This document is a structural design calculation report prepared by TLP Engineering Consultants Inc. for the Reedy Creek Improvement District in Orange County, Florida, detailing the design of two replacement overhead sign truss structures (OT-1 and OT-2) located along Epcot Center Drive. The project, identified as CFTOD C006779, involves the replacement of span trusses for overhead sign structures using LRFD methodology and FDOT design specifications. The OT-1 truss structure measures 67 feet in length with left and right truss heights of 24.133 feet and 25.803 feet respectively, while the OT-2 structure spans 75 feet with heights of 23.483 feet and 24.433 feet. Both structures utilize 5.563-inch O.D. pipe chords with 0.375-inch wall thickness, 4-inch by 4-inch by 0.5-inch web angles, and 24-inch O.D. pipe uprights with 0.562-inch wall thickness. The design incorporates comprehensive connection details, drilled shaft foundations, and reinforcement specifications, with all design checks returning "OK" status. The calculations were completed on March 19, 2026, and approved by David Michael Waddell, P.E., under Certificate of Authority #27382.
The design calculations demonstrate that both overhead sign structures meet all LRFD and FDOT specifications for structural adequacy under wind loads of 150 mph at design heights of 67 and 75 feet respectively. Foundation design incorporates drilled shafts with 5-foot diameters; the OT-1 structure requires 19-foot and 18-foot deep shafts at the left and right uprights respectively, while the OT-2 structure requires 17-foot and 20-foot deep shafts. Both structures include 19 number 11 reinforcing bars evenly spaced with 8-inch stirrup spacing in designated zones. Anchorage consists of 2-inch diameter ASTM F1554 bolts, with 10 bolts at each base connection embedded 40 inches into the drilled shafts. All fatigue calculations, connection checks, shear and torsion resistance, and reinforcement capacity evaluations conform to applicable standards with adequate safety margins. The document includes detailed specifications for splices, gusset plates, base connections, and longitudinal and transverse reinforcement requirements necessary for construction implementation.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EPCOT CENTER DRIVE
Orange County, Florida
MISCELLANEOUS STRUCTURES DESIGN CALCULATIONS
Prepared for:
Reedy Creek Improvement District
Prepared by:
TLP Engineering Consultants Inc.
450 South Orange Avenue, Suite 450
Orlando, Florida 32801
March 2026
APPROVED BY:
THIS DOCUMENT HAS BEEN DIGITALLY SIGNED
AND SEALED BY
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED. THE SIGNATURE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES.
TLP ENGINEERING CONSULTANTS, INC.
450 SOUTH ORANGE AVE., SUITE 600
ORLANDO, FLORIDA 32801
PH: 407-901-5060
CERT. OF AUTH. #27205
DAVID MICHAEL WADDELL, P.E. NO. 37382
No.37382 pwheatley Text Box
SA-04
Miscellaneous Structures
EPCOT Center Drive
Overhead Sign Replacement
Span Truss Overhead Sign Design
Span Overhead Sign Program LRFD v1.5
© 2021 Florida Department of Transportation
User manual including Program Changes
FDOT
Design Specifications & References:
[LRFD LTS] AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires & Traffic Signals [AASHTO] AASHTO LRFD Bridge Design Specifications.
[SMn] - FDOT Structures Manual. n=1: Structures Design Guidelines; n=3: FDOT Modifications to Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals (LRFDLTS).
[Index] - FDOT Standard Plans.
[AISC} Steel Construction Manual.
Reference:J:\PROJECTS\T202502 - CFTOD C006779 GEC Services\TWO No. 1_ECD OH Truss Design\Project Data\Structures\Task 2
Change Folder Data Files Folder
J:\PROJECTS\T202502 - CFTOD C006779 GEC Services\TWO No. 1_ECD OH Truss Design\Project Data\Structures\Task 2 - OH Signs\Design\OH Sign Structures\MathCad Files\OverheadSign-SpanV1.5\Data\
Open Existing Data File (optional)
Sign Number
ECD_OT-1.dat ECD_OT-2.dat Ex1 - Static Sign Panels (Typical).dat Ex2 - Static Sign Panels Front and Back.dat Ex3 - Long Span Structure.dat Ex4 - Walk-In DMS with Walkway.dat Ex5 - Front-Access DMS with Static Signs.dat Ex6 - Walk-In and Front-Access DMS.dat
Station
Project Data
Project Name
CFTOD C006779Project No.
3/18/26Designed by Date
JFM 3/19/26Checked by Date
Sign Structure Data
DMW
ECD TRUSS REPLACEMENT
OT-1
19+00.73
Refresh List
Open File
Page 1 of 34 Printed: 3/19/2026 10:00 AM
Span Overhead Sign Program
Material Properties Data Upright and Chords: ASTM A500, Web Angles: ASTM A709 Grade 36
Vertical Clearance
58Fy of Upright ksi Fu of Upright ksi ft
58Fy of Web ksi Fu of Web ksi
58Fy of Chord ksi Fu of Chord ksi
Truss Data
Truss Length ft ft
Left Truss Height ft
Right Truss Height
No. of Truss Panels
Vert. Truss Depth ft
Wind Load Data Standard Plans and
Instructions Index 700-041Design Wind Speed mph
36Wind Height ft
67.00
24.133
25.803
18.583
3/19/2026 SpanOverheadSignOT-1.xmcd Page 2/34
Load Data
Reset Load Data
Show Panels 11-20Sign Panels
Sign Panel Number
Panel Length
(ft)
Height
Horizontal Offset
Vertical Offset*
Back-side Mounted?
Weight (psf)
Walkways
Walkway
Width
Number of Hangers
(plf)
Attachments
Attachment
Projected Area
(sq. ft)
Drag Coeff., Cd
Attached to Which Chord Member?
(Top / Bottom / Back)
Horizontal
* Vertical offsets are input as negative values when element centroid is below the truss centerline.
Attachment
(lb)
DMS Panels
DMS Panel
Depth
2.13 1.08 -6.5433.5 5
23.0 12.0 50.5 0.0 5
2.13 1.08 44.5 -6.54 5
23.01 12.0 26.5 0.0 5
3/19/2026 SpanOverheadSignOT-1.xmcd Page 3/34
Member Data
Member Properties
Chord Size Design Properties
Nominal Weight
5.56Outside Diameter ( D ) in
0.349Wall Thickness ( t ) in
5.72Area ( A ) in2
19.5Moment of Inertia ( I ) in4
1.85Radius of Gyration ( r ) in
39Torsional Constant ( J ) in4
20.8Nominal Weight plf
Web Size Design Properties plf
4Leg Length ( b ) in
0.5Leg Thickness ( t ) in
3.75Area ( A ) in2
1.18Dist. to Centroid ( x
) in
5.52X Moment of Inertia ( Ix ) in4
1.21X Rad. of Gyration ( rx ) in
0.776Z Rad. of Gyration ( rz ) in
12.8Nominal Weight plf
Left Upright Size Design Properties
Outside Diameter ( D ) in
Wall Thickness ( t ) in
Area ( A ) in2
Moment of Inertia ( I ) in4
Radius of Gyration ( r ) in
Torsional Constant ( J ) in4
Nominal Weight plf
Right Upright Size Design Properties
Outside Diameter ( D ) in
Wall Thickness ( t ) in
Area ( A ) in2
Moment of Inertia ( I ) in4
Radius of Gyration ( r ) in
Torsional Constant ( J ) in4
41.4
140.8
8.29
0.562
41.4
140.8
8.29
0.562
3.50" O.D. Pipe, 0.216" Wall 4.00" O.D. Pipe, 0.226" Wall 4.50" O.D. Pipe, 0.237" Wall 4.50" O.D. Pipe, 0.337" Wall 5.563" O.D. Pipe, 0.258" Wall 5.563" O.D. Pipe, 0.375" Wall 6.625" O.D. Pipe, 0.432" Wall 8.625" O.D. Pipe, 0.500" Wall
CUSTOM
Angle 2-1/2" x 2-1/2" x 1/4" Angle 3" x 3" x 1/4" Angle 3" x 3" x 5/16" Angle 3-1/2" x 3-1/2" x 5/16" Angle 3-1/2" x 3-1/2" x 3/8" Angle 4" x 4" x 3/8" Angle 4" x 4" x 1/2" Angle 5" x 5" x 1/2"
CUSTOM
12.75" O.D. Pipe, 0.375" Wall 14" O.D. Pipe, 0.375" Wall 16" O.D. Pipe, 0.375" Wall 18" O.D. Pipe, 0.438" Wall 20" O.D. Pipe, 0.500" Wall 24" O.D. Pipe, 0.375" Wall 24" O.D. Pipe, 0.562" Wall 24" O.D. Pipe, 0.750" Wall 30" O.D. Pipe, 0.500" Wall 30" O.D. Pipe, 0.625" Wall 30" O.D. Pipe, 0.750" Wall
12.75" O.D. Pipe, 0.375" Wall 14" O.D. Pipe, 0.375" Wall 16" O.D. Pipe, 0.375" Wall 18" O.D. Pipe, 0.438" Wall 20" O.D. Pipe, 0.500" Wall 24" O.D. Pipe, 0.375" Wall 24" O.D. Pipe, 0.562" Wall 24" O.D. Pipe, 0.750" Wall 30" O.D. Pipe, 0.500" Wall 30" O.D. Pipe, 0.625" Wall 30" O.D. Pipe, 0.750" Wall
3/19/2026 SpanOverheadSignOT-1.xmcd Page 4/34
Connection Data
Splice
3/4'' 7/8'' 1''
Splice Bolt Diameter
Number of Splice Bolts
Gusset Plates
5/8'' 3/4'' 7/8'' 1'' 1-1/4''
3/8'' 1/2'' 5/8'' 3/4'' 7/8'' 1''
Min. Gusset Bolt Diameter
Min. Gusset Plate Thickness
Truss Connections
7/8'' 1''
7/8'' 1''
Left Truss Bolt Diameter
Right Truss Bolt Diameter
Number of Left Truss Bolts
Number of Right Truss Bolts
1/2'' 5/8'' 3/4'' 7/8'' 1''
1/2'' 5/8'' 3/4'' 7/8'' 1''
Min. Horizontal Plate Thickness
Min. Vertical Plate Thickness
Base Connection
1'' 1-1/2'' 1-3/4'' 2'' 2-1/4'' 2-1/2''
Left Anchor Bolt Diameter
Left Number of Anchor Bolts
1'' 1-1/2'' 1-3/4'' 2'' 2-1/4'' 2-1/2''
Right Anchor Bolts Diameter
Right Number of Anchor Bolts
1'' 1-1/4'' 1-1/2'' 1-3/4'' 2''
3/8'' 1/2'' 5/8'' 3/4'' 7/8'' 1''
Min. Base Plate Thickness
Min. Stiffener Plate Thickness
3/19/2026 SpanOverheadSignOT-1.xmcd Page 5/34
Foundation Data
Drilled Shafts None
Foundation Type
Left Drilled Shaft Data
Sand Clay
Soil Type
50Soil Density, soil pcf
30Friction Angle, deg
14SPT Number (Nblows)
Shear Strength, c ksf
5.0Shaft Diameter (DB) ft
2Ground to Top of Shaft Offset ft
11Number of Stirrup Spaces (DD)
8Stirrup Spacing (DE) in
Right Drilled Shaft Data
Sand Clay
Soil Type
50Soil Density, soil pcf
30Friction Angle, deg
19SPT Number (Nblows)
Shear Strength, c ksf
5.0Shaft Diameter (FB) ft
2Ground to Top of Shaft Offset ft
11Number of Stirrup Spaces (FD)
8Stirrup Spacing (FE) in
3/19/2026 SpanOverheadSignOT-1.xmcd Page 6/34
Save Data
Save Data File (optional)
File Name
Note: Select an output folder by using the "Change Folder" option above.
Data Initialization
Geometry Check Calculations
Preliminary Geometry Checks
CheckLengtTrussPanel "OK"
CheckClearanceWeb "OK"
CheckLayoutSignPanel "OK"
CheckOverlapPanel "OK"
CheckDMS "n/a"
Member Slenderness Checks
CheckSlendernessChord "OK" KLrChord 62.085
CheckSlendernessWeb "OK" KLrWeb 165.868
CheckClassification.chord "OK" SectionClassification.local.buckling.chord "Compact"
CheckClassification.web "OK" SectionClassification.local.buckling.web "Compact"
3D Model Data and Wireframe Diagram
Design Forces Fatigue Forces and Total Forces
Truss Diagram Data
Save Data
Use current input file
ECD_OT-1.dat
3/19/2026 SpanOverheadSignOT-1.xmcd Page 7/34
Truss Diagram
Note: Use your mouse and keyboard to zoom in, zoom out or rotate the 3D plot above.
(See "Rotating, Spinning, or Zooming a 3D Plot" in Mathcad Help for instructions.)
3D Structural Analysis
Note: A new analysis MUST be run after any change in program input.
PC-SAP Output Data and Design Check Calculations Maximum Reactions and Results Output
Run Analysis
3/19/2026 SpanOverheadSignOT-1.xmcd Page 8/34
ProjectName "ECD TRUSS REPLACEMENT"
SignName "OT-1"
SignStation "19+00.73" vwind 150 mph
Results
Sign Structure Geometry Standard Plans Index 700-041
(A) LTruss 67 ft
(B) HLeft.Truss 24.133 ft
(C) HRight.Truss 25.803 ft
(D) #TrussPanels "7 @ 9' 6-3/4" ( Total_Length = 67 ft. )"
(E) DVerticalTruss 60 in
DHorzTruss 51.962 in
Sign Structure Members CFIChord "0.579 OK"(F) ChordMember "5.563" O.D. Pipe, 0.375" Wall" CFIWeb "0.354 OK"(G) WebMember "Angle 4" x 4" x 1/2"" CFILtUpright "0.61 OK"(H) UprightMemberLeft "24" O.D. Pipe, 0.562" Wall" CFIRtUpright "0.521 OK"(J) UprightMemberRight "24" O.D. Pipe, 0.562" Wall"
(K) Camber "1/2""
Additional Design Checks
CheckSignHangers "OK"
CheckTrussDeflection "OK"
Max. Reactions at Base of Left Upright
LongMomLt 560.3 kip ft
LongShearLt 23.6 kip
TransMomLt 40.1 kip ft
TransShearLt 3.9 kip
AxialLt 11.4 kip
TorqueLt 8.0 kip ft
Max. Reactions at Base of Right Upright
LongMomRt 476.1 kip ft
LongShearRt 18.6 kip
TransMomRt 42.5 kip ft
TransShearRt 3.8 kip
AxialRt 11.2 kip
TorqueRt 7.3 kip ft
3/19/2026 SpanOverheadSignOT-1.xmcd Page 9/34
Splice Calculations
Gusset Plate Calculations
Truss Connection Calculations Base Plate Calculations
Connection Output
Connection Values Note: All truss bolted connections use A325 bolts anchor bolts are ASTM F1554.
All welds are sized assuming E70xx electrodes.
Splice Connection
(SA) SizeAngle "Angle 5" x 5" x 1/2""
(SB) #BoltsReqd.in.Splice "6"
(SC) dBoltReqd.for.Splice "7/8" Dia."
CheckSpacing "OK"
CheckBoltSplice "OK"
Alternate Flange Splice Connection
(PA) tFlange "1-3/8""
(PB) OffsetBolt "2""
(PC) WeldInside "5/16""
(PD) WeldOutside "3/8""
(PE) dBolt "1""
(PF) #Bolts "9"
Gusset Plates
(GA) tGus "1/2""
(GB) dGusBolt "7/8" Dia."
(GC) LBackChordGus "1' 9""
(GD) HBackChordGus "8""
(GE) LFrontChordGus "1' 5-1/2""
(GF) HFrontChordGus "6-1/2""
(GG) LCenterFrontGus "2' 10""
(GH) LBackTrussEnd "1' 3/4""
(GJ) HBackTrussEnd "8-1/4""
(GK) LFrontTrussEnd "1' 2""
(GL) WeldGusset.To.Chord "3/16""
CheckThicknessGusset "OK"
3/19/2026 SpanOverheadSignOT-1.xmcd Page 10/34
Left Truss Connection
(LA) dLtBolt "7/8" Dia."
(LB) #BoltsLt "6"
(LC) tLtHorzConnPL "1/2""
(LD) tLtVertConnPL "1/2""
(LE) WeldLtHorzPLtoUpright "3/16""
(LF) WeldLtVertPLtoUpright "3/16""
(LG) WeldLtConnPLtoChord "3/16""
(LH) WeldLtVertPLtoHorzPL "3/16""
Additional Left Truss Connection Checks
CheckBoltLtTruss.Alter "OK"
CheckBoltLtTruss "OK"
CheckThicknessLtHorz.Plate "OK"
CheckThicknessLtVert.Plate "OK"
CheckThicknessLtConn.Plate "OK"
CheckThicknessLtHorz.Vert "OK"
CheckLtHorzPL "OK"
CheckLtVertPL "OK"
CheckLtUpright "OK"
Right Truss Connection
(RA) dRtBolt "7/8" Dia."
(RB) #BoltsRt "6"
(RC) tRtHorzConnPL "1/2""
(RD) tRtVertConnPL "1/2""
(RE) WeldRtHorzPLtoUpright "3/16""
(RF) WeldRtVertPLtoUpright "3/16""
(RG) WeldRtConnPLtoChord "3/16""
(RH) WeldRtVertPLtoHorzPL "3/16""
Additional Right Truss Connection Checks
CheckBoltRtTruss.Alter "OK"
CheckBoltRtTruss "OK"
CheckThicknessRtHorz.Plate "OK"
CheckThicknessRtVert.Plate "OK"
CheckThicknessRtConn.Plate "OK"
CheckThicknessRtHorz.Vert "OK"
CheckRtHorzPL "OK"
CheckRtVertPL "OK"
CheckRtUpright "OK"
3/19/2026 SpanOverheadSignOT-1.xmcd Page 11/34
Left Base Connection
(BA) dLtAnchor "2" Dia."
(BB) #AnchorLt 10
(BC) tLtBase "2""
(BD) tLtStiff "5/8""
(BE) HLtStiff "2' 3-1/4""
(BF) WeldLtBaseInside "5/16""
(BG) WeldLtBaseOutside "5/16""
(BH) WeldLtStifftoBase "5/16""
(BJ) WeldLtStifftoUpright "1/4""
Right Base Connection
(CA) dRtAnchor "2" Dia."
(CB) #AnchorRt 10
(CC) tRtBase "2""
(CD) tRtStiff "5/8""
(CE) HRtStiff "2' 3-1/4""
(CF) WeldRtBaseInside "5/16""
(CG) WeldRtBaseOutside "5/16""
(CH) WeldRtStifftoBase "5/16""
(CJ) WeldRtStifftoUpright "1/4""
Additional Base Connection Checks
CheckThicknessRatioLtStiff.to.Upright "OK"
CheckThicknessRatioRtStiff.to.Upright "OK"
CheckWeldSizeLimitLtBaseUpright.in "OK"
CheckWeldSizeLimitLtBaseUpright.out "OK"
CheckWeldSizeLimitRtBaseUpright.in "OK"
CheckWeldSizeLimitRtBaseUpright.out "OK"
CheckWeldSizeLimitLtStiffBase "OK"
CheckWeldSizeLimitRtStiffBase "OK"
CheckWeldSizeLimitLtStiffUpright "OK"
CheckWeldSizeLimitRtStiffUpright "OK"
CheckSpacingLtStiff "OK"
CheckSpacingRtStiff "OK"
3/19/2026 SpanOverheadSignOT-1.xmcd Page 12/34
Fatigue Calculations
Fatigue Design Checks
Left Base Connection
CheckFatigueLtUpright "OK (2.71 ksi < 7 ksi)"
CheckFatigueLtBase "OK (1.31 ksi < 2.81 ksi)"
CheckFatigueLtAnchor "OK (0.3 ksi < 7 ksi)"
Right Base Connection
CheckFatigueRtUpright "OK (2.36 ksi < 7 ksi)"
CheckFatigueRtBase "OK (1.15 ksi < 2.81 ksi)"
CheckFatigueRtAnchor "OK (0.26 ksi < 7 ksi)"
Chord Member and Connections
CheckFatigueChordTruss "OK (1.63 ksi < 4.5 ksi)"
CheckFatigueChordSplice "OK (1.88 ksi < 7 ksi)"
CheckFatigueChordSlot "OK (0.52 ksi < 2.6 ksi)"
CheckFatigueHalfChord "OK (0.21 ksi < 2.6 ksi)"
CheckFatigueLtTrussBolt "OK (0.02 ksi < 7 ksi)"
CheckFatigueRtTrussBolt "OK (0.03 ksi < 7 ksi)"
Gusset Plates
CheckFatigueBackPlate "OK (0.04 ksi < 1.2 ksi)"
CheckFatigueBackEndPlate "OK (0.2 ksi < 1.2 ksi)"
CheckFatigueFrontPlate "OK (0.02 ksi < 1.2 ksi)"
CheckFatigueFrontEndPlate "OK (0.04 ksi < 1.2 ksi)"
CheckFatigueTopCenterPlate "OK (0.07 ksi < 1.2 ksi)"
CheckFatigueBotCenterPlate "OK (0.02 ksi < 1.2 ksi)"
Web Members
CheckFatigueWeb "OK (0.53 ksi < 7 ksi)"
Drilled Shaft Calculations
FDOT
Drilled Shaft Foundation for Sign & Signal Structures
FDOT
Drilled Shaft Design Input
3/19/2026 SpanOverheadSignOT-1.xmcd Page 13/34 left drilled shaft (typ) TypeSoil
"Sand" right drilled shaft (typ) γsoil γSoil pcf soil density (typical design value 45 to 50 pcf) ϕsoil ϕSoil deg soil friction angle (sand)
Nblows #Blows number of blows per foot csoil.user cSoil ksf soil shear strength (clay) ϕot 0.6 Resistance Factor against Overturning
SM Vol-3 13.6 ϕtor 0.9 Resistance Factor against Torsion SM Vol-3 13.6 b DShaft ft shaft diameter
Offset OffsetShaft 2.0 ft groundline to top of foundation ii 0 1
CheckMassConcreteii if DShaftii 6ft "Mass Concrete Plan required" "OK"
CheckMassConcrete
"OK"
Applied Loads
Mx
TransMomLt
TransMomRt
40.1
42.5 kip ft
Mz
LongMomLt
LongMomRt
560.3
476.1
3/19/2026 SpanOverheadSignOT-1.xmcd Page 14/34
Vx
LongShearLt
LongShearRt
23.6
18.6 kip
Vz
TransShearLt
TransShearRt
3.9
3.8
Axial AxialLt
AxialRt
11.4
11.2
Torsion TorqueLt
TorqueRt
8.0
7.3
Drilled Shaft Design Length
Compute Shaft Depth Required to Resist Overturning
Mtotal Mx
561.7
478.0
Ptotal Vx
23.9
19.0 short free-head pile in cohesionless soil using Broms method
Kp tan 45 deg ϕsoil
3.0
3.0 esand Offset ft
Guess value LotSand.init
Given ϕot γsoil b LotSand.init
Kp
Ptotal esand LotSand.init Mtotal
LotSand.req Find LotSand.init 16.5
15.3
3/19/2026 SpanOverheadSignOT-1.xmcd Page 15/34
LotSand ceil LotSand.req ft (round up to next foot) short free-head pile in cohesive soil using Modified Broms method for L < 3b (see reference file for derivation) csoil csoili
0.1 ksf csoil.useri
0 ksf=if csoil.useri otherwise i 0 1for csoilreturn csoil ksf
Slope 8
3 b
0.5 eclay
Mtotal
Ptotal Offset
25.5
27.2 nforce M N( ) Slope 2 M N( ) 2 csoil N b mforce M( ) 2 csoil M Slope M m_arm M( ) eclay M
2 M Slope csoil csoil
M Slope 2 csoil n_arm M N( ) eclay M N
2 N Slope M Slope csoil M Slope csoil
Slope 2 M N( ) 2 csoil
Guess values Minit ft Ninit
Ptotal ϕot nforce Minit Ninit ϕot mforce Minit =
3/19/2026 SpanOverheadSignOT-1.xmcd Page 16/34 mforce Minit m_arm Minit nforce Minit Ninit n_arm Minit Ninit
Mfinal
Nfinal
Find Minit Ninit
Lot1Clay.req Mfinal Nfinal 16.3
14.8
Lot1Clay ceil Lot1Clay.req short free-head pile in cohesive soil using Regular Broms method for L > 3b fclay
Ptotal
9 ϕot csoil b
0.9
0.7
Mmaxtemp Ptotal eclay 1.5 b 0.5 fclay gclay
Mmaxtemp
2.25 ϕot csoil b
10.9
9.9
Lot2Clay.req 1.5 b fclay gclay 19.3
18.1
Lot2Clay ceil Lot2Clay.req if L ot < 3b, use Modified Broms method
LotClay
LotClayi Lot1Clayi
Lot1Clayi
3. biif
Lot2Clayi
LotClayreturn
LotClay
3/19/2026 SpanOverheadSignOT-1.xmcd Page 17/34
Therefore, the required length to resist overturning is:
LreqdOT
LreqdOTi LotSandi
TypeSoili "Sand"=if
LotClayi
LreqdOTreturn
LreqdOT
Compute Shaft Depth Required to Resist Torsion
NOTE:ωfdot is based upon concrete/soil interaction. This torsion methodology is not to be used with permanent casing.
SM Vol-9 13.6 load transfer ratio; if 5<N<15, ωfdot is reduced by a factor of
Nblows ωfdot ωfdoti 0 Nblowsi
5if
1.5 Nblowsi
15if
1.5
Nblowsi ωfdotreturn ωfdot 1.4
1.5
CohesionFactor 0.55 fse CohesionFactor csoil 0.55 short free-head pile in cohesionless soil
Guess value LtorSand.init LreqdOT
3/19/2026 SpanOverheadSignOT-1.xmcd Page 18/34
Torsion ϕtor π b LtorSand.init γsoil LtorSand.init
LtorSand.req Find LtorSand.init 2.5
2.3
LtorSand ceil LtorSand.req short free-head pile in cohesive soil
Guess value LtorClay.init LreqdOT
Given fse π b( ) LtorClay.init 1.5 ft fse π ϕtor
LtorClay.req Find LtorClay.init 1.1
LtorClay ceil LtorClay.req
Therefore, the required length to resist torsion is:
LreqdTor
LreqdTori LtorSandi
TypeSoili "Sand"=if
LtorClayi
LreqdTorreturn
LreqdTor
3/19/2026 SpanOverheadSignOT-1.xmcd Page 19/34
Therefore, the required shaft length is:
Lembedded
Lembeddedi max LreqdTori
LreqdOTi
Lembeddedreturn
Lshaft.length Round Lembedded Offset 1 in
Compute Unfactored Maximum Moment in Shaft short free-head pile in cohesionless soil using Broms method fsand
2 Ptotal
3 ϕot γsoil b Kp
5.95
5.30
MmaxSand Ptotal esand fsand Ptotal fsand
704.3
583.0 short free-head pile in cohesive soil using Modified Broms method for L < 3b (see reference file for derivation)
Guess value fmod.init
Ptotal fmod.init b
2 ϕot csoil ϕot fmod.init Slope fmod Find fmod.init 3.9
3.3
MmodBroms Ptotal eclay fmod ϕot csoil b fmod ϕot b fmod
Slope
664.0
552.7
3/19/2026 SpanOverheadSignOT-1.xmcd Page 20/34
MBroms Ptotal eclay 1.5 b 0.5 fclay 799.3
665.0 ot < 3b, use Modified Broms method
MmaxClay
MmaxClayi MmodBromsi
Lot1Clayi
3. biif
MBromsi
MmaxClayreturn
MmaxClay 799.3
665.0
Mmax
Mmaxi MmaxSandi
TypeSoili "Sand"=if
MmaxClayi
Mmaxreturn
704.3
583.0 kip ft (Service moment)
Minimum Reinforcing and Spacing
Fy.rebar 60 ksi reinforcing yield strength fc 4.0 ksi concrete strength Spec 346-3 cover 6 in cover SDG Table 1.4.2-1
Abar 1.56 in longitudinal bar area (#11 bar) dbar 1.41 in longitudinal bar diameter (#11 bar)
Av.bar 0.31 in stirrup area (#5 bar) SM Vol-9 13.6.2 dv.bar 0.625 in stirrup diameter(#5 bar)
3/19/2026 SpanOverheadSignOT-1.xmcd Page 21/34 sv1 4 in stirrup spacing, depth = 0 ft-2 ft SM Vol-9 13.6.2 sv2 SpacingStirrup in stirrup spacing, depth = 2 ft-depth.stir sv3 12 in stirrup spacing, depth > depth.stir
Num_Spaces_DD min #Spaces0 floor
Lshaft.length0 3 ft sv20
Num_Spaces_FD min #Spaces1 floor
Lshaft.length1 sv21
Num_Spaces_xD Num_Spaces_DD
Num_Spaces_FD stirrup depth, see s.v2 and s.v3 above depthstir 2 ft Num_Spaces_xD sv2
9.333
Numbar.eq1 0.01
Abar π b
LRFD 5.7.4.2
Numbar.eq2 0.135
Abar Fy.rebar fc
Numbar
Numbari ceil Numbar.eq1i
Numbar.eq1i Numbar.eq2i if ceil Numbar.eq2i
Numbarreturn number of longitudinal bars
ReinfClearSpacing b 2 cover dv.bar dbar π
6.09 in
3/19/2026 SpanOverheadSignOT-1.xmcd Page 22/34
CheckReinfClearSpacingleft if ReinfClearSpacing0 6in "OK" "No Good" SDG 3.6.10
CheckReinfClearSpacingleft "OK"
CheckReinfClearSpacingright if ReinfClearSpacing1 6in "OK" "No Good" SDG 3.6.10
CheckReinfClearSpacingright "OK"
Check Shear and Torsion ϕshr 0.90 Shear Resistance Factor LRFD 5.5.4.2.1 ϕtor 0.90 Torsion Resistance Factor LRFD 5.5.4.2.1
Vu Vx
19.0
Tu Torsion
Area and perimeter of concrete cross-section
Acp π
2827.4 pcp 2 π
188.5
Diameter, perimeter and area enclosed by the centerline of the outermost closed transverse torsion reinforcement doh b 2 cover dv.bar
47.4 in ph π doh 148.8
Aoh π doh
1762.7
Ao 0.85 Aoh 1498.3
Effective shear depth
Dr b 2 cover dv.bar
3.778
3/19/2026 SpanOverheadSignOT-1.xmcd Page 23/34
LRFD C5.8.2.1
de b
Dr
3.703 dv dvi max 0.9 dei
0.72 bi dvreturn
3.600
Check Shear Strength
LRFD Eqn 5.8.3.3-3 Vc 0.0316 2.0( ) ksi
327.6 kip LRFD 5.8.3.4.1
ACI 11.3.3
sv.shear sv.sheari max sv1 sv2i sv3 sv.shearreturn sv.shear
Vs
Av.bar Fy.rebar dv sv.shear
67.0 kip LRFD Eqn 5.8.3.3-4 ϕshr 0.9 Vu
ShearRatio
ShearRatioi max
Vui ϕshr Vci ϕshr Vsi
ShearRatioreturn
3/19/2026 SpanOverheadSignOT-1.xmcd Page 24/34
Check Torsion Strength
LRFD Eqn 5.8.3.6.2-1 Tn1
2 Ao Av.bar Fy.rebar sv1
1161.2
LRFD 5.8.3.4.1
Tn2
2 Ao Av.bar Fy.rebar sv2
580.6
Tn3
2 Ao Av.bar Fy.rebar sv3
387.1 ϕtor 0.9 Tu kip ft LreqdTor
Tor2sand
Tor2sandi Tui max π bi 2 ft Offseti γsoili
2 ft Offseti ωfdoti bi
0 kip ft
Tor2sandreturn
Tor3sand
Tor3sandi Tui max π bi depthstiri Offseti γsoili depthstiri
0 kip
Tor3sandreturn
65.9
71.9
Tor2clay
Tor2clayi Tui max fsei π bi 2.0 ft Offseti 1.5 ft bi
Tor2clayreturn
3/19/2026 SpanOverheadSignOT-1.xmcd Page 25/34
Tor3clay
Tor3clayi Tui max fsei π bi depthstiri
Offseti 1.5 ft
Tor3clayreturn
118.0
118.7
Tor2
Tor2i Tor2sandi TypeSoili
"Sand"=if
Tor2clayi
Tor2return
Tor3
Tor3i Tor3sandi TypeSoili
"Sand"=if
Tor3clayi
Tor3return
65.9
71.9
TorRation1
Tu ϕtor Tn1
0.008
0.007
TorRation2 ϕtor Tn2
0.015
0.014
TorRation3 ϕtor Tn3
0.189
0.207
3/19/2026 SpanOverheadSignOT-1.xmcd Page 26/34
TorRatio
TorRatioi max TorRation1i TorRation2i TorRation3i
TorRatioreturn
0.015
0.014
Tcr 0.125 ksi
Acp pcp in kip in 883.6 kip ft LRFD Eqn 5.8.2.1-4
TorsionRatio
TorsionRatioi TorRatioi Tui
0.25 ϕtor Tcri
0 otherwise
TorsionRatioreturn
LRFD Eqn 5.8.2.1-3
CheckShearTorsionleft if ShearRatio0 TorsionRatio0 1 "OK" "No Good" "OK"
CheckShearTorsionleft "OK"
CheckShearTorsionright if ShearRatio1 TorsionRatio1 1 "OK" "No Good" "OK"
CheckShearTorsionright "OK"
Check Maximum Spacing Transverse Reinforcement vu Vu ϕshr b dv
0.01 ksi 0.125 fc 0.5 ksi LRFD Eqn 5.8.2.9-1 smax1 smax1i min 0.8 dvi
24 in smax1return in LRFD Eqn 5.8.2.7-1
3/19/2026 SpanOverheadSignOT-1.xmcd Page 27/34 smax2 smax2i min 0.4 dvi
12 in smax2return in LRFD Eqn 5.8.2.7-2 smax smaxi smax1i vui 0.125 fcif smax2i smaxreturn
CheckMaxSpacingTransvReinfleft if max sv1 sv20 smax0 "OK" "No Good"
CheckMaxSpacingTransvReinfleft "OK"
CheckMaxSpacingTransvReinfright if max sv1 sv20
CheckMaxSpacingTransvReinfright "OK"
C heck Longitudinal Reinforcement for Combined Shear and Torsion
LRFD Eqn 5.8.3.6.3-1 Mu Mx
561.7
478.0
Vtemp
Vtempi max
Vui ϕshr
0.5 Vsi
Vtemp lbf
LongReinfshr.tor
Mu ϕtor dv
0.45 ph Tu
2 Ao ϕtor kip
Fy.rebar
2.93
2.49
3/19/2026 SpanOverheadSignOT-1.xmcd Page 28/34
Numbar Abar 29.6
CheckLongReinfshr.tor.left if Numbar0 Abar LongReinfshr.tor0
CheckLongReinfshr.tor.left "OK"
CheckLongReinfshr.tor.right if Numbar1 Abar LongReinfshr.tor1
CheckLongReinfshr.tor.right "OK"
FDOT
References
LRFD = AASHTO LRFD Bridge Design Specifications
LRFD LTS = AASHTO Luminaire, Traffic Signal, and Sign Structure Specifications.
SM = FDOT Structures Manual
SDG = FDOT Structures Design Guidelines
Spec = FDOT Standard Specifications
ACI = ACI 318 Structural Concrete Building Code
UF Report = FDOT/University of Florida Report BD545 RPWO #54
FDOT
Left Drilled Shaft Output
LLtShaft "n/a" IncludeShaft 1if
Lshaft.length0
DLtShaft "n/a" IncludeShaft 1if
DShaft0
3/19/2026 SpanOverheadSignOT-1.xmcd Page 29/34 dLtLongReinf "n/a" IncludeShaft 1if
NumBars num2str Numbar0 concat NumBars " No. 11 bars evenly spaced"( )
CheckLtMassConcrete "n/a" IncludeShaft 1if
CheckMassConcrete0 otherwise
#SpacesLtStirrup "n/a" IncludeShaft 1if
Num_Spaces_DD otherwise
SpacingLtShearStirrup "n/a" IncludeShaft 1if
SpacingStirrup0 fceil a( ) ceil a( ) floor a( ) ceil a( ) a 0.99if
#Spaces_DF fceil
3 ft Num_Spaces_DD SpacingStirrup0
#Spaces_DF 9
CheckSpacingLtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckReinfClearSpacingleft "OK"=if
ClearSpc num2str round ReinfClearSpacing0 msg concat "Say OK (" ClearSpc " in)"( )
ReinfClearSpacing0 5.85 inif msg "N.G. Try decreasing shaft diameter (DB)." otherwise otherwise msgreturn
3/19/2026 SpanOverheadSignOT-1.xmcd Page 30/34
CheckCapacityLtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckLongReinfshr.tor.left "OK"=if msg "N.G. Try increasing shaft diameter and/or decreasing stirrup spacing
CheckShearTorsionCombLt "n/a"return IncludeShaft 1if msg "OK" CheckShearTorsionleft "OK"=if msg "N.G. Try increasing number of stirrup spaces (DD), decreasing stirru
CheckMaxSpacingLtStirrup "n/a"return IncludeShaft 1if msg "OK" CheckMaxSpacingTransvReinfleft "OK"=if msg "N.G. Try decreasing shaft diameter (DB)." otherwise
Right Drilled Shaft Output
LRtShaft "n/a" IncludeShaft 1if
Lshaft.length1
DRtShaft "n/a" IncludeShaft 1if
DShaft1 dRtLongReinf "n/a" IncludeShaft 1if
NumBars num2str Numbar1
CheckRtMassConcrete "n/a" IncludeShaft 1if
CheckMassConcrete1 otherwise
#SpacesRtStirrup "n/a" IncludeShaft 1if
Num_Spaces_FD otherwise
3/19/2026 SpanOverheadSignOT-1.xmcd Page 31/34
SpacingRtShearStirrup "n/a" IncludeShaft 1if
SpacingStirrup1
CheckSpacingRtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckReinfClearSpacingright "OK"=if
ClearSpc num2str round ReinfClearSpacing1
ReinfClearSpacing1 5.9 inif msg "N.G. Try decreasing shaft diameter (FB)." otherwise otherwise
CheckCapacityRtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckLongReinfshr.tor.right "OK"=if msg "N.G. Try increasing shaft diameter and/or decreasing stirrup spacing
CheckShearTorsionCombRt "n/a"return IncludeShaft 1if msg "OK" CheckShearTorsionright "OK"=if msg "N.G. Try increasing number of stirrup spaces (FD), decreasing stirru
CheckMaxSpacingRtStirrup "n/a"return IncludeShaft 1if msg "OK" CheckMaxSpacingTransvReinfright "OK"=if msg "N.G. Try decreasing shaft diameter (FB)." otherwise
Drilled Shaft Calculations
Anchor Bolt Calculations
3/19/2026 SpanOverheadSignOT-1.xmcd Page 32/34
Drilled Shaft Design
Left Drilled Shaft Design Checks
CheckLtMassConcrete "OK"
CheckSpacingLtLongReinf "OK"
CheckCapacityLtLongReinf "OK"
CheckShearTorsionCombLt "OK"
CheckMaxSpacingLtStirrup "OK"
Left Drilled Shaft Dimensions/Reinforcing
(DA) LLtShaft 19.0 ft
(DB) DLtShaft 5.0 ft
(DC) dLtLongReinf "19 No. 11 bars evenly spaced"
(DD) #SpacesLtStirrup 11
(DE) SpacingLtShearStirrup 8.00 in
Right Drilled Shaft Design Checks
CheckRtMassConcrete "OK"
CheckSpacingRtLongReinf "OK"
CheckCapacityRtLongReinf "OK"
CheckShearTorsionCombRt "OK"
CheckMaxSpacingRtStirrup "OK"
Right Drilled Shaft Dimensions/Reinforcing
(FA) LRtShaft 18.0 ft
(FB) DRtShaft 5.0 ft
(FC) dRtLongReinf "19 No. 11 bars evenly spaced"
(FD) #SpacesRtStirrup 11
(FE) SpacingRtShearStirrup 8.00 in
Anchor Bolt Design
Anchor Bolt Lengths
(DF) LLtAnchorEmbed 40 in
(FF) LRtAnchorEmbed 40 in
Additional Anchor Bolt Checks
CheckCapacityLtAnchor "OK" CheckCapacityRtAnchor "OK"
CheckBreakoutLtAnchor "OK" CheckBreakoutRtAnchor "OK"
ClearSpacingbar.to.bar 6.1 in should be ~6" for concrete to flow from inside to outside of the reinforcing cage should be >=2" for anchorage placement inside the reinforcement cage
