Site Utility Plan.pdf

PDF 3 MB Posted

Attached to
523-25-003 Bulk Oxygen Corrections
Solicitation number
36C24126Q0398
Issued by

About this file

This is a Civil Site Survey Plan drawing for a federal construction project at the U.S. Department of Veterans Affairs (VA) West Roxbury Healthcare System Campus in West Roxbury, Massachusetts. The project is titled "EHRM Infrastructure Upgrades" and is identified as Project Number 523A4-22-700, drawing VF102, dated 04/30/2026, at 65% Corrected Design Development phase and marked "NOT FOR CONSTRUCTION."

The project scope provides complete recabling within multiple buildings at the West Roxbury MA healthcare system campus, including Buildings 1, 2, 3, 5, 7, 8, 10, 20, 21, 22, 30, 70, 88, 96, 97, the new MCR (Master Control Room), and site infrastructure upgrades at 1400 VFW Parkway. The drawing was prepared by TRIPLE C - The A/E Group (Architect/Engineer of Record), located at 100 Pearl Street, 14th floor, Hartford, CT 06103, with Mat Perkins as the principal contact. The survey is based on VA-supplied as-built drawings and photographic, visual, and LIDAR survey data. The site plan includes existing and proposed infrastructure elements such as utilities, storm drains, sanitary sewers, electrical systems, water lines, telecommunications, and parking facilities, with a comprehensive legend identifying all infrastructure components and abbreviations used throughout the document.

View the file

Other files

File Type Posted
AUL Maps - JP.pdf PDF
VA Med AUL 2007.pdf PDF
36C24126Q0398 0003.docx DOCX document
36C24126Q0398 0002 6-16-26.docx DOCX document
523-25-003 Bulk Oxygen Corrections_Site Visit Sign-in JP WX.pdf PDF
S06 36C24126Q0398 0001.pdf PDF
523-25-003.CD.VABOS-O2-V2-JP-Dwg-Stamped.pdf PDF
523-25-003.CD.VABOS-O2-V3-WR-Dwg-Stamped.pdf PDF
523-25-003.CD.VABOS-O2-V2-JP-Spec.pdf PDF
523-25-003.CD.VABOS-O2-V1-Br-Spec.pdf PDF
523-25-003.CD.VABOS-O2-V1-Br-Dwg-Stamped.pdf PDF
523-25-003.CD.VABOS-O2-V3-WR-Spec.pdf PDF
523-25-003 Bulk Oxygen Corrections_Site Visit Sign-in BK.pdf PDF
S02-S02-26_0303 New O2 VAMC Brockton B8 Proposed Location - Copy.pdf PDF
S02-S02 36C24126Q0398 Karla review.docx DOCX document
S02-S02-523-25-003 CD VABOS O2 V1 Br Spec .pdf PDF
S02-S02-PCRA JP Bulk O2 523-25-003 June 25 sign .pdf PDF
S02-S02 ICRA JP Bulk O2 523-25-003 .pdf PDF
S02-S02 West Roxbury Base Offer Breakdown.xlsx XLSX spreadsheet
S02-S02-523-25-003 VABOS O2 Dwg All .pdf PDF
S02-S02- Wage Determination West Roxbury_Jamaica Plains.pdf PDF
S02-S02 Jamaica Plains Base Offer Breakdown.xlsx XLSX spreadsheet
S02-S02-523-25-003 CD VABOS O2 V2 JP Spec .pdf PDF
S02-S02-523-25-003 CD VABOS O2 V3 WR-Spec .pdf PDF
S02-S02- Wage Determination Brockton.pdf PDF
S02-S02-BK Bulk O2 PCRA Signed By PM .pdf PDF
S02-S02-PCRA WRX Bulk O2 523-25-003 June 25 sign .pdf PDF
S02-S02 ICRA WRX Bulk O2 523-25-003 .pdf PDF
S02-S02-523-25-003 SOW Bulk Oxygen Correction Construction.docx DOCX document
S02-S02 Brockton Base Offer Breakdown.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UGE

o o o o o o o o oo o o o o oo

OH

T

OH

T

OH

T

OH

T

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

CO

MM

CO

MM

CO

MM

CO

MM

CO

MM

CO

MM

DN

DN

o o o o ooo

UG

E

CO

MM

UGE UGE

UGE

UGE

COMM COMMCOMM

UGE

UGE

UGE

UGE

CO

MM

UGE UGE UGE

UGE

UG

E

UG

E

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UGE

UG

E

UG

E

UG

E

UGE

UG

E

UG

E

UG

E

UGE

UG

E

UG

E

UG

E

UGEUGEUGEUGE

UGE

UGE

UGEUGEUGEUGE

UGE

UGE

UGE

SDSDSDSDSDSD

SD

SD

SD

D

D

D

S

D

S

D

SD

SD

SD

SD

SD

SD

SD

D

SD

SD

SS SS SS SS SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS SS SS SS SS SS SS SS

W W W W W

W W W W

W

W W W W

W W

W W

W W

W

W

W

EUGEUGEUGE

S

SD

SS

SS

SSSS

S

SS

W W

W

W W

UG

E

UG

E

UG

E

UG

E

W

W

W

W

W

W

W

W W

W W

W W

W W

WWW

SS

SS

SS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

DY

H

SD

SD

WW

D

D D

D

D

SD

SD

SD

SD

SD

SD

SD

SD

SD

D

D

D

D

SDSDSDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

S

SS

SS

SS

D

S

D

GA

S

GA

S

GA

S

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

COMM

W W

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

OX

Y

OX

Y

UG

E

UG

E

UGE

UGE

UGE

UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UGE

W W

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGEUGE

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UG

E

UGEUGE

COMM

COMM

COMM

COMM

COMM

UGE

UGE

UGE

UGE UGE UGE UGE

W W W

W

W

W DY

H

DY

H

UG

E

UGE

UG

E

UG

E

UG

E

UGE

UGE

UGE

97 97

102102

100101

EX. ELECTRICAL

EX. ELECTRICAL

EX. ELECTRICAL

EX

. E

LE

CT

RI

CA

L

EX

. E

LE

CT

RI

CA

L

EX. ELECTRICAL

EX

. E

LE

CTR

ICAL

EX. ELECTRICAL

EX. ELECTRICAL

EX. ELECTRICAL

EX

. E

LE

CT

RI

CA

L

EX. ELECTRICAL

EX. STORM

EX. STORM

EX. STORM

EX. STORM

EX

. S

TO

RM

EX. STORM

EX. WATER

EX. WATER

EX. WATER

EX

. W

AT

ER

EX. SAN. SEWEREX. SAN. SEWER

PARKING GARAGEPARKING GARAGE

OL

IG

OC

EN

E

VFW PKWY

SPRING STREET

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

65% CORRECTED DESIGN

DEVELOPMENT

04/30/2026

NOT FOR CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

1400 VFW Parkway, West Roxbury, MA 02132

523A4-22-700

SITE

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103

MAT PERKINS

(860)270-0753

STAMP CIVIL SITE SURVEY PLAN

ENLARGED PLAN

VF102

K.STRUBLEM.PERKINS

1" = 40'F1 CIVIL SITE SURVEY PLAN-ENLARGED PLAN

PROJECT SCOPE OF WORK

THIS PROJECT PROVIDES COMPLETE RECABLING WITHIN MULTIPLE BUILDINGS AT THE WEST ROXBURY MA HEALTHCARE SYSTEM CAMPUS. MULTIPLE BUILDINGS ON CAMPUS INCLUDING BUILDINGS 1, 2, 3, 5, 7, 8,10, 20, 21, 22, 30, 70, 88, 96, 97, NEW MCR, AND ALSO SITE INFRASTRUCTURE UPGRADES.

SEE SHEET VF101 FOR CONTINUATION

F/F FACE TO FACE

FF EL FINISH FLOOR ELEVATION

FG FINISH GRADE

FH FIRE HYDRANT

FL FLOW LINE

FOC FACE OF CURB

FT FEET OR FOOT

FTG FOOTING

HC HANDICAP

HCP HANDICAPPED

HDPE HIGH DENSITY POLYETHYLENE

HNDRL HANDRAIL

HORIZ HORIZONTAL

ID INSIDE DIAMETER OR INSIDE DIMENSION

INFO INFORMATION

INV INVERT

INV EL INVERT ELEVATION

LAT LATITUDE

LF LINEAR FEET (FOOT)

LOC LOCATION

LP LOW POINT

LS LUMP SUM

MATL MATERIAL

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MON MONUMENT

MTG MEETING

MULT MULTIPLE

N NORTH

NA NOT APPLICABLE

NO NUMBER

NTS NOT TO SCALE

OC ON CENTER

PC POINT OF CURVE

PCT PERCENT

PI POINT OF INTERSECTION

PL PROPERTY LINE

PRKG PARKING

PROJ PROJECT

PROP PROPOSED

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE (PLASTIC)

QTY QUANTITY

R RADIUS

RCB REINFORCED CONCRETE BOX

RCP REINFORCED CONCRETE PIPE

RD ROAD OR ROOF DRAIN

REQD REQUIRED

ROW RIGHT OF WAY

RT RIGHT

RW ROADWAY

ABBRV ABBREVIATION

ABC AGGREGATE BASE COURSE

AC ASPHALTIC CONCRETE

ACP ASPHALTIC CONCRETE PAVING

ADA AMERICANS WITH DISABILITIES ACT

AGGR AGGREGATE

APPROX APPROXIMATE

ASPH ASPHALT

ASSY ASSEMBLY

AVE AVENUE

BC BACK OF CURB

BDRY BOUNDARY

BITUM BITUMINOUS

BLDG BUILDING

BLVD BOULEVARD

BM BENCHMARK

BRG BEARING

CB CATCH BASIN

CFS CUBIC FEET PER SECOND

CL CENTER LINE

CLASS CLASSIFICATION

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CO SEWER CLEAN OUT

CONC CONCRETE

CONSTR CONSTRUCTION

COORD COORDINATE

CORR CORRIDOR

CU FT CUBIC FEET

CU YD CUBIC YARD

DA DRAINAGE AREA

DAT DATUM

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DESCR DESCRIPTION

DET DETAIL

DI DROP INLET

DIA DIAMETER

DIFF DIFFERENCE

DIM DIMENSION

DIP DUCTILE IRON PIPE

DIR DIRECTION

DIST DISTANCE

DWG DRAWING

E EAST

EA EACH

EC EDGE OF CURB

EG EXISTING GRADE

EL ELEVATION

ENGR ENGINEER

ENTR ENTRANCE

EP EDGE OF PAVEMENT (PAVING)

EPA ENVIRONMENTAL PROTECTION AGENCY

EQUIP EQUIPMENT

ERD EXISTING ROOF DRAIN

ES EDGE OF SHOULDER

ESMT EASEMENT

EST ESTIMATE

EX EXISTING

EXIST EXISTING

SD STORM DRAIN

SDMH STORM DRAIN MANHOLE

SECT SECTION

SF SQUARE FOOT (FEET)

SHLDR SHOULDER

SMH STEAM MANHOLE

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ YD SQUARE YARD

SS SANITARY SEWER

SSMH SANITARY SEWER MANHOLE

ST STREET

STLT STREETLIGHT

STA STATION

STD STANDARD

STM STEAM

SURF SURFACE

SURV SURVEY

SW SIDEWALK

SWR SEWER

SYM SYMBOL

TAN TANGENT

TC TOP OF CURB

TD TRENCH DRAIN

TE TOP ELEVATION

TEMP TEMPORARY

THK THICKNESS

THRU THROUGH

TMH TOP OF MANHOLE

TOC TOP OF CURB

TOC WALL TOP OF CONCRETE WALL

TOF TOP OF FOOTING

TOP TOP OF WALL

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TYP TYPICAL

UGND UNDERGROUND

UNO UNLESS NOTED

OTHERWISE

UNPV RD UNPAVED ROAD

UTIL UTILITY

VAR VARIES

VC VERTICAL CURVE

VERT VERTICAL

VIC VICINITY

VOL VOLUME

W WEST

W/ WITH

W/O WITHOUT

CIVIL SHEET ABBREVIATIONS

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND, PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C.

CONSTRUCTION MAY HAVE OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.

COMMTELECOMMUNICATIONS

STORM DRAIN INLET

TREE

W

SS

SD

GAS

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

FENCE LINE

UNDERGROUND GAS LINE

ELECTRICAL VAULT

UGE

D

CAMPUS BOUNDARY

UNDERGROUND ELECTRICAL LINE

BACK OF CURB

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

FIRE HYDRANT

STREETLIGHT

WATER VALVE

SIDEWALK

STLT

OXY

STREETLIGHT CONDUIT

UNDERGROUND OXYGEN LINE

5' CONTOUR

1' CONTOUR

S

E

XX

XX

NEW

LEGEND

EXISTING

CONCRETE

A.C. PAVEMENT

GRAPHIC SCALE

1" = 40'

20' 40' 80'40'

TRUE NORTH

File details come from the government source that posted it. Updated .