This is a Schedule of Items for the Sandia Crest House Complex Demolition and Removal contract. The document outlines pricing for demolition and removal services with a base scope and two optional items.
The base scope includes five pay items: Mobilization (1 lump sum), Demolition Material Handling for dismantle, demolish, removal, and off-site disposal (365 tons on actual quantity basis), Supplemental Specification 704.03 Material Handling for backfill (1,000 cubic yards on actual quantity basis), Security/Privacy Fabric Fence and Gate (300 linear feet on design quantity basis), and a Demolition Report (1 lump sum). Optional Item #1 covers additional structures: Dyer House removal and disposal with asbestos-containing material, Del Toro removal and disposal, mobilization, and a demolition report, all on lump sum basis. Optional Item #2 addresses Lake Marvin area work including mobilization, Former Lake Marvin Recreation Building Area removal, retaining wall removal (270 linear feet), eight individual cabin removals (Cabins #1-#8), and a demolition report, all on lump sum basis except the retaining wall which is measured in linear feet. The document includes a glossary defining measurement abbreviations: AQ (Actual Quantity), ACM (Asbestos Containing Material), CY (Cubic Yard), LF (Linear Foot), LS (Lump Sum), LSQ (Lump Sum Quantity), LBP (Lead Based Paint), and TON (2,000 pounds). Unit costs and total costs are blank, indicating this is a pricing template for contractor submission.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items Sandia Crest House Complex Demolition and Removal
PAY ITEMS DESCRIPTION
METHOD OF
MEASURE PAY UNIT QUANTITY UNIT COST TOTAL COST
151 Mobilization LSQ LS 1 $ $
800.06.1
Demolition Material Handling: Dismantle, demolish, removal, handle, and off-site disposal
AQ
TON
800.06.2
Supplemental Specification
704.03 - Material Handling:
Backfill Material
AQ
CY
619.11
Supplemental Specification
619.03 (b)(4) and
619.03 (b)(5) - Security/Privacy Fabric Fence and Gate
DQ
LF
719 Demolition Report LSQ LS 1 $ $
TOTAL $
**Pay Items can be found in the Specification Section attached to the Statement of Work
OPTIONAL ITEMS
OPTIONAL ITEM #1
PAY ITEMS DESCRIPTION
METHOD OF
MEASURE PAY UNIT QUANTITY UNIT COST TOTAL COST
1 Mobilization LSQ LS 1 $ $
2 Dyer House - Removal and Disposal, with Asbestos- Containing Material
LSQ LS 1 $ $
3 Del Toro - Removal and Disposal LSQ LS 1 $ $
4 Demolition Report LSQ LS 1 $ $
TOTAL $
OPTIONAL ITEM #2
PAY ITEMS DESCRIPTION
METHOD OF
MEASURE PAY UNIT QUANTITY UNIT COST TOTAL COST
1 Mobilization LSQ LS 1 $ $
2 Former Lake Marvin Recreation Building Area LSQ LS 1 $ $
3 Removal of Retaining Wall LSQ LF 270 $ $ 4 Lake Marvin Cabin #1 LSQ LS 1 $ $ 5 Lake Marvin Cabin #2 LSQ LS 1 $ $ 6 Lake Marvin Cabin #3 LSQ LS 1 $ $ 7 Lake Marvin Cabin #4 LSQ LS 1 $ $ 8 Lake Marvin Cabin #5 LSQ LS 1 $ $ 9 Lake Marvin Cabin #6 LSQ LS 1 $ $
10 Lake Marvin Cabin #7 LSQ LS 1 $ $ 11 Lake Marvin Cabin #8 LSQ LS 1 $ $ 12 Demolition Report LSQ LS 1 $ $
TOTAL $
SUMMARY
Base Pay Item $
Optional Item 1 $
Optional Item 2 $
GRAND TOTAL $
Glossary Sandia Crest House Complex Demolition and Removal
AQ – Actual Quantity
ACM – Asbestos Containing Material
CY – Cubic Yard
LF – Linear Foot
LS – Lump Sum
LSQ – Lump Sum Quantity
LBP – Lead Based Paint