ClearSpacingbar.to.bolt.left 4.1 in Checkclear.bar.to.bolt
ClearSpacingbar.to.bolt.right 4.1 in
3/19/2026 SpanOverheadSignOT-1.xmcd Page 33/34
Create MicroStation File
MicroStation Data
Create MicroStation Text File
File Name
MicroStation Table Directions
1. Open the text menu and select "TableData" on the menu. This sets the text font for correct placement in the table.
2. Open the key‐in dialog box and type in “include” and then add the full path to the text file.
3. Place the text using the text node provided in the Table. Some minor adjustment may be necessary to center the text.
Check All
CheckAll_Results "All checks are OK"
Checks_Not_OK "none"
Use same name as current data file
ECD_OT-1.txt
3/19/2026 SpanOverheadSignOT-1.xmcd Page 34/34
Span Overhead Sign Program LRFD v1.5
© 2021 Florida Department of Transportation
User manual including Program Changes
FDOT
Design Specifications & References:
[LRFD LTS] AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires & Traffic Signals [AASHTO] AASHTO LRFD Bridge Design Specifications.
[SMn] - FDOT Structures Manual. n=1: Structures Design Guidelines; n=3: FDOT Modifications to Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals (LRFDLTS).
[Index] - FDOT Standard Plans.
[AISC} Steel Construction Manual.
Reference:J:\PROJECTS\T202502 - CFTOD C006779 GEC Services\TWO No. 1_ECD OH Truss Design\Project Data\Structures\Task 2
Change Folder Data Files Folder
J:\PROJECTS\T202502 - CFTOD C006779 GEC Services\TWO No. 1_ECD OH Truss Design\Project Data\Structures\Task 2 - OH Signs\Design\OH Sign Structures\MathCad Files\OverheadSign-SpanV1.5\Data\
Open Existing Data File (optional)
Sign Number
ECD_OT-1.dat ECD_OT-2.dat Ex1 - Static Sign Panels (Typical).dat Ex2 - Static Sign Panels Front and Back.dat Ex3 - Long Span Structure.dat Ex4 - Walk-In DMS with Walkway.dat Ex5 - Front-Access DMS with Static Signs.dat Ex6 - Walk-In and Front-Access DMS.dat
Station
Project Data
Project Name
CFTOD C006779Project No.
3/18/26Designed by Date
JFM 3/19/26Checked by Date
Sign Structure Data
DMW
ECD TRUSS REPLACEMENT
OT-2
25+82.76
Refresh List
Open File
Page 1 of 34 Printed: 3/19/2026 10:04 AM
Material Properties Data Upright and Chords: ASTM A500, Web Angles: ASTM A709 Grade 36
Vertical Clearance
58Fy of Upright ksi Fu of Upright ksi ft
58Fy of Web ksi Fu of Web ksi
58Fy of Chord ksi Fu of Chord ksi
Truss Data
Truss Length ft ft
Left Truss Height ft
Right Truss Height
No. of Truss Panels
Vert. Truss Depth ft
Wind Load Data Standard Plans and
Instructions Index 700-041Design Wind Speed mph
34Wind Height ft
75.00
23.483
24.433
18.583
3/19/2026 SpanOverheadSignOT-2.xmcd Page 2/34
Load Data
Reset Load Data
Show Panels 11-20Sign Panels
Sign Panel
Back-side Mounted?
Walkways
Width
Number of Hangers
(plf)
Attachments
Attachment
Projected Area
(sq. ft)
Drag Coeff., Cd
Attached to Which Chord Member?
(Top / Bottom / Back)
Horizontal
* Vertical offsets are input as negative values when element centroid is below the truss centerline.
Attachment
(lb)
DMS Panels
DMS Panel
Depth
2.13 1.08 -6.5429.0 5
23.0 12.0 47.5 0.0 5
2.13 1.08 41.5 -6.54 5
2.13 1.08 -6.54 5
53.0
23.01 12.0 23.5 0.0 5
3/19/2026 SpanOverheadSignOT-2.xmcd Page 3/34
Member Data
Member Properties
Chord Size Design Properties
Nominal Weight
5.56Outside Diameter ( D ) in
0.349Wall Thickness ( t ) in
5.72Area ( A ) in2
19.5Moment of Inertia ( I ) in4
1.85Radius of Gyration ( r ) in
39Torsional Constant ( J ) in4
20.8Nominal Weight plf
Web Size Design Properties plf
4Leg Length ( b ) in
0.5Leg Thickness ( t ) in
3.75Area ( A ) in2
1.18Dist. to Centroid ( x
) in
5.52X Moment of Inertia ( Ix ) in4
1.21X Rad. of Gyration ( rx ) in
0.776Z Rad. of Gyration ( rz ) in
12.8Nominal Weight plf
Left Upright Size Design Properties
Outside Diameter ( D ) in
Wall Thickness ( t ) in
Area ( A ) in2
Moment of Inertia ( I ) in4
Radius of Gyration ( r ) in
Torsional Constant ( J ) in4
Nominal Weight plf
Right Upright Size Design Properties
Outside Diameter ( D ) in
Wall Thickness ( t ) in
Area ( A ) in2
Moment of Inertia ( I ) in4
Radius of Gyration ( r ) in
Torsional Constant ( J ) in4
41.4
140.8
8.29
0.562
41.4
140.8
8.29
0.562
3.50" O.D. Pipe, 0.216" Wall 4.00" O.D. Pipe, 0.226" Wall 4.50" O.D. Pipe, 0.237" Wall 4.50" O.D. Pipe, 0.337" Wall 5.563" O.D. Pipe, 0.258" Wall 5.563" O.D. Pipe, 0.375" Wall 6.625" O.D. Pipe, 0.432" Wall 8.625" O.D. Pipe, 0.500" Wall
CUSTOM
Angle 2-1/2" x 2-1/2" x 1/4" Angle 3" x 3" x 1/4" Angle 3" x 3" x 5/16" Angle 3-1/2" x 3-1/2" x 5/16" Angle 3-1/2" x 3-1/2" x 3/8" Angle 4" x 4" x 3/8" Angle 4" x 4" x 1/2" Angle 5" x 5" x 1/2"
CUSTOM
12.75" O.D. Pipe, 0.375" Wall 14" O.D. Pipe, 0.375" Wall 16" O.D. Pipe, 0.375" Wall 18" O.D. Pipe, 0.438" Wall 20" O.D. Pipe, 0.500" Wall 24" O.D. Pipe, 0.375" Wall 24" O.D. Pipe, 0.562" Wall 24" O.D. Pipe, 0.750" Wall 30" O.D. Pipe, 0.500" Wall 30" O.D. Pipe, 0.625" Wall 30" O.D. Pipe, 0.750" Wall
12.75" O.D. Pipe, 0.375" Wall 14" O.D. Pipe, 0.375" Wall 16" O.D. Pipe, 0.375" Wall 18" O.D. Pipe, 0.438" Wall 20" O.D. Pipe, 0.500" Wall 24" O.D. Pipe, 0.375" Wall 24" O.D. Pipe, 0.562" Wall 24" O.D. Pipe, 0.750" Wall 30" O.D. Pipe, 0.500" Wall 30" O.D. Pipe, 0.625" Wall 30" O.D. Pipe, 0.750" Wall
3/19/2026 SpanOverheadSignOT-2.xmcd Page 4/34
Connection Data
Splice
3/4'' 7/8'' 1''
Splice Bolt Diameter
Number of Splice Bolts
Gusset Plates
5/8'' 3/4'' 7/8'' 1'' 1-1/4''
3/8'' 1/2'' 5/8'' 3/4'' 7/8'' 1''
Min. Gusset Bolt Diameter
Min. Gusset Plate Thickness
Truss Connections
7/8'' 1''
7/8'' 1''
Left Truss Bolt Diameter
Right Truss Bolt Diameter
Number of Left Truss Bolts
Number of Right Truss Bolts
1/2'' 5/8'' 3/4'' 7/8'' 1''
1/2'' 5/8'' 3/4'' 7/8'' 1''
Min. Horizontal Plate Thickness
Min. Vertical Plate Thickness
Base Connection
1'' 1-1/2'' 1-3/4'' 2'' 2-1/4'' 2-1/2''
Left Anchor Bolt Diameter
Left Number of Anchor Bolts
1'' 1-1/2'' 1-3/4'' 2'' 2-1/4'' 2-1/2''
Right Anchor Bolts Diameter
Right Number of Anchor Bolts
1'' 1-1/4'' 1-1/2'' 1-3/4'' 2''
3/8'' 1/2'' 5/8'' 3/4'' 7/8'' 1''
Min. Base Plate Thickness
Min. Stiffener Plate Thickness
3/19/2026 SpanOverheadSignOT-2.xmcd Page 5/34
Foundation Data
Drilled Shafts None
Foundation Type
Left Drilled Shaft Data
Sand Clay
Soil Type
55Soil Density, soil pcf
32Friction Angle, deg
20SPT Number (Nblows)
Shear Strength, c ksf
5.0Shaft Diameter (DB) ft
2Ground to Top of Shaft Offset ft
11Number of Stirrup Spaces (DD)
8Stirrup Spacing (DE) in
Right Drilled Shaft Data
Sand Clay
Soil Type
45Soil Density, soil pcf
29Friction Angle, deg
7SPT Number (Nblows)
Shear Strength, c ksf
5.0Shaft Diameter (FB) ft
2Ground to Top of Shaft Offset ft
11Number of Stirrup Spaces (FD)
8Stirrup Spacing (FE) in
3/19/2026 SpanOverheadSignOT-2.xmcd Page 6/34
Save Data
Save Data File (optional)
File Name
Note: Select an output folder by using the "Change Folder" option above.
Data Initialization
Geometry Check Calculations
Preliminary Geometry Checks
CheckLengtTrussPanel "OK"
CheckClearanceWeb "OK"
CheckLayoutSignPanel "OK"
CheckOverlapPanel "OK"
CheckDMS "n/a"
Member Slenderness Checks
CheckSlendernessChord "OK" KLrChord 60.811
CheckSlendernessWeb "OK" KLrWeb 163.715
CheckClassification.chord "OK" SectionClassification.local.buckling.chord "Compact"
CheckClassification.web "OK" SectionClassification.local.buckling.web "Compact"
3D Model Data and Wireframe Diagram
Design Forces Fatigue Forces and Total Forces
Truss Diagram Data
Save Data
Use current input file
ECD_OT-2.dat
3/19/2026 SpanOverheadSignOT-2.xmcd Page 7/34
Truss Diagram
Note: Use your mouse and keyboard to zoom in, zoom out or rotate the 3D plot above.
(See "Rotating, Spinning, or Zooming a 3D Plot" in Mathcad Help for instructions.)
3D Structural Analysis
Note: A new analysis MUST be run after any change in program input.
PC-SAP Output Data and Design Check Calculations Maximum Reactions and Results Output
Run Analysis
3/19/2026 SpanOverheadSignOT-2.xmcd Page 8/34
ProjectName "ECD TRUSS REPLACEMENT"
SignName "OT-2"
SignStation "25+82.76" vwind 150 mph
Results
Sign Structure Geometry Standard Plans Index 700-041
(A) LTruss 75 ft
(B) HLeft.Truss 23.483 ft
(C) HRight.Truss 24.433 ft
(D) #TrussPanels "8 @ 9' 4-1/2" ( Total_Length = 75 ft. )"
(E) DVerticalTruss 60 in
DHorzTruss 51.962 in
Sign Structure Members CFIChord "0.697 OK"(F) ChordMember "5.563" O.D. Pipe, 0.375" Wall" CFIWeb "0.334 OK"(G) WebMember "Angle 4" x 4" x 1/2"" CFILtUpright "0.521 OK"(H) UprightMemberLeft "24" O.D. Pipe, 0.562" Wall" CFIRtUpright "0.582 OK"(J) UprightMemberRight "24" O.D. Pipe, 0.562" Wall"
(K) Camber "3/4""
Additional Design Checks
CheckSignHangers "OK"
CheckTrussDeflection "OK"
Max. Reactions at Base of Left Upright
LongMomLt 475.5 kip ft
LongShearLt 20.3 kip
TransMomLt 51.3 kip ft
TransShearLt 5.1 kip
AxialLt 11.5 kip
TorqueLt 10.2 kip ft
Max. Reactions at Base of Right Upright
LongMomRt 531.1 kip ft
LongShearRt 22.1 kip
TransMomRt 53.1 kip ft
TransShearRt 5.0 kip
AxialRt 11.8 kip
TorqueRt 10.2 kip ft
3/19/2026 SpanOverheadSignOT-2.xmcd Page 9/34
Splice Calculations
Gusset Plate Calculations
Truss Connection Calculations Base Plate Calculations
Connection Output
Connection Values Note: All truss bolted connections use A325 bolts anchor bolts are ASTM F1554.
All welds are sized assuming E70xx electrodes.
Splice Connection
(SA) SizeAngle "Angle 5" x 5" x 1/2""
(SB) #BoltsReqd.in.Splice "6"
(SC) dBoltReqd.for.Splice "7/8" Dia."
CheckSpacing "OK"
CheckBoltSplice "OK"
Alternate Flange Splice Connection
(PA) tFlange "1-3/8""
(PB) OffsetBolt "2""
(PC) WeldInside "5/16""
(PD) WeldOutside "3/8""
(PE) dBolt "1""
(PF) #Bolts "9"
Gusset Plates
(GA) tGus "1/2""
(GB) dGusBolt "7/8" Dia."
(GC) LBackChordGus "1' 8-3/4""
(GD) HBackChordGus "8""
(GE) LFrontChordGus "1' 5-1/4""
(GF) HFrontChordGus "6-1/2""
(GG) LCenterFrontGus "2' 9-1/2""
(GH) LBackTrussEnd "1' 3/4""
(GJ) HBackTrussEnd "8-1/4""
(GK) LFrontTrussEnd "1' 1-3/4""
(GL) WeldGusset.To.Chord "3/16""
CheckThicknessGusset "OK"
3/19/2026 SpanOverheadSignOT-2.xmcd Page 10/34
Left Truss Connection
(LA) dLtBolt "7/8" Dia."
(LB) #BoltsLt "6"
(LC) tLtHorzConnPL "1/2""
(LD) tLtVertConnPL "1/2""
(LE) WeldLtHorzPLtoUpright "3/16""
(LF) WeldLtVertPLtoUpright "3/16""
(LG) WeldLtConnPLtoChord "3/16""
(LH) WeldLtVertPLtoHorzPL "3/16""
Additional Left Truss Connection Checks
CheckBoltLtTruss.Alter "OK"
CheckBoltLtTruss "OK"
CheckThicknessLtHorz.Plate "OK"
CheckThicknessLtVert.Plate "OK"
CheckThicknessLtConn.Plate "OK"
CheckThicknessLtHorz.Vert "OK"
CheckLtHorzPL "OK"
CheckLtVertPL "OK"
CheckLtUpright "OK"
Right Truss Connection
(RA) dRtBolt "7/8" Dia."
(RB) #BoltsRt "6"
(RC) tRtHorzConnPL "1/2""
(RD) tRtVertConnPL "1/2""
(RE) WeldRtHorzPLtoUpright "3/16""
(RF) WeldRtVertPLtoUpright "3/16""
(RG) WeldRtConnPLtoChord "3/16""
(RH) WeldRtVertPLtoHorzPL "3/16""
Additional Right Truss Connection Checks
CheckBoltRtTruss.Alter "OK"
CheckBoltRtTruss "OK"
CheckThicknessRtHorz.Plate "OK"
CheckThicknessRtVert.Plate "OK"
CheckThicknessRtConn.Plate "OK"
CheckThicknessRtHorz.Vert "OK"
CheckRtHorzPL "OK"
CheckRtVertPL "OK"
CheckRtUpright "OK"
3/19/2026 SpanOverheadSignOT-2.xmcd Page 11/34
Left Base Connection
(BA) dLtAnchor "2" Dia."
(BB) #AnchorLt 10
(BC) tLtBase "2""
(BD) tLtStiff "5/8""
(BE) HLtStiff "2' 3-1/4""
(BF) WeldLtBaseInside "5/16""
(BG) WeldLtBaseOutside "5/16""
(BH) WeldLtStifftoBase "5/16""
(BJ) WeldLtStifftoUpright "1/4""
Right Base Connection
(CA) dRtAnchor "2" Dia."
(CB) #AnchorRt 10
(CC) tRtBase "2""
(CD) tRtStiff "5/8""
(CE) HRtStiff "2' 3-1/4""
(CF) WeldRtBaseInside "5/16""
(CG) WeldRtBaseOutside "5/16""
(CH) WeldRtStifftoBase "5/16""
(CJ) WeldRtStifftoUpright "1/4""
Additional Base Connection Checks
CheckThicknessRatioLtStiff.to.Upright "OK"
CheckThicknessRatioRtStiff.to.Upright "OK"
CheckWeldSizeLimitLtBaseUpright.in "OK"
CheckWeldSizeLimitLtBaseUpright.out "OK"
CheckWeldSizeLimitRtBaseUpright.in "OK"
CheckWeldSizeLimitRtBaseUpright.out "OK"
CheckWeldSizeLimitLtStiffBase "OK"
CheckWeldSizeLimitRtStiffBase "OK"
CheckWeldSizeLimitLtStiffUpright "OK"
CheckWeldSizeLimitRtStiffUpright "OK"
CheckSpacingLtStiff "OK"
CheckSpacingRtStiff "OK"
3/19/2026 SpanOverheadSignOT-2.xmcd Page 12/34
Fatigue Calculations
Fatigue Design Checks
Left Base Connection
CheckFatigueLtUpright "OK (2.37 ksi < 7 ksi)"
CheckFatigueLtBase "OK (1.16 ksi < 2.81 ksi)"
CheckFatigueLtAnchor "OK (0.26 ksi < 7 ksi)"
Right Base Connection
CheckFatigueRtUpright "OK (2.63 ksi < 7 ksi)"
CheckFatigueRtBase "OK (1.28 ksi < 2.81 ksi)"
CheckFatigueRtAnchor "OK (0.29 ksi < 7 ksi)"
Chord Member and Connections
CheckFatigueChordTruss "OK (2 ksi < 4.5 ksi)"
CheckFatigueChordSplice "OK (2.31 ksi < 7 ksi)"
CheckFatigueChordSlot "OK (0.35 ksi < 2.6 ksi)"
CheckFatigueHalfChord "OK (0.18 ksi < 2.6 ksi)"
CheckFatigueLtTrussBolt "OK (0.03 ksi < 7 ksi)"
CheckFatigueRtTrussBolt "OK (0.03 ksi < 7 ksi)"
Gusset Plates
CheckFatigueBackPlate "OK (0.04 ksi < 1.2 ksi)"
CheckFatigueBackEndPlate "OK (0.19 ksi < 1.2 ksi)"
CheckFatigueFrontPlate "OK (0.03 ksi < 1.2 ksi)"
CheckFatigueFrontEndPlate "OK (0.04 ksi < 1.2 ksi)"
CheckFatigueTopCenterPlate "OK (0.07 ksi < 1.2 ksi)"
CheckFatigueBotCenterPlate "OK (0.01 ksi < 1.2 ksi)"
Web Members
CheckFatigueWeb "OK (0.51 ksi < 7 ksi)"
Drilled Shaft Calculations
FDOT
Drilled Shaft Foundation for Sign & Signal Structures
FDOT
Drilled Shaft Design Input
3/19/2026 SpanOverheadSignOT-2.xmcd Page 13/34 left drilled shaft (typ) TypeSoil right drilled shaft (typ) γsoil γSoil pcf soil density (typical design value 45 to 50 pcf) ϕsoil ϕSoil deg soil friction angle (sand)
Nblows #Blows number of blows per foot csoil.user cSoil ksf soil shear strength (clay) ϕot 0.6 Resistance Factor against Overturning
SM Vol-3 13.6 ϕtor 0.9 Resistance Factor against Torsion SM Vol-3 13.6 b DShaft ft shaft diameter
Offset OffsetShaft ft groundline to top of foundation ii 0 1
CheckMassConcreteii if DShaftii 6ft "Mass Concrete Plan required" "OK"
CheckMassConcrete
Applied Loads
Mx
TransMomLt
TransMomRt
51.3
53.1
LongMomLt
LongMomRt
475.5
531.1
3/19/2026 SpanOverheadSignOT-2.xmcd Page 14/34
Vx
LongShearLt
LongShearRt
20.3
22.1
TransShearLt
TransShearRt
5.1
5.0
Axial AxialLt
AxialRt
11.5
11.8
TorqueLt
TorqueRt
10.2
Drilled Shaft Design Length
Compute Shaft Depth Required to Resist Overturning
Mtotal Mx
478.3
533.7
Ptotal Vx
21.0
22.6 short free-head pile in cohesionless soil using Broms method
Kp tan 45 deg ϕsoil
3.3
2.9 esand Offset
Guess value LotSand.init ϕot γsoil b LotSand.init
Kp
Ptotal esand LotSand.init Mtotal
LotSand.req Find LotSand.init 14.5
17.1
3/19/2026 SpanOverheadSignOT-2.xmcd Page 15/34
LotSand ceil LotSand.req short free-head pile in cohesive soil using Modified Broms method for L < 3b (see reference file for derivation) csoil csoili
0.1 ksf csoil.useri
0 ksf=if csoil.useri csoilreturn
Slope 8
3 b eclay
Ptotal Offset
24.8
25.6 nforce M N( ) Slope 2 M N( ) 2 csoil N mforce M( ) 2 csoil M Slope M m_arm M( ) eclay M
2 M Slope csoil csoil
M Slope 2 csoil n_arm M N( ) eclay M N
2 N Slope M Slope csoil M Slope csoil
Slope 2 M N( ) 2 csoil
Guess values Minit ft Ninit
Ptotal ϕot nforce Minit Ninit ϕot mforce Minit =
3/19/2026 SpanOverheadSignOT-2.xmcd Page 16/34 mforce Minit m_arm Minit nforce Minit Ninit n_arm Minit Ninit
Mfinal
Nfinal
Find Minit Ninit
Lot1Clay.req Mfinal Nfinal 15.2
15.7
Lot1Clay ceil Lot1Clay.req fclay
Ptotal
9 ϕot csoil b
0.8
0.8
Mmaxtemp Ptotal eclay 1.5 b 0.5 fclay gclay
Mmaxtemp
2.25 ϕot csoil b
10.1
10.6
Lot2Clay.req 1.5 b fclay gclay 18.4
18.9
Lot2Clay ceil Lot2Clay.req ot < 3b, use Modified Broms method
LotClay
LotClayi Lot1Clayi
Lot1Clayi
3. biif
Lot2Clayi
LotClayreturn
LotClay
3/19/2026 SpanOverheadSignOT-2.xmcd Page 17/34
Therefore, the required length to resist overturning is:
LreqdOT
LreqdOTi LotSandi
TypeSoili "Sand"=if
LotClayi
LreqdOTreturn
LreqdOT
Compute Shaft Depth Required to Resist Torsion
NOTE:ωfdot is based upon concrete/soil interaction. This torsion methodology is not to be used with permanent casing.
SM Vol-9 13.6 load transfer ratio; if 5<N<15, ωfdot is reduced by a factor of
Nblows ωfdot ωfdoti 0 Nblowsi
5if
1.5 Nblowsi
15if
1.5
Nblowsi ωfdotreturn
1.5
0.7
CohesionFactor 0.55 fse CohesionFactor csoil short free-head pile in cohesionless soil
Guess value LtorSand.init LreqdOT
3/19/2026 SpanOverheadSignOT-2.xmcd Page 18/34
Torsion ϕtor π b LtorSand.init γsoil LtorSand.init
LtorSand.req Find LtorSand.init 2.6
4.3
LtorSand ceil LtorSand.req short free-head pile in cohesive soil
Guess value LtorClay.init LreqdOT
Given fse π b( ) LtorClay.init 1.5 ft fse π ϕtor
LtorClay.req Find LtorClay.init 1.2
1.2
LtorClay ceil LtorClay.req
Therefore, the required length to resist torsion is:
LreqdTor
LreqdTori LtorSandi
TypeSoili "Sand"=if
LtorClayi
LreqdTorreturn
LreqdTor
3/19/2026 SpanOverheadSignOT-2.xmcd Page 19/34
Therefore, the required shaft length is:
Lembedded
Lembeddedi max LreqdTori
LreqdOTi
Lembeddedreturn
Lshaft.length Round Lembedded Offset 1 in
Compute Unfactored Maximum Moment in Shaft short free-head pile in cohesionless soil using Broms method fsand
2 Ptotal
3 ϕot γsoil b Kp
5.10
6.23
MmaxSand Ptotal esand fsand Ptotal fsand
591.5
673.0 short free-head pile in cohesive soil using Modified Broms method for L < 3b (see reference file for derivation)
Guess value fmod.init
Ptotal fmod.init b
2 ϕot csoil ϕot fmod.init Slope fmod Find fmod.init 3.6
3.8
MmodBroms Ptotal eclay fmod ϕot csoil b fmod ϕot b fmod
Slope
563.8
628.8
3/19/2026 SpanOverheadSignOT-2.xmcd Page 20/34
MBroms Ptotal eclay 1.5 b 0.5 fclay 685.5
758.3 ot < 3b, use Modified Broms method
MmaxClay
MmaxClayi MmodBromsi
Lot1Clayi
3. biif
MBromsi
MmaxClayreturn
MmaxClay 685.5
758.3
Mmaxi MmaxSandi
TypeSoili "Sand"=if
MmaxClayi
Mmaxreturn
591.5
673.0 kip ft (Service moment)
Minimum Reinforcing and Spacing
Fy.rebar 60 ksi reinforcing yield strength fc 4.0 ksi concrete strength Spec 346-3 cover 6 in cover SDG Table 1.4.2-1
Abar 1.56 in longitudinal bar area (#11 bar) dbar 1.41 in longitudinal bar diameter (#11 bar)
Av.bar 0.31 in stirrup area (#5 bar) SM Vol-9 13.6.2 dv.bar 0.625 in stirrup diameter(#5 bar)
3/19/2026 SpanOverheadSignOT-2.xmcd Page 21/34 sv1 4 in stirrup spacing, depth = 0 ft-2 ft SM Vol-9 13.6.2 sv2 SpacingStirrup in stirrup spacing, depth = 2 ft-depth.stir sv3 12 in stirrup spacing, depth > depth.stir
Num_Spaces_DD min #Spaces0 floor
Lshaft.length0 sv20
Num_Spaces_FD min #Spaces1 floor
Lshaft.length1 sv21
Num_Spaces_xD Num_Spaces_DD
Num_Spaces_FD stirrup depth, see s.v2 and s.v3 above depthstir 2 ft Num_Spaces_xD sv2
Numbar.eq1 0.01
Abar
LRFD 5.7.4.2
Numbar.eq2 0.135
Abar Fy.rebar
Numbari ceil Numbar.eq1i
Numbar.eq1i Numbar.eq2i ceil Numbar.eq2i
Numbarreturn number of longitudinal bars
ReinfClearSpacing b 2 cover dv.bar
3/19/2026 SpanOverheadSignOT-2.xmcd Page 22/34
CheckReinfClearSpacingleft if ReinfClearSpacing0 6in "OK" "No Good" SDG 3.6.10
CheckReinfClearSpacingleft "OK"
CheckReinfClearSpacingright if ReinfClearSpacing1 6in "OK" "No Good" SDG 3.6.10
CheckReinfClearSpacingright "OK"
Check Shear and Torsion ϕshr 0.90 Shear Resistance Factor LRFD 5.5.4.2.1 ϕtor 0.90 Torsion Resistance Factor LRFD 5.5.4.2.1
Vu Vx
21.0
Tu Torsion
Area and perimeter of concrete cross-section
Acp π pcp 2 π
Diameter, perimeter and area enclosed by the centerline of the outermost closed transverse torsion reinforcement doh b 2 cover dv.bar in ph π doh
Aoh π doh
Ao 0.85 Aoh
Effective shear depth
Dr b 2 cover dv.bar
3/19/2026 SpanOverheadSignOT-2.xmcd Page 23/34
LRFD C5.8.2.1
de b
Dr dvi max 0.9 dei
0.72 bi dvreturn
Check Shear Strength
LRFD Eqn 5.8.3.3-3 Vc 0.0316 2.0( ) ksi kip LRFD 5.8.3.4.1
ACI 11.3.3
sv.shear sv.sheari max sv1 sv2i sv.shearreturn sv.shear
Vs
Av.bar Fy.rebar dv sv.shear kip LRFD Eqn 5.8.3.3-4 ϕshr 0.9 Vu
ShearRatioi max
Vui ϕshr Vci ϕshr Vsi
ShearRatioreturn
3/19/2026 SpanOverheadSignOT-2.xmcd Page 24/34
Check Torsion Strength
LRFD Eqn 5.8.3.6.2-1 Tn1
2 Ao Av.bar Fy.rebar sv1
Tn2
2 Ao Av.bar Fy.rebar sv2
Tn3
2 Ao Av.bar Fy.rebar sv3 ϕtor 0.9 Tu kip ft LreqdTor
Tor2sandi Tui max π bi 2 ft Offseti γsoili
2 ft Offseti
Tor2sandreturn
Tor3sandi Tui max π bi depthstiri γsoili depthstiri
Tor3sandreturn
76.9
23.1
Tor2clayi Tui max fsei π bi 2.0 ft Offseti 1.5 ft bi
Tor2clayreturn
3/19/2026 SpanOverheadSignOT-2.xmcd Page 25/34
Tor3clayi Tui max fsei π bi depthstiri
Offseti 1.5 ft
Tor3clayreturn
115.8
115.8
Tor2i Tor2sandi TypeSoili
"Sand"=if
Tor2clayi
Tor2return
Tor3i Tor3sandi TypeSoili
"Sand"=if
Tor3clayi
Tor3return
76.9
23.1
TorRation1
Tu ϕtor Tn1
0.010
0.010
TorRation2 ϕtor Tn2
0.019
TorRation3 ϕtor Tn3
0.221
0.066
3/19/2026 SpanOverheadSignOT-2.xmcd Page 26/34
TorRatioi max TorRation1i TorRation2i TorRation3i
TorRatioreturn
Tcr 0.125 ksi
Acp pcp in kip in kip ft LRFD Eqn 5.8.2.1-4
TorsionRatioi TorRatioi Tui
0.25 ϕtor Tcri
0 otherwise
TorsionRatioreturn
LRFD Eqn 5.8.2.1-3
CheckShearTorsionleft if ShearRatio0 TorsionRatio0 1 "OK" "No Good" "OK"
CheckShearTorsionleft "OK"
CheckShearTorsionright if ShearRatio1 TorsionRatio1 1 "OK" "No Good" "OK"
CheckShearTorsionright "OK"
Check Maximum Spacing Transverse Reinforcement vu Vu ϕshr b dv ksi 0.125 fc 0.5 ksi LRFD Eqn 5.8.2.9-1 smax1i min 0.8 dvi
24 in smax1return in LRFD Eqn 5.8.2.7-1
3/19/2026 SpanOverheadSignOT-2.xmcd Page 27/34 smax2i min 0.4 dvi smax2return in LRFD Eqn 5.8.2.7-2 smaxi smax1i vui 0.125 fcif smax2i smaxreturn
CheckMaxSpacingTransvReinfleft if max sv1 sv20
CheckMaxSpacingTransvReinfleft "OK"
CheckMaxSpacingTransvReinfright if max sv1 sv20
CheckMaxSpacingTransvReinfright "OK"
C heck Longitudinal Reinforcement for Combined Shear and Torsion
LRFD Eqn 5.8.3.6.3-1 Mu Mx
478.3
533.7
Vtemp
Vtempi max
Vui ϕshr
0.5 Vsi
lbf
LongReinfshr.tor
Mu ϕtor dv
0.45 ph Tu
2 Ao ϕtor kip
Fy.rebar
2.51
2.80
3/19/2026 SpanOverheadSignOT-2.xmcd Page 28/34
Numbar Abar
CheckLongReinfshr.tor.left if Numbar0 Abar LongReinfshr.tor0
CheckLongReinfshr.tor.left "OK"
CheckLongReinfshr.tor.right if Numbar1 Abar LongReinfshr.tor1
CheckLongReinfshr.tor.right "OK"
FDOT
References
LRFD = AASHTO LRFD Bridge Design Specifications
LRFD LTS = AASHTO Luminaire, Traffic Signal, and Sign Structure Specifications.
SM = FDOT Structures Manual
SDG = FDOT Structures Design Guidelines
Spec = FDOT Standard Specifications
ACI = ACI 318 Structural Concrete Building Code
UF Report = FDOT/University of Florida Report BD545 RPWO #54
FDOT
Left Drilled Shaft Output
LLtShaft "n/a" IncludeShaft 1if
DLtShaft "n/a" IncludeShaft 1if
DShaft0
3/19/2026 SpanOverheadSignOT-2.xmcd Page 29/34 dLtLongReinf "n/a" IncludeShaft 1if
NumBars num2str Numbar0
CheckLtMassConcrete "n/a" IncludeShaft 1if
CheckMassConcrete0 otherwise
#SpacesLtStirrup "n/a" IncludeShaft 1if
Num_Spaces_DD otherwise
SpacingLtShearStirrup "n/a" IncludeShaft 1if
SpacingStirrup0 fceil a( ) ceil a( ) floor a( ) ceil a( ) a 0.99if
#Spaces_DF fceil
3 ft Num_Spaces_DD SpacingStirrup0
#Spaces_DF 7
CheckSpacingLtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckReinfClearSpacingleft "OK"=if
ClearSpc num2str round ReinfClearSpacing0
ReinfClearSpacing0 5.85 inif msg "N.G. Try decreasing shaft diameter (DB)." otherwise otherwise
3/19/2026 SpanOverheadSignOT-2.xmcd Page 30/34
CheckCapacityLtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckLongReinfshr.tor.left "OK"=if msg "N.G. Try increasing shaft diameter and/or decreasing stirrup spacing
CheckShearTorsionCombLt "n/a"return IncludeShaft 1if msg "OK" CheckShearTorsionleft "OK"=if msg "N.G. Try increasing number of stirrup spaces (DD), decreasing stirru
CheckMaxSpacingLtStirrup "n/a"return IncludeShaft 1if msg "OK" CheckMaxSpacingTransvReinfleft "OK"=if msg "N.G. Try decreasing shaft diameter (DB)." otherwise
Right Drilled Shaft Output
LRtShaft "n/a" IncludeShaft 1if
Lshaft.length1
DRtShaft "n/a" IncludeShaft 1if
DShaft1 dRtLongReinf "n/a" IncludeShaft 1if
NumBars num2str Numbar1
CheckRtMassConcrete "n/a" IncludeShaft 1if
CheckMassConcrete1 otherwise
#SpacesRtStirrup "n/a" IncludeShaft 1if
Num_Spaces_FD otherwise
3/19/2026 SpanOverheadSignOT-2.xmcd Page 31/34
SpacingRtShearStirrup "n/a" IncludeShaft 1if
SpacingStirrup1
CheckSpacingRtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckReinfClearSpacingright "OK"=if
ClearSpc num2str round ReinfClearSpacing1
ReinfClearSpacing1 5.9 inif msg "N.G. Try decreasing shaft diameter (FB)." otherwise otherwise
CheckCapacityRtLongReinf "n/a"return IncludeShaft 1if msg "OK" CheckLongReinfshr.tor.right "OK"=if msg "N.G. Try increasing shaft diameter and/or decreasing stirrup spacing
CheckShearTorsionCombRt "n/a"return IncludeShaft 1if msg "OK" CheckShearTorsionright "OK"=if msg "N.G. Try increasing number of stirrup spaces (FD), decreasing stirru
CheckMaxSpacingRtStirrup "n/a"return IncludeShaft 1if msg "OK" CheckMaxSpacingTransvReinfright "OK"=if msg "N.G. Try decreasing shaft diameter (FB)." otherwise
Drilled Shaft Calculations
Anchor Bolt Calculations
3/19/2026 SpanOverheadSignOT-2.xmcd Page 32/34
Drill…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .