This document provides specifications for project 523A4-24-010 to replace the pool roof at the VAMC West Roxbury located in West Roxbury, Massachusetts. The project scope involves removing the existing roof system and installing a new roof system with flood and gravel topcoat. Bidders are instructed to visit the site by appointment only and all employees must comply with VA security requirements.
The specifications outline construction security, operations and storage areas, alterations, disposal and restoration requirements. Professional surveying, layout, as-built drawings, and use of roadways are also addressed. Safety requirements include an accident prevention plan, activity hazard analyses, inspections, personal protective equipment, infection control, fire safety, electrical safety, and fall protection. The document provides details on training, government furnished property, relocated equipment, storage space, and instructions.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10-01-14 i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 USE OF ROADWAYS
1.16 RESIDENT ENGINEER'S FIELD OFFICE
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.18 TEMPORARY USE OF EXISTING ELEVATORS
1.19 TEMPORARY USE OF NEW ELEVATORS
1.20 TEMPORARY TOILETS
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
1.22 NEW TELEPHONE EQUIPMENT
1.23 TESTS
1.24 INSTRUCTIONS
1.25 GOVERNMENT-FURNISHED PROPERTY
10-01-14 ii
1.26 RELOCATED EQUIPMENT ITEMS
1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.28 CONSTRUCTION SIGN
1.29 SAFETY SIGN
1.30 PHOTOGRAPHIC DOCUMENTATION
1.31 FINAL ELEVATION Digital Images
1.32 HISTORIC PRESERVATION
11-01-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for project #523A4-24-003 replace pool roof as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
VA Contracting Officer.
C. NA
D. Before placement and installation of work subject to tests the
Contractor shall coordinate and notify the Project Engineer in sufficient time to enable testing personnel to be present at the site in time for proper testing and field inspection. Such prior notice shall be not less than two (2) weeks unless otherwise designated by the
Project Engineer.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, #523A4-24-003
This project primary purpose for the project #523A4-24-003 replace pool roof s to replace pool roof.
This project will include removal of exiting roof systems and build up new roof system with flood and gravel topcoat, but is not limited to, all work including construction administration, and includes all support equipment to complete necessary repairs. Work to be performed at VAMC West Roxbury in accordance with the Statement of Work, Specifications, Drawings, Federal, State, and Local Codes
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
01 00 00 -2
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order Contractor’s employees off the premises in the event of a national emergency. The Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards:
1. The Contractor shall provide unarmed guards at the project site after construction hours if required by the Contracting Officer.
01 00 00 -3
2. The Contractor shall provide the guards and VA police with communication devices as directed.
3. The Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.
D. Key Control:
1. The Contractor shall provide duplicate keys and lock combinations to the Contracting Officer’s representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
E. Document Control:
1. Before starting any work, the Contractor shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
01 00 00 -4
• Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
• “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. If required by the Contracting Officer, a limited number of (2 to 5) permits shall be issued for Contractor and its employees for parking in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. The general contractor shall provide a written request, at a minimum of 2 weeks prior to planned mobilization and construction commencement, a request to the VA Project Engineer and Contracting Officer to store any materials within VA interior spaces. Request shall include a detailed inventory of materials being requested to be stored, quantities of each material, material safety data sheet (and globally harmonized system of classification) information of each material, approximate duration of anticipated storage being requested, how the material will be stored, where in the requested space each material will be stored, etc.
B. Temporary buildings (e.g., storage sheds, shops, Conex trailers, offices) and utilities may be erected by the Contractor only with the approval of the VA Project Engineer and Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall
01 00 00 -5 remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the VA Project Engineer & Contracting Officer. See subpar
A above for the required request details.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
F. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by VA Project Engineer & Contracting Officer. The general contractor shall bear the cost to perform the required off-hour work.
The general contractor shall plan-ahead and determine what work (i.e.
demolition, powder actuated power tool work, select construction activities, public corridor work, door & frame replacement, etc.) could
01 00 00 -6 interfere with medical center operations, business or patient care and plan to perform these activities during other than normal business hours. Do not store materials and equipment in other than assigned areas.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To ensure such executions, Contractor shall furnish the VA Project
Engineer & Contracting Officer with a realistic construction schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall submit a request to the VA
Project Engineer & Contracting Officer at a minimum of three (3) weeks in advance of each proposed date of starting work in each specific area of site, building or portion thereof. If the written request is not accepted by the VA Project Engineer or Contracting Officer, the general contractor shall revise and resubmit the notification at a minimum of two (2) weeks in advance of the new proposed date of starting work from
01 00 00 -7 the newly submitted date of the revised request. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, Chief Engineering, Engineering Manager, and the VA Project Engineer & Contracting
Officer.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall always maintain a minimum temperature of 4 degrees C (40 degrees F), except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall decide for pre-inspection of site with
Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
I. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking, building entrances, building loading docks, corridors, tunnel system, public corridors, and stairwells and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
J. Coordinate the work for this contract with other construction operations as directed by VA Project Engineer & Contracting Officer.
J. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces or exterior envelopes are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
01 00 00 -8
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items were directed by VA Project Engineer &
Contracting Officer.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which is not to be removed and which does not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
01 00 00 -9
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. The Contractor is prohibited from using VA dumpsters. The Contractor shall furnish and pay for all dumpsters required to legally remove construction debris from the VA Medical Center. The contractor shall request placement of a dumpster onto VA property through a written request to the VA Project Engineer identifying on a marked-up site plan
(using Google Earth screen shot) the approximate proposed location of dumpster(s). Request shall include dumpster cut-sheet showing size.
Request shall include cut-sheet of the planned dumpster cover to be utilized. Dumpster shall not impact roadways, parking lots, ramps, entrances/exits, access to exterior equipment, hydrants, Siamese fire pipe connections/PIV, underground utilities, manholes, etc. If during the period of performance, the government requires the contractor’s dumpster is required to be relocated for special events, construction work, emergency repairs, security concerns, or any other reasoning, the contractor shall bear the cost to relocate the dumpster to the new approved dumpster location at no additional cost to the government.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
01 00 00 -10
VA Project Engineer & Contracting Officer. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the VA Project Engineer & Contracting Officer before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to be existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or removal.
1.11 COORDINATION - COORDINATE WORK AND PRODUCTS MEETING THE REQUIREMENTS
ASSOCIATED WITH ALL APPLICABLE SPECIFICATION SECTIONS AND PLANS TO PRODUCE A
SYSTEM COMPLETE, FUNCTIONAL AND READY FOR THE PURPOSE INTENDED.
A. Pre-worksite Re-visit Requirements … Before starting work in a particular area, visit the worksite and carefully examine the areas to verify complexity, existing conditions and difficulties that will affect work including all work done under various specification sections and the VA. Commencement of work shall be construed as acceptance of the existing conditions and difficulties. No change to the contract price or schedule shall be allowed for work caused by unfamiliarity with the site conditions that are visible or readily construed by an observer.
B. Coordinate the location of all work, equipment and components with all trades and equipment installers to prevent interferences and maintain proper use and access to all items and spaces. General Contractor is responsible for coordinating all equipment and components being installed with the placement location and dimension.
requirements. Prior to job execution each trade shall submit
“complete” coordinated shop drawings indicating all equipment and material layouts with locations from walls/columns, bottom/top.
01 00 00 -11 elevations, vibration isolators, supports, dimensions, utility requirements and equipment submittal numbers. Each trade shall maintain a set of working drawings to document as-built information as the work progresses and submit to the Project Engineer monthly for review.
C. New work shall be installed and connected to existing work neatly and carefully. All work shall be coordinated with other trades to avoid conflicts and to obtain a neat competent installation that will afford maximum accessibility for easy and proper operation, maintenance, service and headroom. All work shall be installed in a manner that permits easy accessibility and proper removal of system components requiring periodic service. Disturbed or damaged work shall be replaced or repaired to new conditions at the cost of the general contractor. Any items determined to be in non-compliance shall be corrected by the Contractor at no additional expense to the Government.
1.12 RELATED WORK – MINIMUM WORK PERFORMANCE REQUIREMENTS. NO STATEMENTS HERE
IN SHALL RELIEVE THE CONTRACTOR OF RESPONSIBILITIES DESCRIBED ELSEWHERE IN
THE CONTRACT DOCUMENTS.
A. General Contractor shall assure that all trades are aware of their respective full scope of work. Contractor shall procure all necessary permits and inspections. Refer to all contract drawings, specifications and notes for additional responsibilities, details and scope of work.
All work shall be performed by personnel properly skilled (& certified and licensed) in the task they are performing and aware of their project responsibilities. Workmanship shall be the best of their respective kind using the most modern approved methods and materials.
General Contractor shall directly supervise all phases of construction, and the supervisor shall have full authority to act on field conditions associated with all trades to prevent construction delays. Daily work logs shall be issued to the VA Project Engineer describing in detail the manpower, man-hours, work performed by each trade.
B. Information on existing conditions and proposed design solutions described in the contract documents are based on non-destructive testing and visual site investigation observations accessible in an occupied structure. Locations of components are approximate, and information provided is diagrammatic. In some instances, it may have.
01 00 00 -12 been impracticable to detail all the items in the specifications or on the drawings because of variances in the methods of achieving the necessary results. In such instances, the Contractor shall furnish all labor, materials, drawings, services and connections necessary not limited to the information provided to produce systems, appurtenances and equipment which are complete, functional and ready for proper operation by facility personnel for the purpose intended in accordance with their needs and the requirements of the manufacturers at no additional cost/time to the Government. All work shall be performed within the requirements of the General Conditions, General
Requirements, Drawings, Specifications and Notes. Prior to the Offer
Opening Date the Contractor is highly advised to visit the facility and carefully examine the conditions/difficulties that will affect construction to avoid problems that may be caused by unfamiliarity with conditions/difficulties that are either visible or readily construed by an observer.
C. Provide all necessary labor, material and coordination to complete the work described or implied by the construction documents at no additional cost or time to the Government. All equipment, components, materials, and articles furnished under the contract shall be new and free from defects, and be of the most suitable grade, size and capacity for the purpose intended, unless otherwise either specified or approved by the VA Project Engineer.
D. All materials, equipment, components, articles, and assemblies installed shall be complete for operation, service and maintenance for the purpose intended not limited to the details and information provided. All materials, equipment, components, articles, assemblies, and execution shall be in conformance with the contract documents, manufacturer’s written procedures and recommendations, latest editions of all applicable Federal/State/City codes/regulations/ordinances, and the jurisdiction having authority (JHA) on the applicable work. Except where specific dates are given, the issue (including amendments, addenda, revisions, supplements, and errata) in effect on the date of
Invitation for Bids shall be applicable. If criteria requirements conflict, the most stringent requirement (the greater quantity of superior work and materials) shall be met.
E. Verify all dimensions, clearances, information, and assumptions on
01 00 00 -13 existing conditions. All work shall be performed within approved tolerances, meet the requirements of the manufacturer and be neat, straight, plumb, level, smooth. Contractor is responsible for reviewing all contract documents for discrepancies prior to commencing all work. Contractor shall notify the VA Project Engineer of any variances with adequate time so that alternate solutions can be established without disrupting the established construction schedule. Data and information furnished or referred to in the construction documents is for the Contractor’s use. The Government assumes no responsibility for any interpretation of or conclusion drawn from the data or information made by the contractor based on the information made available by the
Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions that can affect the work by any of its officers or agents before the execution of this contract, unless that understanding, or representation is expressly stated in the contract.
I. Work coordination of all trades and all material delivery.
II. Verify that all delivered materials match the approved submittals.
III. Establish procedures to ensure compliance with all contract requirements.
IV. Prepare daily work logs, daily sign-in sheets and monitor progress with respect to the schedule.
V. Plan of each trade in preparation for the next trade to perform work.
VI. Monitor the performance of each trade for compliance with the
VII. Ensure that each trade meets their responsibilities with respect to the
VIII. Report results of coordination, material delivery, contract compliance, progress plans, and performance to the VA Project Engineer in a timely manner.
IX. Arrange phases and perform work to always ensure utility services for other buildings and areas as required.
01 00 00 -14
X. Safety & Infection Control requirements: ILSM, ICRA, GEMS and Patient
Safety.
References to the APPLICABLE PUBLICATIONS are a minimum requirement standard. Except where a specific date is given the issue (including amendments, addenda, revisions, supplements, and errata) in effect on the date of Invitation for Bids shall be applicable. Drawings and specification sections shall govern in those instances where contract document requirements are greater than those specified in the
APPLICABLE PUBLICATION.
1.13 CONSTRUCTION COMMENCEMENT CONTRACTOR SHALL PROCEED WITH CONSTRUCTION
ONLY AFTER VETERANS AFFAIRS’ ACCEPTANCE OF “ALL” REQUIRED SUBMITTALS AND
COORDINATION DRAWINGS.
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in detail (i.e., common industry practice to take three (3) field measurements to permanent features such as fittings and valves). To ensure compliance, as-built drawings shall be made available for the VA Project Engineer review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings to the VA Project Engineer & Contracting Officer within 15 calendar days after each completed phase and after the acceptance of the project by the VA Project Engineer & Contracting Officer.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the VA Project Engineer &
Contracting Officer, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed, and restoration performed by the Contractor at Contractor's expense.
When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
01 00 00 -15
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.16 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevators for handling building materials and
Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the VA Project Engineer &
Contracting Officer for use of elevators. The VA Project Engineer &
Contracting Officer will ascertain that elevators are in proper condition. Contractor may use service elevator No.S-6 in Building
No. 3 for daily use. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.
2. Contractor covers and provides maximum protection of following elevator components:
a. Entrance jambs, heads soffits and threshold plates.
b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
c. Finish flooring.
3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractor’s expense.
01 00 00 -16
4. If brake lining of elevators are excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining at the contractor’s expense.
5. All parts of main controller, starter, relay panel, selector, etc., worn or damaged during temporary use shall be removed and replaced with new parts at the contractor’s expense, if recommended by elevator inspector after elevator is released by Contractor.
6. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer.
1.17 NOT INCLUDED
1.18 TEMPORARY TOILETS – GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE NOT
PERMITTED OR AUTHORIZED TO USE GOVERNMENT RESTROOMS.
A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by VA Project Engineer & Contracting
Officer, provide suitable dry closets where directed. Keep such places clean and free from flies and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.
B. Contractor may have for use of Contractor's workmen, such toilet accommodations as may be assigned to Contractor by the west roxbury
VAMC.
1.19 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final
01 00 00 -17 acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
Contractor shall install meters at Contractor's expense and furnish the
Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.
C. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
1. Obtain heat by connecting to Medical Center heating distribution system.
a. Steam is available at no cost to Contractor.
D. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.
E. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the
Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation of use of water from Medical Center's system.
1.20 NOT INCLUDED
1.21 TESTS
A. The contractor shall provide a written testing and commissioning plan
01 00 00 -18 complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected.
outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer and
VA Project Engineer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonable period during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.22 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic at the same time) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and two (2) compact discs
01 00 00 -19
(four hard copies and two electronic copy each) for each separate piece of equipment shall be delivered to the VA Project Engineer &
Contracting Officer coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item.
Emphasis shall be placed on the use of special tools and instruments.
The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned
Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.
This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the VA Project Engineer & Contracting Officer and shall be considered concluded only when the VA Project Engineer & Contracting Officer is satisfied regarding complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to
01 00 00 -20 request the removal of, and substitution for, any instructor who, in the opinion of the VA Project Engineer & Contracting Officer, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
1.23 GOVERNMENT-FURNISHED PROPERTY
A. The Government shall deliver to the Contractor, the
Government-furnished property shown on the drawings (if applicable).
B. Equipment furnished by Government to be installed by Contractor will be furnished to Contractor at the Medical Center.
C. Storage space will be provided by the Government for equipment furnished by government to be installed by Contractor, and the
Contractor shall be prepared to unload and store such equipment therein upon its receipt at the Medical Center.
D. Notify VA Project Engineer and Contracting Officer in writing, 60 days in advance, of date on which Contractor will be prepared to receive equipment furnished by Government. Arrangements will then be made by the Government for delivery of equipment.
1. Immediately upon delivery of equipment, Contractor shall arrange for a joint inspection thereof with a representative of the Government.
At such time the Contractor shall acknowledge receipt of equipment described, make notations, and immediately furnish the Government representative with a written statement as to its condition or shortages.
2. Contractor thereafter is responsible for such equipment until such time as acceptance of contract work is made by the Government.
E. Equipment furnished by the Government will be delivered in a partially assembled (knock down) condition in accordance with existing standard commercial practices, complete with all fittings, fastenings, and appliances necessary for connections to respective services installed under contract. All fittings and appliances (i.e., couplings, ells, tees, nipples, piping, conduits, cables, and the like) necessary to make the connection between the Government furnished equipment item and the utility stub-up shall be furnished and installed by the contractor at no additional cost to the Government.
01 00 00 -21
F. Completely assemble and install the Government furnished equipment in place ready for proper operation in accordance with specifications and drawings.
G. Furnish supervision of installation of equipment at construction site by qualified factory trained technicians regularly employed by the equipment manufacturer.
1.24 RELOCATED EQUIPMENT AND/OR ITEMS
A. Contractor shall disconnect, dismantle as necessary, remove, and reinstall in new location, all existing equipment, and items to be relocated by the Contractor.
B. Perform relocation of such equipment or items at such times and in such a manner as directed by the VA Project Engineer & Contracting Officer.
C. Suitably cap existing service lines, such as steam, condensate return, water, drain, gas, air, vacuum and/or electrical, at the main whenever such lines are disconnected from equipment to be relocated. Remove abandoned lines in finished areas and cap as specified herein before under paragraph "Abandoned Lines".
D. Provide all mechanical and electrical service connections, fittings, fastenings, and any other materials necessary for assembly and installation of relocated equipment; and leave such equipment in proper operating condition.
E. Contractor shall employ services of an installation engineer, who is an authorized representative of the manufacturer of this equipment to supervise assembly and installation of existing equipment, required to be relocated.
F. All service lines such as noted above for relocated equipment shall be in place at point of relocation ready for use before any existing equipment is disconnected. Make relocated existing equipment ready for operation or use immediately after reinstallation.
01 00 00 -22
1.24 Construction signs
A. Provide a Construction Sign were directed by the Contracting Officer.
All wood members shall be of framing lumber. Cover sign frame with 24 gage galvanized sheet steel nailed securely around edges and on all bearings. Provide 3 4 inch by 4-inch posts (or equivalent round posts) set 4 feet into ground. Set bottom of sign level at 3 feet above ground and secure to posts with through bolts. Make posts full height of sign.
Brace posts with 2 by 4-inch material as directed.
B. Paint all surfaces of sign and posts two coats of white gloss paint.
Border and letters shall be of black gloss paint, except project title which shall be blue gloss paint.
C. Maintain sign and remove it when directed by the Contracting Officer.
D. Detail Drawing of construction sign showing required legend and other characteristics of sign is attached hereto and made a part of this specification.
1.25 SAFETY SIGN
E. Provide a Safety Sign where directed by the Contracting Officer. Face of sign shall be 3/4-inch-thick exterior grade plywood. Provide 2 - 4 by 4-inch posts extending full height of sign and 3 feet into ground.
Set bottom of sign level at 4 feet above ground.
F. Paint all surfaces of Safety Sign and posts with one prime coat and two coats of white gloss paint. Letters and design shall be painted with gloss paint of colors noted.
G. Maintain sign and remove it when directed by the Contracting Officer.
H. Standard Detail Drawing Number SD10000-02(Found on VA TIL) of safety sign showing required legend and other characteristics of sign is attached hereto and is made a part of this specification.
I. Post the number of accident-free days daily.
01 00 00 -23
1.2 HISTORIC PRESERVATION
Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the Contracting Officer verbally, and then with a written follow up.
- - - E N D - - -
01-01-21
01 57 19-
SECTION 01 35 26
SAFETY REQUIREMENTS
TABLE OF CONTENTS
1.1 APPLICABLE PUBLICATIONS
1.2 DEFINITIONS
1.3 REGULATORY REQUIREMENTS
1.4 ACCIDENT PREVENTION PLAN (APP)
1.5 ACTIVITY HAZARD ANALYSES (AHAs)
1.6 PRECONSTRUCTION CONFERENCE
1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP)
1.8 TRAINING
1.9 INSPECTIONS
1.10 ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS
1.11 PERSONAL PROTECTIVE EQUIPMENT (PPE)
1.12 INFECTION CONTROL
1.13 TUBERCULOSIS SCREENING
1.14 FIRE SAFETY
1.15 ELECTRICAL
1.16 FALL PROTECTION
1.17 SCAFFOLDS AND OTHER WORK PLATFORMS
1.18 EXCAVATION AND TRENCHES .................. Error! Bookmark not defined.
1.19 CRANES
1.20 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
1.21 CONFINED SPACE ENTRY
1.22 WELDING AND CUTTING
1.23 LADDERS
1.24 FLOOR & WALL OPENINGS
SECTION 01 35 26
SAFETY REQUIREMENTS
1.1 APPLICABLE PUBLICATIONS:
A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.
B. American Society of Safety Engineers (ASSE):
A10.1-2011...........Pre-Project & Pre-Task Safety and Health
Planning
A10.34-2012..........Protection of the Public on or Adjacent to
Construction Sites
A10.38-2013..........Basic Elements of an Employer’s Program to
Provide a Safe and Healthful Work Environment
American National Standard Construction and
Demolition Operations
C. American Society for Testing and Materials (ASTM):
E84-2013.............Surface Burning Characteristics of Building
Materials
D. The Facilities Guidelines Institute (FGI):
FGI Guidelines-2010Guidelines for Design and Construction of
Healthcare Facilities
E. National Fire Protection Association (NFPA):
10-2018..............Standard for Portable Fire Extinguishers
30-2018..............Flammable and Combustible Liquids Code
51B-2019.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70-2020..............National Electrical Code
70B-2019.............Recommended Practice for Electrical Equipment
Maintenance
70E-2018 ............Standard for Electrical Safety in the Workplace
99-2018..............Health Care Facilities Code
241-2019.............Standard for Safeguarding Construction, Alteration, and Demolition Operations
F. The Joint Commission (TJC)
TJC Manual ..........Comprehensive Accreditation and Certification
Manual
G. U.S. Nuclear Regulatory Commission
10 CFR 20 ...........Standards for Protection Against Radiation
H. U.S. Occupational Safety and Health Administration (OSHA):
29 CFR 1910 .........Safety and Health Regulations for General
Industry
29 CFR 1926 .........Safety and Health Regulations for Construction
Industry
1.2 DEFINITIONS:
A. Critical Lift. A lift with the hoisted load exceeding 75% of the crane’s maximum capacity; lifts made out of the view of the operator (blind picks); lifts involving two or more cranes; personnel being hoisted; and special hazards such as lifts over occupied facilities, loads lifted close to power-lines, and lifts in high winds or where other adverse environmental conditions exist; and any lift which the crane operator believes is critical.
B. OSHA “Competent Person” (CP). One who can identify existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous, or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29
CFR 1926.32(f)).
C. "Qualified Person" means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.
D. High Visibility Accident. Any mishap which may generate publicity or high visibility.
E. Accident/Incident Criticality Categories:
1. No impact – near miss incidents that should be investigated but are not required to be reported to the VA.
2. Minor incident/impact – incidents that require first aid or result in minor equipment damage (less than $5000). These incidents must be investigated but are not required to be reported to the VA.
3. Moderate incident/impact – Any work-related injury or illness that results in:
a. Days away from work (any time lost after day of injury/illness onset).
b. Restricted work.
c. Transfer to another job.
d. medical treatment…