236313_air_cooled_condensers.pdf
PDF 68 KB Posted
- Solicitation number
- S124834-vCurrent
- Issued by
- Hampden County, Massachusetts
About this file
This document is a specification for air-cooled condensers as part of the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. The project requires the supply and installation of factory-assembled and tested air-cooled refrigerant condensers for outdoor installation, including condenser coils, fans, motors, and controls. The condensers must be capable of withstanding seismic events and comply with ASHRAE standards. Bidders must submit product data, shop drawings, and operation/maintenance information. Acceptable manufacturers are listed. The work is part of a larger state and local contract opportunity for the general contractor renovations of the Chicopee Armory.
The specification outlines requirements for the condensers' construction, components, and performance testing. Installation details are provided, including concrete bases, vibration isolation, and coordination with other trades. Field testing, startup, and demonstration procedures are also specified. No additional details on pricing, set-asides, funding sources, or other commercial terms are included in this document.
View the file
Other files
Show 40 more
Latest 50 of 185 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101
CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11
10090 AIR-COOLER CONDENSERS 236313-1
SECTION 236313
AIR-COOLED CONDENSERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
B. The requirements of Section 230100, “Basic Mechanical Requirements” apply to work defined by this Section.
C. The requirements of Section 230500, “Basic Mechanical Materials and Methods” apply to work defined by the Section.
1.2 SUMMARY
A. This Section includes packaged, air-cooled condensers for [outdoor] [indoor] installation.
1.3 PERFORMANCE REQUIREMENTS
A. Seismic Performance: Air-cooled refrigerant condensers shall withstand the effects of earthquake motions determined according to ASCE/SEI 7 .
1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified."
1.4 SUBMITTALS
A. Product Data: For each air-cooled condenser, include rated capacities, operating characteristics, furnished specialties, and accessories. Include equipment dimensions, weights and structural loads, required clearances, method of field assembly, components, and location and size of each field connection.
B. Shop Drawings: Signed and sealed by a qualified professional engineer.
1. Vibration Isolation Base Details: Detail fabrication including anchorages and attachments to structure and to supported equipment. Include auxiliary motor slides and rails and equipment mounting frames.
2. Wiring Diagrams: Power, signal, and control wiring.
C. Operation and Maintenance Data: For air-cooled condensers to include in emergency, operation, and maintenance manuals.
10090 AIR-COOLER CONDENSERS 236313-2
1.5 QUALITY ASSURANCE
A. Product Options: Drawings indicate size, profiles, and dimensional requirements of air-cooled condensers and are based on the specific system indicated. Refer to Division 1 Section
"Product Requirements."
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
C. Fabricate and label refrigeration system according to ASHRAE 15, "Safety Code for
Mechanical Refrigeration."
D. ASHRAE/IESNA 90.1 Compliance: Applicable requirements in ASHRAE/IESNA 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."
1.6 COORDINATION
A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Division 3.
B. Coordinate installation of roof curbs, equipment supports, and roof penetrations. These items are specified in Division 7 Section "Roof Accessories."
C. Coordinate location of refrigerant piping and electrical rough-ins.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Carrier Corporation; Commercial HVAC Systems.
2. Colmac Coil Manufacturing, Inc.
3. Coolenheat Inc.
4. Dunham-Bush, Inc.
5. Engineered Air.
6. Heatcraft Refrigeration Products LLC.
7. McQuay International.
8. Trane; a business of American Standard Companies.
9. USA Coil & Air.
10. YORK; a Johnson Controls company.
http://www.specagent.com/LookUp/Default.aspx?Section=236313 http://www.specagent.com/LookUp/?ulid=3562&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456821837&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456813679&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456813680&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456813681&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456813682&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456813683&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456813684&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456821838&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456813685&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456821841&mf=04&src=wd
10090 AIR-COOLER CONDENSERS 236313-3
2.2 MANUFACTURED UNITS
A. Description: Factory assembled and tested; consisting of casing, condenser coils, condenser fans and motors, and unit controls.
B. Refrigerant: R-410A .
C. Condenser Coil: Seamless copper-tube, finned coil; factory tested at 425 psig.
1. Tube: 3/8-inch- diameter seamless copper.
2. Coil Fin: Aluminum .
3. Circuit: To match compressors with liquid subcooling coil.
D. Condenser Fans and Drives: Propeller fans with aluminum or galvanized-steel fan blades, for vertical air discharge; directly driven with permanently lubricated ball-bearing motors with integral current- and thermal-overload protection.
