Drawings 529-26-102.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24426R0035
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10 engineering discipline <EDIT TEXT>:
321 4 5 6
S:
\F ac ilit ie s
M an ag em en t\P ro je ct a nd T ec h
Su pp or t\R ev it\
Fr e
St at io n\
.rv t
/3 /2
5:
:1
PM
G001
COVER SHEET REPLACE FIRE STATION ROOF
BUTLER , PA
529-26-102
Hunter Lohr
10/2/2025 JLM HDL
1 {3D}
REPLACE FIRE STATION ROOF
PROJECT #529-26-102
BUTLER VAMCBUTLER VAMC
325 New Castle Rd.
Butler, PA 16001
Revisions: Date:
SHEET INDEX
Drawing Number Drawing Title
G001 COVER SHEET
G002 GENERAL NOTES AND LEGENDS
G003 GENERAL SITE LAYOUT
A101 ARCHITECTURAL - ROOF PLAN
A102 ARCHITECTURAL - ELEVATIONS
A103 ARCHITECTURAL - DETAILS
RD
GENERAL NOTES:
1. THE CONTRACTOR SHALL COORDINATE ALL WORK ASSOCIATED
WITH THIS PROJECT WITH THE SUB-CONTRACTORS TO PROVIDE A
COMPLETE AND FINISHED PROJECT.
2. BUILDING 48 SHALL REMAIN OCCUPIED. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR ALL METHODS AND MEANS OF
CONSTRUCTION AND SHALL BE RESPONSIBLE FOR PROVIDING A
SAFE WORK ENVIRONMENT DURING THE CONSTRUCTION PERIOD.
EVERY EFFORT SHALL BE MADE BY THE CONTRACTOR TO
PROTECT THE OCCUPANTS, VISITORS AND CUSTOMERS FROM
THE HAZARDS OF CONSTRUCTION.
3. ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S WRITTEN INSTRUCTIONS AND
RECOMMENDATIONS.
4. THE CONTRACTOR IS RESPONSIBLE FOR ALL FIELD
MEASUREMENTS. THE GOVERNMENT WILL NOT BE HELD
RESPONSIBLE FOR BIDDING ERRORS MADE OR FOR THE FAILURE
TO ADEQUATELY INSPECT THE JOB SITE FOR EXISTING
CONDITIONS AND DIMENSIONS.
5. ALL WORK SHALL BE PERFORMED IN THE BEST AND MOST
PROFESSIONAL MANNER BY CONTRACTORS SKILLED IN THEIR
RESPECTIVE TRADES.
6. MATERIALS WHICH COULD BE A POTENTIAL SOURCE OF
STORMWATER POLLUTION, SUCH AS GASOLINE, DIESEL FUEL,
HYDRAULIC OIL, ETC., SHALL BE STORED AT THE END OF EACH
DAY IN A STORAGE TRAILER OR COVERED LOCATION, OR TAKEN
OFF-SITE AND PROPERLY DISPOSED OF. ALL TYPES OF WASTE
GENERATED AT THIS SITE SHALL BE DISPOSED OF IN A MANNER
CONSISTENT WITH STATE LAW AND/OR REGULATIONS.
7. THE CONTRACTOR SHALL SUBMIT ALL COMPONENT COLORS,
MODEL NUMBERS, SIZES, ETC. OF ALL BUILDING ELEMENTS TO
THE VA FOR APPROVAL BEFORE ORDERING MATERIALS.
8. THE CONTRACTOR SHALL VISIT THE SITE TO VERIFY FIELD
CONDITIONS, NO ADDITIONAL PAYMENT WILL BE MADE FOR
FAILURE TO ACCOUNT FOR OBSERVABLE CONDITIONS.
9. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND
SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING
LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO
PERFORM WORK. THE VA WILL NOT BE RESPONSIBLE FOR LOST,
DAMAGED, OR STOLEN ITEMS.
10. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK
AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY
PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO
REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE
DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A
RESULT OF INADEQUATE TEMPORARY PROTECTION OR
CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
11. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PREVENT THE
SPREAD OF DUST, SMOKE, FUMES, ETC., THROUGHOUT THE
BUILDING AND NEIGHBORHOOD. PROTECT ALL AIR INTAKES WITH
CHARCOAL FILTERS FOR ROOF APPLICATIONS.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING,
WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS,
ETC. THAT ARE DAMAGED DURING CONSTRUCTION.
13. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SERVICES
INCLUDING, ADEQUATE LIGHTING, WATER, TOILETS, POWER,
HEAT, ETC. AS REQUIRED FOR WORKMAN, MATERIAL
INSTALLATION, WORK PROTECTION, ETC. OR AS DISCUSSED AND
ALLOWED BY THE VA COR.
14. THE CONTRACTOR SHALL REVIEW ALL CONSTRUCTION
DOCUMENTS AND NOTIFY THE VA COR OF ANY INACCURACIES OR
DISCREPANCIES IN THE DOCUMENTS AND IN FIELD CONDITIONS
SHOWN ON THE DRAWINGS IN A TIMELY MANNER.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY
AND JOB SAFETY AT ALL TIMES. CONSTRUCTION ACTIVITIES
SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, STATE AND
LOCAL REQUIREMENTS, FEDERAL CODES, RULES, REGULATIONS
AND ORDINANCES INCLUDING, BUT NOT LIMITED TO, THE
INTERNATIONAL ENERGY CONSERVATION CODE, THE
INTERNATIONAL BUILDING CODE, AMERICAN NATIONAL
STANDARDS INSTITUTE (ANSI), AND THE NATIONAL FIRE
PROTECTION ASSOCIATION (NFPA).
16. THE CONTRACTOR SHALL BE AWARE THAT THE EXISTING FACILITY
HAS THE POTENTIAL OF HAVING OTHER CONSTRUCTION
PROJECTS GOING ON AT THE SAME TIME. COORDINATE WITH VA
COR.
17. REGULAR AND ADA ACCESS TO BUILDINGS 5 AND 46 SHALL BE
MAINTAINED AT ALL TIMES.
18. CONTRACTOR TO REVIEW AND LOCATE ALL DUMPSTER
LOCATIONS WITH VA COR PRIOR TO START OF WORK.
19. STOCK PILING OF NEW ROOFING MATERIALS ON EXISTING AND
NEW ROOF AREAS IS NOT PERMITTED.
20. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
APPROVED PLANS AND SPECIFICATIONS ISSUED BY THE VA. ANY
DEVIATIONS FROM THESE DOCUMENTS SHALL REQUIRE WRITTEN
NOTIFICATION TO THE COR PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION OF ANY CHANGE. WITHOUT WRITTEN APPROVAL
FROM THE VA, THE CONTRACTOR WILL BE WORKING AT HIS/HER
OWN RISK. ANY WORK INSTALLED IN CONFLICT WITH THE
CONTRACT DRAWINGS, CODE REQUIREMENTS, OR
MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL
OF THE VA SHALL BE CORRECTED AT THE CONTRACTORS
EXPENSE.
21. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF
CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL
PROVIDE SAID DOCUMENTATION TO THE COR UPON COMPLETION
OF CONSTRUCTION IN DIGITAL FORMAT. RECORD DOCUMENTS
SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK,
PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT
EXPRESSED/SPECIFIED IN THE CONSTRUCTION DOCUMENTS. **NO
EXCEPTION ALLOWED**
22. ALLOWABLE WORKING HOURS ARE FROM 8:00 AM TO 5:00 PM
MONDAY THRU FRIDAY AND NOT ON GOVERNMENT HOLIDAYS
UNLESS GIVEN WRITTEN PERMISSION FROM THE COR.
GENERAL DEMOLITION NOTES:
1. EXISTING MECHANICAL EQUIPMENT, VENTS, PIPING, CONDUIT,
EXHAUSTS, DUCTWORK SHALL EITHER BE LEFT IN PLACE OR
TEMPORARILY RELOCATED FOR WORK TO BE EXECUTED IN
ACCORDANCE WITH THE DETAILS PROVIDED. CONTRACTOR TO
COORDINATE ELECTRICAL AND MECHANICAL EQUIPMENT
REQUIRING TEMPORARY SHUTDOWN AND RE-START.
COORDINATE THOSE SHUTDOWNS WITH THE COR.
2. REMOVE ALL EXISTING ROOFING MATERIALS AT EACH ROOF
AREA AS IDENTIFIED IN THE EXISTING ROOF TYPES ON EACH
DEMOLITION PLAN, DOWN TO THE EXISTING ROOF DECK.
REMOVALS SHALL INCLUDE ALL BASE FLASHING, METAL FLASHING
AND OTHER MATERIALS ASSOCIATED WITH THE ROOF AND IN
ACCORDANCE WITH THE DETAILS. ALL MATERIALS TO BE
REMOVED AND NOT REPLACED OR RESET SHALL BECOME
PROPERTY OF THE CONTRACTOR.
3. REMOVE ADHESIVES, ASPHALT, AND OTHER MATERIALS DOWN
TO THE DECK, TO PROVIDE A UNIFORM, EVEN SUBSTRATE IN
ACCORDANCE WITH GOOD PRACTICE AND NRCA INDUSTRY
STANDARDS.
4. VISUALLY INSPECT THE SURFACE WITH THE VA COR TO
DETERMINE AREAS OF THE EXISTING ROOF DECK OR SHEATHING
IN NEED OF REPAIR UNDER THE UNIT PRICE PROVIDED IN THE BID
PROPOSAL.
ASBESTOS AWARENESS NOTES:
1. ASBESTOS CONTAINING MATERIAL (ACM) MAY EXIST IN
NORMALLY INACCESSIBLE LOCATIONS SUCH AS WITHIN WALLS,
CEILINGS, CRAWL SPACES, PIPE CHASES, SHAFTS, TRENCHES, OR
OTHER LOCATIONS. THERE IS NO KNOWN ACM FOR THIS
PROJECT.
2. IF SUSPECT MATERIAL IS ENCOUNTERED DURING THE COURSE
OF THIS PROJECT, WORK IN THIS AREA SHALL STOP AND THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR.
3. MATERIALS WHICH ARE COMPLETELY INACCESSIBLE UNDER
NORMAL CIRCUMSTANCES AND WHICH ARE IN RELATIVELY
INTACT CONDITION ARE UNLIKELY TO POSE A SIGNIFICANT
HEALTH HAZARD TO BUILDING OCCUPANTS, AND IF
UNDISTURBED, CAN REMAIN IN PLACE.
4. ANY SUSPECTED ACM WHICH IS ENCOUNTERED DURING
MAINTENANCE, RENOVATION OR DEMOLITION WORK SHOULD BE
ASSUMED TO BE ASBESTOS-CONTAINING AND BE TREATED
ACCORDINGLY.
LADDER CABLE TRAY
ROOF
DRAIN
VENT
PIPE
VENTILATION HOOD WITH CURB
ROOF LEGEND KEY
KEYED
NOTE
SNOW GUARDS
AREA BOUNDARY
RF/ELECTRICAL/COMMUNICATION CABLING
ANTENNA
ANTENNA BOX
GENERAL SYMBOLS ABBREVIATIONS
C C
X
X
A/E ARCHITECT/ENGINEER
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
ALT ALTERNATE
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
AUX AUXILIARY
AVG AVERAGE
BD BOARD
BKG BACKING
BLDG BUILDING
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BSMT BASEMENT
BTWN BETWEEN
CBB CEMENTITIOUS (BACKER) BOARD
CJ
CONSTRUCTION JOINT OR CONTROL
JOINT
CL CENTER LINE
CLR CLEAR
CO
CARBON MONOXIDE, CERTIFICATE OF
OCCUPANCY, CLEANOUT, OR COMPANY
COL COLUMN
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONSTR CONSTRUCTION
CONTR CONTRACTOR
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DOC DOCUMENT
DN DOWN
DR DOOR, DRAIN, OR DRIVE
DS DOWNSPOUT
EA EACH
EPS EXPANDED POLYSTYRENE BOARD
EQ EQUAL
EW EACH WAY
EX EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXT GR EXTERIOR GRADE
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FLR FLOOR
FLR FIN FLOOR FINISH
FRMG FRAMING
FT FEET OR FOOT
FTG FOOTING
GALV GALVANIC OR GALVANIZED
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GYP GYPSUM
GYP BD GYPSUM BOARD
HDR HEADER
HM HOLLOW METAL
HORIZ HORIZONTAL
HOSP HOSPITAL
HT HEIGHT
INSUL INSULATION
LF LINEAR FEET
MFG MANUFACTURER
OC ON CENTER
OFD OVERFLOW DRAIN
PRELIM PRELIMINARY
PT PAINT, PNEUMATIC TUBE, OR PRESSURE
PWR POWER
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RD ROAD OR ROOF DRAIN
REC RECESSED
REQD REQUIRED
RET RETARDANT
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RO ROUGH OPENING
SAN SANITARY
SIM SIMILAR
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
STD STANDARD
STL PL STEEL PLATE
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUSP CLG SUSPENDED CEILING
SYS SYSTEM
TO TOP OF ___
TOF TOP OF FOUNDATION
TYP TYPICAL
UG UNDER GROUND
W/ WITH
W/O WITHOUT
WD WOOD
WP WATERPROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10 engineering discipline <EDIT TEXT>:
321 4 5 6
S:
\F ac ilit ie s
M an ag em en t\P ro je ct a nd T ec h
Su pp or t\R ev it\
Fr e
St at io n\
.rv t
/3 /2
5:
:1
PM
G002
GENERAL NOTES AND LEGENDS REPLACE FIRE STATION ROOF
BUTLER , PA
529-26-102
Hunter Lohr
10/2/2025 JLM HDLRevisions: Date:
