This document is an amendment to a solicitation for the replacement of a pool roof at a Veterans Affairs Medical Center. The amendment extends the bid due date to February 9, 2024 at 1:00 PM EST in response to requests for information from potential offerors. It incorporates the latest applicable wage determination, attaches drawings and specifications for the roof replacement project, and provides photos of the existing roof condition. Bids are to be emailed to the contracting officer by the new due date. A subsequent amendment will provide call-in details for an offeror conference related to the solicitation. The opportunity is for the Department of Veterans Affairs to replace the pool roof at the VAMC West Roxbury facility located in Massachusetts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID OPENING Information.docx | DOCX document | |
| 36C24124B0021 0002.docx | DOCX document | |
| 2024 WRVA - Roof Assemblies.pdf | ||
| 211_2131_261029_exhaust_fan_detail_KEE-Layout.pdf | ||
| 211_2131_261005_Raised_Metal_Edge_KEE-Layout.pdf | ||
| S02 - MA WD 01-19-24.txt | TXT text file | |
| Pool Roof RFIs 1-10.docx | DOCX document | |
| Sloped Roof Photo.jpg | JPG image | |
| Section 075501 Pool Roof Upper Elevation.docx | DOCX document | |
| As Built Low Roof Plans Part A and B.pdf | ||
| Garland Roof Measurement Report.pdf | ||
| 211_2131_261002_typical_section_finish_KEE-Layout.pdf | ||
| 523A4-24-010_ Pool roof - Sign in sheet.pdf | ||
| 211_2131_261006_Raised_Metal_Edge_Cap_KEE-Layout.pdf | ||
| 211_2131_261012_coping_cap_KEE-Layout 02.pdf | ||
| S02 - ICRA.pdf | ||
| S02 - SOW 523A4-24-010.docx | DOCX document | |
| S02 - Drawing Cutsheet.pdf | ||
| S02 - Specifications.pdf | ||
| S02 - MA WD (12-08-2023).txt | TXT text file | |
| S02 - PCRA.pdf | ||
| 36C24124B0021.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 523A4-24-010 Department of Veterans Affairs VAMC Manchester Michael Muller 718 Smyth Road Manchester
NH
03104 Department of Veterans Affairs VAMC Manchester Michael Muller 718 Smyth Road Manchester
NH
03104 To all Offerors/Bidders
36C24124B0021 01-02-2024
X X X
***EXTENDED to: 2/9/2024 by 1:00pm EST X The purpose of Amendment 0001 is for the following:
1. Post the RFI's received for this project (see attachments)
2. Incorporate the latest Wage Determination into the solicitation (see MA Wage Determination as of 1-19-24).
3. Post the Site Visit Sign In Sheet (see attachment).
4. Extend the Bid Due Date to 2/9/2024 by 1pm EST.
Please email all bids to Michael.Muller@va.gov by the new bid due date extension of 2/9/24 by 1pm EST.
A separate amendment with a conference line will be posted in a subsequent amendment.
Michael Muller Contracting Officer See attached document: Pool Roof RFIs 1-10.
See attached document: S02 - MA WD 01-19-24.
See attached document: 211_2131_261002_typical_section_finish_KEE-Layout.
See attached document: 211_2131_261005_Raised_Metal_Edge_KEE-Layout.
See attached document: 211_2131_261012_coping_cap_KEE-Layout 02.
See attached document: 211_2131_261006_Raised_Metal_Edge_Cap_KEE-Layout.
See attached document: 211_2131_261029_exhaust_fan_detail_KEE-Layout.
See attached document: 2024 WRVA - Roof Assemblies.
See attached document: Garland Roof Measurement Report.
See attached document: As Built Low Roof Plans Part A and B.
See attached document: Section 075501 Pool Roof Upper Elevation.
See attached document: Sloped Roof Photo.
See attached document: 523A4-24-010_ Pool roof - Sign in sheet.
*Nothing further* Page 1 of