1. Weather-proof motors with rain shield and shaft slinger.
2. Extend grease lines to outside of casing.
E. Operating and Safety Controls: Include condenser fan motor thermal and overload cutouts;
115-V control transformer, if required; magnetic contactors for condenser fan motors and a nonfused factory-mounted and -wired disconnect switch for single external electrical power connection.
F. Unit Casings: Galvanized or zinc-coated steel treated and finished with manufacturer's standard paint coating , designed for outdoor installation with weather protection for components and controls , and with the following:
1. Removable panels for access to controls, condenser fans, motors, and drives.
2. Plated -steel fan guards.
3. Lifting eyes.
2.3 MOTORS
A. Comply with NEMA designation, temperature rating, service factor, enclosure type,, and requirements in Division 23, Basic Mechanical Materials and Methods, "Motors for
Mechanical Equipment."
1. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load will not require motor to operate in service factor range above 1.0.
2. Controllers, Electrical Devices, and Wiring: Electrical devices and connections are specified in Division 26 Sections.
3. Enclosure Type: Totally enclosed, fan cooled.
2.4 SOURCE QUALITY CONTROL
A. Verification of Performance: Rate air-cooled condensers according to ARI 210/240 .
10090 AIR-COOLER CONDENSERS 236313-4
B. Testing Requirements: Factory test sound-power-level ratings according to ARI 270.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of air-cooled condensers.
B. Examine roughing-in for refrigerant piping systems to verify actual locations of piping connections before equipment installation.
C. Examine walls, floors, and roofs for suitable conditions where air-cooled condensers will be installed.
D. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Install units level and plumb, firmly anchored in locations indicated; maintain manufacturer's recommended clearances.
B. Install air-cooled condensers on concrete base. Concrete base is specified in Division 23
Section "Basic Mechanical Materials and Methods," and concrete materials and installation requirements are specified in Division 3.
C. Concrete Bases:
1. Install dowel rods to connect concrete base to concrete slab. Unless otherwise indicated, install dowel rods on 18-inch centers around full perimeter of the base.
2. For equipment supported on structural slab, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete floor.
3. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
4. Install anchor bolts to elevations required for proper attachment to supported equipment.
5. Install anchor bolts according to anchor-bolt manufacturer's written instructions.
D. Vibration Isolation: Mount air-cooled condensers on rubber pads with a minimum deflection of
1/4 inch . Vibration isolation devices and installation requirements are specified in Division 26
Section "Mechanical Vibration and Seismic Controls."
E. Maintain manufacturer's recommended clearances for service and maintenance.
F. Loose Components: Install electrical components, devices, and accessories that are not factory mounted.
10090 AIR-COOLER CONDENSERS 236313-5
3.3 CONNECTIONS
A. Piping installation requirements are specified in other Division 23 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Install piping adjacent to machine to allow service and maintenance.
C. Refrigerant Piping: Connect piping to unit with pressure relief, service valve, filter-dryer, and moisture indicator on each refrigerant-circuit liquid line. Refrigerant piping and specialties are specified in Division 23 Section "Refrigerant Piping."
D. Ground equipment according to Division 26 Section "Grounding and Bonding."
E. Connect wiring according to Division 26 Section "Conductors and Cables."
3.4 FIELD QUALITY CONTROL
A. Perform the following field tests and inspections and prepare test reports:
1. Perform electrical test and visual and mechanical inspection.
2. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.
3. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation. Complete manufacturer's starting checklist.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
5. Verify proper airflow over coils.
B. Verify that vibration isolation and flexible connections properly dampen vibration transmission to structure.
C. Remove and replace malfunctioning air-cooled condensers and retest as specified above.
3.5 STARTUP SERVICE
A. Complete installation and startup checks according to manufacturer's written instructions and perform the following:
1. Inspect for physical damage to unit casing.
2. Verify that access doors move freely and are weathertight.
3. Clean units and inspect for construction debris.
4. Verify that all bolts and screws are tight.
5. Adjust vibration isolation and flexible connections.
6. Verify that controls are connected and operational.
B. Lubricate bearings on fans.
C. Verify that fan wheel is rotating in the correct direction and is not vibrating or binding.
10090 AIR-COOLER CONDENSERS 236313-6
D. Start unit according to manufacturer's written instructions and complete manufacturer's startup checklist.
E. Measure and record airflow over coils.
F. Verify proper operation of capacity control device.
G. Verify that vibration isolation and flexible connections properly dampen vibration transmission to structure.
H. After startup and performance test, lubricate bearings.
3.6 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain air-cooled condensers. Refer to Division 1 Section "Closeout
Procedures."
END OF SECTION 236313
File details come from the government source that posted it. Updated .