S02-S02-523-25-003 VABOS O2 Dwg All .pdf
PDF 8 MB Posted
- Attached to
- 523-25-003 Bulk Oxygen Corrections
- Solicitation number
- 36C24126Q0398
About this file
These are construction documents for bulk oxygen system corrections at three Department of Veterans Affairs (VA) Boston Healthcare System facilities: VAMC Brockton, VAMC Jamaica Plain, and VAMC West Roxbury in Massachusetts. The project, designated VA Project #523-25-003, VA Contract #36C24125R0010, and WPA Project #WPA1502, is dated March 26, 2026.
The construction documents are organized into three volumes corresponding to each facility and include site demolition plans, civil layout plans, civil details, structural details, plumbing plans with piping legends and symbols, and electrical plans. The scope of work encompasses demolition of existing structures and utilities, installation of new oxygen piping systems, construction of concrete equipment pads and barriers, installation of new fencing with electrical and security devices, and related site work. Key requirements include contractor coordination with the VA Contracting Officer Representative (COR) for oxygen supply shutdowns with minimum two-week notice, ground penetrating radar scans for excavation areas, compliance with NFPA standards and Massachusetts building codes, and maintenance of temporary oxygen supplies during construction. The architect is William Pevear Architects, Inc. (VOSB); the mechanical/electrical/plumbing and fire protection engineer is Affiliated Engineers, Inc.; and the surveyor and civil engineer is Nitsch Engineering, Inc. The documents specify general construction protocols, detail symbols and abbreviations used throughout the drawings, and include notes on erosion and sediment control, earth moving and grading, structural specifications, and utility system requirements.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.410.1377
MEP&FP Engineer
HYPERLINK "https://aeieng.com/"Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 857.302.6445
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
V1-VAMC Brockton V2-VAMC Jamaica Plain V3-VAMC West Roxbury
CONSTRUCTION
DOCUMENTS
03/26/2026
C :\U se rs
\a do rn .W
PA
\D oc um en ts
\V
AB
H S
Bu lk
O 2_ ad or n@ w illi am pe ve ar .c om .rv t 3/
/2
9:
:3
AM
V0-GI000
COVER
DEPARTMENT OF VETERANS AFFAIRS
BOSTON HEALTHCARE SYSTEM
Bulk Oxygen Corrections
CONSTRUCTION DOCUMENTS
ARCHITECT
MECH / ELEC / PLUMBING / FP
William Pevear Architects, Inc. (VOSB)
872 Massachusetts Avenue, Suite 2-9 Cambridge, MA 02139 T: 617.335.5186
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210 T: 857.302.6469
SURVEYOR & CIVIL ENGINEER
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843 T: 617.338.0063
March 26, 2026
VA Project # 523-25-003 VA Contract # 36C24125R0010
VA PO # 523C7043
WPA Project # WPA1502
VAMC BROCKTON - VOLUME 1
VAMC WEST ROXBURY - VOLUME 3
VAMC JAMAICA PLAIN- VOLUME 2
Revisions: Date:
B8 SITE
B3 SITE
B4 SITE
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
HYPERLINK "https://aeieng.com/"Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 6857.302.6469
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Brockton VA Medical Center VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
VAMC Brockton
03/26/2026
C :\U se rs
\a do rn .W
PA
\D oc um en ts
\V
AB
H S
Bu lk
O 2_ ad or n@ w illi am pe ve ar .c om .rv t 3/
/2
9:
:3
AM
V1-GI000
COVER - VAMC BROCKTON
DEPARTMENT OF VETERANS AFFAIRS
BOSTON HEALTHCARE SYSTEM
Bulk Oxygen Corrections
ARCHITECT
MECH / ELEC / PLUMBING / FP
William Pevear Architects, Inc. (VOSB)
872 Massachusetts Avenue, Suite 2-9 Cambridge, MA 02139 T: 617.335.5186
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210 T: 857.302.6469
940 Belmont Street, Brockton, MA 02301
SURVEYOR & CIVIL ENGINEER
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843 T: 617.338.0063
March 26, 2026
VA Project # 523-25-003 VA Contract # 36C24125R0010
VA PO # 523C7043
WPA Project # WPA1502
CONSTRUCTION DOCUMENTS
VOLUME 1
VAMC BROCKTON
1.
2.
3.
4.
5.
6.
7.
8.
A.
B.
C.
D.
E.
9.
10.
11.
CONTRACTOR SHALL NOT SHUT-OFF AND/OR INTERRUPT O2 SUPPLY TO HOSPITAL WITHOUT EXPLICIT WRITTEN PERMISSION FROM THE AUTHORIZED VA COR. CONTRACTOR SHALL BE REQUIRED TO COORDINATE TEMPORARY O2 SUPPLY FOR ALL SHUTDOWN(S) USING THE VA FACILITY SUPPLIERS. ALL REQUEST(S) FOR
SHUT DOWN SHALL BE MADE MIN. OF 2 WEEKS IN ADVANCE.
CONTRACTOR SHALL PREPARE AND REVIEW WORK PLAN WITH THE VA COR AND PROVIDE ADDITIONAL
DOCUMENTATION AS REQUIRED BY VA PRIOR TO START OF WORK.
CONTRACTOR IS REQUIRED TO PROVIDE GROUND PENETRATING RADAR SCANS OF ALL AREAS WHERE EXCAVATION IS REQUIRED. CONTRACTOR SHALL NOTIFY THE COR OF ANY POTENTIAL CONFLICTS.
CONTRACTOR TO NOTIFY COR OF BELOW GRADE CONFLICTS WITH NEW LAYOUT AND ADJUST LOCATION OF
PIERS AND FOUNDATIONS TO ACCOMMODATE.
DO NOT SCALE DRAWINGS.
DIMENSIONS ARE INTENDED TO COMMUNICATE DESIGN INTENT ONLY AND SHALL NOT BE USED FOR THE PURPOSES OF FABRICATION OR INSTALLATION. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AS INDICATED ON DRAWINGS PRIOR TO FABRICATION AND INSTALLATION. CONTRACTOR TO NOTE TERMS SUCH AS "FLUSH," "ALIGN," "MATCH," "CENTER" AND SIMILAR AS THESE TAKE PRECEDENT OVER DIMENSIONAL
NOTATION AND SCHEDULED SYSTEMS.
CONTRACTOR SHALL INSTALL MATERIALS IN EXACT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
SUBMITTAL SHOP DRAWINGS:
ORIGINAL DRAWINGS SHALL BE PREPARED BY CONTRACTOR, SUBCONTRACTOR, SUPPLIER OR
DISTRIBUTOR, WHICH ILLUSTRATE SOME PORTION OF THE WORK, SHOWING FABRICATION, LAYOUT, SETTING, OR ERECTION OF DETAILS.
SHOP DRAWINGS SHALL BE PREPARED BY A QUALIFIED DETAILER.
DETAILS SHALL BE IDENTIFIED BY REFERENCE TO SHEET AND DETAIL NUMBERS INDICATED ON CONTRACT
DRAWINGS.
DO NOT REPRODUCE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL COORDINATE ALL SUCH DRAWINGS, AND REVIEW THEM FOR ACCURACY,
COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS AND SHALL INDICATE ITS APPROVAL THEREON AS EVIDENCE OF
SUCH COORDINATION AND REVIEW.
CONTRACT LIMIT LINES SHALL BE WHERE INDICATED ON THE DRAWINGS. HOWEVER, IN ORDER TO COMPLETE OR FACILITATE INDICATED WORK, CONTRACTOR MAY BE REQUIRED TO CARRY OUT WORK ADJACENT TO, BUT OUTSIDE INDICATED LIMITS. THIS INCLUDES BUT IS NOT LIMITED TO ACCESS TO BUILDINGS TO COORDINATE
WORK.
PROVIDE SECURE CONSTRUCTION FENCING AROUND ALL AREA OF CONSTRUCTION,
EXCAVATION, AND STORAGE AREAS.
THE DEPARTMENT OF VETERANS AFFAIRS IS THE AUTHORITY HAVING JURISDICTION. THE MASSACHUSETTS OFFICE OF PUBLIC SAFETY AND INSPECTION NOR THE LOCAL INSPECTIONAL SERVICES HAS JURISDICTION OVER THIS PROJECT. THE PROJECT HAS BEEN DESIGNED TO MEET NFPA AND CERTAIN CRITERIA OF MA
BUILDING CODES AS NOTED.
GENERAL NOTES
DETAIL XX
DETAIL
DETAIL NAME
SCALE 1/8" = 1'-0"
SYMBOLS
DOOR / WINDOW SYMBOL XXXX
DETAIL IDENTIFICATION
SHEET NUMBER
DETAIL CALLOUT
SECTION
IDENTIFICATION
SHEET NUMBER
SECTION
DETAIL
IDENTIFICATION
SHEET NUMBER
DETAIL
LINETYPES
OVERHEAD
(OVERCOUNTER AND SOFFITS)
REFERENCE (COLUMN LINES
AND MATCHLINES)
BELOW AND BEYOND
(UNDERCOUNTER AND FOOTINGS)
BREAK LINE
DOCUMENT REVISION
LIMIT OF WORK
& AND
L ANGLE
@ AT
CL CENTERLINE
Ø DIAMETER
# POUND
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
AV AUDIOVISUAL
AVB AIR VAPOR BARRIER
BO BOTTOM OF
BOT BOTTOM
BOS BOTTOM OF STEEL
B/T BENCH TOP
B/W BETWEEN
CC CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
CG CORNER GUARD
CH CEILING HEIGHT
CJ CONTROL JOINT
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL COLUMN
COMMS COMMUNICATIONS
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CPT CARPET
CR CARD READER
CT CERAMIC TILE
CUH CABINET UNIT HEATER
CW CURTAIN WALL
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWG DRAWING
E EAST
EIFS EXTERIOR INSULATION & FINISH SYSTEM
EJ EXPANSION JOINT
EMER SHR EMERGENCY SHOWER
EMERG EMERGENCY
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXIST EXISTING
EXT EXTERIOR
F/F FACE TO FACE
FACP FIRE ALARM CONTROL PANEL
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FTR FINNED TUBE RADIATION
G GAS
GALV GALVANIZED
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GWB GYPSUM WALL BOARD
HB HOSE BIBB
HORIZ HORIZONTAL
HPT HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IF INSIDE FACE
IG INSULATED GLASS
INT INTERIOR
L LEFT
LGMF LIGHT GAUGE METAL FRAMING
LPT LOW POINT
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MH MENTAL HEALTH
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
N NORTH
NIC NOT IN CONTRACT
NRP NON-REMOVABLE PIN
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OPH OPPOSITE HAND
O OXYGEN
R RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REINF REINFORCED
REQ/REQ'D REQUIRED
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SIM SIMILAR
SOG SLAB ON GRADE
SST STAINLESS STEEL
STRUC STRUCTURAL
TD TRENCH DRAIN
TO TOP OF
TOC TOP OF CONCRETE SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TPO THERMOPLASTIC POLYOLEFIN
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
VC VA FURNISHED, CONTRACTOR INSTALLED
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED, VA INSTALLED
W WEST
WH WALL HYDRANT
ABBREVIATIONS
SHEET LIST
TYPICAL CORNER
POST FOOTING
TYPICAL LINE
POST FOOTING
SEE PLAN
8'
0"
SECURITY FENCE AND ACCESS
GATE BY DELEGATED DESIGNER
CONCRETE FOOTING, SEE STRUCTURAL
FOR ADDITIONAL INFORMATION
GALVANIZED STEEL CHAIN
LINK FENCING, TYP.
GALVANIZED STEEL
FENCE POST, TYP.
BE
LO
W G
R
AD
E
4' -0
" M
IN
1' - 0" TYP.
PAD LOCK
HARDWARE WITH INTER-
CHANGEABLE 7 PIN BEST CORE,
COORDINATE KEY CORE WITH
COR.
8"
HEIGHT PER NFPA
SEE MEP FOR NEW AND
RELOCATED CCTV AND LIGHTING
3' - 0"
TYPICAL, SWING AND LOCK
SIDE MIRROR AS PER SPECIFIC
INSTALLATION.
HARDWARE:
PAD LOCK HARDWARE
WITH BEST 7 PIN CORE
H
EI
G H
T
PE
R N
FP
A
8'
0"
SINGLE SWING GATE SINGLE SLIDING GATE, IN LINE
WITH ADJACENT FENCE
±11'-0"
TYPICAL, LOCK SIDE MIRROR AS PER SPECIFIC
INSTALLATION.
HARDWARE:
ROLLER SLIDE
PAD LOCK HARDWARE WITH BEST 7 PIN CORE
PROVIDE ROLLER TRACKS AND ROLLER WHEEL
PIPE TRACKS ATTACHED AT EACH LINE POST
WHEEL CARRIER
TYP. CROSS BRACING AS REQURIED
PAD LOCK HARDWARE
REAR WHEELS
BROCKTON B3
B31
B32
BROCKTON B8
B81
B82
BROCKTON B4
B41
B42
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
HYPERLINK "https://aeieng.com/"Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 6857.302.6469
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Brockton VA Medical Center VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
VAMC Brockton
03/26/2026
C :\U se rs
\a do rn .W
PA
\D oc um en ts
\V
AB
H S
Bu lk
O 2_ ad or n@ w illi am pe ve ar .c om .rv t 3/
/2
9:
:3
AM
V1-GI001
GENERAL NOTES, PROJECT
INFORMATION, SHEET LIST
SCALE: 1/2" = 1'-0"
02 CHAIN LINK FENCE DETAIL
SCALE: 1/2" = 1'-0"
01 GATE SCHEDULE & LEGENDS - BROCKTON
Gate Schedule - Brockton Mark Width Material Hardware Gate Type
B31 12' - 0" GALV. STEEL CHAIN LINK HW-2 Single Sliding B32 3' - 0" GALV. STEEL CHAIN LINK HW-1 Single Swing B41 5' - 0" GALV. STEEL CHAIN LINK HW-2 Single Sliding B42 3' - 0" GALV. STEEL CHAIN LINK HW-1 Single Swing B81 12' - 0" GALV. STEEL CHAIN LINK HW-2 Single Sliding B82 3' - 0" GALV. STEEL CHAIN LINK HW-1 Single Swing
HARDWARE TYPES:
HW-1
PAD LOCK HARDWARE WITH BEST 7 PIN CORE
HW-2
ROLLER SLIDE
PAD LOCK HARDWARE WITH BEST 7 PIN CORE
PROVIDE ROLLER TRACKS AND ROLLER WHEEL
Sheet Number Sheet Name
GENERAL INFORMATION
V1-GI000 COVER - VAMC BROCKTON
V1-GI001 GENERAL NOTES, PROJECT INFORMATION, SHEET LIST
CIVIL
V1-C101 SITE DEMOLITION PLAN BUILDING 3
V1-C102 SITE DEMOLITION PLAN BUILDING 4 & 8
V1-C201 CIVIL LAYOUT PLAN BUILDING 3
V1-C202 CIVIL LAYOUT PLAN BUILDING 4 & 8
V1-C301 CIVIL DETAILS
STRUCTURAL
V1-ST101 STRUCTURAL DETAILS
V1-ST102 STRUCTURAL DETAILS
PLUMBING
V1-P001 PLUMBING LEGEND
V1-P201 PLUMBING PLAN
ELECTRICAL
V1-E201 ELECTRICAL PLAN BUILDING 3, 4, AND 8
GATE NUMBERS:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10
JMS
Revisions: Date:
321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
JRD
CONSTRUCTION
DOCUMENTS
Brockton VA Medical Center VA Boston Healthcare System
VAMC Brockton
03/26/2026 V1-C101
SITE DEMOLITION PLAN
BUILDING 3
GRAPHIC SCALE
GENERAL NOTES: EROSION AND SEDIMENT CONTROL NOTES:
DEMOLITION NOTES: ABBREVIATIONSPROPOSED LEGEND
T: 857.302.6445
'-1
9' (R ec
' (V is.)
4'-6' (E M)
QL-D
Q L-
D (R
EC
Construction Fence
2'-4' (EM)
Survey Scope Limits
2'-4' (EM)
QL-B
QL-B
QL-B
QL-B
4'- 6'
(E M)
QL-B
QL-C
LP
QL-C
DMH
4'-6' (Vis.)
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10
JMS
Revisions: Date:
321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
JRD
CONSTRUCTION
DOCUMENTS
Brockton VA Medical Center VA Boston Healthcare System
VAMC Brockton
03/26/2026 V1-C102
SITE DEMOLITION PLAN
BUILDING 4 & 8
GRAPHIC SCALE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10
JMS
Revisions: Date:
321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
JRD
CONSTRUCTION
DOCUMENTS
Brockton VA Medical Center VA Boston Healthcare System
VAMC Brockton
03/26/2026 V1-C201
CIVIL LAYOUT PLAN BUILDING
GRAPHIC SCALE
EARTH MOVING AND GRADING NOTES:
ADDITIONAL NOTES:
T: 857.302.6445V1-
DMH
4'-6' (Vis.)
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10
JMS
Revisions: Date:
321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
JRD
CONSTRUCTION
DOCUMENTS
Brockton VA Medical Center VA Boston Healthcare System
VAMC Brockton
03/26/2026 V1-C202
CIVIL LAYOUT PLAN BUILDING
4 & 8
GRAPHIC SCALE
PAVEMENT MATCHING DETAIL
CONCRETE WALKWAY DETAILTYPICAL PARKING STRIPING DETAIL
DETECTABLE WARNING PANEL
DETECTABLE WARNING PANEL FOR PEDESTRIAN RAMPS DETAIL
SECTION A-A
ACCESSIBLE RAMP WITH RETURNED SIDES DETAIL
HOT MIX ASPHALT PAVING (TWO COURSES) DETAIL
TYPICAL PAVEMENT AND GRANITE CURB SECTION DETAIL
CRUSHED STONE PERIMETER SKIRT DETAIL
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10
JMS
Revisions: Date:
321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
JRD
CONSTRUCTION
DOCUMENTS
Brockton VA Medical Center VA Boston Healthcare System
VAMC Brockton
03/26/2026 V1-C301
CIVIL DETAILS
STRUCTURAL NOTES:
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
V1-ST101
STRUCTURAL DETAILS
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10
Revisions: Date:
321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 857.302.6445
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
NLR BJD03/26/2026
CONSTRUCTION
DOCUMENTS
Brockton VA Medical Center VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
VAMC Brockton
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
V1-ST102
STRUCTURAL DETAILS
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10
Revisions: Date:
321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
Key Plan
NLR BJD03/26/2026
CONSTRUCTION
DOCUMENTS
Brockton VA Medical Center VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
VAMC Brockton
T: 617.335.5186T: 857.302.6445 T: 617.338.0063
A - AIR
AAP - AREA ALARM PANEL
ACC - ACCESS
ACFM - ACTUAL CUBIC FEET PER MINUTE
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
ALT - ALTERNATE
AMPS - AMPERES
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECTURAL
ASME - AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASSY - ASSEMBLY
BHP - BRAKE HORSEPOWER
BLDG - BUILDING
BOP - BOTTOM OF PIPE ELEVATION
BOT - BOTTOM
BT - BATHTUB
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNITS
PER HOUR
BTWN - BETWEEN
CA - COMPRESSED AIR
CFCI - CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CFM - CUBIC FEET PER MINUTE
CLG - CEILING
CM - COFFEE MAKER
CMU - CONCRETE MASONRY UNIT
CO - CLEANOUT
CO2 - CARBON DIOXIDE
CONN - CONNECTION / CONNECT
CONTR - CONTRACTOR
CORR - CORRIDOR
CS - CLINICAL SINK /
COLD SOFT WATER / CUP SINK
CTE - CONNECT TO EXISTING
CTR - CENTER
CU - COPPER
CRVTR - CORROSIVE VENT
THROUGH ROOF
CWW - CLEARWATER WASTE
D - DEPTH / DRAIN LINE
DCW - DOMESTIC COLD WATER
DET - DETAIL
DFU - DRAINAGE FIXTURE UNIT
DHR - DOMESTIC HOT WATER RETURN
DHW - DOMESTIC HOT WATER
DIA - DIAMETER
DIM - DIMENSION
DISCH - DISCHARGE
DN - DOWN / DOWNSPOUT NOZZLE
DS - DOWNSPOUT
DW - DISHWASHER
DWG - DRAWING
EA - EACH
EEW - EMERGENCY EYEWASH
EFF - EFFICIENCY
EOSC - EMERGENCY OXYGEN SUPPLY
CONNECTION
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATION
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
ES - EMERGENCY SHOWER
EWC - ELECTRIC WATER COOLER
EWT - ENTERING WATER
TEMPERATURE
EXP - EXPANSION
EXT - EXTERIOR
°F - FAHRENHEIT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FLA - FULL LOAD AMPERES
FLR - FLOOR
FM - FORCE MAIN
FP - FIREPROOF
FPM - FEET PER MINUTE
FS - FLOOR SINK
FSEC - FOOD SERVICE EQUIPMENT
CONTRACTOR
FT - FEET
FTHD - FEET HEAD
FTG - FOOTING
G - GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL CONTRACTOR
GPH - GALLONS PER HOUR
GPM - GALLONS PER MINUTE
HB - HOSE BIBB
HD - HUB DRAIN
HP - HORSEPOWER
HR - HOSE REEL
HT - HEAT TRACE HOT WATER
HTR - HEATER
HVAC - HEATING, VENTILATING,
& AIR CONDITIONING
HZ - HERTZ
ID - INSIDE DIAMETER
IE - INVERT ELEVATION
IM - ICE MAKER
IN - INCHES
IN WC - INCHES WATER COLUMN
IW - INDIRECT WASTE
JS - JANITOR'S SINK
KW - KILOWATT
L - LENGTH
LA - LABORATORY COMPRESSED AIR
LAV - LAVATORY
LBS - POUNDS
LTG - LIGHTING
LWT - LEAVING WATER TEMPERATURE
MAP - MASTER ALARM PANEL
MAX - MAXIMUM
MB - MOP BASIN
MBH - ONE THOUSAND BTUH
MC - MECHANICAL CONTRACTOR
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM / MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
NC - NORMALLY CLOSED
NIC - NOT IN CONTRACT
NO - NUMBER
NOM - NOMINAL
NPSH - NET POSITIVE SUCTION HEAD
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OC - ON CENTER
OD - OUTSIDE DIAMETER /
OVERFLOW DRAIN
OFCI - OWNER FURNISHED,
CONTRACTOR INSTALLED
OFOI - OWNER FURNISHED,
OWNER INSTALLED
P - PUMP
PC - PLUMBING CONTRACTOR
PH - PHASE
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REDUCING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS PER SQUARE INCH
GAUGE
PW - PURE WATER
R - RADIUS
RAD - REFRIGERATED AIR DRYER
RD - ROOF DRAIN
REC - RECESSED
RECPT - RECEPTACLE
REF - REFERENCE
REQD - REQUIRED
RI - ROUGH-IN
RPM - REVOLUTIONS PER MINUTE
RV - RELIEF VALVE
S - STORM
SAN - SANITARY
SCH - SCHEDULE
SCFM - STANDARD CUBIC FEET
PER MINUTE
SD - SUBSOIL DRAIN
SF - SQUARE FEET
SH - SHOWER
SHT - SHEET
SPEC - SPECIFICATION
SQ - SQUARE
SR - SERVICE RECEPTOR
S/S - STAINLESS STEEL
STD - STANDARD
STRU - STRUCTURAL / STRUCTURE
SUCT - SUCTION
TD - TRENCH DRAIN
TDH - TOTAL DYNAMIC HEAD
TEMP - TEMPERATURE
TMV - THERMOSTATIC MIXING VALVE
TOB - TOP OF BEAM
TOD - TOP OF DECK
TOJ - TOP OF JOIST
TOS - TOP OF SLAB / TOP OF STEEL
TF - TRAP FILLER
TP - TRAP PRIMER
TYP - TYPICAL
UR - URINAL
V - VENT / VOLTS
VAC - VACUUM
VEL - VELOCITY
VFD - VARIABLE FREQUENCY DRIVE
VOL - VOLUME
VTR - VENT THRU ROOF
W - WASTE / WATER
W/ - WITH
W/O - WITHOUT
WAGD - WASTE ANESTHETIC
GAS DISPOSAL
WB - WALL BOX
WC - WATER CLOSET
WCO - WALL CLEANOUT
WGE - WASTE GAS EXHAUST
WH - WALL HYDRANT
WHA - WATER HAMMER ARRESTOR
WHTR - WATER HEATER
WSFU - WATER SUPPLY FIXTURE UNIT
X - EXISTING
YCO - YARD CLEANOUT
ZVB - ZONE VALVE BOX
ABBREVIATIONS
PIPING SYMBOLS AND ABBREVIATIONS
SYMBOLS INDICATED HERE AND NOT USED IN THE CONTRACT
DOCUMENTS DO NOT APPLY TO THIS PROJECT.
WATER SYSTEM PIPELINE
STRAINER
FLANGE
UNION
PIPE CAP
FILTER
THERMOMETER
PRESSURE GAUGE
(WITH GAUGE VALVE)
DIRECTION OF PITCH (DOWN)
PIPE GUIDE
PIPE SLEEVE
ANCHOR
PIPE FITTINGS, VALVES, & SPECIALTIES
EXPANSION JOINT
PIPE FLEXIBLE CONNECTION
GENERAL PIPELINE STRAINER
WITHOUT DRAINBUTTERFLY VALVE
GATE VALVE
BALL VALVE
BALANCING VALVE
CHECK VALVE
DIAPHRAGM VALVE
PLUG VALVE
REDUCED PRESSURE
BACKFLOW PREVENTER
PRESSURE REDUCING VALVE
SOLENOID VALVE
S
PRESSURE RELIEF VALVE
ZVB ZONE VALVE BOX
LABEL IS SHOWN ON FRONT
OF VALVE BOX TO INDICATE
ORIENTATION
AAP OR MAP
AREA OR MASTER ALARM
PANEL LABEL IS SHOWN ON
FRONT OF PANEL TO
INDICATE ORIENTATION
M WATER METER
WATER HAMMER
ARRESTOR
HOSE BIBB
WALL HYDRANT
SLIDE-OXYGEN OR
VACUUM BOTTLE
OUTLET
FLOW SENSING DEVICE
HEAT TRACE TERMINATION
POINT
HEAT TRACE POWER
CONNECTION POINT
BACKWATER VALVE
THERMOSTATIC MIXING VALVE
TEMPERATURE BLENDING VALVE
PRESSURE OR VACUUM
SWITCH
VALVE IN VERTICAL
DOUBLE CHECK BACKFLOW
PREVENTER
RPBP
CIVIL UTILITIES SYSTEMS
PIV
SHUTOFF VALVE
CURB INLET
CATCH BASIN OR INLET
MANHOLE
FIRE HYDRANTWATER LINE
SANITARY SEWER
STORM SEWER
W
SAN
STM
FORCE MAINFM
FIRE MAINF
POST INDICATOR VALVE
DRAINS AND CLEANOUTS
CLEANOUT
FLOOR CLEANOUT
FIXTURE WASTE TRAP
HUB DRAIN
FCO
FLOOR DRAIN/FLOOR SINK
ROOF DRAIN
FIXTURE INSTALLATION
FIXTURE
WATER CLOSET
URINAL
LAVATORY
DRINKING FOUNTAIN
SHOWER VALVE
SHOWER HEAD
BARRIER FREE DESIGN
FLOOR TO RIM - 17"
FLOOR TO RIM - 17", MIN. ONE PER ROOM
FLOOR TO RIM - 34", MAX. FLOOR TO UNDER
APRON - 29"
FLOOR TO SPOUT - 36", MAX. FLOOR TO
UNDER APRON - 27"
FLOOR TO VALVE - 42"
FLOOR TO HEAD - 60" ON HOSE ADJ. - 48"
NON-BARRIER FREE
FLOOR TO RIM - 15"
FLOOR TO RIM - 24"
FLOOR TO RIM - 31"
FLOOR TO RIM - 40"
FLOOR TO VALVE - 48"
FLOOR TO HEAD - 78",
VARIES
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
COLD SOFT WATER
HEAT TRACE HOT WATER
NON-POTABLE WATER
DEIONIZED WATER INDIRECT WASTE
CLEARWATER WASTE
FORCE MAIN
STORM
SUBSOIL DRAIN
WASTE OR SOIL
PURE WATER
REVERSE OSMOSIS WATER
VENT
CSW
HT
NPW
DI
PW
RO
TRAP FILLER LINETF
CORROSION RESISTANT
WASTE
SD
S
FM
IW
CWW
CWV
CRW
CRV
CLEARWATER VENT
CORROSION RESISTANT VENT
LA
NITROGEN
LABORATORY VACUUM
LABORATORY COMPRESSED AIR
ARGONAR
LVAC
N2
UNDERFLOOR WASTE OR
SOIL, SUBSOIL, STORM &
FORCE MAIN
OD OVERFLOW DRAIN
HYDROGENH2
DCW
DHW
DHR
OXYGENO2
PROCESS COLD WATERPCW
PROCESS HOT WATERPHW
PROCESS HOT WATER RETURNPHR
LAB COLD WATERLCW
LAB HOT WATERLHW
LAB HOT WATER RETURNLHR
MA MEDICAL COMPRESSED AIR
MEDICAL VACUUMMV
CA COMPRESSED AIR
NATURAL GASNG
SAN
V
GREASE WASTEGW
CARBON DIOXIDECO2
NITROUS OXIDEN2O
LIQUID NITROGEN LN2
WASTE OR STORM
VENT
WASTE ANESTHETIC GAS DISPOSALWAGD
WASTE GAS EVACUATIONWGE
TEMPERED WATERTW
WATER
PIPING SYSTEM LABELS
GASES
ECCENTRIC REDUCER
CONCENTRIC REDUCER
PIPING SYMBOLS
TOP CONNECTION
(45° OR 90°)
BOTTOM CONNECTION
(45° OR 90°)
45° PIPE RISE(R) / DROP(D)
TEE (REFER TO
SPECIFICATION FOR SIDE,
TOP OR BOTTOM TEE)
LINE CONTINUATION BREAK
ELBOW UP
ELBOW DOWN
DOUBLESINGLE
OR
FLOW DIRECTION
CONNECTION POINT
D
N/A
EXISTING PIPING TO REMAIN
OR
SHEET SYMBOLS
A/15B-6
SPECIALTY ITEMS
(I.E. GAUGE FILTER, ETC.)
REFER TO EQUIPMENT LIST
P-1
ROOM NAME & NUMBER
DESIGNATION
SECTION DESIGNATION.
-TOP INDICATES SECTION NUMBER,
-BOTTOM INDICATES ON WHICH
SHEET SECTION APPEARS
MATCHLINE
DESIGNATION
DETAIL REFERENCE.
-TOP INDICATES SECTION NUMBER,
-BOTTOM INDICATES ON WHICH
SHEET SECTION APPEARS
REVISION REFERENCE.
REFER TO SHEET REVISION
BLOCK
SHEET KEYNOTE REFERENCE
PLAN CONTINUATION REFERENCE.
-BOTTOM INDICATES ON WHICH
SHEET CONTINUATION APPEARS
CONSTRUCTION BULLETIN
REVISION NUMBER
SCHEDULED EQUIPMENT DESIGNATION.
-TOP INDICATES EQUIPMENT
ABBREVIATION
-BOTTOM INDICATES EQUIPMENT
NUMBER
REFER TO EQUIPMENT SCHEDULES
ELEVATION DESIGNATION.
REFERENCE OFFICIAL
PROJECT DATUM
EQ
POINT OF NEW
CONNECTION TO EXISTING
REFER
P-1
P-1
ROOM NAME
HALFTONE LIGHT LINE
INDICATES EXISTING WORK
HEAVY DASHED LINE WITH
HATCH INDICATES
EXISTING WORK TO BE
DEMOLISHED
HEAVY LINE INDICATES
NEW WORK
DETAIL REFERENCE, INDICATING
DETAIL NUMBER / SHEET ON WHICH
DETAIL APPEARS.
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.410.1377
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 857.302.6445
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003
WPA Project # WPA1502
VAMC West Roxbury
07/16/2025
A u to d e s k D o c s
/2
-0
V
A M
C B u lk
O x y g e n C o rr e c t N
F P
A D e fi c ie n c ie s /2
-0
V A
M C
A E
I.
rv t
/2
/2
:5
:5
A
M
V1-P001
PLUMBING LEGEND
100% Construction Documents 03/26/2026
HH
GP
GP
GP
GP
22"
R=119.62
BENCH MARK:
(description)
ELEVATION=XXX.XX(DATUM)
FIELD BOOK -- PAGE --
SET ON (date)
S
S
CONDUIT
PANEL
METAL
CONDUITS
CALL
BOXCONTROL BOX
CALL
BOX
CONDUIT
PANEL
SHUTOFF VALVE
PICNIC TABLE ON
CONCRETE PAD
GRASS
GRASS
GRASS
GRASS
GRASS
CONCRETE
PAD
CONCRETE
CONCRETE PAD
CC
BOULDER
CON
CRE
TE
CONCRETE
PLANTER
CONCRETE
PLANTER
CONCRETE
PAD
CC
CC
C C
PIPE
PIPE
S
TO
N E
S
TO
N E
G R A S S
O2 TANK
OXYGE
N
TANKS
GENERATOR
CLF
C
LF
C
LF
METAL
BOX
BRICK
BUILDING
SIGN
BITUMINOUS
CONCRETE
BITUMINOUS
CONCRETE
BITUMIN
OUS
CONCRE
TE
B
IT
U M
IN
O U S
C O N C R
ET
E
BITUMINOUS
CONCRETE
GRASS
GRASS
GRASS
GRASSA
B
119 7.
120 1.
119 8. 119 35.
119 5.
119 2.
118 8.
9.
0.
0.
118 7.
119 0.
119 2.
118 7.
118 5.
118 5.
118 34.
118 85.
119 34.
118 85.
119 53.
119 82.
44.
72.
119 7.
119 8.
119 8.
119 7.
5.
119 52.119 4.
117 95.
118 3.
117 73.
48.
117 94.
118 9.
0.
118 7.
119 54.119 3.
118 9.
118 7.
118 7.
118 5.
118 5.
64.
98.
118 2.
118 0.
118 0.
117 9.
117 4.
117 8.
117 8.
117 19.
117 50.
117 05.
116 73.
116 29.
116 49.
9.
9.
118 5.
118 8.
118 7.
118 60.
118 41.
118 1.
116 13.
115 75.
116 21.
116 6.
117 2.
116 94.116 31.
117 6.
117 9.
118 2.
117 8.
117 7.
116 84.
S
M A S S A C H U S E
TT
S
S
TA
TE
P
LA
N E
C O O R D
IN
A
TE
S Y S T E M
SS
S
HH
S
GP
GP
GP
GP
GATE
S
MP
JB
JB
OXYGEN
TANK
STO
NE
STO
NE
10'C
LF
10'C
LF
CO
NC
G R A S S
V G C
ELECTRIC
BOX
PIPE/CONDUIT
PIPE/CONDUIT
SWITCH
PANEL
COOLING
TOWER
AIR PRESSURE
MONITOR
CO
NCR
ETE
WA
LK
G R A S S
BITUMINOUS
CONCRETE
BIT
UMI
NOU
S
CO
NCR
ETE
O
0 7
105 93.
106 05.
98.
107 29.
107 92.
51.
108 49.
108 45.
107 66.
107 22.
.106
107 51.
107 05.
107 8.
107 4.
107 3.
106 32.
106 49.
106 70.
25.
107 98.
107 5.
108 2.
108 55.
108 6.
108 .
108 2.
107 7.
107 27.
107 60.
E
E
DMH
4'-6' (Vis.)
[7 .3 m
[6 .4 m
10'[3m]
PROP. G
RANITE
R 3'
[R 0.9M
R 16'
[R 4.9M
O2
O2
O2
CTE O2 PIPING MAIN UNDERGROUND W/
NEW O2 MAIN. CONTRACTOR TO CONFIRM
SIZE OF EXISTING O2 MAIN, CONNECTED
TO DEMOLISHED BULK O2 SYSTEM, IN
FIELD PRIOR TO INSTALLATION.
ROUTE O2 PIPING MAIN
UNDERGROUND TO NEW BULK
O2 SYSTEM (BY OTHERS)
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 6857.302.6469
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Brockton VA Medical Center
VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003
WPA Project # WPA1502
VAMC Brockton
03/26/2026
A u to d e s k D o c s
/2
-0
V
A M
C B u lk
O x y g e n C o rr e c t N
F P
A D e fi c ie n c ie s /2
-0
V A
M C
A E
I.
rv t
/2
/2
:5
:5
A
M
V1-P201
PLUMBING PLAN BUILDING 3,4
AND 8
SCALE: 1" = 1'-0"
BUILDING 3 SITE PLAN
SCALE: 1" = 1'-0"
BUILDING 4 SITE PLAN
SCALE: 1" = 1'-0"
BUILDING 8 SITE PLAN
1. PROJECT CONDITIONS
A. THE CONTRACTOR SHALL COMPLETELY FAMILIARIZE HIMSELF WITH ALL EXISTING BUILDING AND SITE CONDITIONS AND
LIMITATIONS WHICH MAY HAVE A BEARING ON THE OPERATIONS HEREIN SPECIFIED, AND SHALL INCLUDE ALL WORK REQUIRED TO COMPLETE THE PROJECT AS SHOWN ON THE DRAWINGS. NO EXTRA COMPENSATION WILL BE ALLOWED FOR UNFORESEEN CONDITIONS THAT CAN BE DETERMINED FROM A CAREFUL EXAMINATION OF THE SITE AND AREAS TO BE RENOVATED.
B. ITEMS OF VALUE WHICH ARE NOT INDICATED TO BE RETURNED TO THE OWNER, SHALL BECOME THE PROPERTY OF THE
CONTRACTOR. STORAGE OR SALE OF ITEMS ON THE PROJECT SITE IS PROHIBITED.
C. PROTECTION: ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST
MIGRATION.
D. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES SERVING USED AREAS WITHOUT FIRST OBTAINING PERMISSION FROM THE
OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED. COORDINATE ALL WORK WITH OWNER.
E. ALL WORK MUST BE COORDINATED W/ OWNER PRIOR TO ANY COMMENCEMENT OF WORK.
2. SCOPE OF WORK
A. ELECTRICAL/SECURITY
1. COORDINATE WITH OWNER FOR ELECTRICAL SHUTDOWN AND REMOVE ALL LIGHTING AND SECURITY DEVICES AFFIXED TO THE
CHAIN-LINK FENCE TO ENABLE ITS REMOVAL.
2. SECURELY STORE ALL LIGHTING FIXTURES AND SECURITY DEVICES IN A CLEAN, DRY ENVIRONMENT FOR FUTURE
REINSTALLATION.
3. REGULATORS REQUIREMENTS
A. STRICTLY COMPLY WITH NFPA AND ALL APPLICABLE FEDERAL AND VA DESIGN GUIDES.
4. HANDLING OF MATERIALS
A. REMOVE ALL MATERIAL DEBRIS FROM THE SITE AS IT ACCUMULATES. DO NOT STORE, SELL, BURN, OR OTHERWISE DISPOSE OF DEBRIS ON SITE. REMOVE ALL MATERIALS IN SUCH MANNER AS TO PREVENT SPILLAGE. KEEP ALL PAVEMENTS AND AREAS ADJACENT TO AND LEADING FROM THE SITE, CLEAN AND FREE OF MUD, DIRT, AND DEBRIS AT ALL TIMES.
5. TRANSFER OF RESPONSIBILITY AND DISPOSITION OF MATERIALS
A. UPON RECEIPT OF NOTICE TO PROCEED WITH THE WORK, THE TITLE TO ALL MATERIALS FOR DEMOLITION SHALL BE VESTED IN
THE CONTRACTOR WHEREUPON THE OWNER WILL NOT BE RESPONSIBLE FOR THE CONDITION, LOSS, OR DAMAGE TO SAID
PROPERTY. ALL SUCH ITEMS SHALL BE REMOVED FROM THE OWNER'S PROPERTY.
6. CLEAN-UP AND REPAIR
A. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT AND DEMOLISHED MATERIALS FROM SITE. REMOVE
PROTECTION AND LEAVE INTERIOR AREAS BROOM CLEAN.
B. REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN STRUCTURES AND SURFACES TO EXISTING CONDITION
PRIOR TO COMMENCEMENT OF SELECTIVE DEMOLITION WORK. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR
DAMAGED BY SELECTIVE DEMOLITION WORK.
DEMOLITION NOTES
GENERAL:
1. DRAWINGS ARE DIAGRAMMATIC: DETERMINE LOCATIONS OF SYSTEMS AND COMPONENTS IN FIELD.
2. DIMENSIONS SHOWN ON PLAN ARE HORIZONTAL DIMENSIONS SHOWN IN ELEVATION ARE VERTICAL.
3. DETERMINE EXACT LOCATIONS OF EXISTING UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. EXERCISE CAUTION
AND IDENTIFY LOCATIONS OF UNMARKED UTILITY LINES AS NECESSARY TO PERFORM WORK OF THIS SECTION.
4. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH NFPA AND ALL APPLICABLE FEDERAL AND VA DESIGN GUIDES.
5. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO, ELECTRICAL HVAC, PROCESS PIPING, SPRINKLER PLUMBING STRUCTURAL AND GENERAL
ARCHITECTURE.
6. ANY INTERFERENCE SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE, AND SHALL BE RESOLVED
PRIOR TO THE INSTALLATION OF THE WORK.
7. ALL PIPING. ALL PIPING PENETRATING EXTERIOR WALLS AND ROOFS SHALL BE FLASHED IN A APPROVED MANNER AND SHALL BE SEALED WEATHERTIGHT. PIPING PENETRATING FIRE RATED PARTITIONS SHALL BE PROVIDED WITH FIRE RATED SEALS AS
REQUIRED.
8. INSTALLATION SHALL ADHERE TO MANUFACTURERS' RECOMMENDATIONS.
9. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING.
SCOPE OF WORK:
A. ELECTRICAL/SECURITY
1. MOUNT ELECTRICAL FIXTURES AND SECURITY DEVICES TO NEW FENCE.
2. EXTEND WIRING TO ELECTRICAL FIXTURES AND SECURITY DEVICES.
3. STRICTLY COMPLY WITH NFPA, NEC AND ALL APPLICABLE FEDERAL AND VA DESIGN GUIDES.
NEW WORK NOTES
HH
GP
GP
GP
GP
22"
R=119.62
BENCH MARK:
(description)
ELEVATION=XXX.XX(DATUM)
FIELD BOOK -- PAGE --
SET ON (date)
S
S
CONDUIT
PANEL
METAL
CONDUITS
CALL
BOXCONTROL BOX
CALL
BOX
CONDUIT
PANEL
SHUTOFF VALVE
PICNIC TABLE ON
CONCRETE PAD
GRASS
GRASS
GRASS
GRASS
GRASS
CONCRETE
PAD
CONCRETE
CONCRETE PAD
CC
BOULDER
CON
CRE
TE
CONCRETE
PLANTER
CONCRETE
PLANTER
CONCRETE
PAD
CC
CC
C C
PIPE
PIPE
S
TO
N E
S
TO
N E
G R A S S
O2 TANK
OXYGE
N
TANKS
GENERATOR
CLF
C
LF
C
LF
METAL
BOX
BRICK
BUILDING
SIGN
BITUMINOUS
CONCRETE
BITUMINOUS
CONCRETE
BITUMIN
OUS
CONCRE
TE
B
IT
U M
IN
O U S
C O N C R
ET
E
BITUMINOUS
CONCRETE
GRASS
GRASS
GRASS
GRASSA
B
119 7.
120 1.
119 8. 119 35.
119 5.
119 2.
118 8.
9.
0.
0.
118 7.
119 0.
119 2.
118 7.
118 5.
118 5.
118 34.
118 85.
119 34.
118 85.
119 53.
119 82.
44.
72.
119 7.
119 8.
119 8.
119 7.
5.
119 52.119 4.
117 95.
118 3.
117 73.
48.
117 94.
118 9.
0.
118 7.
119 54.119 3.
118 9.
118 7.
118 7.
118 5.
118 5.
64.
98.
118 2.
118 0.
118 0.
117 9.
117 4.
117 8.
117 8.
117 19.
117 50.
117 05.
116 73.
116 29.
116 49.
9.
9.
118 5.
118 8.
118 7.
118 60.
118 41.
118 1.
116 13.
115 75.
116 21.
116 6.
117 2.
94.116
31.
117 6.
117 9.
118 2.
117 8.
117 7.
116 84.
S
M A S S A C H U S E
TT
S
S
TA
TE
P
LA
N E
C O O R D
IN
A
TE
S Y S T E M
SS
S
HH
S
GP
GP
GP
GP
GATE
S
MP
JB
JB
OXYGEN
TANK
STO
NE
STO
NE
10'C
LF
10'C
LF
CO
NC
G R A S S
V G C
ELECTRIC
BOX
PIPE/CONDUIT
PIPE/CONDUIT
SWITCH
PANEL
COOLING
TOWER
AIR PRESSURE
MONITOR
CO
NCR
ETE
WA
LK
G R A S S
BITUMINOUS
CONCRETE
BIT
UMI
NOU
S
CO
NCR
ETE
O
0 7
105 93.
106 05.
98.
107 29.
107 92.
108 51.
108 49.
45.
107 66.
107 22.
.106
107 51.
107 05.
107 8.
107 4.
107 3.
106 32.
106 49.
106 70.
107 25.
107 98.
107 5.
108 2.
108 55.
108 6.
108 .
108 2.
107 7.
107 27.
107 60.
E
E
DMH
4'-6' (Vis.)
[7 .3 m
[6 .4 m
10'[3m]
PROP. G
RANITE
R 3'
[R 0.9M
R 16'
[R 4.9M
RELOCATE LIGHTING FIXTURES AND
SECURITY DEVICES TO NEW CHAIN LINK
FENCE. REFER TO CIVIL DWGS. FOR FENCING
SCOPE OF WORK AND DETAILS.
RELOCATE LIGHTING FIXTURES AND
SECURITY DEVICES TO NEW CHAIN LINK
FENCE. REFER TO CIVIL DWGS. FOR
FENCING SCOPE OF WORK AND DETAILS.
RELOCATE LIGHTING
FIXTURES AND SECURITY
DEVICES TO NEW CHAIN LINK
FENCE. REFER TO CIVIL DWGS.
FOR FENCING SCOPE OF
WORK AND DETAILS.
RELOCATE EXISTING
LIGHTING FIXTURE
ALONG PATH TO NEW
LOCATION AS SHOWN
XR
XL
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 6857.302.6469
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Brockton VA Medical Center
VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003
WPA Project # WPA1502
VAMC Brockton
03/26/2026
A u to d e s k D o c s
/2
-0
V
A M
C B u lk
O x y g e n C o rr e c t N
F P
A D e fi c ie n c ie s /2
-0
V A
M C
A E
I.
rv t
/2
/2
:5
:5
A
M
V1-E201
ELECTRICAL PLAN BUILDING
3,4 AND 8
1. PROJECT CONDITIONS
A. THE CONTRACTOR SHALL COMPLETELY FAMILIARIZE HIMSELF WITH ALL EXISTING BUILDING AND SITE CONDITIONS AND
LIMITATIONS WHICH MAY HAVE A BEARING ON THE OPERATIONS HEREIN SPECIFIED, AND SHALL INCLUDE ALL WORK REQUIRED TO COMPLETE THE PROJECT AS SHOWN ON THE DRAWINGS. NO EXTRA COMPENSATION WILL BE ALLOWED FOR UNFORESEEN CONDITIONS THAT CAN BE DETERMINED FROM A CAREFUL EXAMINATION OF THE SITE AND AREAS TO BE RENOVATED.
B. ITEMS OF VALUE WHICH ARE NOT INDICATED TO BE RETURNED TO THE OWNER, SHALL BECOME THE PROPERTY OF THE
CONTRACTOR. STORAGE OR SALE OF ITEMS ON THE PROJECT SITE IS PROHIBITED.
C. PROTECTION: ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST
MIGRATION.
D. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES SERVING USED AREAS WITHOUT FIRST OBTAINING PERMISSION FROM THE
OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED. COORDINATE ALL WORK WITH OWNER.
E. ALL WORK MUST BE COORDINATED W/ OWNER PRIOR TO ANY COMMENCEMENT OF WORK.
2. SCOPE OF WORK
A. ELECTRICAL/SECURITY
1. COORDINATE WITH OWNER FOR ELECTRICAL SHUTDOWN AND REMOVE ALL LIGHTING AND SECURITY DEVICES AFFIXED TO THE
CHAIN-LINK FENCE TO ENABLE ITS REMOVAL.
2. SECURELY STORE ALL LIGHTING FIXTURES AND SECURITY DEVICES IN A CLEAN, DRY ENVIRONMENT FOR FUTURE
REINSTALLATION.
3. REGULATORS REQUIREMENTS
A. STRICTLY COMPLY WITH NFPA AND ALL APPLICABLE FEDERAL AND VA DESIGN GUIDES.
4. HANDLING OF MATERIALS
A. REMOVE ALL MATERIAL DEBRIS FROM THE SITE AS IT ACCUMULATES. DO NOT STORE, SELL, BURN, OR OTHERWISE DISPOSE OF DEBRIS ON SITE. REMOVE ALL MATERIALS IN SUCH MANNER AS TO PREVENT SPILLAGE. KEEP ALL PAVEMENTS AND AREAS ADJACENT TO AND LEADING FROM THE SITE, CLEAN AND FREE OF MUD, DIRT, AND DEBRIS AT ALL TIMES.
5. TRANSFER OF RESPONSIBILITY AND DISPOSITION OF MATERIALS
A. UPON RECEIPT OF NOTICE TO PROCEED WITH THE WORK, THE TITLE TO ALL MATERIALS FOR DEMOLITION SHALL BE VESTED IN
THE CONTRACTOR WHEREUPON THE OWNER WILL NOT BE RESPONSIBLE FOR THE CONDITION, LOSS, OR DAMAGE TO SAID
PROPERTY. ALL SUCH ITEMS SHALL BE REMOVED FROM THE OWNER'S PROPERTY.
6. CLEAN-UP AND REPAIR
A. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT AND DEMOLISHED MATERIALS FROM SITE. REMOVE
PROTECTION AND LEAVE INTERIOR AREAS BROOM CLEAN.
B. REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN STRUCTURES AND SURFACES TO EXISTING CONDITION
PRIOR TO COMMENCEMENT OF SELECTIVE DEMOLITION WORK. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR
DAMAGED BY SELECTIVE DEMOLITION WORK.
XR- REMOVE TO BE RELOCATED
DEMOLITION NOTES
GENERAL:
1. DRAWINGS ARE DIAGRAMMATIC: DETERMINE LOCATIONS OF SYSTEMS AND COMPONENTS IN FIELD.
2. DETERMINE EXACT LOCATIONS OF EXISTING UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. EXERCISE CAUTION
AND IDENTIFY LOCATIONS OF UNMARKED UTILITY LINES AS NECESSARY TO PERFORM WORK OF THIS SECTION.
3. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH NFPA AND ALL APPLICABLE FEDERAL AND VA DESIGN GUIDES.
4. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THE WORK WITH THAT OF ALL OTHER TRADES, INCLUDING BUT NOT LIMITED TO, ELECTRICAL HVAC, PROCESS PIPING, SPRINKLER PLUMBING STRUCTURAL AND GENERAL
ARCHITECTURE.
5. ANY INTERFERENCE SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE, AND SHALL BE RESOLVED
PRIOR TO THE INSTALLATION OF THE WORK.
6. INSTALLATION SHALL ADHERE TO MANUFACTURERS' RECOMMENDATIONS.
7. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING.
SCOPE OF WORK:
A. ELECTRICAL/SECURITY
1. MOUNT ELECTRICAL FIXTURES AND SECURITY DEVICES TO NEW FENCE.
2. EXTEND WIRING TO ELECTRICAL FIXTURES AND SECURITY DEVICES.
3. COORDINATE WITH OWNER TO RE-COMMISSION THE SYSTEM.
XL - RELOCATED
NEW WORK NOTES
KEY NOTES
ANY EXISTING GROUNDING ELECTRODE CONNECTIONS ON FENCE SHALL BE REMOVED BY CONTRACTOR. GROUNDING ELECTRODE
SHALL BE REINSTALLED ON NEW FENCE USING 4 AWG COPPER WIRE FOR NEC COMPLIANCE.
ANY EXISTING LIGHTING FIXTURES PRESENT ON FENCE SHALL BE REMOVED AND KEPT IN FUNCTIONING ORDER. LIGHTING FIXTURES
SHOULD THEN BE REINSTALLED ON THE NEW FENCE.
ANY SECURITY DEVICES AFFIXED TO THE EXISTING FENCE SHALL BE REMOVED AND KEPT IN FUNCTIONING ORDER. SECURITY
DEVICES SHOULD THEN BE REINSTALLED ON THE NEW FENCE.
SCALE: 1" = 1'-0"
BUILDING 3 SITE PLAN ELECTRICAL
SCALE: 1" = 1'-0"
BUILDING 4 SITE PLAN ELECTRICAL
SCALE: 1" = 1'-0"
BUILDING 8 SITE PLAN ELECTRICAL
O2 SITE
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
HYPERLINK "https://aeieng.com/"Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 6857.302.6469
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Jamaica Plain VA Medical Center VA Boston Healthcare System
Bulk Oxygen Corrections VA Project # 523-25-003 WPA Project # WPA1502
VAMC Jamaica Plain
CONSTRUCTION
DOCUMENTS
03/26/2026
C :\U se rs
\a do rn .W
PA
\D oc um en ts
\V
AB
H S
Bu lk
O 2_ ad or n@ w illi am pe ve ar .c om .rv t 3/
/2
9:
:3
AM
V2-GI000
COVER - VAMC JAMAICA
PLAIN
DEPARTMENT OF VETERANS AFFAIRS
BOSTON HEALTHCARE SYSTEM
Bulk Oxygen Corrections 150 S Huntington Ave, Boston, MA 02130
VA Project # 523-25-003 VA Contract # 36C24125R0010
VA PO # 523C7043
WPA Project # WPA1502
CONSTRUCTION DOCUMENTS
VOLUME 2
VAMC JAMAICA PLAIN
ARCHITECT
MECH / ELEC / PLUMBING / FP
William Pevear Architects, Inc. (VOSB)
872 Massachusetts Avenue, Suite 2-9 Cambridge, MA 02139 T: 617.335.5186
Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210 T: 857.302.6469
SURVEYOR & CIVIL ENGINEER
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843 T: 617.338.0063
March 26, 2026
3.
4.
5.
6.
7.
8.
A.
B.
C.
D.
E.
9.
10.
11.
CONTRACTOR SHALL NOT SHUT-OFF AND/OR INTERRUPT O2 SUPPLY TO HOSPITAL WITHOUT EXPLICIT WRITTEN PERMISSION FROM THE AUTHORIZED VA COR. CONTRACTOR SHALL BE REQUIRED TO COORDINATE TEMPORARY O2 SUPPLY FOR ALL SHUTDOWN(S) USING THE VA FACILITY SUPPLIERS. ALL REQUEST(S) FOR
SHUT DOWN SHALL BE MADE MIN. OF 2 WEEKS IN ADVANCE.
CONTRACTOR SHALL PREPARE AND REVIEW WORK PLAN WITH THE VA COR AND PROVIDE ADDITIONAL
DOCUMENTATION AS REQUIRED BY VA PRIOR TO START OF WORK.
CONTRACTOR IS REQUIRED TO PROVIDE GROUND PENETRATING RADAR SCANS OF ALL AREAS WHERE EXCAVATION IS REQUIRED. CONTRACTOR SHALL NOTIFY THE COR OF ANY POTENTIAL CONFLICTS.
CONTRACTOR TO NOTIFY COR OF BELOW GRADE CONFLICTS WITH NEW LAYOUT AND ADJUST LOCATION OF
PIERS AND FOUNDATIONS TO ACCOMMODATE.
DO NOT SCALE DRAWINGS.
DIMENSIONS ARE INTENDED TO COMMUNICATE DESIGN INTENT ONLY AND SHALL NOT BE USED FOR THE PURPOSES OF FABRICATION OR INSTALLATION. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AS INDICATED ON DRAWINGS PRIOR TO FABRICATION AND INSTALLATION. CONTRACTOR TO NOTE TERMS SUCH AS "FLUSH," "ALIGN," "MATCH," "CENTER" AND SIMILAR AS THESE TAKE PRECEDENT OVER DIMENSIONAL
NOTATION AND SCHEDULED SYSTEMS.
CONTRACTOR SHALL INSTALL MATERIALS IN EXACT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
SUBMITTAL SHOP DRAWINGS:
ORIGINAL DRAWINGS SHALL BE PREPARED BY CONTRACTOR, SUBCONTRACTOR, SUPPLIER OR
DISTRIBUTOR, WHICH ILLUSTRATE SOME PORTION OF THE WORK, SHOWING FABRICATION, LAYOUT, SETTING, OR ERECTION OF DETAILS.
SHOP DRAWINGS SHALL BE PREPARED BY A QUALIFIED DETAILER.
DETAILS SHALL BE IDENTIFIED BY REFERENCE TO SHEET AND DETAIL NUMBERS INDICATED ON CONTRACT
DRAWINGS.
DO NOT REPRODUCE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL COORDINATE ALL SUCH DRAWINGS, AND REVIEW THEM FOR ACCURACY,
COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS AND SHALL INDICATE ITS APPROVAL THEREON AS EVIDENCE OF
SUCH COORDINATION AND REVIEW.
CONTRACT LIMIT LINES SHALL BE WHERE INDICATED ON THE DRAWINGS. HOWEVER, IN ORDER TO COMPLETE OR FACILITATE INDICATED WORK, CONTRACTOR MAY BE REQUIRED TO CARRY OUT WORK ADJACENT TO, BUT OUTSIDE INDICATED LIMITS. THIS INCLUDES BUT IS NOT LIMITED TO ACCESS TO BUILDINGS TO COORDINATE
WORK.
PROVIDE SECURE CONSTRUCTION FENCING AROUND ALL AREA OF CONSTRUCTION,
EXCAVATION, AND STORAGE AREAS.
THE DEPARTMENT OF VETERANS AFFAIRS IS THE AUTHORITY HAVING JURISDICTION. THE MASSACHUSETTS OFFICE OF PUBLIC SAFETY AND INSPECTION NOR THE LOCAL INSPECTIONAL SERVICES HAS JURISDICTION OVER THIS PROJECT. THE PROJECT HAS BEEN DESIGNED TO MEET NFPA AND CERTAIN CRITERIA OF MA
BUILDING CODES AS NOTED.
GENERAL NOTES
DETAIL XX
DETAIL
DETAIL NAME
SCALE 1/8" = 1'-0"
SYMBOLS
DOOR / WINDOW SYMBOL XXXX
DETAIL IDENTIFICATION
SHEET NUMBER
DETAIL CALLOUT
SECTION
IDENTIFICATION
SHEET NUMBER
SECTION
DETAIL
IDENTIFICATION
SHEET NUMBER
DETAIL
LINETYPES
OVERHEAD
(OVERCOUNTER AND SOFFITS)
REFERENCE (COLUMN LINES
AND MATCHLINES)
BELOW AND BEYOND
(UNDERCOUNTER AND FOOTINGS)
BREAK LINE
DOCUMENT REVISION
LIMIT OF WORK
& AND
L ANGLE
@ AT
CL CENTERLINE
Ø DIAMETER
# POUND
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
AV AUDIOVISUAL
AVB AIR VAPOR BARRIER
BO BOTTOM OF
BOT BOTTOM
BOS BOTTOM OF STEEL
B/T BENCH TOP
B/W BETWEEN
CC CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
CG CORNER GUARD
CH CEILING HEIGHT
CJ CONTROL JOINT
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL COLUMN
COMMS COMMUNICATIONS
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CPT CARPET
CR CARD READER
CT CERAMIC TILE
CUH CABINET UNIT HEATER
CW CURTAIN WALL
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWG DRAWING
E EAST
EIFS EXTERIOR INSULATION & FINISH SYSTEM
EJ EXPANSION JOINT
EMER SHR EMERGENCY SHOWER
EMERG EMERGENCY
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXIST EXISTING
EXT EXTERIOR
F/F FACE TO FACE
FACP FIRE ALARM CONTROL PANEL
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FTR FINNED TUBE RADIATION
G GAS
GALV GALVANIZED
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GWB GYPSUM WALL BOARD
HB HOSE BIBB
HORIZ HORIZONTAL
HPT HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IF INSIDE FACE
IG INSULATED GLASS
INT INTERIOR
L LEFT
LGMF LIGHT GAUGE METAL FRAMING
LPT LOW POINT
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MH MENTAL HEALTH
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
N NORTH
NIC NOT IN CONTRACT
NRP NON-REMOVABLE PIN
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OPH OPPOSITE HAND
O OXYGEN
R RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REINF REINFORCED
REQ/REQ'D REQUIRED
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SIM SIMILAR
SOG SLAB ON GRADE
SST STAINLESS STEEL
STRUC STRUCTURAL
TD TRENCH DRAIN
TO TOP OF
TOC TOP OF CONCRETE SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TPO THERMOPLASTIC POLYOLEFIN
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
VC VA FURNISHED, CONTRACTOR INSTALLED
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED, VA INSTALLED
W WEST
WH WALL HYDRANT
ABBREVIATIONS
SHEET LIST
GALV UNISTRUT
MOUNTING BRACKET W/
EPOXY FASTENERS INTO
CEMETICIOUS EXTERIOR
WALL FINISH
PROVIDE SURFACE
MOUNTED PIPE SUPPORT
AS REQUIRED
O2 PIPING, PROTECTED
AND INSULATED AS
REQUIRED, SEE MEP.
RELOCATE AND MOUNT
EMERGENCY O2 VALVE
BOX TO UNISTRUT
TYPICAL CORNER
POST FOOTING
TYPICAL LINE
POST FOOTING
SEE PLAN
8'
0"
SECURITY FENCE AND ACCESS
GATE BY DELEGATED DESIGNER
CONCRETE FOOTING, SEE STRUCTURAL
FOR ADDITIONAL INFORMATION
GALVANIZED STEEL CHAIN
LINK FENCING, TYP.
GALVANIZED STEEL
FENCE POST, TYP.
BE
LO
W G
R
AD
E
4' -0
" M
IN
1' - 0" TYP.
PAD LOCK
HARDWARE WITH INTER-
CHANGEABLE 7 PIN BEST CORE,
COORDINATE KEY CORE WITH
COR.
8"
HEIGHT PER NFPA
3' - 0"
HARDWARE:
PAD LOCK HARDWARE
WITH BEST 7 PIN CORE
SINGLE SWING GATE SINGLE SLIDING GATE, IN LINE
WITH ADJACENT FENCE
±15'-0"
HARDWARE:
ROLLER SLIDE
PAD LOCK HARDWARE WITH BEST 7 PIN CORE
PROVIDE ROLLER TRACKS AND ROLLER WHEEL PIPE TRACKS ATTACHED AT EACH LINE POST
WHEEL CARRIER
TYP. CROSS BRACING AS REQURIED
PAD LOCK HARDWARE
REAR WHEELS
JP2
JP1
Project Number
Medical Center
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
65% DESIGN
DEVELOPMENT
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANT
7 8 9 10321 4 5 6
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
MEP&FP Engineer
HYPERLINK "https://aeieng.com/"Affiliated Engineers, Inc.
55 Thomson Place, 6th Floor Boston, MA 02210
T: 6857.302.6469
Surveyor & Civil Engineer
Nitsch Engineering, Inc.
370 Merrimack St, Building F, Suite 201, Lawrence, MA 01843
T: 617.338.0063
Key Plan
Jamaica Plain…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .