J-15_DBA-ND5.doc

DOC document 6 KB Posted

Attached to
Operation of the Q. Burdick Job Corps Center
Solicitation number
S09F6ND010
Issued by

About this file

RFP attach J-15 Davis Bacon WD

View the file

Other files

File Type Posted
Amend4.doc DOC document
Amend3.doc DOC document
Amend2.doc DOC document
J-23_Vehicles.xls XLS spreadsheet
J-23_EPMS Report.pdf PDF
J-13_Burdick Property Report.pdf PDF
J-7_WIP-ND.pdf PDF
J-20_OMS 10 OA.pdf PDF
J-14_Burdick Site Map0001.pdf PDF
Pre-Prop Conf Powerpoint 2.8.06.ppt PPT presentation
J-17_National Staff Compensation Report.xls XLS spreadsheet
J-20_OMS 10 CTS.pdf PDF
J-12_Burdick Space Utilization0001.pdf PDF
J-20_MPO35 Monthly Ctr Summary.pdf PDF
J-8_Utility and Fuel Usage Rep for Contr Yr.doc DOC document
J-19_Report of Survey-PB Dewberry0001.pdf PDF
J-20_MSO 20 Educ Attain Report.pdf PDF
J-20_CTT-10 Report.pdf PDF
J-16_SCA 05-2407.doc DOC document
J-20_OMS 10 Center Report Card.pdf PDF
Amend1.doc DOC document
J-22_CDSS PLAN 2008 RevJuly08.doc DOC document
Burdick RFP.doc DOC document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: ND080005 08/15/2008 ND5

Superseded General Decision Number: ND20070005

State: North Dakota

Construction Type: Building

County: Ward County in North Dakota.

Building Projects (does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 02/08/2008 1 05/16/2008 2 05/23/2008 3 08/15/2008

BRND0002-002 05/01/2008

Rates Fringes

BRICKLAYER.......................$ 24.48 8.39

* CARP1176-003 05/01/2008

Rates Fringes

CARPENTER

CARPENTER(Including formwork, drywall hanging, drywall finishing, & cabinet installation; excluding metal building erection, heat and frost insulation, soft flooring & gypcrete flooring)...................$ 18.00 10.42

ELEC0714-005 07/01/2007

WARD COUNTY:

Rates Fringes

ELECTRICIAN

ELECTRICIANS(including low voltage wiring for telephones, computers, doorbells, alarms, & HVAC controls)...................$ 31.26 7.62+11%

PLUM0300-009 05/01/2008

Rates Fringes

PLUMBER

PLUMBERS(incl HVAC piping)..$ 23.36 8.00

* SHEE0010-034 06/02/2008

Rates Fringes

Sheet Metal Worker

SHEET METAL WORKERS(HVAC

only).......................$ 19.20 10.29

SUND2000-001 03/23/2000

Rates Fringes

Heat and Frost Insulator.........$ 8.00 .66

Laborers:

Mason Tender................$ 9.88 Unskilled...................$ 8.70

PAINTER

PAINTERS (including paper hanging excluding drywall finishing)..................$ 12.05

Power equipment operators:

Crane.......................$ 15.55 5.10 Skid Steer..................$ 9.64

TILE SETTER......................$ 11.50 .22

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .