This is an Amendment 2 Questions and Answers document for solicitation 127EAU26Q0036, which addresses contractor inquiries regarding demolition projects at multiple forest recreation sites.

The document clarifies key project requirements across a base contract and optional items. For Optional Item #2 (Lake Marvin structures/cabins), pricing must be based solely on provided plans and documentation since the site was not visited. The damage resulted from a natural disaster rather than historic demolition. For the Sandia Crest House structure (base contract), the contractor must include utility disconnect and coordination in pricing, and self-sustaining campers are permitted on the upper Sandia Recreation Area parking lot. Both recreation residences at Casa Loma (Option #1) utilize septic tanks and are serviced by PNM electric. The contractor is responsible for maintaining demolition fencing throughout the entire performance period and leaving it for forest use upon completion. Regarding environmental considerations, contractors should anticipate that concealed or unidentified asbestos-containing materials may be discovered during demolition despite the completed hazardous materials survey. Water/sewage tanks appear empty but may require pumping if contents are discovered. For restoration requirements, Option #1 requires seeding using weed-free, native plant materials appropriate to the site that are not invasive. Road clearing and limbing to improve equipment access is permitted with prior written approval from the Contracting Officer/Contracting Officer's Representative. Staging areas for contractor equipment and materials will be determined during prework meetings for the base contract and each optional location.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2: Questions and Answers for solicitation 127EAU26Q0036

Question 1) For Optional Item #2 (Lake Marvin structures/cabins), should pricing be based solely on the provided plans/documents since the site was not included in the scheduled visit?

Answer 1) Yes, pricing should be based on provided plans/documentation for Option Item #2.

Question 2) Are there any additional photographs, historical demolition records, utility information, or environmental documentation available for Optional Item #2?

Answer 2) There is no historic demolition as the damage was done by a natural disaster for Option #2.

Question 3) For the Sandia Crest House structure, can the Government confirm whether all utilities have been disconnected, or should the contractor include utility disconnect/coordination in pricing?

Answer 3) Contractor to include disconnect/coordination for utilities

Question 4) Regarding the two external water/sewage tanks referenced in the Statement of Work, are there any known contents, pumping requirements, or disposal restrictions the contractor should account for?

Answer 4) The water/sewage tanks seem to be empty but will need to be pumped if anything is found as the forest had no documentation that it has been serviced recently

Question 5) Can the Government confirm whether hazardous material quantities identified in the asbestos survey should be considered complete for bidding purposes, or should contractors anticipate concealed/unidentified ACM during demolition activities?

Answer 5) The hazardous material test done was based on specialist knowledge and done with what was likely to have hazardous material present. It is possible for concealed or unidentified ACM to be found during demolition.

Question 6) Is there a designated staging area approved for contractor equipment/materials during the performance period?

Answer 6) Staging areas will be discussed during the prework meeting for the base and each option location.

Amendment 2: Questions and Answers for solicitation 127EAU26Q0036

Question 7) For the demolition fencing requirement, is the contractor responsible for maintaining the fence for the entire performance period, or only during active demolition operations?

Answer 7) Contractor is responsible for maintaining fence during performance period and leaving for forest use after contract is complete.

Question 8) Can the Government confirm whether restoration to “natural state” is limited to grading/backfill and debris removal, or if additional seeding/landscaping restoration is anticipated under this contract?

Answer 8) Seeding will be needed for option #1. Weed Free plant material should be selected for all seeding and mulching projects, to restore natural species composition and ecosystem function to the disturbed area. Plant or seed materials should be used, which are appropriate to the site, capable of becoming established, and are not invasive.

Question 9) Is the Casa Loma residences septic or sewer line?

Answer 9) Both recreation residences for Option #1 are on septic tanks

Question 10) Electrical Company that services the Casa Loma Residences?

Answer 10) PNM is the electric provider to the facilities for the base and option #1

Question 11) How much clearing and limbing can be done on the roads leading to the Casa Loma Residences to make way for equipment.

Answer 11) Routine road maintenance and Limbing and Brushing to improve access is permitted around the facilities, contractor will be required to send plans for approval to the CO/COR prior to work.

Question 12) Are self-sustaining campers allowable on the parking lot for the Sandia Crest House demo?

Answer 12) Yes, self-sustaining campers can be used on the upper Sandia Recreation Area parking lot.