S02-S02-26_0303 New O2 VAMC Brockton B8 Proposed Location - Copy.pdf

PDF 837 KB Posted

Attached to
523-25-003 Bulk Oxygen Corrections
Solicitation number
36C24126Q0398
Issued by

About this file

This document is a site plan and construction drawing showing the proposed alternate location for a VAMC Brockton B8 O2 tank farm and access. The drawing is dated 3/3/2026 and was developed based on a meeting on 3/3/2026 with VA, Nitsch, and WPA representatives. The plan depicts a detailed layout at a scale of 1"=30' showing street dimensions, sidewalk configurations, curbing specifications, and survey scope limits. The proposed improvements include granite curb installation (typical), concrete sidewalk construction, and sawcut details with various radius measurements ranging from 1 foot to 149 feet. The drawing indicates clearance requirements and shows WB-67 Interstate Semi-Trailer turning movements for site access evaluation.

The plan includes extensive annotations in red highlighting multiple components of the proposed facility, including utility connections, structural elements, drainage considerations, and access routes. Notable features include specification of quality levels (QL-B, QL-C, QL-D) for survey data, construction fence specifications at 4'-6" visibility height with 2'-4" electromagnetic marks, and detailed measurements of pedestrian facilities and vehicular circulation areas. The document appears to be a technical planning document for a federal Veterans Affairs Medical Center construction or renovation project related to medical gas infrastructure.

View the file

Other files

File Type Posted
36C24126Q0398 0003.docx DOCX document
Site Utility Plan.pdf PDF
AUL Maps - JP.pdf PDF
VA Med AUL 2007.pdf PDF
36C24126Q0398 0002 6-16-26.docx DOCX document
S06 36C24126Q0398 0001.pdf PDF
523-25-003.CD.VABOS-O2-V1-Br-Dwg-Stamped.pdf PDF
523-25-003.CD.VABOS-O2-V3-WR-Spec.pdf PDF
523-25-003 Bulk Oxygen Corrections_Site Visit Sign-in JP WX.pdf PDF
523-25-003 Bulk Oxygen Corrections_Site Visit Sign-in BK.pdf PDF
523-25-003.CD.VABOS-O2-V2-JP-Dwg-Stamped.pdf PDF
523-25-003.CD.VABOS-O2-V1-Br-Spec.pdf PDF
523-25-003.CD.VABOS-O2-V3-WR-Dwg-Stamped.pdf PDF
523-25-003.CD.VABOS-O2-V2-JP-Spec.pdf PDF
S02-S02-523-25-003 CD VABOS O2 V1 Br Spec .pdf PDF
S02-S02-523-25-003 SOW Bulk Oxygen Correction Construction.docx DOCX document
S02-S02 ICRA JP Bulk O2 523-25-003 .pdf PDF
S02-S02-PCRA WRX Bulk O2 523-25-003 June 25 sign .pdf PDF
S02-S02- Wage Determination Brockton.pdf PDF
S02-S02-523-25-003 CD VABOS O2 V2 JP Spec .pdf PDF
S02-S02-523-25-003 CD VABOS O2 V3 WR-Spec .pdf PDF
S02-S02-PCRA JP Bulk O2 523-25-003 June 25 sign .pdf PDF
S02-S02 West Roxbury Base Offer Breakdown.xlsx XLSX spreadsheet
S02-S02 36C24126Q0398 Karla review.docx DOCX document
S02-S02 Brockton Base Offer Breakdown.xlsx XLSX spreadsheet
S02-S02 ICRA WRX Bulk O2 523-25-003 .pdf PDF
S02-S02-BK Bulk O2 PCRA Signed By PM .pdf PDF
S02-S02-523-25-003 VABOS O2 Dwg All .pdf PDF
S02-S02- Wage Determination West Roxbury_Jamaica Plains.pdf PDF
S02-S02 Jamaica Plains Base Offer Breakdown.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SM

H

DM

H

W

VW

V

W V

EM

H

EM

H

DM

H

'-1

9' (R ec

Vi s.

2'-4' (EM)

2' -4

EM

4' -6

EM

QL-D

QL-

D (R

EC

Construction Fence

4'-6' (Vis.)

QL-C (REC.)

2'-4' (E M)

Survey Scope Limits

Survey Scope Limits

2'-4' (EM)

Q L-

B

QL-B

QL-B

Q L-

B

Q L-

B

4' -6

EM

QL-B

Q L-

C

LP

Q L-

C

IM AVENUE

SI

DE

W

AL

K

SIDEWALK

SI

DE

W

AL

K

CONC.

PLCC CURB

SIDEWALK

SAWCUT

SAWCUT

R6' [R1.8M]5'

[1.5m]

[7.

3m

[6.

1m

[6.

1m

[7.

3m

[6.

4m

[6.

4m

[7.

3m

[6.

4m

.1'

[7.

3m

[6.

4m

5' [1.5 m]

8' [2.4 m]

5' [1.5 m]

8' [2.4 m]

5' [1.5 m]

21' [6.4 m]

10' [3m]

24' [7.3m]

11' [3.4m]

5' [1.5m]

8' [2.4m]

8' [2.4 m]

12'[3.7m]

11' [3.4m]11'

[3.4m]11' [3.4m]

5' [1.5m]

24' [7.3m]

21' [6.4 m]

8' [2.

4m

5' [1.5m]

PR

OP

. G

RA

NI

TE

CU

RB

(T

YP

PROP. GRANITE

CURB (TYP.)

PROP. CONC.

SIDEWALK

13' [4m]

11' [3.4m]

11' [3.4m]

R25' [R7.6M]

R25' [R7.6M]

R5' [R1.5M]

R5' [R1.5M]

R39' [R11.9M] R3'

[R0.9M]

R1' [R0.3M]

R3' [R0.9M]

R5' [R1.5M]

R50' [R15.2M]

HH

R50' [R15.2M]

R2' [R0.6M]

R149' [R45.4M]

R16' [R4.9M]

R146' [R44.4M]

R26' [R7.9M]

R4' [R1.2M]

R4' [R1.2M]

8' [2.

4m

8' [2.

4m

WB-67 - Interstate Semi-Trailer

27.9

Max 68.5° Horiz Max 10° Vert

43.5 4

45.5 2.5

23.5 4 17.4 4.2

19.5

WB-67 - Interstate Semi-Trailer Overall Length 73.501ft Overall Width 8.500ft Overall Body Height 13.500ft Min Body Ground Clearance 1.334ft Max Track Width 8.500ft Lock-to-lock time 6.00s Max Steering Angle (Virtual) 28.40°

SCALE: 1"=30'

60'30'0' wpevear Polygon wpevear Polygon wpevear Callout proposed new o2 pad wpevear PolyLine wpevear Callout assumed location of water loop- locate pad ±min 5' from line wpevear Callout 12' wide pull-off for o2 truck, asphalt with 12"x12" concrete spill pad.

wpevear Callout relocate existing site lighting wpevear Callout re-locate existing signage wpevear Callout modify sidewalk as required to accommodate pull-off wpevear PolyLine wpevear Callout confirm set-back distance from wetland wpevear Callout modify stripping as required for pull-off wpevear Callout relocate/ remove replace existing tree wpevear Ellipse wpevear Polygon wpevear Line wpevear Cloud+ wpevear Cloud+ relocated tree wpevear Text Box Overview:

provide 12' wide truck pull-off area along driveway access to B8 parking. Relocate o2 pad min. 5' from side walk as per NFPA on flat area. Provide fence mtd. lighting and CCTV sim. to existing.

wpevear Ellipse wpevear Ellipse wpevear Ellipse wpevear Ellipse wpevear Ellipse wpevear Ellipse wpevear Ellipse wpevear Ellipse wpevear Ellipse wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Rectangle wpevear Callout proposed new planters wpevear Callout new bollards wpevear Line wpevear Callout o2 fenced enclosure with sliding gate wpevear PolyLine wpevear Callout extend o2, power and LV lines as required wpevear Text Box Proposed alternate location for VAMC Brockton B8 O2 tank farm and access date: 3/3/2026 based on meeting 3/3/2026 10am with VA, Nitsch and WPA wpevear Callout modify storm-water drain(s) as required for new road surface wpevear Callout confirm manhole cover /access location away from new road.

wpevear Polygon

Sheets and Views
Layout Plan 'B'

File details come from the government source that posted it. Updated .