BLISS_RFP_Sections_B-M_02_01_2013.pdf

PDF 1 MB Posted

Attached to
test
Solicitation number
SAQMMA-12-R-0130
Issued by

About this file

RFP Sections B-M

View the file

Other files

File Type Posted
15)__EXH_F__BLISS_Pricing_Tables_04-05-2013.xlsx XLSX spreadsheet
8)_ExhA.1_Atch_3E_PD-_Badge_Office_Technician_A003_4-5-13.pdf PDF
15)__EXH_F__BLISS_Pricing_Tables_04-05-2013.pdf PDF
4)_EXH_A_TORs_A003_(FINAL)_4-5-13.pdf PDF
3)_BLISS_Consolidated_RFP_A003_(track_changes)_4-5-13.pdf PDF
13)_EXH_A1Atch12_Fuel_SOO_(FINAL)_4-5-13.pdf PDF
12)_EXH_A1_Atch11_PMO_SOO_A003_(FINAL)_4-5-13.pdf PDF
5)_EXH_A1_TOR_SOOs_A003_(FINAL)_4-5-13.pdf PDF
5)_EXH_A1_TOR_SOOs_A003_(track_changes)_4-5-13.pdf PDF
6)_EXH_A1_Atch1_Food_SOO_A003_(FINAL)_4-5-13.pdf PDF
BLiSS_Responses_3-29-13.pdf PDF
BLiSS_Responses_3-27-2013.pdf PDF
BLISS_Questions_Responses_03252013.pdf PDF
Responses_to_Questions_3202013_(2).pdf PDF
SF30_A002_Cont_Page.pdf PDF
Sect_J_EXHA1_Atch3D_RSOEquip_Rev2.pdf PDF
SF30_SAQMMA12R0130A002.pdf PDF
1EXHIBIT_A_Task_Order_Requests_(A002).pdf PDF
BLISS_Consolidated_RFP_A002_B-M.pdf PDF
Sect_J_ExhA1_Atch_4_FIRE_PROTECTION_A002_031213.pdf PDF
ExhA.1_PD-_Badge_Office_Supervisor_-_Baghdad_-BLISS.pdf PDF
2EXH_A1_TOR_SOO_A001_Mar_3_(conformed).pdf PDF
2EXH_A1_TOR_SOO_A001_Mar_3_(track_changes)_(2).pdf PDF
20_EXH_F__BLISS_Pricing_Tables_A001_Mar_3_.xlsx XLSX spreadsheet
ExhA1_Atch_12_Amendment_1_Fuel_SOO.pdf PDF
SF30_SAQMMA12R0130-A001.pdf PDF
ExhA1_Atch_8_Amendment_1_Warehouse_Operations.pdf PDF
RFP_Questions_2-25-2013.pdf PDF
DRAFT_RFP_Questions_Feb202013.pdf PDF
Local_Labor_Law.doc DOC document
Sect_J_EXHA1_Atch3E_labor_by_site.xlsx XLSX spreadsheet
Sec_J_EXH_A_Task_Order_Requests.pdf PDF
Sect_J_EXHA1_Attch12_Fuel_SOO.pdf PDF
Sect_J_EXHA1_Atch3D_RSOEquip.xlsx XLSX spreadsheet
Sect_J_EXHA1_Atch5B_PropTEs.pdf PDF
Sect_J_ExhA1_Atch3A_RDISS_ORC.pdf PDF
BLISS_COVER_SF-33_SAQMMA12R0130.pdf PDF
Sect_J_EXHA1_Atch4_Iraq_Fire_Protection.pdf PDF
Sect_J_EXHA1_Atch10_BLISS_Rqt_Matrix_013013.xlsx XLSX spreadsheet
Sect_J_EXH_A1_Atch1_Food_SOO.pdf PDF
Sect_J_EXHD_DD254.SAQMMA12R0130pdf.pdf PDF
Sect_J_EXHA1_Attch11_PMO_SOO.pdf PDF
Sec_J_Exh_A.1_Task_Order_SOOs_.pdf PDF
draft_BLISS_RFP_12_28_2012_DS.docx DOCX document
draft_BLISS_RFP_12_05_2012.pdf PDF
Questions_for_FedBizOps_Nov_20_2012.pdf PDF
Questions_9-6-12.pdf PDF
Industry_Day_Presentation_for_Release_to_Public.pdf PDF
draft_BLISS_RFP_Nov16.pdf PDF
SITE_SURVEY_ANNOUNCEMENT.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of State SAQMMA-12-R-0130 Baghdad Life

Request for Proposal Support Services

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 OVERVIEW

This requirement is in support of the U.S. Department of State (DOS) mission in Iraq, providing life support and logistics functions for DOS sites.

The current DOS sites are broken down below by regions. DOS sites within Iraq may be added or removed under this contract as future conditions change:

Central – Baghdad Embassy Compound (BEC), to include o Olympia o Embassy Heliport (EHP) o Embassy Annex Prosperity (EAP)

Note: This area may be referred to as “International Zone” or “IZ” in this document.

Central - Baghdad Diplomatic Support Center (BDSC), at the Baghdad International

Airport (BIAP)

South – U.S. Consulate General in Basrah, to include o Basrah Air Hub

North (DOS sites in this region are optional) o Erbil Diplomatic Support Center (EDSC)

B.2 TYPE OF CONTRACT

This is an indefinite-delivery, indefinite-quantity (IDIQ) contract, as defined in FAR 16.504

(Indefinite-Quantity Contracts), for non-commercial items. Contract types for the individual task orders will fall under one or more of the following, depending on the type, complexity, and urgency of the task order requirement: fixed-price, cost-reimbursement, labor-hour, and/or time-and-materials. If a task order will be performance-based, its requirements will be conveyed and administered at the task order level.

B.3 MINIMUM AND MAXIMUM QUANTITIES

a) The Government shall meet the contract minimum of $100,000.00 through the issuance of task order(s), and inclusive of all direct costs, indirect costs, and profit/fee within the contract’s five-year period of performance (base year plus four option years).

b) The maximum for the contract five-year period of performance (base year plus four option years) shall be any quantity or combination of supplies and services not exceeding

$1,000,000,000.00 (inclusive of all direct costs, indirect costs, and profit/fee).

Request for Proposal Support Services

B.4 CLIN STRUCTURE (FUNDING)

a) The contract will be funded pursuant to the following CLIN (contract line item number) structure:

CLIN Description

X001 Minimum Quantity

X002 Price (fixed-price)

X003 Price (labor-hour and time-and-materials)

X004 Direct and Indirect Costs (cost-reimbursement)

X005 Fee (e.g., cost-plus-fixed-fee)

b) CLIN X001 will be funded at the contract level if used, and CLINs X002–X005 will be funded at the task order level.

c) The dollar amounts listed under CLINS X001 through X005 will represent obligated/allotted dollars.

B.5 SUB-CLIN STRUCTURE (ESTIMATING AND BILLING)

a) Under each applicable CLIN, the Contractor will use sub-CLINs exclusively for estimating and billing purposes at the task order level.

b) The following is the first-tier list of sub-CLINs:

Sub-CLIN Description Reference

X00XA Reserved

X00XB BLiSS Support Services Sections B.7 and C

X00XC BLiSS Support Supplies Sections B.8 and C

X00XD BLiSS Program Management Office

Sections B.9, C, H.63

(Program Management), and

H.64(g)

c) The sub-CLIN, for each tier, is broken down as follows:

st identifier = contract year nd identifier = static digit rd identifier = static digit th identifier = last digit of CLIN th identifier = sub-CLIN cost element th identifier (if applicable) = continuation of sub-CLIN cost element th identifier (if applicable) = continuation of sub-CLIN cost element th identifier (if applicable) = continuation of sub-CLIN cost element

Request for Proposal Support Services

For instance, sub-CLIN 0004C will be used when other direct cost in support of performance is required during the base year under a cost-reimbursement arrangement (i.e., task order or line item in a task order).

B.6 TRANSITION PERIOD

a) All costs associated with Transition will be allocated as follows:

Labor Services- Included as part of the FFP under task order base period. Services’ costs are defined as costs for direct labor activities.

Other Direct Costs- Includes as part of CPFF under task order base period. ODC are cost directed by the Government and otherwise not included in the FFP services (e.g., equipment, spares, travel, post hardship differential, danger pay, and DBA)

B.7 BAGHDAD LiFE SUPPORT SERVICES

B.7.1 Food Services. This section applies when the Contractor proposes and the

Government awards the fixed-price under fixed-unit price with quantity variation arrangements (i.e., task orders or line items in a task order).

a) Applicable to Base Year. For Contractor planning purposes, the Base Year price for food will be $20 per person per workday for Full Authorized patrons (breakfast, lunch and dinner), and $8 per person per day for Partial Authorized patrons (lunch only), otherwise known as the Basic Daily Food Allowance (BDFA). The cost of operations for food service during the

Base Year will be provided as a separate Firm Fixed Price Offer under Section J Exhibit F

Pricing Table 2 attached, which cover labor with associated costs.

b) Applicable to Option Year 1-4. Fixed unit price (FUP) for breakfast, lunch, dinner and snack bar will be negotiated during the base year which will included cost of food and cost of operations.

B.7.2 Fuel Acquisition and Delivery Services - This section applies when the Contractor proposes and the Government awards the fixed-price under fixed-unit price with variation in quantities and economic price adjustment (EPA) arrangements (i.e., task orders or line items in a task order).

a) The following table displays the negotiated firm fixed unit prices (FUP) per gallon and per fuel type, for delivery of fuels: the fuel to be furnished during the period specified in each task order; the delivery points; methods of deliver;, and estimated quantities are shown below. The quantities shown are best estimates of required quantities only under the base period. Unless otherwise specified, the total quantity ordered and required to be delivered may be greater than or less than such quantities. Unit prices are effective for the base period and all option periods subject to EPA.

Request for Proposal Support Services

Items Fuel and Delivery Sites

Base Period

Estimated

Gallons

Firm Fixed

Price per

Gallon

X00XD3A

Basrah

Consulate General Basrah

Storage/Issuance facility capacity projected:

138K gallons Diesel

Capacity to be added in the future:

30K capacity Diesel

Delivery every 3 days two tankers Diesel

1,800,000

X00XD3B

Basrah

Consulate General Basrah every 4 weeks one tanker MOGAS

(assumes 8k X 2-3 or 1 x 32k Litres gallon tanker)

50,000

X00XD3C

BDSC diesel

2 delivery points on the West End and 1

East end

All deliveries pumped through the wall to storage tanks

6,600,000

X00XD3D

BDSC MoGas

2 delivery points on the West End and 1

East end

All deliveries pumped through the wall to storage tanks

165,000

X00XD3E

BEC diesel

Delivery Schedule: Daily

All deliveries pumped through the wall to storage tanks

2 delivery points on the West End and 1

East end

4,500,000

X00XD3F

BEC MoGas

Delivery Schedule: Weekly

All deliveries pumped through the wall to storage tanks

2 delivery points on the West End and 1

East end

320,000

X00XD3G

Prosperity (EAP) diesel

Delivery Schedule: Daily

2 210K gal fuel bags

6,500,000

Request for Proposal Support Services

Items Fuel and Delivery Sites

Base Period

Estimated

Gallons

Firm Fixed

Price per

Gallon

X00XD3H

Prosperity (EAP) MoGas

Delivery Schedule: Weekly

2 210K gal fuel bags

275,000

X00XD3I

EHP (diesel)

2 delivery points through the wall 7,200

b) The negotiated firm-fixed-unit-prices are in United States currency.

c) Each negotiated firm fixed unit price is based on work descriptions provided in Exhibit A.1

Attachment 12 Statement of Objective.

d) Each negotiated FUP consists of applicable costs, indirect costs, and profit. No other costs are included. Bulk fuel management, coordination of supply chains, order placements and administration will be captured in a separate CLINs under the Program Management Office task order.

e) The unit of measure of each negotiated firm fixed unit price is “per gallon”.

f) The Contractor is expected to be in compliance with applicable U.S. and GOI laws and regulations.

g) Any costs included in the negotiated FUP shall not be charged again elsewhere under this contract.

h) At the task order level, the awardee fixed-price will reflect the proposed FUP multiplied by the proposed and awarded number of units (gallons), respectively.

i) The prices paid shall be the Firm Fixed Price per Gallon specified in subsequent price change modifications issued in accordance with contract clause

NOTE: Vendor delivering the fuel must ensure all delivery tickets are signed by the BLiSS contractor’s designated representative and contains the representative’s printed name, organization and the date product was received at the delivery location.

B.7.3 BLiSS Task Orders-

a) See Section J Exhibit F Pricing Tables for Task Order 1 through 6 prices.

Request for Proposal Support Services

B.8 OTHER DIRECT COSTS

a) For purposes of this contract, supplies’ costs are defined as "direct non-labor costs/other direct costs (ODCs) and costs for materials [as defined in FAR 52.232-7(b)(1)(ii)(A), (B), and (C) (Payments under Time-and-Materials and Labor-Hour Contracts)]." This does not include food items and associated sundries.

b) Supplies’ costs and their associated indirect costs will be proposed and awarded at the task order level.

c) For supplies’ costs under arrangements when payment is made based on actual costs incurred

(e.g., cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements), the

Government will pay the actual incurred costs that the Contracting Officer determines allowable, pursuant to FAR 31.201-2 (Determining Allowability).

d) Government payment of indirect costs under cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements is described in Sections B.7 and B.8.

f) All costs associated with Life Support Supplies will be allocated to the following sub-CLINs under sub-CLIN X00XC:

Sub-CLIN X00XC1: Spares

Sub-CLIN X00XC2: Equipment

Sub-CLIN X00XC3: Travel

Each additional supply will be assigned a distinct sub-CLIN at the task order level.

B.9 PROGRAM MANAGEMENT OFFICE (PMO) TASK ORDER

a) For purposes of this contract, Program Management Office (PMO) costs are defined as “all direct and indirect costs associated with the contract-specified program manager labor category, and all direct and indirect costs required to manage the overall contract performance both in a domestic location and in Iraq.”

b) Examples of PMO costs may include:

1. Performing program management at the contract (country-wide) and task order levels;

2. Preparing contract deliverables (invoices, reports, etc.), excluding the Transition Plan;

3. Communicating with the Government about overall contract performance;

4. Preparing and negotiating task order proposals;

5. Preparing and negotiating contract and task order modification proposals;

6. Managing staff working directly on task order(s);

Request for Proposal Support Services

7. Managing logistics and establishing/overseeing supply chains for food purchasing and deliveries;

8. Managing and coordinating supply chains, and ordering fuels for all sites;

9. Managing subcontracts.

c) Costs for Contractor staff leading or working on a specific task order, or Contractor staff performing the technical requirements of the contract, are not considered PMO costs.

d) PMO costs will be proposed and awarded at the task order level.

e) All costs associated with PMO will be allocated to the following sub-CLINs under sub-CLIN

X00XD:

Sub-CLIN X00XD1A Domestic Services

Sub-CLIN X00XD2A Domestic Supplies

Sub-CLIN X00XD2A1 Travel

Sub-CLIN X00XD1B Iraq Services

Sub-CLIN X00XD2B Iraq Supplies

Sub-CLIN X00XD2B1 Travel

Sub-CLIN X00XD3A throuogh X00XD3I Bulk Fuel- See B.7.2 above

f) “Domestic” is defined as the “United States, which means the 50 States plus the District of

Columbia.”

g) For domestic services’ performance, each direct labor category and its costs collectively will be assigned a distinct sub-CLIN (i.e., X00XD1A1, X00XD1A2, etc.) at the task order level.

h) Each additional domestic supply will be assigned a distinct sub-CLIN (i.e., X00XD2A2, X00XD2A3, etc.) at the task order level.

i) For services’ performance in Iraq, each direct labor category and its costs collectively will be assigned a distinct sub-CLIN (i.e., X00XD1B1, X00XD1B2, etc.) at the task order level.

j) Each additional Iraq supply will be assigned a distinct sub-CLIN (i.e., X00XD2B2, X00XD2B3, etc.) at the task order level.

k) For a given direct labor category, Post Hardship Differential Pay (if applicable – see Section

B.14), Danger Pay (if applicable – see Section B.14), and DBA Insurance (see Section B.15) costs, in addition to other costs, shall each be allocated on a separate line item under the labor category’s distinct sub-CLIN.

Request for Proposal Support Services

l) Services’ costs are defined as "costs for direct labor activities, as required under Sections

H.63 (Program Management) and H.64 (g)."

m) Supplies’ costs (except fuel) are defined as "direct non-labor costs/other direct costs (ODCs) and costs for materials [as defined in FAR 52.232-7(b)(1)(ii)(A), (B), and (C) (Payments under Time-and-Materials and Labor-Hour Contracts)], as required under Sections H.63

(Program Management) and H.64(g)."

n) Fuel costs are fixed unit prices subject to economic price adjustment in accordance with

Clause B.18.

o) Payment under the different contract types is described in Sections B.11 and B.12.

B.10 GENERAL PAYMENT INFORMATION

a) At the task order level, the Contractor may be paid for or recover (if consistent with FAR

Part 31 and the Contractor’s disclosed cost accounting practices) allowable direct and applicable indirect costs under arrangements when cost analysis is performed and/or under arrangements when the determination, negotiation, or allowance of costs are required by a contract clause (e.g., FAR 52.216-7, FAR 52.232-7, and FAR 52.232-16) (see FAR 31.000).

b) The Contractor may also be paid for applicable indirect costs as part of the awarded fixed-price under competitively-awarded fixed-price task orders.

c) For cost-reimbursement arrangements and the materials portion of time-and-materials arrangements, the Contractor must estimate applicable direct and indirect costs in its task order proposals in order to be eligible to recover such costs after their incurrence after task order award. The Government will not reimburse costs for cost elements for which there are no estimated costs, except under Baghdad Task Order Operations and Maintenance Supplies, whereby the contractor will be permitted to recover all allowable actual incurred costs. Any other exceptions must be issued by the Contracting Officer.

B.11 PROVISIONAL BILLING INDIRECT COST RATES

a) This section applies to cost-reimbursement arrangements (i.e., task orders or line items in a task order), and materials portion of time-and-materials arrangements.

b) The following table displays the negotiated provisional billing indirect cost rates:

Indirect Cost Rate

Description

Negotiated Provisional

Billing Indirect Cost

Rate

Allocation Base

Contractor Fiscal

Year Period

1)

Request for Proposal Support Services

2)

c) The Contractor may recover, if consistent with FAR Part 31 and the Contractor’s disclosed cost accounting practices, allowable indirect costs.

d) Only the Contractor's indirect cost rates are identified above.

e) The Contractor shall be reimbursed:

1. only the indirect cost rate descriptions identified in the table unless prior written approval was obtained by the Contractor’s cognizant Federal agency official; and

2. at the negotiated provisional billing indirect cost rates until revised billing indirect cost rates or final indirect cost rates have been established by the Contractor’s cognizant Federal agency official.

f) If any revised billing indirect cost rate or final indirect cost rate(s) established by the

Contractor’s cognizant Federal agency official exceeds this contract’s respective ceiling indirect cost rate (see Section B.12), the Contractor shall be reimbursed at the contract’s ceiling indirect cost rate.

g) The Contractor shall make no change to its disclosed method of classifying or allocating indirect costs without the prior written approval of the Contractor’s cognizant Federal agency official.

h) The Contractor’s fiscal year period is the period used by the Contractor for cost accounting purposes.

B.12 CEILING INDIRECT COST RATES

a) This section applies to cost-reimbursement arrangements (i.e., task orders or line items in a task order), materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements.

b) The following table displays the negotiated ceiling indirect cost rates:

Description

Negotiated Ceiling

Allocation Base

Contractor Fiscal

Year Period

1)

Request for Proposal Support Services

2)

c) The negotiated ceiling indirect cost rates will be compared to the respective established final indirect cost rates, and the Government shall pay the lesser of the negotiated ceiling indirect cost rates and the respective established final indirect cost rates. See Section B.11(f) for the other usage of the negotiated ceiling indirect cost rates.

d) If the Government uses the quick-closeout procedure provided in FAR 52.216-7 (Allowable

Cost and Payment), the Government will not pay indirect cost rates that exceed the respective negotiated ceiling indirect cost rates.

B.13 TRAVEL COSTS

a) Travel under this contract is defined as Contractor air and ground transportation, lodging, meals and incidental expenses, travel time, and passport/visa costs.

b) Travel costs shall be allocated accordingly pursuant to Sections B.6, B.8 (f), and B.9 (e).

Travel must be directly related to and be required for performance of the contract. In no event shall costs associated with employees commuting be payable as a direct cost under this contract.

c) Except as otherwise provided herein, the Contractor shall be paid its allowable travel costs in accordance with FAR 31.205-46 (Travel Costs).

d) Travel costs are authorized only for travel beyond a 50-miles’ radius of the Contractor employee’s local place of performance (official duty station) whenever work is required to be accomplished at a remote work site.

e) No travel costs (or associated labor time during travel) shall be allowable for work performed at a Contractor’s local office or any other work site within a 50-miles’ radius of the

Contractor employee’s local place of performance (official duty station).

f) No travel costs (or associated labor time during travel) shall be allowable for telecommuting beyond (or within) a 50-miles’ radius of the Contractor’s local place of performance (official duty station).

g) Costs when using a privately owned vehicle (POV) for official travel are allowable provided that such costs are reasonable and do not exceed costs that would have resulted from use of

Request for Proposal Support Services other reasonable transportation methods (e.g., taxi, airplane, train). Reasonable associated costs, such as tolls and parking fees, are also generally allowable.

h) When traveling in a POV for official travel, the Contractor shall be paid mileage costs at a rate that does not exceed the POV mileage rate established by the Internal Revenue Service.

i) Costs for car rentals for official travel are allowable pursuant to the following:

1. such rentals are consistent with good business practice;

2. such costs are reasonable and do not exceed costs that would have resulted from use of other reasonable transportation methods (e.g., taxi, airplane, train); and

3. such costs do not exceed the actual cost of renting a compact automobile (maximum of one automobile for four Contractor personnel), unless extenuating circumstances

(e.g., excess baggage) require other arrangements and Contracting Officer approval is obtained.

4. Reasonable associated costs, such as tolls and parking fees, are also generally allowable.

j) After task order award under a cost-reimbursement arrangement or the materials portion of a time-and-materials arrangement, travel must be authorized in advance by the Contracting

Officer’s Representative or Government Technical Monitor.

k) The following items concern passports and visas:

1. The Contractor shall be responsible for ensuring that all personnel who will be required to travel outside the United States have a current and valid U.S. passport.

2. The Contractor shall be responsible for obtaining any visas required for travel to foreign countries under this contract.

3. The Contractor’s costs for obtaining and maintaining passports and/or visas will be generally allowable, but the Contractor shall pro-rate equitably such costs if they will benefit cost objectives (e.g., contracts) other than this cost objective.

4. The Government will not reimburse the Contractor for travel expenses when travel is cancelled or modified as a result of the Contractor’s failure to obtain a visa.

Request for Proposal Support Services

l) Costs for travel that have been modified or cancelled are not allowable unless such modification or cancellation was caused by the Government or otherwise exceeded the control of the Contractor.

m) Pursuant to FAR 47.402, 47.403, and the Fly America Act, the Contractor shall use a U.S.-flag air carrier service unless specific conditions exist. If such conditions exist under a fixed-price arrangement (i.e., task order or line item in a task order), the Contractor shall submit with its task order proposal a memorandum explaining why it does not intend to use a U.S.-flag air carrier service. Inclusion of such costs in the awarded fixed-price is contingent upon

Government acceptance of such explanation.

If such conditions exist under arrangements when payment is made based on actual costs incurred (e.g., cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements), the

Contractor shall submit with its voucher a memorandum explaining why it did not use a

U.S.-flag air carrier service. Reimbursement is contingent upon Government acceptance of such explanation.

n) The costs of going from post of duty in the host country to the Washington, D.C., area shall be generally allowable when a Contractor employee must interrupt his/her overseas

Temporary Duty (TDY) and return to the U.S. and the Contractor makes a written determination that such travel is necessary due to death, or serious illness or injury of a member of the immediate family of the employee or the immediate family of the employee's spouse. "Serious illness or injury" and "immediate family" are defined in accordance with

Section 699.5 of the Uniform State/AID/USIA Regulations, in effect of the date of such travel. A copy of the written determination shall be furnished to the Contracting Officer.

o) When, for any reason other than emergency medical evacuation (MEDEVAC), the COM determines it is necessary to evacuate the Contractor's employees, these employees’ travel costs from post of duty in the host country to the Washington, D.C. area shall be generally allowable.

p) The COR may also authorize emergency or irregular travel and transportation in other situations, when in his/her opinion, the circumstances warrant such action. In such cases, the

Contractor employees’ travel costs shall be generally allowable.

q) Except as noted above, any costs resulting from a failure of a Contractor's employee to complete his/her assignment because of a personal reason shall not be allowable.

B.14 POST HARDSHIP DIFFERENTIAL PAY AND DANGER PAY

Post Hardship Differential Pay and Danger Pay, which are forms of incentive compensation, will be generally allowable If applicable, they shall be allocated to a separate CLIN or sub-CLIN.

Request for Proposal Support Services

However, Government payment of such costs is contingent on the Contractor meeting all of the following requirements:

a) Payment will be made only for areas identified as Post Hardship Differential Pay areas and/or

Danger Pay areas in Section 920 of the Department of State Standardized Regulations

(DSSR).

b) Paying Post Hardship Differential Pay and Danger Pay is part of the Contractor’s established incentive compensation plan or policy, or employer/employee agreement entered into in good faith before the services are rendered, pursuant to FAR 31.205-6(f)(1)(i) (Bonuses and

Incentive Compensation).

c) When paying Post Hardship Differential Pay and Danger Pay is part of the Contractor’s established incentive compensation plan or policy, such plan or policy is followed consistently as to imply, in effect, an agreement to make such payment, pursuant to FAR

31.205-6(f)(1)(i) (Bonuses and Incentive Compensation).

d) The Contractor's basis for paying Post Hardship Differential Pay and Danger Pay is supported, pursuant to FAR 31.205-6(f)(1)(ii) (Bonuses and Incentive Compensation).

e) Payment of such costs is otherwise consistent with FAR Part 31.

f) Payment will be made only for eligible employees. Eligible employees are employees:

i. whose country of citizenship is not in the task order place of performance; and

ii. whose primary residence is in an area not identified in Section 920 of the DSSR, or an area identified in Section 920 of the DSSR with an applicable DSSR percentage that is less than the respective applicable DSSR percentage for the task order place of performance.

g) Payment for a given workweek for an eligible employee will not exceed the dollar amount resulting from multiplying the applicable DSSR percentage by the employee’s basic compensation for the given workweek.

h) The applicable DSSR percentage will be the DSSR percentage effective at the time of task order proposal(s) (or later time until task order award, if feasible) when the Contractor proposes and the Government awards the fixed-price under fixed-price arrangements (i.e., task orders or line items in a task order).

i) The applicable DSSR percentage will be the DSSR percentage effective at the time of task order performance for arrangements when payment is made based on actual costs incurred arrangements, and progress payments based on costs under fixed-price arrangements).

Request for Proposal Support Services

j) An eligible employee’s basic compensation for a given workweek is the dollar amount attributable to the employee as a result of the employee’s productive hours and paid time off

(e.g., sick, vacation, holiday) hours for the given workweek. It is the employee’s base salary/unloaded compensation for the given workweek. However, such compensation must:

i. benefit the task order; and/or

ii. be an equitable amount that is necessary to the overall operation of the business, although a direct relationship to any particular cost objective (e.g., task order) cannot be shown.

k) The number of hours included in an eligible employee’s basic compensation for a given workweek cannot exceed the number of hours for the task order’s normal workweek.

l) Basic compensation included in the negotiated firm-fixed-unit-prices in Section B.7 (b) consists of each eligible employee’s negotiated base salary/unloaded compensation for the contract period of performance.

m) Basic compensation will consist of proposed (or later time until task order award, if feasible) base salary/unloaded compensation for labor-hour arrangements and the time portion of time-and-materials arrangements.

n) Basic compensation will consist of actual incurred base salary/unloaded compensation for arrangements when payment is made based on actual costs incurred (e.g., cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements).

o) An eligible employee may receive Post Hardship Differential Pay and Danger Pay during paid time off only when the employee takes paid time off in the task order place of performance or in another Post Hardship Differential Pay and Danger Pay area, respectively.

When an eligible employee takes paid time off in another Post Hardship Differential Pay and/or Danger Pay area, payment will be based on the applicable DSSR percentage(s) for the task order place of performance.

p) Payment of Post Hardship Differential Pay for an eligible employee will not commence until the eligible employee has served 42 calendar days in the task order place of performance.

Payment will commence on the first productive or non-productive day after day 42, and will be retroactive to day 1 served unless Iraq is removed from Footnote N in the Post

Classification and Payment Tables in Section 920 of the DSSR (in which case, payment will not be retroactive). The 42 calendar days are not required to be consecutive, and “served” consists of productive time, paid time off, and time otherwise spent in the task order place of

q) Payment of Post Hardship Differential Pay for an eligible employee will conclude when the eligible employee departs the task order place of performance, unless such departure is to another Post Hardship Differential Pay area during paid time off.

Request for Proposal Support Services

r) For Post Hardship Differential Pay, when an eligible employee has not yet served 42 calendar days and returns to the task order place of performance after an absence from the task order place of performance, the number of days served resumes on the day of return.

For example, if an eligible employee served 30 calendar days in the task order place of performance and departed the task order place of performance for 14 days, the day of return

(day 44) will be considered day 31 of days served.

s) Payment of Danger Pay for an eligible employee will commence on the day of arrival in the task order place of performance and conclude on the day of departure from the task order place of performance, unless such departure is to another Danger Pay area during paid time off.

B.15 DEFENSE BASE ACT (DBA) INSURANCE

a) Defense Base Act (DBA) Insurance costs shall be allocated to a separate CLIN or sub CLIN..

b) The Contractor will have a DBA self-insurance program approved by the Department of

Labor or an insurance policy with an insurance company approved by the Department of

Labor. Approved providers can be found at the Department of Labor website http://www.dol.gov/owep/dlhwc/lscarrier.htm. .

c) Payment will be made only for performance occurring outside the United States of America.

d) Payment will be made only to covered Contractor and subcontractor employees. They are:

United States citizens or residents;

hired in the United States or its possessions, regardless of citizenship; or local nationals and third country nationals where task order performance takes place in a country where there are no local worker’s compensation laws.

e) DBA Insurance costs included in the proposed and awarded fixed-price under fixed-price arrangements (i.e., task orders or line items in a task order) will reflect each covered employee’s proposed and awarded taxable compensation, respectively, for the task order period multiplied by the DBA Insurance rate negotiated in the Contractor’s DBA Insurance policy or established in the Contractor’s DOL-approved self-insurance program.

f) For arrangements when payment is made based on actual costs incurred (e.g., cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements), Government payment of

DBA Insurance costs will reflect each covered employee’s actual incurred taxable http://www.dol.gov/owep/dlhwc/lscarrier.htm

Request for Proposal Support Services compensation multiplied by the DBA Insurance rate negotiated in the Contractor’s DBA

Insurance policy or established in the Contractor’s DOL-approved self-insurance program.

g) The employee’s taxable compensation for the period is:

the amount that benefits the task order(s); or an equitable amount that is necessary to the overall operation of the business, although a direct relationship to any particular cost objective (e.g., task order) cannot be shown.

h) “Taxable compensation” is compensation considered by the Internal Revenue Service as gross income for income tax purposes (e.g., Unloaded Labor, Bonus, Post Hardship

Differential Pay, and Danger Pay).

B.16 OVERTIME

Generally, for the firm fixed price task orders, the Government will not pay for overtime. The below only pertains to any task orders issued as other than a fixed-price arrangement.

a) Overtime is defined as time worked in excess of the number of hours in a normal workweek..

b) “Number of hours” includes productive time hours, travel time hours, and paid time off hours

(e.g., sick, vacation, holiday).

c) “Productive time hours” consist of hours that, other than travel time hours, directly benefit the contract.

d) “Travel time hours” consist of hours spent by the employee traveling to or from authorized work locations. See Section B.13 (j) for further information.

e) A normal workweek is defined in Section B.7 (g).

f) Payment for overtime must be authorized in writing by the Contracting Officer or his designated representative prior to the employee performing any overtime.

g) Payment for overtime must not conflict with any Contractor uncompensated overtime policy or practice.

h) For labor-hour arrangements and the time portion of time-and-materials arrangements, any

Government payment for Contracting Officer-authorized-employee overtime will be made at the fixed fully-loaded hourly labor rates negotiated in the task order for normal workweek

Request for Proposal Support Services

i) For cost-reimbursement arrangements and the materials portion of time-and-materials arrangements, any Government payment for Contractor employee overtime will be made at the actual incurred hourly labor rate that the Contractor pays the Contracting Officer-authorized employee and determined allowable by the Contracting Officer. Such payment will be based on law, regulation, and Contractor policy or practice.

j) A Contracting Officer-authorized employee is a Contractor employee who has been granted permission by the Contracting Officer to work overtime.

k) The Government generally discourages overtime, so the Contractor agrees to use its best efforts to avoid (and when applicable, control) overtime.

B.17 DATA OTHER THAN CERTIFIED COST OR PRICING DATA

The Government did not require and rely upon certified cost or pricing data, as described in FAR

Subpart 15.4, for award of the contract because adequate price competition had been obtained.

Instead, where applicable, the Government required and relied upon data other than certified cost or pricing data.

B.18 ECONOMIC PRICE ADJUSTMENT (APPLICABLE TO FUEL ACQUISITION)

(a) WARRANTIES. The Contractor warrants that—

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this contract.

(b) DEFINITIONS. As used throughout this clause, the term—

(1) Award price - the unit price offered by the Contractor and set forth opposite the item in the Schedule.

(2) Reference price - the market price, this is either published in an independent publication or supplied by the Contractor, with which the award price is to fluctuate. The reference price should be a market price for the same or similar product(s) as the item being purchased.

(3) Date of delivery means - The date product is received.

(c) ADJUSTMENTS. The prices payable under this contract shall be the award price increased or decreased by the amount, determined according to the following formula that the reference price shall have increased or decreased, to and including the date of delivery.

(1) The amount of increase or decrease in the award price shall be based on the same number of cents, or fraction thereof, that the reference price increases or decreases per like unit of measure.

Request for Proposal Support Services

(2) The reference price with which the award price for the listed item is to fluctuate (and which is more fully defined in the Table below) is—

(i) The average of the prices published in _Platts Oilgram. See http://www.platts.com/Products/oilgrampricereport, http://www.platts.com/Products/asiapacificarabgulfmarketscan

(ii) The established price posted by the Iraqi Ministry of Oil, Oil Products

Distribution Company (OPDC). See http://wiki.openoil.net/index.php?title=Iraqi_Ministry_of_Oil

(3) COMMERCIAL. For price adjustments utilizing commercial publications such as

Platts Oilgram, etc., the reference price in effect on the date of delivery shall be that item’s reference price that is in effect for the dates in the Table below.

If an effective date is not cited in a publication, then the date of publication shall apply. An increase or decrease in any reference price published in a trade price service or in a commercial journal shall apply only to deliveries made on or after the effective date of such trade price service or commercial journal. In the event of a holiday for which an effective date is not used, the latest effective price(s) prior to the effective date shall be used.

NOTE: Platts issues corrections to its published prices on a regular basis. Platts posts corrections to its website (www.platts.com) for its subscribers. If a correction to a reference price is found on the Platts website, all of the items that use that reference price will be corrected. The Department of State (DoS) will correct any other reference prices, as notice of the correction is received. DoS will work with the pricing services to determine the appropriate price, whenever an offeror or contractor can show that the price referenced should be reviewed.

(4) NONCOMMERCIAL (NOTIFICATION). For price adjustments utilizing a reference price indicator other than commercial publications such as Platts Oilgram, the

Contractor shall notify the Contracting Officer (CO) of any changes in the reference price in writing within 15 calendar days from the date thereof.

(i) INCREASES. Any increase in unit price as a result of an increase in reference price shall apply only to deliveries made on or after the date of receipt by the CO of a written notification from the Contractor of such increase. However, the prices payable under this contract shall in no event exceed the Contractor’s posted or established selling price in effect on the date of delivery for the product supplied in the form of delivery made at the point of delivery.

Also, no notification incorporating an increase in a contract unit price shall be executed pursuant to this clause until the increase has been verified by the CO.

(ii) DECREASES. If the Contractor fails to notify the CO of any decrease in the reference price, within the allotted 15 day period, such decrease shall apply to all deliveries made on or after the effective date of such decrease. However, if any overpayment is made to the

Contractor as a result of the Contractor’s failure to give timely notice to the Contracting

Officer of any decrease in the established price, the Contractor shall be charged interest on such overpayment from the date of the overpayment to the date of reimbursement by the Contractor http://www.platts.com/Products/oilgrampricereport http://www.platts.com/Products/asiapacificarabgulfmarketscan http://wiki.openoil.net/index.php?title=Iraqi_Ministry_of_Oil

Request for Proposal Support Services for the overpayment in accordance with the Disputes paragraph of the CONTRACT TERMS

AND CONDITIONS – COMMERICAL ITEMS clause of this contract.

(5) Where the reference price is the Contractor’s established price (see (c)(2)(iii) above), the Contractor warrants that the product selected is one for which, except for modification required by the specifications of this contract, the Contractor has an established price. Such price is the net price after applying any applicable standard trade discounts offered by the Contractor for its catalog, list, or schedule price. The Contractor further warrants that, as of the current date, any differences between the unit prices of the line items identified in the

Schedule and the Contractor's established price for like quantities of the nearest commercial equivalents of such contract items are due to compliance with contract specifications and to compliance with any requirements that this contract may contain for preservation, packaging, and packing beyond standard commercial practice.

(d) MODIFICATIONS. Any resultant price changes shall be provided via notification through contract modifications and/or postings to the DOS ENERGY web page at http://www.desc.DoS.mil/ under the heading Vendor Resources and then Product Price

Adjustments.

(e) FAILURE TO DELIVER. Notwithstanding any other provisions of this clause, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Excusable Delays and Termination for Cause paragraphs of the CONTRACT TERMS AND CONDITONS – COMMERCIAL ITEMS clause of the this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(f) UPWARD CEILING ON ECONOMIC PRICE ADJUSTMENT. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed 200 percent of the award price, except as provided hereafter:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the CO in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the CO.

(2) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the CO issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the

CO shall so promptly notify the Contractor in writing.

(g) REVISION OF REFERENCE PRICE INDICATOR. In the event—

Request for Proposal Support Services

(1) Any applicable reference price is discontinued or its method of derivation is altered substantially;

(2) The reference price is an average of published or posted prices, and any one price ceases to be published or posted;

(3) The reference price is published in a trade price service or commercial journal and such publication ceases to publish said reference price or changes its method of quoting prices;

or

(4) The CO determines that the reference price consistently and substantially failed to reflect market conditions—the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustment described hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract.

(h) CONVERSION FACTORS. If this clause requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the

CONVERSION FACTORS clause, apply unless otherwise specified in the Schedule.

(i) EXAMINATION OF RECORDS. The Contractor agrees that the CO or designated representatives shall have the right to examine the Contractor’s books, records, documents, or other data the CO deems necessary to verify Contractor adherence to the provisions of this clause.

(j) FINAL INVOICE. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

Request for Proposal Support Services

SECTION C – STATEMENT OF WORK

C.1 STATEMENT OF WORK

C.1.A Background

This requirement is in support of the U.S. Department of State (DOS) mission in Iraq, providing life support and logistics functions for DOS sites. This document defines the general contract scope and will serve as the basis for all task orders issued for support services

This SOW establishes general Contractor requirements for Baghdad Life Support Services

(BLiSS) contract for support functions to the DOS in the country of Iraq. The Contractor shall furnish all supervision, labor, housing (unless provided by the USG for a limited number of contractor employees providing critical services as detailed in Section J Exhibit A.1 Attachment

6), and transportation required for the satisfactory performance of work, as specified in each task order.

The current DOS sites are broken down below by regions. DOS sites within Iraq may be added or removed under this contract as future conditions change:

Central – Baghdad Embassy Compound (BEC), to include o Olympia o Embassy Heliport (EHP) o Embassy Annex Prosperity (EAP)

Note: This area may be referred to as “International Zone” or “IZ” in this document.

Central - Baghdad Diplomatic Support Center (BDSC), at the Baghdad International

Airport (BIAP)

South – U.S. Consulate General in Basrah, to include o Basrah Air Hub

North (DOS sites in this region are optional) o Erbil Diplomatic Support Center (EDSC)

The Government reserves the right to expand the list of sites within Iraq during the life of this contract. This may be in the form of a comprehensive assignment of BLiSS tasks to a specific location, or a menu of tasks assigned on an as-needed basis.

Request for Proposal Support Services

The BLiSS Statements of Objectives (SOO) are furnished in Section J Exhibit A.1.Each SOO defines the objectives by services and site locations. Offerors shall propose a Performance Work

Statement (PWS) and identify all performance metrics, as a part of their technical proposal for evaluation for each site (BEC/IZ, BDSC and Basrah).

Current life support for these sites is provided by the U.S. Army Materiel Command's "LOGCAP

IV" (Logistic Civil Augmentation Program), Defense Logistics Agency (DLA), and Army

Sustainment Command (ASC) Green Equipment Maintenance contract. These contracts and arrangements are due to end in December 2013. The intent is to award this contract prior to May

1, 2013 and transition to a new DOS contract no later than October 1, 2013.

C.1.B A general description of each site is provided below:

Baghdad Embassy Compound (BEC)–

The BEC is located in the International Zone (IZ) in Baghdad, Iraq and consists of 104 acres.

This is the largest U.S. Embassy in the world. The mission of the United States Embassy in

Baghdad is to represent the United States of America to the Government of Iraq (GOI).

The U.S. Ambassador COM (Chief of Mission) is the U.S. President's representation to the GOI.

The BEC contains several different dining facilities: 2 major cafeterias with one on the main Embassy compound and the second at Camp Condor, and 3 snack bar operations located in the Embassy compound.

The main dining facility cafeteria area on the Embassy Compound is a 3,000 square meter facility that currently has a feeding and seating capacity of roughly 2,500 personnel. This area does not include the various refrigerated vans and containers used for storage of frozen, chilled and dry storage of food, or supplies. The dining area is 2100m2, kitchen 760m2, and serving lines 460m2. The food preparation areas and equipment are state-of-the-art, and all equipment and furnishings are in serviceable condition. Additional feeding capacity projects are being contemplated to accommodate personnel surges. The maximum occupancy on the BEC is 2600, while Camp Condor houses 1129 and has its own dining facility.

Currently, Local Nationals (LNs) are only entitled to lunch meals, not breakfast or dinner. The largest feeding requirement occurs during lunch time on week days as LN direct hire personnel are entitled to eat lunch meals. Three snack bar operations located on the Embassy compound (1 within Annex 1, 1 in Annex 2, and 1 in the Chancery) alleviate the feeding demand during the lunch meal at the cafeterias. Two of the snack bar operations serve only cold sandwiches and hot soup. The Annex 1 snack bar is equipped with a grill that provides a hot entrée lunch item 5 days a week: Sunday through Thursday.

Hours of Operation: See Section J Exhibit A.1

When IZ is used in this document, it includes the BEC, Camp Olympia, EAP, Camp Condor and the Embassy Heliport, unless otherwise stated.

Request for Proposal Support Services

Diplomatic Security Man Camp (Camp Condor). Considered part of the Baghdad Embassy

Compound and located adjacent to it, is the Diplomatic Security (DS) Man Camp, Camp Condor.

The site houses approximately 1,200 people. Camp Condor contains five one-megawatt backup generators, a water treatment system with two wells and a waste water treatment plant. The

Condor DFAC is a 1600 square meter facility that serves 1,200 residents three meals per day, consisting of a dining area, kitchen and serving lines. The food preparation areas and equipment are state-of-the-art, and all equipment and furnishings are in serviceable condition.

Camp Olympia –

Is a 45-acre site, consisting of the Embassy HeliPort (EHP), the RSO Firing

Range, and lay down Yard, located within the International Zone.

Embassy Heliport –

Located within the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .