Site Utility Plan.pdf
PDF 3 MB Posted
- Attached to
- 523-25-003 Bulk Oxygen Corrections
- Solicitation number
- 36C24126Q0398
About this file
This is a Civil Site Survey Plan drawing for a federal construction project at the U.S. Department of Veterans Affairs (VA) West Roxbury Healthcare System Campus in West Roxbury, Massachusetts. The project is titled "EHRM Infrastructure Upgrades" and is identified as Project Number 523A4-22-700, drawing VF102, dated 04/30/2026, at 65% Corrected Design Development phase and marked "NOT FOR CONSTRUCTION."
The project scope provides complete recabling within multiple buildings at the West Roxbury MA healthcare system campus, including Buildings 1, 2, 3, 5, 7, 8, 10, 20, 21, 22, 30, 70, 88, 96, 97, the new MCR (Master Control Room), and site infrastructure upgrades at 1400 VFW Parkway. The drawing was prepared by TRIPLE C - The A/E Group (Architect/Engineer of Record), located at 100 Pearl Street, 14th floor, Hartford, CT 06103, with Mat Perkins as the principal contact. The survey is based on VA-supplied as-built drawings and photographic, visual, and LIDAR survey data. The site plan includes existing and proposed infrastructure elements such as utilities, storm drains, sanitary sewers, electrical systems, water lines, telecommunications, and parking facilities, with a comprehensive legend identifying all infrastructure components and abbreviations used throughout the document.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UGE
o o o o o o o o oo o o o o oo
OH
T
OH
T
OH
T
OH
T
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
CO
MM
CO
MM
CO
MM
CO
MM
CO
MM
CO
MM
DN
DN
o o o o ooo
UG
E
CO
MM
UGE UGE
UGE
UGE
COMM COMMCOMM
UGE
UGE
UGE
UGE
CO
MM
UGE UGE UGE
UGE
UG
E
UG
E
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UG
E
UG
E
UG
E
UGE
UG
E
UG
E
UG
E
UGE
UG
E
UG
E
UG
E
UGEUGEUGEUGE
UGE
UGE
UGEUGEUGEUGE
UGE
UGE
UGE
SDSDSDSDSDSD
SD
SD
SD
D
D
D
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
D
SD
SD
SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS SS SS SS SS SS
W W W W W
W W W W
W
W W W W
W W
W W
W W
W
W
W
EUGEUGEUGE
S
SD
SS
SS
SSSS
S
SS
W W
W
W W
UG
E
UG
E
UG
E
UG
E
W
W
W
W
W
W
W
W W
W W
W W
W W
WWW
SS
SS
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
DY
H
SD
SD
WW
D
D D
D
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
D
D
D
SDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
SS
SS
SS
D
S
D
GA
S
GA
S
GA
S
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
COMM
W W
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
OX
Y
OX
Y
UG
E
UG
E
UGE
UGE
UGE
UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGE
W W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGEUGE
UGE
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UG
E
UGEUGE
COMM
COMM
COMM
COMM
COMM
UGE
UGE
UGE
UGE UGE UGE UGE
W W W
W
W
W DY
H
DY
H
UG
E
UGE
UG
E
UG
E
UG
E
UGE
UGE
UGE
97 97
102102
100101
EX. ELECTRICAL
EX. ELECTRICAL
EX. ELECTRICAL
EX
. E
LE
CT
RI
CA
L
EX
. E
LE
CT
RI
CA
L
EX. ELECTRICAL
EX
. E
LE
CTR
ICAL
EX. ELECTRICAL
EX. ELECTRICAL
EX. ELECTRICAL
EX
. E
LE
CT
RI
CA
L
EX. ELECTRICAL
EX. STORM
EX. STORM
EX. STORM
EX. STORM
EX
. S
TO
RM
EX. STORM
EX. WATER
EX. WATER
EX. WATER
EX
. W
AT
ER
EX. SAN. SEWEREX. SAN. SEWER
PARKING GARAGEPARKING GARAGE
OL
IG
OC
EN
E
VFW PKWY
SPRING STREET
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
65% CORRECTED DESIGN
DEVELOPMENT
04/30/2026
NOT FOR CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
1400 VFW Parkway, West Roxbury, MA 02132
523A4-22-700
SITE
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103
MAT PERKINS
(860)270-0753
STAMP CIVIL SITE SURVEY PLAN
ENLARGED PLAN
VF102
K.STRUBLEM.PERKINS
1" = 40'F1 CIVIL SITE SURVEY PLAN-ENLARGED PLAN
PROJECT SCOPE OF WORK
THIS PROJECT PROVIDES COMPLETE RECABLING WITHIN MULTIPLE BUILDINGS AT THE WEST ROXBURY MA HEALTHCARE SYSTEM CAMPUS. MULTIPLE BUILDINGS ON CAMPUS INCLUDING BUILDINGS 1, 2, 3, 5, 7, 8,10, 20, 21, 22, 30, 70, 88, 96, 97, NEW MCR, AND ALSO SITE INFRASTRUCTURE UPGRADES.
SEE SHEET VF101 FOR CONTINUATION
F/F FACE TO FACE
FF EL FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOW LINE
FOC FACE OF CURB
FT FEET OR FOOT
FTG FOOTING
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HNDRL HANDRAIL
HORIZ HORIZONTAL
ID INSIDE DIAMETER OR INSIDE DIMENSION
INFO INFORMATION
INV INVERT
INV EL INVERT ELEVATION
LAT LATITUDE
LF LINEAR FEET (FOOT)
LOC LOCATION
LP LOW POINT
LS LUMP SUM
MATL MATERIAL
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
MTG MEETING
MULT MULTIPLE
N NORTH
NA NOT APPLICABLE
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
PC POINT OF CURVE
PCT PERCENT
PI POINT OF INTERSECTION
PL PROPERTY LINE
PRKG PARKING
PROJ PROJECT
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE (PLASTIC)
QTY QUANTITY
R RADIUS
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RD ROAD OR ROOF DRAIN
REQD REQUIRED
ROW RIGHT OF WAY
RT RIGHT
RW ROADWAY
ABBRV ABBREVIATION
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CONCRETE
ACP ASPHALTIC CONCRETE PAVING
ADA AMERICANS WITH DISABILITIES ACT
AGGR AGGREGATE
APPROX APPROXIMATE
ASPH ASPHALT
ASSY ASSEMBLY
AVE AVENUE
BC BACK OF CURB
BDRY BOUNDARY
BITUM BITUMINOUS
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BRG BEARING
CB CATCH BASIN
CFS CUBIC FEET PER SECOND
CL CENTER LINE
CLASS CLASSIFICATION
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO SEWER CLEAN OUT
CONC CONCRETE
CONSTR CONSTRUCTION
COORD COORDINATE
CORR CORRIDOR
CU FT CUBIC FEET
CU YD CUBIC YARD
DA DRAINAGE AREA
DAT DATUM
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESCR DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DIST DISTANCE
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
EG EXISTING GRADE
EL ELEVATION
ENGR ENGINEER
ENTR ENTRANCE
EP EDGE OF PAVEMENT (PAVING)
EPA ENVIRONMENTAL PROTECTION AGENCY
EQUIP EQUIPMENT
ERD EXISTING ROOF DRAIN
ES EDGE OF SHOULDER
ESMT EASEMENT
EST ESTIMATE
EX EXISTING
EXIST EXISTING
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SECT SECTION
SF SQUARE FOOT (FEET)
SHLDR SHOULDER
SMH STEAM MANHOLE
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ YD SQUARE YARD
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
ST STREET
STLT STREETLIGHT
STA STATION
STD STANDARD
STM STEAM
SURF SURFACE
SURV SURVEY
SW SIDEWALK
SWR SEWER
SYM SYMBOL
TAN TANGENT
TC TOP OF CURB
TD TRENCH DRAIN
TE TOP ELEVATION
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TMH TOP OF MANHOLE
TOC TOP OF CURB
TOC WALL TOP OF CONCRETE WALL
TOF TOP OF FOOTING
TOP TOP OF WALL
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TYP TYPICAL
UGND UNDERGROUND
UNO UNLESS NOTED
OTHERWISE
UNPV RD UNPAVED ROAD
UTIL UTILITY
VAR VARIES
VC VERTICAL CURVE
VERT VERTICAL
VIC VICINITY
VOL VOLUME
W WEST
W/ WITH
W/O WITHOUT
CIVIL SHEET ABBREVIATIONS
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND, PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C.
CONSTRUCTION MAY HAVE OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
COMMTELECOMMUNICATIONS
STORM DRAIN INLET
TREE
W
SS
SD
GAS
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
FENCE LINE
UNDERGROUND GAS LINE
ELECTRICAL VAULT
UGE
D
CAMPUS BOUNDARY
UNDERGROUND ELECTRICAL LINE
BACK OF CURB
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
FIRE HYDRANT
STREETLIGHT
WATER VALVE
SIDEWALK
STLT
OXY
STREETLIGHT CONDUIT
UNDERGROUND OXYGEN LINE
5' CONTOUR
1' CONTOUR
S
E
XX
XX
NEW
LEGEND
EXISTING
CONCRETE
A.C. PAVEMENT
GRAPHIC SCALE
1" = 40'
20' 40' 80'40'
TRUE NORTH
File details come from the government source that posted it. Updated .