GENERAL NOTES
1 SEE G002 FOR GENERAL NOTES AND LEGENDS.
CONTRACTOR RESPONSIBLE FOR ALL MEANS AND METHODS,
MOVEMENT OF MATERIALS, SAFETY PRECAUTIONS, STORAGE, AND
MAINTENANCE OF EXITS FROM BUILDING.
3 MINIMUM ONE LANE MUST REMAIN OPEN AT ALL TIMES.
4 CONTRACTOR TO COORDINATE CLOSURES OF PARKING LOTS/SPACES
WITH CONTRACTING OFFICERS REPRESENTATIVE (COR).
5 REGULAR AND ADA ACCESS TO BUILDING 48 MUST BE MAINTAINED AT
ALL TIMES.
6 DO NOT SCALE DRAWINGS. FIELD VERIFY EXISTING CONDITIONS
PRIOR TO BIDDING.
N E
W
13'-11 1/8"
6'-11 9/16"
3'-8 7/8"
(TYP.)
13'-11 1/8"
6'-11 9/16"
3'-8 7/8"
(TYP.)SLOPE DOWN @ 2%
HO
SP
ITA
L
HOSPITAL ROAD
HO
SP
ITA
L
RO
AD
H
OS
PI
TA
L
RO
AD
HOSPITAL ROAD
SE
C
ON
D
ST
RE
ET
"A"
ST
REE
T
FIR
ST
ST
RE
ET
FIR
ST
ST
RE
ET
FIR
ST
ST
RE
ET
SE
CO
ND
S
TR
EE
T
SE
CO
ND
S
TR
EE
T
"B
ST
RE
"B"
STR
EET
FO
UR
TH
S
TR
EE
T
FI
RS
T S
TR
EE
T
HOSPITAL ROAD
HOSPITAL
ROA
D
HO
SP
ITA
LROAD
HO
SP
ITA
L
R
OA
D
SE
CO
ND
S
TR
EE
T
RO
AD
1.
A
(L
EA
SE
D)
ONLY
ONLY
DUFFY ROAD
TO
I-
EV
AN
S
CI
TY
W
C
A S
T L E
R
O A D
P
R
O U
T
VAN
W
13'-11 1/8"
6'-11 9/16"
3'-8 7/8"
(TYP.)
13'-11 1/8"
6'-11 9/16"
3'-8 7/8"
(TYP.)
SLOPE DOWN @ 2%
HO
SP
ITA
L
HOSPITAL ROAD
HO
SP
ITA
L
RO
AD
H
OS
PI
TA
L
RO
AD
HOSPITAL ROAD
SE
C
ON
D
ST
RE
"A"
ST
REE
T
FIR
ST
ST
RE
ET
FIR
ST
ST
RE
ET
FIR
ST
ST
RE
ET
SE
CO
ND
S
TR
EE
T
SE
CO
ND
S
TR
EE
T
"B
ST
RE
FO
UR
TH
S
TR
EE
T
FI
RS
T S
TR
EE
T
HOSPITAL ROAD
HOSPITAL
ROA
D
HO
SP
ITA
LROAD
HO
SP
ITA
L
R
OA
D
SE
CO
ND
S
TR
EE
T
RO
AD
1.
A
(L
EA
SE
D)
ONLY
ONLY
DUFFY ROAD
TO
I-
EV
AN
S
CI
TY
W
C
S
T L E
R
O A D
P
R
O U
T
VAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10 engineering discipline <EDIT TEXT>:
321 4 5 6
S:
\F ac ilit ie s
M an ag em en t\P ro je ct a nd T ec h
Su pp or t\R ev it\
Fr e
St at io n\
.rv t
/3 /2
5:
:1
PM
G003
GENERAL SITE LAYOUT REPLACE FIRE STATION ROOF
BUTLER , PA
529-26-102
Hunter Lohr
10/2/2025 JLM HDLRevisions: Date:
1" = 200'-0"1 Campus
AREA OF WORK
STAGING
AREA
1" = 30'-0"2 Project Location
EPDM ROOF TO
BE REPLACED
(LOC)
STAGING
AREA
CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT
THE EXISTING STRUCTURE FROM WEATHER OR OTHER DAMAGE. ANY
DAMAGE SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
3 DO NOT SCALE DRAWINGS. FIELD VERIFY EXISTING CONDITIONS
PRIOR TO BIDDING.
4 CONTRACTOR RESPONSIBLE FOR VERIFYING ALL MEASUREMENTS.
REMOVE EXISTING RUBBER ROOF AND ANY UNDERLAYMENT DOWN
TO EXISTING WOOD DECK. REMOVE AND REPLACE ANY ROOF
DECKING IN DISREPAIR. REMOVAL AND REPLACEMENT OF DECKING
BOARDS WILL BE BY APPROVAL OF THE COR.
6 INSTALL PIPE FLASHING AT EXISTING VENT PIPES PER DETAIL.
7 INSTALL NEW EPDM ROOF SYSTEM PER DETAIL.
A102
A102
A102
A102
1/2" / 1'-0"
1/ 2"
1'
-0
1/2" / 1'-0"
1/ 2"
1'
-0
36' - 8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10 engineering discipline <EDIT TEXT>:
321 4 5 6
S:
\F ac ilit ie s
M an ag em en t\P ro je ct a nd T ec h
Su pp or t\R ev it\
Fr e
St at io n\
.rv t
/3 /2
5:
:1
PM
A101
ARCHITECTURAL - ROOF PLAN REPLACE FIRE STATION ROOF
BUTLER , PA
529-26-102
Hunter Lohr
10/2/2025 JLM HDLRevisions: Date:
1/8" = 1'-0"1 02 EPDM ROOF
NEW SEAMLESS GUTTER,
ENTIRE PERIMETER
NEW EPDM
ROOF SYSTEM
EX ASPHALT SHINGLE
ROOF TO REMAIN
CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT
THE EXISTING STRUCTURE FROM WEATHER OR OTHER DAMAGE. ANY
DAMAGE SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
3 DO NOT SCALE DRAWINGS. FIELD VERIFY EXISTING CONDITIONS
PRIOR TO BIDDING.
4 CONTRACTOR RESPONSIBLE FOR VERIFYING ALL MEASUREMENTS.
REMOVE EXISTING RUBBER ROOF AND ANY UNDERLAYMENT DOWN
TO EXISTING WOOD DECK. REMOVE AND REPLACE ANY ROOF
DECKING IN DISREPAIR. REMOVAL AND REPLACEMENT OF DECKING
BOARDS WILL BE BY APPROVAL OF THE COR.
6 INSTALL PIPE FLASHING AT EXISTING VENT PIPES PER DETAIL.
7 INSTALL NEW EPDM ROOF SYSTEM PER DETAIL.
01 FIRST FLOOR
0' - 0"
A102
02 EPDM ROOF
16' - 7 1/2"
01 FIRST FLOOR
0' - 0"
02 EPDM ROOF
16' - 7 1/2"
4' - 0"
01 FIRST FLOOR
0' - 0"
A102
02 EPDM ROOF
16' - 7 1/2"
01 FIRST FLOOR
0' - 0"
02 EPDM ROOF
16' - 7 1/2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10 engineering discipline <EDIT TEXT>:
321 4 5 6
S:
\F ac ilit ie s
M an ag em en t\P ro je ct a nd T ec h
Su pp or t\R ev it\
Fr e
St at io n\
.rv t
/3 /2
5:
:1
PM
A102
ARCHITECTURAL - ELEVATIONS REPLACE FIRE STATION ROOF
BUTLER , PA
529-26-102
Hunter Lohr
10/2/2025 JLM HDLRevisions: Date:
3/16" = 1'-0"1 EAST
3/16" = 1'-0"2 SOUTH
3/16" = 1'-0"3 WEST
3/16" = 1'-0"4 Section 1
SEE DETAIL SHT A103
EX INSULLATION,
REPLACE ANY
DAMAGED IN KIND
PROVIDE NEW
DOWNSPOUT
WITH TURN-OUT
PROVIDE NEW
DOWNSPOUT
TO UG PIPE
CONNECTOR
PROVIDE NEW
DOWNSPOUT
TO UG PIPE
CONNECTOR
PROVIDE NEW DOWNSPOUT
WITH TURN-OUT
PROVIDE NEW
DOWNSPOUT TO
CLEANOUT/UG PIPE
CONNECTOR
3/8" THK, High-density (1000 psi) Gypsum Board
SUBSTRATE
WALL
1/2" (13 mm) MIN.
GUTTER
(SEE NOTE #5 & #7)
ACCEPTABLE MFG. RECOMMENDED PRIMER
5" (127 mm) QUICKSEAM FLASHING
1/4" (6 mm) MAX.
1" (25 mm) MIN.
WOOD NAILER (SEE NOTE #6)
1-1/4" (32 mm) HOT DIPPED GALVANIZED ROOF NAILS AT 4" (102 mm) O.C. MAX. STAGGERED 1/2" (13 mm)
MIN. 1.5" FROM EDGE OF ROOF
CONTINUOUS BEAD
OF LAP SEALANT
(SEE NOTE #2)
.090" (2.28 mm) EPDM MEMBRANE
CONTINUOUS BEAD OF
LAP SEALANT (REQUIRED)
APPROPRIATE FASTENER
(SEE NOTE #5)
APPROPRIATE MFG. RECOMMENDED
MEMBRANE ADHESIVE
(ADHERED SYSTEMS)
9" (228 mm) QUICKSEAM
FORMFLASH
NOTE:
1. REFER TO SPECIFICATIONS FOR
ADDITIONAL INSTALLATION REQ'S.
2. LAP SEALANT IS REQUIRED ALONG
UPSLOPE EDGE OF QUICKSEAM
FLASHING WHEN ROOF SLOPE IS
1" (25 mm) PER FOOT OR GREATER.
REFER TO MFG. SPEC FOR SEAM
EDGE TREATMENT.
3. ROUND ALL METAL CORNERS AND
PLACE BACK OF GUTTER STRAP
1/4" (6 mm) BELOW TOP OF WOOD NAILER.
4. DO NOT PRE-NAIL MEMBRANE TO
THE FACE OF THE WOOD NAILER.
5. CONSTRUCT AND ANCHOR GUTTER
IN ACCORDANCE WITH SMACNA
RECOMMENDATIONS.
6. WOOD NAILER MUST BE INSTALLED
TO MEET APPLICABLE BUILDING CODES
OR 200 LB PER LINEAR FOOT MINIMUM
IN ANY GIVEN DIRECTION.
7. FLANGE OF METAL GUTTER MUST
BE FULLY SUPPORTED BY WOOD AND
TERMINATED AT LEAST 1/2" (13 mm)
FROM EDGE OF WOOD.
NOTES:
1. ROOF SLOPE 1/2" IN 12".
STAINLESS STEEL
DRAWBAND SET IN
ELASTOMERIC MASTIC
SEALANT
REMOVE EXISTING PIPE
FLASHING, CLEAN AND
PREPARE PIPE, INSTALL
PREFABRICATED SELF
ADHERED EPDM PIPE
FLASHING
8" M
IN
1-1/2" = 1'-0"
PIPE FLASHING DETAIL2
NTS
ROOF DETAIL NEW WORK1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10 engineering discipline <EDIT TEXT>:
321 4 5 6
S:
\F ac ilit ie s
M an ag em en t\P ro je ct a nd T ec h
Su pp or t\R ev it\
Fr e
St at io n\
.rv t
/3 /2
5:
:1
PM
A103
ARCHITECTURAL - DETAILS REPLACE FIRE STATION ROOF
BUTLER , PA
529-26-102
Hunter Lohr
10/2/2025 JLM HDLRevisions: Date:
| G001 - COVER SHEET |
| G002 - GENERAL NOTES AND LEGENDS |
| G003 - GENERAL SITE LAYOUT |
| A101 - ARCHITECTURAL - ROOF PLAN |
| A102 - ARCHITECTURAL - ELEVATIONS |
| A103 - ARCHITECTURAL - DETAILS |
File details come from the government source that posted it. Updated .