This is a Past Performance Questionnaire template for federal construction contract 529-26-102, Replace Fire Station Roof construction, issued by the Department of Veterans Affairs Network Contracting Office 4 located in Pittsburgh, PA 15215. The document is designed for contractors submitting proposals to provide past performance references from previous projects.

The questionnaire requires offerors to complete contractor information including company name, point of contact, address, phone number, reference project title, contract period of performance, contract number, contract dollar value, description of work, and the contractor's role (prime contractor, sub-contractor, or key personnel). Reference contacts must complete a detailed performance evaluation using a 0-5 scale, where 0 indicates neutral/no record, 1 is unacceptable, 2 is marginal, 3 is acceptable, 4 is very good, and 5 is outstanding. The evaluation covers 20 performance criteria organized into five categories: Quality–Management & Workmanship (six items), Timeliness and Adherence to Schedule (three items), Business Practices/Customer Relationship and Ability to Perform (four items), Compliance & Safety (four items including infection control), and Overall Customer Satisfaction (three items). Reference contacts must provide remarks for specific questions and an overall performance rating with comprehensive narrative explanation. Completed forms must be returned to the contracting officers Keneisha.coleman@va.gov and Jeffrey.Pruett@va.gov no later than 11:00 a.m. EST, February 18, 2026—one day before the RFP due date. The reference contact must certify the accuracy of submitted information and provide printed name, email, business title, signature, and date.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs Network Contracting Office 4

1010 Delafield Road Pittsburgh, PA 15215

1 | P a g e

Past Performance Questionnaire for: 529-26-102 Replace Fire Station Roof construction

INSTRUCTIONS TO OFFEROR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.

Company Name Street Address

Point of Contact (POC) City

POC Phone Number State Reference Project Title Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number Contract Dollar Value

Description of Work Role of Contractor on This Project (check appropriate box)

Prime Contractor Sub-contractor Key Personnel

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named above is submitting a proposal for a United States Department of Veterans Affairs contract, and has sent this form to you as a past performance reference contact. Please complete the following pages in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contracting Officer via postal mail or email directly to:

Please return the completed form ASAP, but no later than 11:00 am EST, February 18 2026. (Due a day before the RFP) If you have any questions, please contact Keneisha.coleman@va.gov and Jeffrey.Pruett@va.gov mailto:Keneisha.coleman@va.gov mailto:Jeffrey.Pruett@va.gov

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name Street Address

POC Name City

Phone Number State

Email Zip Code

PERFORMANCE INFORMATION: Choose the number on the scale of 0 (Neutral) to 5 (Exceptional) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE AN EXPLANATION FOR THE OVERALL RATING in the Remarks section, below.

0 1 2 3 4 5

NEUTRAL UNACCEPTABLE MARGINAL ACCEPTABLE VERY GOOD OUTSTANDING

No record of past performance, or not applicable or the record is inconclusive.

Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.

Performance did not meet some contractual requirements.

There were problems, some of a serious nature, for which corrective action was only marginally effective.

Performance met most contractual requirements.

There were some minor problems and corrective actions taken by the contractor were satisfactory.

Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.

Performance exceeded all contract requirements. There were no problems.

The Contractor … 0 1 2 3 4 5

QUALITY – MANAGEMENT & WORKMANSHIP

1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2. Demonstrated ability to hire, maintain, and replace, if necessary, qualified construction personnel during the contract period.

3. Provided and followed approved quality control plan and/or inspection procedures to meet contract requirements.

4. Corrected deficiencies in timely manner and pursuant to their quality control procedures.

5. Submittals clearly identified the proposed item IAW the specifications and drawings.

6. Suggested alternative approaches to problems.

TIMELINESS AND ADHERENCE TO SCHEDULE

7.

Contractor provided timely notices of possible delays/schedule revisions.

REMARKS:

8.

Timeliness in submitting submittals and reports and responding to agency inquiries, RFP's, etc.

9. Developed realistic and met approved progress schedules.

BUSINESS PRACTICES/CUSTOMER RELATIONSHIP AND ABILITY TO PERFORM

10.

Displayed initiative to solve problems.

11.

How well did the contractor work independent of Government guidance, oversight and assistance?

12.

Subcontractors / tradesmen were adequately managed and coordinated. Explain any subcontracting issues (positive or negative) that impacted the performance of your contract(s).

13. For contract changes, contractor provided timely and realistic change order proposals.

COMPLIANCE & SAFETY

14. Reports (i.e., daily, test, logs) / records were submitted completely and accurately satisfy the requirement.

15.

Applicable to Federal Contracts –Contractor complied with applicable Federal Laws and Regulations such as Construction Wage Rate Requirements – timely payrolls and compliance; Drug-Free Workplace; Environmental Regulations and Use of Recovered Materials; Executive Order 13101 Greening the Government.

16.

Contractor’s safety program was in compliance with federal regulations. Contractor implemented and followed their safety plan and ran a “safe jobsite”.

INFECTION CONTROL

17.

Contractor had an Infection Control Process in place and complied with agency Infection Control Requirements.

OVERALL CUSTOMER SATISFACTION

18. Demonstrated reasonableness in modifications cost proposal.

19. Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

YES NO

20. Would you award another contract to this contractor? If not, please explain in “remarks.”

YES NO

OVERALL PERFORMANCE RATING:

REMARKS (Please use as much space as is needed – the box will expand as you type).

I hereby certify that the information that I have reported above is accurate to the best of my knowledge.

Printed Name

E-mail address

Business Title Signature Date

File details come from the government source that posted it. Updated .