TICKETING IMPROVEMENTS

LRAA PROJECT #C25S08

LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT

June 19, 2026

This Addendum Number 2, consisting of fifty three (53) pages, is issued in connection with the above-described Contract Documents. The Louisville Regional Airport Authority, pursuant to provisions contained in said Documents, hereby advises all interested parties that changes have been made to the Contract Documents as follows:

The Bid Period has been Extended to June 30, 2026 at 10:00AM

No other changes are made to the bid process relating to submittal method

1. Specifications

a. Section 3 General Provisions, 80-08 Failure to Complete On Time

i. Revise Project Completion from April 29, 2027 to April 29, 2029

b. Section 3 General Provisions, 80-08 Failure to Complete On Time

i. Revise tables to clarify daily liquidated damages

c. Section 08 11 13 Hollow Metal Doors and Frames

i. Replace in its entirety (attached)

1. address exterior and interior doors

d. Section 10 51 13 Metal Lockers

i. Add Specification to Project (attached)

e. Section 11 21 43 Weighing and Wrapping Equipment

i. Replace in its entirety (attached) to address:

1. Addition of temporary scale size

2. Clarification to quantity of attic stock displays

f. Section 27 11 00 Communications Room Equipment

1. Deleted 2-post racks.

2. Added 4-post racks.

g. Section 27 40 01 Multi-Use Flight Information Displays

1. Deleted all DDC and software requirements.

2. Revised Display requirements.

2. Drawings

a. Sheet g0.12

i. Replace Sheet in its entirety (attached) to address:

1. Revision to orientation and layout of temporary ticket counters and scales

2. Addition of temporary ticket counters and scales. Elimination of single counters for new layout to be all double counters.

3. Revision of temporary scales from being relocated from existing to being provided by project. Temporary scale size to be standard 24”x24”.

4. Revision to quantity of temporary scales

5. Electrical and telecom drawings not provided. Provide additional electrical and data to support additional temporary ticket counters and scales. Relocate power and data to new orientation and layout

6. Addition of removal of one panel of curtainwall at Vestibules 2 and 3 with the addition of temporary construction wall and door to allow portering of bags.

7. Removal, salvage and reinstallation of two existing recharge counters.

8. Clarification that temporary kiosk relocation quantities vary by airline and are indicated in specifications

9. Indication of changes to temporary breakrooms and offices as covered on g0.13

10. Addition of temporary doors for new temporary offices

11. Clarification to which walls are to be temporary stud and gyp bd walls versus temporary construction walls. Stud walls are indicated with a wall tag. All other walls to be construction temporary walls systems.

12. General renumbering of views and relocation of temporary counter details to sheet g0.13

b. Sheet g0.13

1. Reconfiguration of Temporary Breakrooms and Office

2. Addition of two Temporary Offices. Provide power and data as indicated at other temporary offices

3. Addition of stud and gyp bd temporary wall on north side of space

Additional work at each Temporary Breakroom:

4. Addition of metal lockers (30) total 3-tier 15”x15”x6’ metal lockers.

5. Relocation of Airline FID displays above lockers

6. Removal of relocation requirement and addition of apartment size refrigerator to be provided by project. Model and make indicated in drawings

7. Addition of microwave oven to be provided by project. Model and make indicated in drawings

8. Reduction in size of millwork from 6’ to 5’

9. Provide power for microwave, coffee maker, frig, two FID displays and two workstations (not shown-duplex at each)

10. Provide data for two FID displays and two workstations (not shown-duplex at each)

11. Provide waterline from sink to coffee maker Relocation of temporary counter details from sheet g0.12 Clarification to millwork requirements at temporary counters

12. Indication on sheet of revisions to temporary counters as documented on sheet g0.12

c. Sheet t4.01 Communications Room L238E

1. Deleted equipment dimensions from floor plans.

d. Sheet t4.02 Communications Room L238E Rack Elevations

1. Added Keynote 9.

e. Sheet t4.03 Communications Room L225D1

1. Deleted equipment dimensions from floor plans.

f. Sheet t4.04 Communications Room L225D1 Rack Elevations

1. Added Keynote 9.

g. Sheet t7.02 Telecom Schedules

1. Revised UPS schedule with correct UPS part number.

3. Contractor’s Questions and Responses are attached.

Attachments:

1. Specifications

• 08 11 13 Hollow Metal Doors and Frames

• 10 51 13 Metal Lockers

• 11 21 43 Weighing and Wrapping Equipment

• 27 11 00 Communications Room Equipment

• 27 40 01 Multi-Use Flight Information Display Systems

2. Drawings

• G0-12 Phasing Plans - Phase 1 and 2

• G0-13 Phasing Plans – Phase 3

• T4.01 Communications Room L238E

• T4.02 Communications Room L238E Rack Elevations

• T4.03 Communications Room L225D1

• T4.04 Communications Room L225D1 Rack Elevations

• T7.02 Telecom Schedules

3. Reference Materials

• Plan Sheet E-7.1 – Electrical Riser Diagram – Commercial Power

• Plan Sheet E-7.1 – Electrical Riser Diagram – Emergency Power

4. SDF Campus Map

5. Contractor’s Questions and Responses (10 Pages)

LOUISVILLE REGIONAL AIRPORT AUTHORITY

KYLE HARTLAGE, P.E.

Vice President

Louisville Regional Airport Authority 08 May 2026 Ticketing Renovation Issued for Bid in Add 02 06-18-26

Alliiance 08 11 13-1 Hollow Metal Doors and Frames Comm. No. 2024054-03

SECTION 08 11 13

HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes:

1. Non-rated and Fire-rated steel doors

2. Non-rated and Fire-rated steel door frames.

B. Related Sections

1. Section 08 71 00 – Hardware: Door hardware and weather-stripping.

2. Section 09 21 16 – Gypsum Board Systems.

3. Section 09 90 00 – Painting: Field finishing of doors and frames.

1.2 REFERENCES

A. Department of Justice (DOJ):

1. ADAAG – Americans with Disabilities Act Accessibility Guidelines.

B. American National Standards Institute (ANSI)

1. ANSI 224.1 – Test Procedure and Acceptance Criteria for Prime Painted Steel

Surfaces for Steel Doors and Frames.

2. ANSI 250.8 – Recommended Specifications for Standard Steel Doors and Frames.

C. ASTM International:

1. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated

(Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

2. ASTM C1363 - Standard Test Method for Thermal Performance of Building Materials and Envelope Assemblies

3. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building

Materials

4. ASTM E413 - Classification for Rating Sound Insulation.

D. National Fire Protection Association (NFPA)

1. NFPA 80 – Standard for Fire Doors and Windows.

2. NFPA 105 – Standard for the Installation of Smoke Door Assemblies and other

Opening Protectives.

3. NFPA 252 – Standard Methods of Fire Tests for Door Assemblies.

E. Underwriters Laboratories Inc.:

1. UL 10B - Fire Tests of Door Assemblies.

2. UL 10C - Positive Pressure Fire Tests of Door Assemblies.

3. UL 1784 - Air Leakage Tests of Door Assemblies.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Submittal procedures.

B. Product Data: Submit door and frame configurations, location of cut-outs for hardware reinforcement.

C. Shop Drawings: Indicate door and frame elevations, internal reinforcement and finishes

Alliiance 08 11 13-2 Hollow Metal Doors and Frames

D. Installation Instructions: Submit manufacturer's installation instructions.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with ANSI 250.8 and DHI - Door Hardware Institute - The Installation of Commercial Steel Doors and Steel Frames, Insulated Steel Doors in Wood Frames and Builder's Hardware.

B. Fire Rated Door Construction: Conform to NFPA 252. Where required by code, provide rated openings with labeled units listed by UL or Warnock Hersey.

C. Fire Rated Stair Doors: Rate of rise of 450 degrees F across door thickness.

D. Installed Fire Rated Door Assembly: Conform to NFPA 80 for fire rated class as indicated on Drawings.

E. Attach label from agency approved by authority having jurisdiction to identify each fire rated door.

1. Indicate temperature rise rating for stair doors.

F. Surface Burning Characteristics:

1. Foam Insulation: Maximum 75/450-flame spread/smoke developed index when tested in accordance with ASTM E84.

G. Apply label from agency approved by authority having jurisdiction to identify each foam plastic insulation material.

1.5 DELIVERY, STORAGE AND PROTECTION

A. Protect products under provisions of Section 01 60 00 – Product Requirements.

B. Protect doors with resilient packaging sealed with heat shrunk plastic,or accept doors on site in manufacturer’s packaging. Inspect for damage.

1. Break seal on site to permit ventilation.

1.6 FIELD MEASUREMENTS

A. When re-using existing doors, replacing doors in existing frames, or replacing hardware on existing doors, field verify all existing doors, frames and hardware prior to manufacturing of any doors, frames and hardware.

PART 2 - PRODUCTS

2.1 STEEL DOORS AND FRAMES

A. Acceptable Manufacturers:

1. Ceco Door Products.

2. Curries Company

3. Pioneer Industries.

4. Republic Builders Products.

5. Steelcraft.

6. Substitutions: Under provisions of Section 01 60 00 – Product Requirements.

B. Product Description: Standard shop fabricated steel doors, and frames; fire rated and non-rated types; flush face.

Alliiance 08 11 13-3 Hollow Metal Doors and Frames

2.2 STEEL DOORS AND FRAMES

A. Standard Interior Doors (Fire Rated and Non-Rated): ANSI A250.8, 1-3/4 inch thick.

1. Level 2 - Heavy Duty, with minimum 18 gauge cold-rolled steel sheet faces; Model 1, full flush design.

B. Interior Doors in heavy abuse locations (Non-Rated): ANSI A250.8, 1-3/4 inch thick.

1. Level 3 - Extra heavy Duty, with minimum 16 gauge galvanized steel sheet faces;

Model 1, full flush design.

C. Interior Frames:

1. Nominal 16 gage/0.053 inch thick sheet steel with mitered or coped, continuously welded corners. For use with Level 2 or 3 doors.

2.3 COMPONENTS

A. Door Core: Internal core shall be manufacturer’s standard resin-impregnated paper honeycomb, rigid polystyrene (ASTM C578), unitized steel grid, vertical steel stiffeners, or rigid mineral fiber core.

2.4 ACCESSORIES

A. Door Silencers: Ives SR64, or equivalent, molded, non-staining resilient rubber; fitted into drilled holes in frame.

B. Undercoating: For coating the inside face of frames requiring corrosion resistance including exterior frames, and frames that are filled with grout.

1. Provide water-based, VOC- free asphaltic coating that is spray applied and approved for use with UL and WH fire rated frames.

C. Primer: ANSI A250.10 rust inhibitive type.

D. Supports and Anchors: Fabricate from not less than 0.0478 inch (1.2 mm) thick steel sheet;

0.0516 inch (1.3 mm) thick galvanized steel where used with galvanized frames.

E. Inserts, Bolts, and Exposed Fasteners: Manufacturer’s standard units. Where items are to be built into exterior walls, hot-dip galvanize complying with ASTM A153, Class C or D, as applicable. Unless otherwise indicated, provide countersunk flat heads for exposed screws and bolts.

2.5 FABRICATION

A. Prepare doors to receive mortised and concealed hardware according to final door hardware schedule and templates provided by hardware supplier. Fabricate doors and frames with hardware reinforcement welded in place. Where frames are scheduled to be filled with grout, protect frame hardware preparations with mortar guard boxes. Comply with applicable requirements of ANSI A115 specifications for door and frame preparation for hardware.

B. Fabricate frames as slip-on units for gypsum board partitions.

C. Prepare interior frames for silencers and install.

D. Attach fire rating label to each fire rated door and frame.

Alliiance 08 11 13-4 Hollow Metal Doors and Frames

E. Provide nonremovable stops on “outside” face of doors for glass, louvers, and other door panels. Unless noted otherwise on Drawings, provide screw-applied, removable glazing beads or stops on “inside” face of door.

2.6 SHOP FINISHING

A. Surface Preparation: Doors and Frames are to be thoroughly cleaned and chemically treated to remove dirt, oil, grease, and other contaminants that could impair paint adhesion.

B. Primer: All surfaces of the door and frame exposed to view shall receive a factory applied coat of rust inhibiting primer, either air dried or baked on, which complies with ANSI A224.1 acceptance criteria, and is compatible with field finish paint systems specified in Section 09 90 00.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify opening sizes and tolerances are acceptable.

3.2 INSTALLATION

A. Install doors and frames in accordance with ANSI A250.8.

B. Coordinate doorframes with gypsum board wall construction for frame anchor placement.

Refer to Drawings for partition types.

C. Grout frames solid when located in masonry or concrete walls.

1. To facilitate the installation and maintenance of closers, secure one-inch rigid foam insulation at the head of the frame at the closer mounting location prior to filling the frame with grout.

D. Screw, bolt, or weld anchors for frames steel stud partition systems to both flanges of studs.

Attach floor clips with two bolts or power-driven anchors per clip. Conceal exposed fasteners in frames.

E. Coordinate installation of doors and frames with installation of hardware specified in Section 08 71 00.

F. Install roll formed steel reinforcement channels between two abutting frames. Anchor to structure and floor.

G. Install door louvers plumb and level.

H. Coordinate installation of glass and glazing specified in Section 08 80 00.

I. Adjust door for smooth and balanced door movement.

3.3 TOLERANCES

A. Maximum Diagonal Distortion: 1/16 inch measured with straight edge, corner to corner.

END OF SECTION

Alliiance 105113–1 Metal Lockers

SECTION 10 51 13

METAL LOCKERS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes metal lockers, accessories.

1.2 REFERENCES

A. ASTM International:

1. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated

(Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Submittal procedures.

B. Shop Drawings: Indicate locker plans, elevations, sections, details and attachments to other Work.

1. Show locker fillers, trim, base, sloping tops, and accessories. Include locker numbering plan.

C. Product Data: Submit data on locker types, sizes and accessories.

D. Samples:

1. Lockers: Submit two 3 x 6 inches in size of specified base metal and finish.

E. Manufacturer's Installation Instructions: Submit installation template and attachment devices.

1.4 QUALITY ASSURANCE

A. Obtain locker units and accessories through one source from a single manufacturer.

B. Regulatory Requirements: Unless otherwise indicated, metal lockers are to comply with accessibility requirements under the “Americans with Disabilities Act (ADA), Accessibility Guidelines for Buildings and facilities) ADAAG”.

1. Provide not less than one shelf located no higher than 48 inches above the floor for front reach.

2. Provide hardware that does not require tight grasping, pinching or twisting of the wrist and that operates with a force of not more than 5 lbf.

3. Provide at least one hook at 48” AFF.

1.5 DELIVERY, STORAGE, AND PROTECTION

A. Section 01 60 00 – Product Requirements: Product storage and handling requirements.

B. Protect locker finish and adjacent surfaces from damage.

Alliiance 105113–2 Metal Lockers

PART 2 - PRODUCTS

2.1 LOCKERS

A. Acceptable Manufacturers:

1. Hadrian Inc.

2. List Industries, Inc.

3. Lyon Metal Products, Inc.

4. Penco Products, Inc.

5. Republic Storage Systems Co., Inc.

6. Substitutions: Under provisions of Section 01 60 00 – Product Requirements.

2.2 COMPONENTS

A. Sheet Steel: ASTM A653/A653M, commercial quality, coating class G60, stretcher leveled; to the following minimum thicknesses:

1. Body and Shelf: 24] gage.

2. Door Outer Face: 18 gage.

3. Door Inner Face: 20 gage.

4. Door Frame: 16 gage.

5. Hinges: 14 gage.

6. Base: 20 gage.

7. Sloping Top: 20 gage.

8. Trim: 20 gage.

2.3 LOCKER TYPES

A. Locker Unit Type I:

1. Width: 15 inches.

2. Depth: 15 inches.

3. Height: 72 inches.

4. Configuration: triple tier.

5. Mounting: Free standing.

6. Base: 4” Metal base

7. Top: Sloped metal with closures.

8. Locking: Equipped for padlock hasps.

9. Ventilation Method: Door louvers.

10. Type: Conventional

2.4 ACCESSORIES

A. For Each Locker: One double prong wall hooks, hat shelf ,and [rubber bumper.

2.5 FABRICATION

A. Locker Body: Formed and flanged; with steel stiffener ribs; electric spot welded.

B. Frames: Formed channel shape, welded and ground flush, welded to body

C. Doors: Welded construction, channel reinforced top and bottom with intermediate stiffener ribs, grind and finish edges smooth.

D. Hinges: Two for doors under 42 inches high; three for doors over 42 inches high; weld securely to locker body and door.

E. Locking device supplied by Owner.

Alliiance 105113–3 Metal Lockers

F. Number Plates: Furnish rectangular shaped plates. Form numbers of block font style, in contrasting color.

G. Furnish ventilation openings at top and bottom of each locker.

H. Form recess for operating handle and locking device.

I. Finish edges smooth without burrs.

J. Fabricate sloped metal tops, ends and closure pieces.

K. Furnish end panels and filler strips.

L. Fabricate 4 inch high steel bases with end closures.

2.6 FACTORY FINISHING

A. Clean, degrease, and neutralize metal; prime and finish with two coats of baked enamel paint.

B. Color: As selected from manufacturer's standard range.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 – Administrative Requirements: Coordination and project conditions.

B. Verify prepared bases are in correct position and configuration.

C. Verify bases and embedded anchors are properly sized.

3.2 INSTALLATION

A. Install lockers plumb and square.

B. Place and secure on prepared base.

C. Secure lockers with anchor devices to suit substrate materials. Minimum Pullout Force: 100 lb.

D. Bolt adjoining locker units together to provide rigid installation.

E. Install end panels, filler panels, sloped tops, and bases.

F. Install accessories.

G. Replace components not operating smoothly.

3.3 CLEANING

A. Section 01 70 00 – Execution and Closeout Requirements: Final cleaning.

B. Clean locker interiors and exterior surfaces.

Add02 06-18-26

Alliiance 11 14 16-1 Weighing and Wrapping Equipment Comm. No. 2024054-03

SECTION 11 21 43

WEIGHING AND WRAPPING EQUIPMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Ticket Counter scales.

2. Temporary Ticket Counter Scales

3. Spare displays for ticket counter scales.

4. Spare displays for existing Repack Table scales.

5. Certified calibration of all new or relocated scales.

B. Related Sections:

1. Section 06 41 00 – Architectural Wood Casework: Bagwell base millwork.

2. Division 26 – Electrical: Power.

1.2 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Submittal requirements.

B. Product Data: Submit manufacturer’s product data.

C. Shop Drawings: Indicate profiles and sizes, quantities, and indicator display.

1.3 CLOSEOUT SUBMITTALS

A. Section 01 70 00 – Execution and Closeout Requirements: Requirements for submittals.

1.4 QUALIFICATIONS

A. Calibration: Scale calibration must be done by a State of KY certified calibration company.

1.5 PRE-INSTALLATION MEETINGS

A. Section 01 31 19 – Project Meetings: Pre-installation meeting.

B. Convene minimum one week prior to commencing work of this section.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 – Common Product Requirements: Requirements for transporting, handling, storing, and protecting products.

1.7 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

B. Coordinate work with electrical for power source location.

Add02 06-18-26

Alliiance 11 14 16-2 Weighing and Wrapping Equipment Comm. No. 2024054-03

1.8 WARRANTY

A. Section 01 70 00 – Execution Requirements: Requirements for warranties.

B. Furnish one-year manufacturer’s warranty.

1.9 MAINTENANCE SERVICE

A. Section 01 70 00 – Execution and Closeout Requirements: Requirements for maintenance service.

PART 2 - PRODUCTS

2.1 BAGGAGE SCALES

A. Doran Model DBS; low profile scale.

1. Custom Size: 26” wide x 32” deep (to fit 26” x 32” platform).

2. Temporary Ticket Counter Scales: Standard 24”x24”

3. Display: DS 100, Control Display only.

B. Kennedy Electronics KSL, Low Profile

1. Standard size: 26 ¼”x28 ¼” (to fit 26” x 28” platform).

2. Temporary Ticket Counter scales: Standard 24”x24”

C. Provide (2) displays at single ticket counter: one facing agent and one facing customer.

Provide (3) displays where scale is shared between two ticket counters: one facing each agent and one facing customer.

D. Cabling: All cabling needed.

E. Provide complete scales where indicated on drawings.

F. Provide six (6) total replacement display units for owner’s maintenance stock.

G. Substitutions: Under provisions of Section 01 60 00 – Product Requirements.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 31 13 – Project Coordination: Verification of existing conditions before starting work.

3.2 INSTALLATION

A. Install per manufacturer’s recommendations.

B. Coordinate with casework sub-contractor.

3.3 CALIBRATION

A. Scales must be calibrated and certified immediately after installation or relocation to allow for immediate use by passengers and airline personnel.

Add02 06-18-26

Alliiance 11 14 16-3 Weighing and Wrapping Equipment Comm. No. 2024054-03

3.4 FIELD QUALITY CONTROL

A. Section 01 70 00 – Execution Requirements: Field inspecting, testing, adjusting, and balancing.

B. Inspection and calibration to be performed by State-certified company. Schedule calibration for SAME DAY as install.

3.5 PROTECTION OF FINISHED WORK

A. Section 01 70 00 – Execution Requirements: Requirements for protecting finished Work.

In Add 02 06-18-26

Alliiance 27 11 00-1 Communications Room Equipment Comm. No. 2024054-03

SECTION 27 11 00

COMMUNICATIONS ROOM EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

B. Specifications throughout all Divisions of the Project Manual are directly applicable to this Section, and this Section is directly applicable to them.

1.2 DESCRIPTION

A. The work covered by this Specification Section includes all labor necessary to perform and complete such construction, equipment incorporated or to be incorporated in such construction, and all services, facilities, tools, and equipment necessary or used to perform and complete such construction.

1.3 SECTION INCLUDES

A. Backboards.

B. Telecommunications equipment racks and cabinets.

C. Cable Runway.

D. Fiber Trough

1.4 REFERENCE STANDARDS AND CODES

A. Refer to Section 270000 “Communications General Requirements” for a list of Reference Standards, Codes, Documents, Abbreviations and Definitions.

1. Specific standards may be referenced throughout this section.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.

2. Include furnished specialties and accessories.

1.6 INFORMATIONAL SUBMITTALS

A. Delegated-Design Submittal: For seismic restraints.

In Add 02 06-18-26

Alliiance 27 11 00-2 Communications Room Equipment Comm. No. 2024054-03

1. Seismic-Restraint Details: Signed and sealed by a qualified professional engineer, licensed in the state where Project is located, who is responsible for their preparation.

2. Design Calculations: Calculate requirements for selecting seismic restraints.

3. Detail fabrication, including anchorages and attachments to structure.

B. Seismic Qualification Certificates: For equipment racks and cabinets from manufacturer.

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. Base certification on the maximum number of components capable of being mounted in each rack type. Identify components on which certification is based.

3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000 "Quality Requirements," to design seismic restraints.

B. Seismic Performance: Equipment racks and cabinets shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the specified seismic forces and the unit will be fully operational after the seismic event."

2. Component Importance Factor: 1.5.

2.2 BACKBOARDS

A. Backboards: Plywood, fire-retardant treated, 3/4 by 48 by 96 inches. Comply with requirements for plywood backing panels specified in Section 061053 "Miscellaneous Rough Carpentry."

B. Install backboards starting at 12 inches AFF with 96-inch dimension vertical. Butt adjacent sheets tightly, and form smooth gap-free corners and joints, unless noted otherwise on drawings.

C. Backboards shall be painted with white, fire-retardant paint on all 6 sides (leaving the certification label exposed and unpainted). Backboards shall be painted prior to installation.

2.3 TELECOMMUNICATIONS EQUIPMENT RACKS AND CABINETS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. Chatsworth Products, Inc.

2. Hubbell Premise Wiring.

3. Middle Atlantic Products, Inc.

4. Panduit Corp.

5. Engineer Approved Equal.

B. General Frame Requirements:

http://www.specagent.com/Lookup?ulid=2336 http://www.specagent.com/Lookup?uid=123457067079 http://www.specagent.com/Lookup?uid=123457067080 http://www.specagent.com/Lookup?uid=123457067082

In Add 02 06-18-26

Alliiance 27 11 00-3 Communications Room Equipment Comm. No. 2024054-03

1. Distribution Frames: Freestanding and wall-mounting, modular-steel units designed for telecommunications terminal support and coordinated with dimensions of units to be supported.

2. Module Dimension: Width compatible with EIA 310-D standard, 19-inch panel mounting.

3. Finish: Manufacturer’s standard baked polyester powder coat.

C. 4-Post Open Frame Relay Rack

1. Size: 19-inch mounting verticals. The overall height shall be 84 inches with a minimum of 45

RU.

2. Construction

a. Racks shall be manufactured from aluminum extrusion. Each rack shall have two L-shaped top angles, two L-shaped base angles and four C-shaped equipment-mounting channels. The base angles shall be pre-punched for attachment to the floor. Baked-polyester powder coat finish.

b. Equipment mounting channels shall be 6 inches deep and punched on the front and rear flange with the EIA-310-D Universal hole pattern, 1-3/4-inch rack-mount units (RU), to provide 45RU for equipment. Each mounting space (RU) shall be marked and numbered on the mounting channel.

c. Equipment attachment points shall be drilled and tapped on both sides with 12-24 mounting holes at universal EIA spacing.

3. Mounting: All racks shall be floor mounted and permanently fixed to the floor with bolt-down kits. Multiple racks shall be connected together.

4. Color: Black.

D. Data Cabinets

1. Size: Fully adjustable 19-inch mounting verticals. Overall dimensions (including front and rear doors) shall be 32 inches wide, 42 inches deep with an overall height of 84 inches, with at least

45 RU.

2. Panels: Side panels shall be fully and easily removable by a latching mechanism.

3. Doors: Front and rear doors shall be vented to allow airflow with a keyed locking mechanism, all data cabinets shall be keyed alike.

4. Construction: The frame shall be made of extruded aluminum. Adjustable vertical mounting rails shall be drilled and tapped with 12-24 mounting holes at universal EIA spacing.

5. Cable Management: Cabinets shall contain integral vertical cable managers on both sides of the cabinet in front of the front mounting rails. Cable management shall run the entire height of the cabinet. If managers are not integral provide vertical cable managers as specified elsewhere in this specification.

6. Mounting: All cabinets shall be floor mounted with adjustable leveling feet and permanently fixed to the floor with bolt-down kits. Multiple cabinets shall be connected together. Provide ganging kits as required.

E. Server Cabinets

1. Size: Fully adjustable 19-inch mounting verticals. Overall dimensions (including front and rear doors) shall be 32 inches wide, 48 inches deep with an overall height of 84 inches, with at least

45 RU.

2. Panels: Side panels shall be fully and easily removable by a latching mechanism.

3. Doors: Front and rear doors shall be vented to allow airflow with a keyed locking mechanism, all server cabinets shall be keyed alike.

4. Construction: The frame shall be made of extruded aluminum. Adjustable vertical mounting rails shall include square-punched mounting holes for Clik-Nut hardware kits and standard cage nuts at universal EIA spacing.

5. Mounting: All cabinets shall be floor mounted with adjustable leveling feet and permanently fixed to the floor with bolt-down kits. Multiple cabinets shall be connected together. Provide ganging kits as required.

In Add 02 06-18-26

Alliiance 27 11 00-4 Communications Room Equipment Comm. No. 2024054-03

F. Co-Location Cabinets

1. Section Quantity: Co-location cabinets shall be provided with the quantity of sections as shown in the drawings.

2. Size: Fully adjustable 19-inch mounting verticals. Overall minimum dimensions (including front and rear doors) shall be 30 inches wide, 42 inches deep with an overall height of 84 inches. 2-section cabinets shall provide 21 RU per section; 3-section cabinets shall provide 14 RU per section.

3. Doors: Front and rear section doors shall be vented to allow airflow with a keyed locking mechanism. Each section shall be keyed differently, front, and rear doors of the same section shall be keyed alike.

4. Keys: Individual keys shall be provided for each section. A grand master key shall be provided for all sections in all co-location cabinets provided under this project. Coordinate keying requirements with the owner.

5. Construction: The frame shall be made of extruded aluminum. Adjustable vertical mounting rails shall be drilled and tapped with 12-24 mounting holes at universal EIA spacing. Each compartment in the cabinet shall include two pairs of equipment mounting rails. Mounting rails shall bolt to the supports located near the top and bottom of the compartment and shall be fully adjustable in depth to provide front and rear support for equipment.

6. Cable Management: Cabinets shall include (2) 5.75” x 2.736” (minimum size) integral vertical cable management pathways that segregate and secure cables from each section.

7. Mounting: All cabinets shall be floor mounted with adjustable leveling feet and permanently fixed to the floor with bolt-down kits. Multiple cabinets shall be connected together. Provide ganging kits as required.

G. Wall Mounted Cabinets

1. Size: 19-inch mounting verticals. Overall dimensions shall be 27.3” wide, XX” deep with an overall height of XX,” with at least XX RU.

2. Wall-mounted cabinets shall be manufactured from steel sheet.

3. Each cabinet will have a rear panel that attaches to the wall, a hinged cabinet body that swings open from the rear panel providing easy access to the rear of equipment and a locking front door.

4. The rear panel will be 5 inches deep and will provide cable access with pre-punched knockouts for conduit along the top and bottom edges of the panel.

5. The cabinet body will include two pairs of vertical 19-inch EIA equipment mounting rails. The mounting rails will be EIA-310-D compliant with the Universal hole pattern. Mounting holes will be spaced vertically on alternating 5/8”-5/8”-1/2” centers and will be roll-formed with #12-24 threads. Mounting rails will provide quantity of rack-mount spaces (RMU) for equipment as shown on drawings.

6. Mounting rails will be adjustable in depth so that they can be positioned at any point within the cabinet body. The design of all cabinets will allow for a total of two pairs of mounting rails per cabinet.

7. Mounting rails will bolt in place directly to the cabinet frame. The mounting rails will be L-shaped.

The side of the mounting rails will be punched to provide lacing points for cables.

8. The hinge design that attaches the cabinet body and the rear panel will allow the rear panel to be removed during installation.

9. The hinge that attaches the cabinet body and the rear panel will allow the cabinet body to open at least 90 degrees. The hasp used to secure the rear panel and the cabinet body together will assist in drawing the components together during the locking action.

10. The cabinet body will include vents that are designed to accept fan kits. The manufacturer of the cabinet will sell compatible fan and filter kits as an accessory.

11. The front door will be hinged and locking. The front door and rear panel will be keyed alike. The front door will have rounded edges and corners. The cabinet body will allow the front door to be attached so that it will swing open from the right or left. The front door will be solid or have a tinted window, as specified below.

12. The cabinet shall be delivered fully assembled and will include installation hardware (hex lag screws) for wood studs and 50 each #12-24 equipment mounting screws.

13. The load bearing capacity for wall mounted cabinets will be 200 pounds per cabinet.

In Add 02 06-18-26

Alliiance 27 11 00-5 Communications Room Equipment Comm. No. 2024054-03

14. Wall mounted cabinets will be certified and UL Listed to standard UL 60950 under category NWIN. UL Listing will be stated in the manufacturer’s product literature.

15. Color: Black.

H. Wall-Mounted, Floor Supported Cabinets

1. Size: 19-inch mounting verticals. Overall dimensions shall be 27.3” wide, XX” deep with an overall height of XX,” with at least XX RU. Overall height includes a 6” high wheeled base.

2. Wall-mounted, floor supported cabinets shall be manufactured from steel sheet.

3. Each cabinet will have a rear panel that attaches to the wall, a hinged cabinet body that swings open from the rear panel providing easy access to the rear of equipment and a locking front door.

4. The rear panel will be 5 inches deep and will provide cable access with pre-punched knockouts for conduit along the top and bottom edges of the panel.

5. The cabinet body will include two pairs of vertical 19-inch EIA equipment mounting rails. The mounting rails will be EIA-310-D compliant with the Universal hole pattern. Mounting holes will be spaced vertically on alternating 5/8”-5/8”-1/2” centers and will be roll-formed with #12-24 threads. Mounting rails will provide quantity of rack-mount spaces (RMU) for equipment as shown on drawings.

6. Mounting rails will be adjustable in depth so that they can be positioned at any point within the cabinet body. The design of all cabinets will allow for a total of two pairs of mounting rails per cabinet.

7. The hinge that attaches the cabinet body and the rear panel will allow the cabinet body to open at least 90 degrees. The hasp used to secure the rear panel and the cabinet body together will assist in drawing the components together during the locking action.

8. The cabinet body will include vents that are designed to accept fan kits. The manufacturer of the cabinet will sell compatible fan and filter kits as an accessory.

9. The front door will be hinged and locking. The front door and rear panel will be keyed alike. The front door will have rounded edges and corners. The cabinet body will allow the front door to be attached so that it will swing open from the right or left. The front door will be solid or have a tinted window, as specified below.

10. The cabinet shall be delivered fully assembled and will include installation hardware (hex lag screws) for wood studs and 50 each #12-24 equipment mounting screws.

11. Load bearing capacity for wall mounted floor supported cabinets with a wheeled base will be 1,000 pounds per cabinet.

12. Color: Black.

I. Cable Management Accessories

1. Open Frame Relay Racks

a. Vertical: Provide vertical wire managers at locations shown in drawings. Provide double-sided vertical cable managers with extended fingers on both sides of the rack.

Vertical cable managers shall contain cable guides (extended fingers) spaced 1 RU apart allowing front to rear cabling within the manager. The width of the cable manager shall be as shown in drawings. The cable manager shall contain a Snap-On or hinged cover and extend the full height of the rack.

b. Horizontal: Provide horizontal managers at locations shown in drawings. Horizontal managers shall be 3.50” high (2RU) x 19” wide x 6” deep. Horizontal managers shall contain cable guide fingers spaced 1.75” apart with a Snap-On or hinged cover.

2. Server and Data Cabinets

a. Vertical: Vertical cable management shall be provided on both sides of the cabinet in front of the front mounting rails. Vertical cable managers shall contain cable guides (fingers) spaced 1 RU apart.

b. Horizontal: Provide horizontal managers at locations shown in drawings. Horizontal managers shall be 3.50” high (2RU) x 19” wide x 6” deep and/or 1.75” high (1RU) x 19”

In Add 02 06-18-26

Alliiance 27 11 00-6 Communications Room Equipment Comm. No. 2024054-03 wide x 6” deep as shown on drawings. Horizontal managers shall contain cable guide fingers spaced 1.75” apart with a Snap-On or hinged cover.

J. PDU Mounting Brackets:

1. Provide vertical PDU mounting brackets compatible with server and data cabinets.

a. Locate vertical PDUs behind rear rack rails.

b. Locate vertical PDUs in a position that does not interfere with the use of rear rack rails.

2.4 CABLE RUNWAY

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. Chatsworth Products, Inc. – UL Classified Cable Runway.

2. Cooper B-Line – Cable Runway.

3. Engineer Approved Equal.

B. Construction: Cable runway shall be manufactured from 3/8-inch wide by 1-1/2-inch-high tubular steel with .065-inch wall thickness. The cable runway (side stringers) will be 9 feet 8½ inches long. Cross members will be welded in between stringers on 9-inch intervals/centers beginning 4-1/4-inches from one end.

C. UL Listed: Cable runway will be UL Classified for suitability as an equipment grounding conductor only (Contractor shall remove paint or use ground straps at splices and intersections).

D. Sizes: Provide cable runway sizes as defined on drawings.

E. Finish shall be epoxy-polyester hybrid powder coat (paint) in black, unless noted otherwise.

F. Connector Assemblies: Turns, transitions, corners and brackets shall meet the same specification as the cable runway section.

G. Connector Assembly Capacity: Splices located within support span shall not diminish rated loading capacity of cable runway.

H. Hardware and Fasteners: Steel, zinc plated matching same color as cable runway section.

I. Support: Provide a combination of wall mount, data cabinet to cable runway mount, relay rack to cable runway mount and ceiling trapeze cable runway support. The use of a single center hung support rod shall not be allowed.

J. Grounding: Grounding kits are required to provide a method of bonding cable runway sections and turns together that is independent of the pathway splices. The grounding kit shall be constructed of UL Listed components. The preferred solution is a #6 AWG green insulated stranded copper conductor connected on both ends to the ladder rack using two-hole compression lugs and stainless-steel hardware.

K. Accessories: All accessories shall be manufactured from the same material as the cable runway section. Provide the following accessories:

1. Cable straps used for attaching cable bundles to the cable runway cross members must be reusable with a hook and loop-style closure.

2. End caps used to cover the ends of cable runway shall be manufactured from a black fire-retardant rubberized material.

http://www.specagent.com/Lookup?ulid=2336

In Add 02 06-18-26

Alliiance 27 11 00-7 Communications Room Equipment Comm. No. 2024054-03

3. End closing kits used to cover the end of cable runway. Kits shall consist of a bar cut to match the width of the cable runway and the hardware required to attach the bar to the end of a length of cable runway.

4. Radius drops used to create a radius to form cables over as the cables exit or enter the cable runway. The extrusion will be formed in a 90-degree arc with a minimum bend radius of 3 inches.

Radius drops will attach to either the side stringer or the cross member of the cable runway using a clevis pin. Provide radius drops at all sections where cable exits runway.

2.5 FIBER TROUGH

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. Panduit - FiberRunner

2. CommScope - FiberGuide

3. Equal

B. Construction: Plastic snap-together design.

C. UL Listed: UL 2024 Optical Fiber Cable Routing Assemblies.

D. Sizes: Provide fiber trough sizes as defined on drawings.

E. Finish: Yellow.

F. Connector Assemblies: Turns, transitions, corners and brackets shall meet the same specification as the fiber trough straight section.

G. Connector Assembly Capacity: Splices located within support span shall not diminish rated loading capacity of fiber trough.

H. Hardware and Fasteners: Steel, zinc plated.

I. Support: Fiber trough shall be located above cable runway and shall be supported from cable runway side rail.

J. Accessories: All accessories shall be manufactured from same material as fiber trough straight section. Provide the following accessories:

1. End closing kits used to cover the end of fiber trough straight sections.

2. Radius drops used to create a radius to form cables over as the cables exit or enter the fiber trough.

3. Vertical tee fitting to create a pathway for cables to exit or enter the fiber trough.

2.6 LABELING

A. Comply with TIA-606-B and UL 969 for a system of labeling materials, including label stocks, laminating adhesives, and inks used by label printers.

http://www.specagent.com/Lookup?ulid=2336

In Add 02 06-18-26

Alliiance 27 11 00-8 Communications Room Equipment Comm. No. 2024054-03

PART 3 - EXECUTION

3.1 EXAMINATION

A. Check actual site conditions before the start of any work. Ensure all preceding trade work associated with the telecommunications system is accurate and complete before proceeding with the installation or use of products specified in this section.

3.2 INSTALLATION

A. Comply with NECA 1.

B. Comply with BICSI TDMM for layout and installation of communications equipment rooms.

C. Bundle, lace, and train conductors and cables to terminal points without exceeding manufacturer's limitations on bending radii. Install lacing bars and distribution spools.

D. Coordinate layout and installation of communications equipment with Owner's telecommunications and LAN equipment and service suppliers. Coordinate service entrance arrangement with local exchange carrier.

1. Meet jointly with telecommunications and LAN equipment suppliers, local exchange carrier representatives, and Owner to exchange information and agree on details of equipment arrangements and installation interfaces.

2. Record agreements reached in meetings and distribute them to other participants.

3. Adjust arrangements and locations of distribution frames, cross-connects, and patch panels in equipment rooms to accommodate and optimize arrangement and space requirements of LAN equipment.

4. Adjust arrangements and locations of equipment with distribution frames, cross-connects, and patch panels of cabling systems of other communications, electronic safety and security, and related systems that share space in the equipment room.

E. Coordinate location of power raceways and receptacles with locations of communications equipment requiring electrical power to operate.

3.3 IDENTIFICATION

A. Identify system components, wiring, and cabling complying with TIA-606-B. Comply with requirements noted elsewhere in Division 27 for specific labeling requirements.

B. Labels shall be preprinted or computer-printed type. Provide self-adhesive vinyl or vinyl-cloth wraparound tape markers, machine printed with alphanumeric cable designators.

3.4 CLOSEOUT ACTIVITIES

A. Refer to Section 270000 “Communications General Requirements”.

In Add 02 06-18-26

Alliiance 27 40 01-1 MUFIDS – Extension of Existing

SECTION 27 40 01

MULTI-USE FLIGHT INFORMATION DISPLAY SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Provide all labor, materials, and equipment for the complete installation of Work called for in the Contract Documents.

B. This section includes the minimum requirements for the installation of new systems relating to the FIDS and CIDS; collectively called MUFIDS.

C. Included in this section are the minimum composition requirements and installation methods for the following:

1. DDC/Drivers, Owner furnished, Contractor installed.

2. Displays, refer to drawings.

3. Display Mounts, refer to drawings.l

4. Other items necessary for delivering a complete working system.

1.2 DEFINITIONS AND TERMS

A. Trade association names and communications terminology are frequently abbreviated. The following acronyms or abbreviations may be referenced within this Section:

1. AWG - American Wire Gauge

2. BICSI - Building Industry Consulting Service International

3. CIDS - Counter Information Display System

4. FIDS - Flight Information Display System

5. Gb - Gigabit

6. GB - Gigabyte

7. GHz - Gigahertz

8. HDD - Hard Disk Drive

9. Hz - Hertz

10. IBC - International Building Code

11. LCD - Liquid Crystal Display

12. LED - Light Emitting Diode

13. MUFIDS - Multi-Use Flight Information Display System

14. NECA - National Electrical Contractors Association

15. RCDD - Registered Communications Distribution Designer

16. RFP - Request for Proposal

17. RPM - Revolutions per Minute

18. STD - Standard

19. STP - Shielded Twisted Pair

20. TR - Telecommunications Room

21. UL - Underwriters Laboratories

22. UTP - Unshielded Twisted Pair

23. VAC - Volts with Alternating Current

24. WAO - Work Area Outlet

Alliiance 27 40 01-2 MUFIDS – Extension of Existing

1.3 QUALITY ASSURANCE

A. Equipment and materials shall be of the quality and manufacture indicated. The equipment specified is based upon the acceptable manufacturers listed. Where “approved equal” is stated, or a substitution is requested, equipment shall be equivalent in every way to that of the equipment specified. All substitutions are subject to the control and approval of the Owner.

B. All cable and equipment shall be installed in a neat and workmanlike manner. All methods of construction that are not specifically described or indicated in the contract documents shall be subject to the control and approval of the Owner.

C. Contractor’s Qualifications:

1. Firms regularly engaged in the installation of integrated systems of similar size and scope, and that have five (5) years of integrated experience with systems like that required for this project. The Contractor shall have been actively engaged in installing, maintaining, and operating similar systems and services as outlined in this document.

2. The integrator and its employees shall be factory certified by the proposed vendor.

3. The Contractor shall have a minimum of three (3) sites that are actively similar systems, and at least one of those sites must be utilizing a system like that being proposed. The system must be currently in operation and have been in operation for at least the proceeding twelve

(12) months.

4. Provide references to include client names, phone numbers and a summary of project details. These references will be checked, and the clients will be asked questions related to the performance of your company.

5. Provide verification that installation personnel responsible have been factory trained to install the products described in this Section.

6. Provide full-time project manager with a minimum of ten (10) years’ field experience in installation of communications systems and infrastructures. Project manager shall be assigned for the duration of the project and shall not be replaced without written consent from the Owner.

D. Manufacturer’s Qualifications:

1. Firms regularly engaged in manufacture of products of the types, ratings and capacities required for this project; whose products have been in satisfactory use in similar service for not less than five (5) years, with production capabilities per applicable NEMA standards.

E. Material and Work specified herein shall comply with the applicable requirements of:

1. International Air Transport Association (IATA) – All latest standards and Practices

2. RP1785 Public Information Systems and Standards

3. Aviation Information Data Exchange (AIDX) Standards / Schema

4. American with Disabilities Act (ADA) standards

5. Construction Specifications Institute (CSI) “Manual of Practice”

6. ISO 9001; Quality Assurance in Design/Development, Production, Installation, and Servicing

7. ISO 9003; Quality Assurance in Final Inspection and Test

Alliiance 27 40 01-3 MUFIDS – Extension of Existing

8. ISO 9004; Quality Management and Quality System Elements Guidelines

9. 9249 Dynamic Flight Related Public Information Displays

10. NECA 1-2015 – Standard Practice of Good Workmanship in Electrical

Construction

11. Title 47 CFR Part 15, Subpart B – Radio Frequency Devices, Unintentional Radiators

12. NFPA 70 – National Electric Code, 2017

13. BICSI – Telecommunications Distribution Methods Manual, 13th Edition

14. Applicable codes and directives of authorities having jurisdiction.

F. Work:

1. The Work shall be performed in compliance with the applicable manufacturer’s installation…