Scrub_File-DCAM-25-CS-IFB-0006.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- DCAM-25-CS-IFB-0006
- Issued by
- District of Columbia
About this file
The file is a scrub file (Excel spreadsheet) and an Invitation for Bids (IFB) for the District of Columbia Department of General Services (DGS) involving epoxy flooring upgrades for four Fire and Emergency Medical Services (FEMS) engine houses. The project will replace epoxy flooring at Engine Houses #1, 11, 16, and 29, located in various Northwest Washington, D.C. locations, with building square footages ranging from 13,363 to 25,634 square feet and construction/renovation dates between 1925 and 2017. The solicitation is specifically set aside for certified Small Business Enterprises (SBEs) through the District of Columbia Department of Small and Local Business Development (DSLBD).
The contract requires contractors to provide all labor, materials, and equipment for comprehensive flooring upgrades, with the scrub file detailing potential work across multiple construction divisions including general requirements, existing conditions, concrete, masonry, finishes, and electrical work. The bid is structured as a local government contract with specific requirements for small business participation, focusing on epoxy flooring replacement and potential associated renovations. While the scrub file shows no specific dollar amounts, the project involves multiple engine house locations and potentially comprehensive facility improvement work beyond just flooring replacement. The solicitation emphasizes local business development by restricting bidding to certified small businesses within the District of Columbia.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Scrub File-DCAM-25-CS-IFB-0006 | |||||
| FEMS: Epoxy Flooring Replacement for E1, E11, E16 and E29 | |||||
| DESCRIPTION | Proposal | Capital | Local | Comments | |
| Division 01 | General Requirements | $ - 0 | $ - 0 | $ - 0 | |
| General Conditions | $ - 0 | ||||
| Project Management | $ - 0 | ||||
| Project Superintendent | $ - 0 | ||||
| Architect | |||||
| Permits & Fees | $ - 0 | ||||
| Division 02 | Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| Temporary Protection | $ - 0 | ||||
| Demolition | $ - 0 | ||||
| Temporary Swing Space Preparation | $ - 0 | $ - 0 | $ - 0 | ||
| Division 03 | Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Furnish & install 4-inch concrete pad | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | |||
| Division 04 | Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Provide masonry/mortar patchwork and repairs around any exterior wall penetrations | $ - 0 | ||||
| $ - 0 | |||||
| Division 05 | Metals | $ - 0 | |||
| Metal Deck | $ - 0 | $ - 0 | $ - 0 | ||
| Ornamental Metals | $ - 0 | $ - 0 | $ - 0 | ||
| Division 06 | Wood, Plastics, Composites | $ - 0 | $ - 0 | $ - 0 | |
| Rough Carpentry | |||||
| Interior Trim | |||||
| Plywood Backing Panels | |||||
| Finish Carpentry | |||||
| Division 07 | Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | |
| Rigid Insulation | $ - 0 | ||||
| Thermal Wrap | $ - 0 | ||||
| Vapor Retarders | $ - 0 | ||||
| Division 08 | Openings | $ - 0 | $ - 0 | $ - 0 | |
| Doors, Frames & Hardware | |||||
| Division 09 | Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Wall Mounted Cabinets | $ - 0 | ||||
| Base Cabinets/Drawers | $ - 0 | ||||
| New Wall Cabinet with Doors | $ - 0 | ||||
| Epoxy flooring coating (with resin) | |||||
| Division 10 | Specialties | $ - 0 | |||
| Toilet Partitions | $ -0 | $ - 0 | |||
| Lockers | $ - 0 | ||||
| Bathroom Accessories | $ - 0 | ||||
| Division 11 | Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Microwave | |||||
| Coffee Maker | |||||
| Six (6) Burner Range w/ Wheels | |||||
| Training Monitor & Monitor Wall Mount | |||||
| Whiteboard | |||||
| Small Kitchen Equipment & Utensils | |||||
| Pre-Rinse Spray & Faucet | |||||
| Base Cabinet w/ Solid Surface | |||||
| Magnetic Knife Holder | |||||
| Ice Machine | |||||
| Dishwasher | |||||
| Refrigerator Five (5) | |||||
| Division 12 | Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| New Training Table | |||||
| One (1) Desk and One (1) Chair | |||||
| Custom Table and Eight (8) Chairs | |||||
| Division 22 | Plumbing | $ -0 | $ -0 | $ -0 | |
| 104 Kitchen Plumbing | $ - 0 | ||||
| 101 Common Area | $ - 0 | ||||
| 103 Toilet | $ - 0 | ||||
| Apparatus Bay | $ - 0 | ||||
| Division 23 | HVAC | $ - 0 | $ - 0 | $ - 0 | |
| 103 Kitchen HVAC | $ - 0 | ||||
| 101 Common Area | $ - 0 | ||||
| 103 Toilet Room Ventilation | $ - 0 | ||||
| Division 26 | Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Furnish & install all new required switches, slide dimmers, outlets, conduit and connections | $ - 0 | ||||
| Furnish and install new electrical outlets Ground Fault Circuit Interrupter (GFI) and covers (1:1 replacement). | $ - 0 | ||||
| Division 27 | Communications | ||||
| Division 28 | Electronic Safety and Security | ||||
| Grand Total | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .