S124834-vCurrent_OD.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Chicopee Armory Renovations General Contractor Bids
Solicitation number
S124834-vCurrent
Issued by
Hampden County, Massachusetts

About this file

This document is an Invitation for Bid (IFB) for general contractor services related to internal renovations, minor building envelope repair, hazardous materials abatement, and modular vault construction at the Chicopee Armory in Massachusetts. The project includes several sub-bid categories such as electrical, HVAC, masonry, plumbing, resilient flooring, roofing and flashing, and metal windows. The bid is open to general contractors qualified by the Commonwealth's Division of Capital Asset Management. Bids are due by July 28, 2011 at 2:00 PM and will be evaluated on a lowest-cost basis. A pre-bid conference was held on June 13, 2011.

The contract will be awarded under Massachusetts General Law Chapter 149, Sections 44A-M, which governs procurement for vertical construction services valued over $25,000. The procurement is restricted for use by the issuing entity only and does not allow for multiple responses. The contract has no set-aside requirements, nor is it funded by federal stimulus monies. The contract was awarded to Kurtz Inc., 810 Southampton Road, Westfield, MA 01085, and the publication of the award was accepted for the Central Register on September 21, 2011.

View the file

Other files

File Type Posted
AE121-10090.pdf PDF
ED101-10090.pdf PDF
Sub_Bid_Result_Chicopee_2011.xls XLS spreadsheet
AE102-10090.pdf PDF
Business_Reference_Form_GC_Chicopee2011.doc DOC document
230719_hvac_pipe_ins.pdf PDF
EP651-10090.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Electrical.doc DOC document
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Metal_Windows.doc DOC document
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
014000_FL-QUALITY_REQUIREMENTS.pdf PDF
236313_air_cooled_condensers.pdf PDF
AE311-10090.pdf PDF
020800_Asbestos_Technical_Specifications.pdf PDF
E-601-10090.pdf PDF
230001-HVAC_FSB.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Resilient_Floors.doc DOC document
017900_FL-DEMONSTRATION_AND_TRAINING.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
AE401-10090.pdf PDF
SF502-10090.pdf PDF
070002-ROOFING_AND_FLASHING_FSB.pdf PDF
265100_Lighting_Fixtures.pdf PDF
030130_FL-MAINTENANCE_OF_CAST-IN-PLACE_CONCRETE.pdf PDF
220001-PLUMBING-FSB.pdf PDF
013100_FL-PROJECT_MANAGEMENT_AND_COORDINATION.pdf PDF
238900_Louvers_and_Vents.pdf PDF
SF101-10090.pdf PDF
016000_FL-PRODUCT_REQUIREMENTS.pdf PDF
M-651-10090.pdf PDF
GI001-10090.pdf PDF
Ch_149_FORM_FOR_GENERAL_BID_MIL_Chicopee2011.doc DOC document
093000_FL-TILING_v1.pdf PDF
088000_FL-GLAZING_v1.pdf PDF
081113_FL-HOLLOW_METAL_DOORS_AND_FRAMES_v1.pdf PDF
231123_fuel_gas_piping.pdf PDF
PL101-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
224000_plumbing_fixtures_JPB.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
220100_plumbing_requirements_JPB.pdf PDF
232113_hydronic_piping.pdf PDF
EL101-10090.pdf PDF
232300_refrigerant_piping.pdf PDF
General_Bid_Tabulation_Chicopee_2011.xls XLS spreadsheet
220500_plumbing_materials_JPB.pdf PDF
262413_Switchboards.pdf PDF
092216_FL-NON-STRUCTURAL_META_FRAMING_v1.pdf PDF
X-100_SURVEY_CONTROL_PLAN.pdf PDF
AE611-10090.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BidHeader

Bid NumberDocument DescriptionKey WordsLast ActionLast Action DateSubCategoryEstimated Units FlagEstimated UnitsBid Value FlagStatewide FlagFederal Stimulus FlagAmendment Deadline DatePosted DatePosted by UserAllow Multiple Responses FlagCalendar Rule TypeEPP FlagProcurement TypeApplicable Procurement LawPrompt Pay FlagAmp FlagSOMWBA FlagProcurement SizeContract Doc NumExtension Date(s)QQ CommentsQQ Quote QualificationQQ Vend. Notification CommentsQQ Document Close DateQQ Delivery Deadline Desc.QQ Award TypeQQ Award RuleQQ Bid TypeQQ Code 1QQ Code 1 DescriptionQQ Code 2QQ Code 2 DescriptionQQ Code 3QQ Code 3 DescriptionQQ Bill to AddressQQ Ship to AddressQQ ShippingQQ SurchargeQQ Alternative ProductAlternate ID UntruncatedShort Description UntruncatedAmendment DateAmendment DescriptionBid Updates
S124834-vCurrentGeneral Contractor IFB for internal renovations,minor building envelope repair, hazardous materials abatement,modular vault construction,including the following sub-bids: electrical, HVAC, masonry, plumbing, resilient flooring, roofing and flashing, and metal windows. For sub-bid forms and dates, see MIL-PN985010-IFB-N16-SUBS soliciation on Comm-PASS.Etzel, Chicopee, ArmorySolicitation MIL-PN985010-IFB-N16 UPDATED by Peter Etzel9/13/11 8:16Construction-Buildings (Vertical)/Building ProjectYesNoNoNo7/28/11 14:006/13/11 13:45MIL-pmeNoStandard, Submit a bid per the Solicitation requirements as long as the Close Date has not been exceeded.NoRestricted To Use By Issuing Entity OnlyMGL c. 149, § 44A - M, Procurement for Vertical Construction services valued over $25,000 open to Bidders qualified by the Commonwealth's Division OF Capital Asset MANAGEMENT. Evaluated ON a lowest-cost basis.NoNoYesN/AMIL-PN985010-IFB-N167/25/11 9:09Add results of July 20, 2011 Sub Bid opening.Date: 09/13/2011 08:16 AM Comments: GC bid results tabulation.
Date: 09/13/2011 07:46 AM Comments: Contract awarded and signed with Kurtz Inc., 810 Southampton Road, Westfield MA 01085. Publication accepted for Central Register 9/21/11.Name: Susan Christedes Organization: Military Division

BidItem

Bid Item NumberFirst NameLast NameTitleAddress Line 1Address Line 2CityZip CodeStatePhone NumberFaxEmailCreated by UserCreated DateQQ Line CommentsQQ Bill to AddressQQ Ship to AddressQQ ShippingQQ SurchargeQQ Alternative ProductQQ Code 1QQ Code 1 DescriptionQQ Code 2QQ Code 2 DescriptionQQ Code 3QQ Code 3 DescriptionQQ Code 4QQ Code 5QQ Code 6
1MIL-pme40682.3878240741

BidAttach

File NameAction Required DescDescription Untruncated
011000_FL-SUMMARY
012200_FL-UNIT_PRICES
012300_FL-ALTERNATES
013100_FL-PROJECT_MANAGEMENT_AND_COORDINATION
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION
013300_SMRT_FORMAT_FOR_SUBMITTALS
014000_FL-QUALITY_REQUIREMENTS
014200_FL-REFERENCES
015000_FL-TEMPORARY_FACILITIES_AND_CONTROLS
016000_FL-PRODUCT_REQUIREMENTS
017300_SMRT_FORMAT
017419_FL-CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL
017700_FL-CLOSEOUT_PROCEDURES
017823_FL-OPERATION_AND_MAINTENANCE_DATA
017839_FL-PROJECT_RECORD_DOCUMENTS
017900_FL-DEMONSTRATION_AND_TRAINING
01811313_FL-SUSTAINABLE_DESIGN_REQUIREMENTS-LEED_FOR_NEW_CONSTRUCTION_AND_MAJOR_RENOVATIONS
019113_FL-GENERAL_COMMISSIONING_REQUIREMENTS
020800_Asbestos_Technical_Specifications
020900_Lead_Paint_Technical_Specifications
024119_FL-SELECTIVE_STRUCTURE_DEMOLITION
030130_FL-MAINTENANCE_OF_CAST-IN-PLACE_CONCRETE
033000_FL-CAST-IN-PLACE_CONCRETE_MAC
033053_FL-MISCELLANEOUS_CAST-IN-PLACE_CONCRETE
040001-MASONRY_WORK_FSB
040120_FL-MAINTENANCE_OF_UNIT_MASONRY_v1
040140_FL-MAINTENANCE_OF_STONE_ASSEMBLIES_v1
042000_FL-UNIT_MASONRY_v1
054000_Cold-Formed_Metal_Framing_MAC
055000_FL-METAL_FABRICATIONS
061000_FL-ROUGH_CARPENTRY_v1
061600_FL-SHEATHING_v1
070002-ROOFING_AND_FLASHING_FSB
07015019_FL-PREPARATION_FOR_RE-ROOFING
072100_FL-THERMAL_INSULATION_v1
075423_FL-THERMOPLASTIC_POLYOLEFIN_TPO_ROOFING_v1
076200_FL-SHEET_METAL_FLASHING_AND_TRIM_v1
079200_FL-JOINT_SEALANTS_v1
08000-METAL_WINDOWS_FSB
081113_FL-HOLLOW_METAL_DOORS_AND_FRAMES_v1
081416_FL-FLUSH_WOOD_DOORS_v1
083323_FL-OVERHEAD_COILING_DOORS_v1
084113_FL-ALUMINUM-FRAMED_ENTRANCES_AND_STOREFRONTS_v1
085113_FL-ALUMINUM_WINDOWS
087100_FL-DOOR_HARDWARE_v1
088000_FL-GLAZING_v1
090005-RESILIENT_FLOORS_FSB
092216_FL-NON-STRUCTURAL_META_FRAMING_v1
092900_FL-GYPSUM_BOARD
093000_FL-TILING_v1
095113_FL-ACOUSTICAL_PANEL_CEILINGS_v1
096513_FL-RESILIENT_BASE_AND_ACCESSORIES
096519_FL-RESILIENT_TILE_FLOORING_v1
099113_FL-EXTERIOR_PAINTING
099123_FL-INTERIOR_PAINTING_v1
099300_FL-STAINING_AND_TRANSPARENT_FINISHING
102800_FL-TOILET_BATH_AND_LAUNDRY_ACCESSORIES_v1
132700_FL-VAULTS
220001-PLUMBING-FSB
220100_plumbing_requirements_JPB
220500_plumbing_materials_JPB
220519_meters_gages_JPB
220529_Hangers_and_Supports_JPB
220548_mech_vibration_seismic_controls_JPB
220553_plumbing_id_JPB
220719_pipe_ins_JPB
221116_DOMESTIC_WATER_PIPING_JPB
221119_plumbing_specialties_JPB
221123_fuel_gas_piping_JPB
224000_plumbing_fixtures_JPB
230001-HVAC_FSB
230100_mech_requirements
230500_mech_materials
230516_pipe_expansion_fittings_loops
230519_meters_gages
230529_hangers_supports
230548_mech_vibration_seismic_controls
230553_mech_id
230593_testing_adjusting_balancing
230713_duct_insulation
230719_hvac_pipe_ins
230900_hvac_instrumentation_controls
230993_seq_of_operations
231123_fuel_gas_piping
232113_hydronic_piping
232123_hydronic_pumps
232300_refrigerant_piping
232500_hvac_water_treatment
233113_metal_ducts
233300_duct_accessories
233713_diffusers_registers_grills
235100_breechings_chimneys_stacks
235216_condensing_boilers
236313_air_cooled_condensers
237333_indir_fired_h_and_v_units
238900_Louvers_and_Vents
260001-ELECTRICAL_FSB
260500_General_Requirements_for_Electrical_Work
260519_Low_Voltage_Electrical_Conductors
260526_Grounding
260530_Electrical_Acceptance_Testing
260533_Raceway_and_Fittings
260550_Installation_of_Electrical_Equipment
260560_Installation_of_Wire_and_Cable
262200_Low_Voltage_Transformers
262413_Switchboards
262416_Panelboards
262816_Safety_Switches
262913_Motor_Controllers
265100_Lighting_Fixtures
AD101-10090
AD102-10090
AD121-10090
AE001-10090
AE101-10090
AE102-10090
AE111-10090
AE121-10090
AE201-10090
AE211-10090
AE301-10090
AE311-10090
AE401-10090
AE501-10090
AE601-10090
AE611-10090
AE621-10090
AE622-10090
AE623-10090
Addendum_01_Combined_PDF_Chicopee2011
Addendum_02_combined
Addendum_03_QandA_not_in_Addendum_02
Addendum_04_QandA_not_in_Previous_Addenda
Bidders_Instructions_and_Checklist_Chicopee2011_Rev02Read & follow when bidding GC's & Subs
Business_Reference_Form_GC_Chicopee2011Complete & Submit with General Contractor Bid
C-100_CIVIL_SITE_PLAN
Ch_149_FORM_FOR_GENERAL_BID_MIL_Chicopee2011Complete, Sign, Submit with General Contractor Bid
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Electrical
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_HVAC
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Metal_Windows
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Plumbing
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Resilient_Floors
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Roofing_and_Flashing
Contractor_Authorized_Signatory_List_Chicopee2011If awarded contract, complete & submit
DCAM_prime_general_contractor_update_10_3_30Complete, Sign, Submit with General Contractor Bid
DCAM_subbidder_update_statement_10_3_30
E-001-10090
E-601-10090
ED101-10090
EFT_FORMGC awarded contract must submit if not already on file
EL101-10090
EL102-10090
EP101-10090
EP102-10090
EP651-10090
ES101-10090
GI001-10090
General_Bid_Tabulation_Chicopee_2011
M-001-10090
M-101-10090
M-401-10090
M-501-10090
M-601-10090
M-651-10090
M-652-10090
MD101-10090
MIL_GC_agreement_mglc149_Chicopee2011
MIL_Invitation_to_Bid_Chicopee2011Read & follow when bidding GC's & Subs
MIL_general_conditions_contract_Chicopee2011_Rev01
PL001-10090
PL101-10090
PL401-10090
PL501-10090
PL601-10090
PreBid_Conference_Tabulation_Chicopee2011_Rev01
Prevailing_Wage_Chicopee_20110531-011General Contractors/Sub-Bidders Comply if awarded contract.
SF101-10090
SF501-10090
SF502-10090
Specifications_Table_of_Contents
Specifications_Volume_1_Cover
Specifications_Volume_2_Cover
Sub_Bid_Result_Chicopee_2011General Contractor must review and select subs per MGL CH149
X-100_SURVEY_CONTROL_PLAN

BidQandA_Header BID_NBR Forum Title Forum Description Key Words Physical Conference Flag Status Last Action Last Action Date Department Finalized Flag Questions Start Date Questions End Date Estimated Final Date View Name of Vendor Flag View Only After Final Date Last Name First Name Title Address Line 1 Address Line 2 City Phone Fax Email Zip Code State Location Description Location Name Comments Conference Start Time Conference End Time

BidQandA Question Number Vendor Name Vendor First Name Vendor Last Name Vendor Email Vendor Phone Finalized Flag Buyer First Name Buyer Last Name Buyer Email Untruncated Question Text Untruncated Answer Text

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .