Question 1 36C249-26-AP-0006 - Frankfort CBOC Lease 2.0 ASR Questions and Request for Extension.pdf

PDF 120 KB Posted

Attached to
X1AA--36C249-26-AP-0006 - Frankfort CBOC Lease 2. 0 (Lex Med Ctr)
Solicitation number
36C24926R0002
Issued by

About this file

This document is a Request for Questions and Request for Extension for the Frankfort CBOC (Community-Based Outpatient Clinic) Lease 2.0 procurement (Solicitation No. RE 36C249-26-AP-0006). The document contains two primary questions from a potential offeror regarding the Acquisition Strategy Report (ASR) for the project. The first question seeks clarification on discrepancies between the design program and sample floor plan, with the VA responding that the ASR design schematic is intended to provide a general floorplan concept for the PACT (Primary Care Transformation) model. The second question requests more details on emergency backup power requirements, with the VA specifying that the generator should power the entire building and providing additional protection guidelines for the emergency generator, including secure location, standoff distances, and utility protection measures.

The document includes specific emergency generator protection details, such as securing the generator against unauthorized access, locating it at least 25 feet away from loading docks, ensuring standoff and venting methods, and protecting critical interior areas. An additional note indicates that exterior power backup, including lighting for egress, walkways, parking lots, and parking structures, must have emergency power backup to ensure safe building evacuation. The document is part of a VA leasing procurement process and appears to be seeking clarification and additional information from potential offerors before finalizing the solicitation.

View the file

Other files

File Type Posted
Question 3 36C249-26-AP-0006 - Frankfort CBOC Lease 2.0 ASR Questions and Request for Extension.pdf PDF
Question 2 36C249-26-AP-0006 - Frankfort CBOC Lease 2.0 ASR Questions.pdf PDF
S02-RLP 36C24926R0002 Revised.pdf PDF
S02 Past Performance Questionnaire Exhibit N.pdf PDF
S02-3517B General Clauses Exhibit E.pdf PDF
S02 Small Business SubCon Plan Exhibit O.pdf PDF
S02-Security Unit Price List FSL II Exhibit I.pdf PDF
Deliniated Map.pdf PDF
S02 - 3516 Solicitation Provisions Exhibit D.pdf PDF
S02-RLP 36C24926R0002 .pdf PDF
S02- FORM 1364 INSTRUCTIONS Exhibit F2.pdf PDF
S02-Tenant Improvements Cost Summary TICS Table Exhibit L.pdf PDF
S02-DOL Wage Determination Exhibit K.pdf PDF
S02- Fire and Safety 12000 Exhibit H.pdf PDF
S02-Architect and Engineering qualifications SF330 Exhibit P.pdf PDF
S02-Agency Space Requirement - Frankfort CBOC Exhibit B.pdf PDF
S02- VA Security Requirements FSL Level II Oct 2024 Exhibit C.pdf PDF
S02-Lease Agreement 36C24926R0002 Exhibit A.pdf PDF
S02- Rent Chart For Form 1364 Exhibit F1.pdf PDF
S02-Seismic Forms A - F with Instructions Exhibit J.pdf PDF
S02 Form 1217 Exhibit G.pdf PDF
S02-FAR 52.204-24 Representation Digital Exhibit M.pdf PDF
S02-Form 1364 Proposal to Lease Space Exhibit F.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE 36C249-26-AP-0006 - Frankfort CBOC Lease 2.0 - ASR Questions and Request for Extension

1. While preparing the Initial Offer for this procurement, our team noticed the following discrepancies between the program for design and sample floor plan provided in the ASR (Exhibit B), and has the three following questions/requests:

Could VA please clarify the below?

Spaces in ASR program but not in the ASR Concept plan:

Spaces in ASR Concept plan but not in the ASR program:

They are meant to follow the space plan in ASR program. The ASR design schematic is there so they can get an idea of the floorplan for the PACT model.

2. Additionally, would it be possible for VA to provide more detail on the emergency backup power requirement mentioned on Page 9 of the ASR under Section 3.02 (runtimes, generator-type, etc.)?

The generator should power the entire building on emergency power.

Refer to Exhibit A