S02-Tenant Improvements Cost Summary TICS Table Exhibit L.pdf
PDF 97 KB Posted
- Solicitation number
- 36C24926R0002
About this file
This document is a Tenant Improvements Cost Summary (TICS) for the Frankfort Community-Based Outpatient Clinic (CBOC) for the Veterans Affairs agency, located in Frankfort, Kentucky. The document provides a detailed breakdown of construction and improvement costs across 33 CSI Masterformat divisions, including categories like General Requirements, Existing Conditions, Concrete, Masonry, Metals, and various building systems such as Electrical, HVAC, Plumbing, and Communications. The space has an ABOA (Assignable Building Area) of 20,751 square feet with a Common Area Factor of 35%, resulting in a Rentable Square Footage (RSF) of 28,014. Despite the comprehensive divisional breakdown, all line items show zero dollar amounts, suggesting this is a template or preliminary cost document without finalized pricing.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For: FRANKFORT CBOC ABOA SF= 20,751.00
Agency: Veterans Affair TIA PER ABOA SF= -$
Location: Frankfort KY. TOTAL TIA= -$
Common Area Factor: 35.00% RSF= 28,014.00 Masterformat
CSI System Elements TI* SHELL**
Div 1 General Requirements -$ -$ Div 2 Existing Conditions -$ -$ Div 3 Concrete -$ -$ Div 4 Masonry -$ -$ Div 5 Metals -$ -$ Div 6 Wood, Plastics, Composites -$ -$ Div 7 Thermal and Moisture Protection -$ -$ Div 8 Openings -$ -$ Div 9 Finishes -$ -$ Div 10 Specialties -$ -$ Div 11 Equipment -$ -$ Div 12 Furnishings -$ -$ Div 13 Special Construction -$ -$ Div 14 Conveying Equipment -$ -$ Div 21 Fire Suppression -$ -$ Div 22 Plumbing -$ -$ Div 23 Heating, Ventilating, and Air Conditioning (HVAC) -$ -$ Div 26.1 Electrical -$ -$ Div 26.2 Lighting -$ -$ Div 27 Communications -$ -$ Div 28.1 Electronic Safety -$ -$ Div 28.2 Electronic Security (TI - Non-BSAC) -$ -$ Div 31 Earthwork -$ -$ Div 32 Exterior Improvements -$ -$ Div 33 Utilities -$ -$
Subtotal -$ -$ General Contractor Fee Percent -$ -$
Subtotal Construction Costs -$ -$ Architectural & Engineering Fees (NIC DID costs) Percent -$ -$ Other Lessor Costs Established Under the Lease -$ -$
Subtotal Lessor's Costs: -$ -$ Lessor's Project Management Fee Percent -$
Total Price to Government: GRAND TOTAL -$ Cost per ABOA SF -$ -$
Cost per RSF -$ -$ Notes:
* Include all subcontractors' costs.
TENANT IMPROVEMENTS COST SUMMARY (TICS)
Trade Costs
Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the 'SHELL' definitions tab, and the lease, for further information.
TICS
File details come from the government source that posted it. Updated .