S02_Price Proposal Breakdown.docx
DOCX document 22 KB Posted
- Solicitation number
- 36C78626R0008
About this file
This is a Price Proposal Breakdown template for the Alabama National Cemetery Gravesite Expansion Phase 3 project (Project Number: 927CM3003, RFP Number: 36C78626R0008). The document provides a standardized format for contractors to submit pricing organized by construction division codes following the MasterFormat classification system. The template includes 28 primary divisions covering the full spectrum of construction work, ranging from general conditions and site work through specialized trades including earthwork, exterior improvements, utilities, electrical, plumbing, HVAC, fire suppression, communications, and electronic safety and security systems. Contractors are required to submit unit prices or lump-sum costs for each applicable division, with subtotals for overhead and profit, culminating in a total project price.
The solicitation is issued by the Department of Veterans Affairs National Cemetery Administration for construction services at the Alabama National Cemetery. This template is used to ensure consistent and comparable cost proposals from competing contractors bidding on the gravesite expansion work.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: 927CM3003 Alabama NC Gravesite Expansion Phase 3
Price Proposal Breakdown
Price Proposal Breakdown
Contractor:
RFP Number:
| Division # |
| Division |
| Price |
| 0 |
| General Conditions |
| 1 |
| General Requirements |
| 2 |
| Existing Conditions/Site Work |
| 3 |
| Concrete |
| 4 |
| Masonry |
| 5 |
| Metals |
| 6 |
| Wood, Plastics & Composites |
| 7 |
| Thermal and Moisture Protection/Roofing |
| 8 |
| Openings |
| 9 |
| Finishes |
| 10 |
| Specialties |
| 11 |
| Equipment |
| 12 |
| Furnishings |
| 13 |
| Special Construction |
| 14 |
| Conveying Equipment |
| 21 |
| Fire Suppression |
| 22 |
| Plumbing |
| 23 |
| Heating, Ventilating, & Air Conditioning |
| 25 |
| Integrated Automation |
| 26 |
| Electrical |
| 27 |
| Communications |
| 28 |
| Electronic Safety & Security |
| 31 |
| Earthwork |
| 32 |
| Exterior Improvements |
| 33 |
| Utilities |
| 34 |
| Transportation |
| 48 |
| Electrical Power Generation |
Misc
Divisions Subtotal
Overhead
Profit
Total