S02 - Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25222B0030
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The solicitation number is 36C25222B0030 for the Z2DA--695-20-104 Upgrade Building 112 Power project. The opportunity type is a solicitation to upgrade the power for Building 112. No other details are provided on products or services required, pricing terms, response dates, or other salient information needed to fully summarize the opportunity.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/3
/2
:5
:2
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts
\R e v it lo c a l fi le s
A
-3
M ilw a u k e e
U p g ra d e
B d c o rd o n a c g
-p a
.c o m
.r v t
G-001
COVER
1 4DGC
UPGRADE POWER BLDG 112
MILWAUKEE VA MEDICAL CENTER
5000 W NATIONAL AVE
MILWAUKEE, WI 53295 MARCH 31, 2022
100% CONSTRUCTION DOCUMENTS
695-20-10420-349
UPGRADE POWER BLDG 112
MILWAUKEE VA MEDICAL CENTER
5000 W NATIONAL AVE
MILWAUKEE, WI 53295
VA PROJECT #: 695-20-104
TM
N N
BLDG 112 BLDG 112
DRAWING LIST
GENERAL
G-001 COVER 1 4
G-100 GENERAL INFORMATION, SYMBOLS & ABBREVIATIONS 2 4
GL101 FIRST FLOOR LIFE SAFETY 3 4
GL102 FIRST FLOOR HAZARDOUS MATERIAL PLAN 4 4
CIVIL
CD101 CIVIL DEMOLITION PLAN 1 3
CS101 CIVIL SITE LAYOUT PLAN 2 3
CS501 CIVIL DETAILS 3 3
STRUCTURAL
S-001 GENERAL NOTES 1 5
S-101 FOUNDATION PLAN 2 5
S-102 SECOND FLOOR FRAMING PLAN 3 5
S-301 FOUNDATION DETAILS 4 5
S-501 FRAMING DETAILS 5 5
ARCHITECTURAL
A-001 ARCHITECTURAL SITE PLAN 1 6
AD101 FIRST FLOOR DEMOLITION PLAN 2 6
A-101 FIRST FLOOR PLAN, DOOR SCHEDULE, AND DOOR & FRAME TYPES 3 6
A-102 SECOND FLOOR/ROOF PLAN AND DETAILS 4 6
A-201 SECTIONS, ELEVATIONS AND DETAILS 5 6
A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 6 6
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 2
PW101 STORM DRAIN PLAN 2 2
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 2
M-101 FIRST FLOOR MECHANICAL PLANS, SCHEDULES, AND DETAILS 2 2
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 9
E-002 FIRE ALARM & TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 9
ED101 FIRST FLOOR DEMOLITION PLAN 3 9
EP101 FIRST FLOOR POWER PLAN 4 9
EL101 FIRST FLOOR LIGHTING PLAN 5 9
E-401 ENLARGED ELECTRICAL PLANS 6 9
E-601 SINGLE LINE DIAGRAM 7 9
E-602 ELECTRICAL PANEL SCHEDULES 8 9
E-603 ELECTRICAL PANEL SCHEDULES 9 9
DocuSign Envelope ID: 95890BE9-97F1-4208-B195-B5EEA54B6B2A
3/31/2022
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
AFF ABOVE FINISHED FLOOR
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EL ELEVATION
ELEC ELECTRIC(AL)
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK, INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS, AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE, AND IN NO WAY DO THE SEPARATIONS DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE DRAWING SEPARATIONS IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED, AND UNIFIED WHOLE. REFER TO ALL OTHER DISCIPLINE
DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS PROJECT.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY ENGINEERING DISCIPLINES, ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY, OR GREATER QUANTITY, OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
8. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
9. PROVIDE BLOCKING WITHIN PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS. PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
10. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
11. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
12. BUILDING EXPANSION AND PAD SIZES BASED ON BASIS OF DESIGN EQUIPMENT. GENERAL CONTRACTOR SHALL BE REQUIRED TO SELECT EQUIPMENT THAT FITS PARAMETERS OUTLINED IN THIS DRAWING PACKAGE. SIZE INCREASES OR LAYOUT CHANGES STEMMING FROM SELECTION OF EQUIPMENT THAT DOES NOT ALIGN WITH THE BUILDING DESIGN SET FORTH ARE REQUIRED TO BE DESIGNED AND PAID FOR BY THE GENERAL
CONTRACTOR.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
9. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
10. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
11. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE
LEVEL AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.|
12. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
13. ALL ITEMS TO BE DEMOLISHED SHALL REMAIN THE PROPERTY OF THE VA FACILITY UNTIL DETERMINE
WHETHER IT IS TO BE SALVAGE FOR REUSES OR DEPOSED OF SITE.
14. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORESEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
15. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
1. CONSTRUCTION OF THIS PROJECT SHALL OCCUR IN SPECIFIC PHASES IN ORDER TO MAINTAIN NORMAL AND BACKUP POWER AT ALL TIMES. EACH PHASE MAY INCLUDE SUB-PHASES WITH STEPS THAT NEED TO TAKE PLACE IN A SPECIFIC ORDER. REFER TO EACH DISCIPLINE FOR SPECIFIC PHASING NOTES AND
REQUIREMENTS.
2. FOR PHASING REQUIREMENTS SEE "PHASING" ON SHEET E-001.
BUILDING LOCATION: MILWAUKEE, WI
CLIMATE ZONE: 6(A)
REFERENCE CODES:
ASHRAE 90.1 - 2019 EDITION
INTERNATIONAL ENERGY CONSERVATION CODE
BUILDING ENVELOPE REQUIREMENTS:
ROOFS: CODE REQUIRED: DESIGNED:
INSULATION ABOVE DECK R-30ci R-31.8ci (MINIMUM)
WALLS, ABOVE GRADE:
STEEL-FRAMED R-13 + R-12.5ci R-13 + R-12.5ci
WALLS, BELOW GRADE:
BELOW-GRADE WALL NR N/A
SLAB ON GRADE FLOORS:
UNHEATED SLABS R-20 FOR 24" BELOW SLAB R-20 FOR 24" BELOW SLAB
HOLLOW METAL DOORS:
SWINGING DOORS U-0.37 U-0.35
DEFINITIONS
ci = CONTINUOUS INSULATION
NR = NO REQUIREMENT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/3
/2
:5
:2
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts
\R e v it lo c a l fi le s
A
-3
M ilw a u k e e
U p g ra d e
B d c o rd o n a c g
-p a
.c o m
.r v t
G-100
GENERAL INFORMATION, SYMBOLS &
ABBREVIATIONS
2 4DGC
UPGRADE POWER BLDG 112
MILWAUKEE VA MEDICAL CENTER
5000 W NATIONAL AVE
MILWAUKEE, WI 53295 MARCH 31, 2022
100% CONSTRUCTION DOCUMENTS
695-20-10420-349
TM
GENERAL SYMBOL LEGEND
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
GENERAL NOTES
DEMOLITION NOTES
PHASING AND CONSTRUCTABILITY NOTES
ENERGY REQUIREMENTS
DN
UP
UP
MAINTENANCE
RM
IT
ELECTRICAL
109EC
GENERATOR
RM
LOCKER
RM
TOILET
OFFICE
LABORATORY
STAFF
LOUNGE
CONTROL
RM
REVERSE
OSMOSIS
AREA
LOADING
DOCK
WEST
BOILER
RM
EAST
BOILER
RM
PUMP
RM
IT
EXIT
EXIT
EXIT
> 1/2 OVERALL DIAGONAL
152'-9"
OVERALL DIAGONAL DIMENSION
180'-5 3/4"
EXIT
B
A
EXIT DISTANCE = 94'
E X
IT
D
IS
T
A N
C E
EXIT DISTANCE = 48'
EXIT DISTANCE = 97'
EXIT DISTANCE = 91'
E X
IT
D
IS
T
A N
C E
CAPACITYCLR
EXTERIOR
EXIT
40" 89
CAPACITYCLR
EXTERIOR
EXIT
40" 89
CAPACITYCLR
EXTERIOR
EXIT
58" 89
CAPACITYCLR
EXTERIOR
EXIT
34" 89
X1
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
HAZARDOUS LOCATION
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
XXX
XXX
FEB
FEC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/3
/2
:5
:2
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts
\R e v it lo c a l fi le s
A
-3
M ilw a u k e e
U p g ra d e
B d c o rd o n a c g
-p a
.c o m
.r v t
GL101
FIRST FLOOR LIFE SAFETY
3 4DGC
UPGRADE POWER BLDG 112
MILWAUKEE VA MEDICAL CENTER
5000 W NATIONAL AVE
MILWAUKEE, WI 53295 MARCH 31, 2022
100% CONSTRUCTION DOCUMENTS
695-20-10420-349
TM
PROPOSED USE:
OWNED BY: PRIVATE
FEDERAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: FEDERAL
COUNTY
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SUBCLASSIFICATION OF OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
PLANT BUILDING
TYPE II (000)
INDUSTRIAL
SPECIAL PURPOSE
2021 NFPA 101, LIFE SAFETY CODE
2018 IBC, INTERNATIONAL BUILDING CODE
2018 IMC, INTERNATIONAL MECHANICAL CODE
2020 NFPA 70, (NEC) NATIONAL ELECTRICAL CODE
2018 NFPA 99, HEALTH CARE FACILITIES CODE
ASHRAE 90.1-2019
2015 ABAAG, ARCHITECTURAL BARRIERS ACT
UPGRADE POWER BLDG 112
MILWAUKEE VA MEDICAL CENTER
CODE INFORMATION
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
5000 W NATIONAL AVE
MILWAUKEE, WI 53295
EGRESS INFORMATION
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
GROSS MEASURED AREA
(INTERIOR FACE WALLS)
OCCUPANT LOAD
(NFPA 101 TABLE 7.3.1.2)
EGRESS WIDTH
(NFPA 101 TABLE 7.11.3
& 7.3.3.1)
COMMON PATH OF TRAVEL
(NFPA 101 40.2.5.1)
EXIT ACCESS TRAVEL
(NFPA 101 7.11.1)
DEAD-END CORRIDOR
(NFPA 101 40.2.5.1)
REQUIRED # OF EXITS
(NFPA 101 7.4.1.1)
DISTANCE BETWEEN EXITS
(NFPA 101 7.5.1.3.2)
10,895 SF
10,511 SF
SPECIAL PURPOSE INDUST.
OCC. LOAD NOT APPLICABLE
EXIT DOORS = 33"/(0.4) =
89 OCCUPANTS / DOOR
50'-0" MAXIMUM
300'-0" MAX. ALLOWED
97'-0" ACTUAL MAX.
50'-0" MAXIMUM
MINIMUM 2 EXITS REQUIRED
REQUIRED EXITS GREATER
THAN 1/2 OVERALL DIAG.
AREA ALLOWED = 15,500 PER STORY
EXISTING FIRST FLOOR AREA = 10,808 SF
PROPOSED FIRST FLOOR AREA = 10,895 SF
ALLOWABLE HEIGHT = 55 FT, 2 STORIES
EXISTING HEIGHT = FT (UNCHANGED)
LIFE SAFETY LEGEND
UP
B
A
MAINTENANCE
RM
IT
ELECTRICAL
109EC
GENERATOR
RM
LOCKER
RM
TOILET
OFFICE
LABORATORY
STAFF
LOUNGE
CONTROL
RM
REVERSE
OSMOSIS
AREA
LOADING
DOCK
WEST
BOILER
RM
EAST
BOILER
RM
PUMP
RM
IT
111111
333333
X1
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/3
/2
:5
:2
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts
\R e v it lo c a l fi le s
A
-3
M ilw a u k e e
U p g ra d e
B d c o rd o n a c g
-p a
.c o m
.r v t
GL102
FIRST FLOOR HAZARDOUS MATERIAL
PLAN
4 4DGC
UPGRADE POWER BLDG 112
MILWAUKEE VA MEDICAL CENTER
5000 W NATIONAL AVE
MILWAUKEE, WI 53295 MARCH 31, 2022
100% CONSTRUCTION DOCUMENTS
695-20-10420-349
TM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
FIRST FLOOR HAZARDOUS MATERIAL PLAN (EXISTING CONDITIONS)
NORTH
0 4 8 16
1. HAZARDOUS MATERIAL LOCATIONS IDENTIFIED IN
PLAN ARE FOR GENERAL LOCATION REFERENCE OF
KNOWN HAZARDOUS MATERIALS ONLY. REFER TO
THE REPORT TITLED, "HAZARDOUS BUILDING
MATERIALS ASSESSMENT REPORT", PREPARED BY
TERRACON, DATED MAY 12, 2021, AND LOCATED IN
APPENDIX E OF THE PROJECT NARRATIVE.
2. THE SCOPE OF WORK OF THIS PROJECT DOES NOT
INCLUDE ABATEMENT OF ALL HAZARDOUS
MATERIALS. HAZARDOUS MATERIALS SHALL BE
PROPERLY HANDLED, REMOVED, AND DISPOSED OF
WHEN THEY ARE ENCOUNTERED AS PART OF THE
BROADER SCOPE OF WORK OF UPGRADES TO THE
ELECTRICAL SYSTEM AND ANCILLARY WORK.
3. CONTRACTOR SHALL STOP WORK AND NOTIFY
CONTRACTING OFFICER REPRESENTATIVE
IMMEDIATELY UPON ENCOUNTERING ANY SUSPECTED
HAZARDOUS MATERIAL THAT ARE NOT INDICATED
IN THE SURVEY REPORT. WORK THAT MAY DISRUPT
THE SUSPECTED HAZARDOUS MATERIAL SHALL NOT
PROCEED UNTIL TESTING, IDENTIFICATION, AND
NECESSARY REMEDIAL ACTION IS TAKEN.
4. DEMOLITION, HANDLING, AND DISPOSAL OF
HAZARDOUS MATERIALS SHALL BE IN COMPLIANCE
WITH ALL APPLICABLE LAWS, CODES, AND DECISIONS
BY THE AUTHORITY HAVING JURISDICTION.
5. ANY CLOTH-ENCASED WIRING ENCOUNTERED
DURING RENOVATION OR DEMOLITION SHALL BE
ASSUMED ASBESTOS CONTAINING MATERIAL.
6. THE IDENTIFIED AND ASSUMED MATERIALS SHALL
BE REMOVED BY A WDHS-LICENSED ABATEMENT
CONTRACTOR PRIOR TO COMMENCEMENT OF
RENOVATION/DEMOLITION ACTIVITIES.
7. CONTRACTOR SHALL COMPLY WITH OSHA LEAD
STANDARD FOR CONSTRUCTION (29 CFR 1926.62).
8. LEAD WASTE SHALL BE EVALUATED FOR HAZARDOUS
CONSTITUENTS PRIOR TO DISPOSAL.
1 ASBESTOS CONTAINING MATERIAL: WINDOW
GLAZING
2 ASBESTOS CONTAINING MATERIAL: CMU WALL
FILLER
3 LEAD BASED PAINT: WINDOWS, INTERIOR AND
EXTERIOR
4 LEAD-BASED PAINT: CEILING BEAMS
(OVERHEAD)
5 LEAD-CONTAINING PAINT: CONCRETE FLOOR
SS
T
T
18"
6"
12"
12"
SS
SS
T
T
T
T
SS
SS
SS
SS
16"
60"
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS GAS
GAS GAS GAS GAS
GAS GAS GAS GAS GAS
FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOC
T T
T T
T T
T T
T T
T T
T
UG/EUG/EUG/EUG/EUG/EUG/EUG/EUG/E
UG/EST
ST
STSTST
GASGASGASGAS
T T
T T
T T
T T
T T
T
T T
T T
T T
T T
T T
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG
/E
UG
/EUG/E
UG/E
UG/E
UG
/E
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGAS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
SS
SS
SS
SS
SS
SS
SS
SS
SS
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
T T T T TUG/E UG/E UG/E UG/E
SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
T T
T T
T T
T T
T T
T T
T T
T T
T T
UG/E UG/E UG/E UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
SS SS SS SS
SS
SS SS
SS
SS SS SS
GASGASGAS
GAS
GAS
GAS
GAS
GA
S
GA
S
RIM 650.00
E 640.46 W 640.46
SE 640.46
RIM 639.44
6"E 634.28 6"W 634.28
RIM 651.03
ABANDONED
C H
A
IN
L
IN
K F
E N
C E
ASPHALT
ASPHALT
ASPHALT
C H
A
IN
LIN
K
FE
N
C E
VAULT
PIPES
ASPHALT
CONCRETE WALK
CONCRETE WALK
FUEL
PUMP
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
WWW
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STEAM TUNNEL P
ER P
LA
N
STEAM TUNNEL P
ER P
LA
N
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
RIM 648.38
E 642.4± W 642.5± N 642.9±
FOCFOCFOCFOCFOCFOCFOC
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
CONCRETE WALL
CONCRETE
TUNNEL
ACCESS
CONCRETE
CONCRETE
HATCH
CONC.
D E
C K
WOOD
STEPS
W A
TE
R
P E
R P
LA
N
LO
D
LOD LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LODLO
D
LO
D
LODLODLOD
BOLLARDS (TYP.)
SS
SS SS
H
IN
ES
B
LV
D
GENERAL WOLCOTT BLVD
FLOWER DR
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
20-349CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
#112
100% CONSTRUCTION DOCUMENTS
1" = 10'
SCALE IN FEET
10 5 10 20
LEGEND
BUILDING/CONCRETE/CURB AND GUTTER TO BE
REMOVED
EXISTING FENCE
EXISTING SANITARY SEWER LINE
EXISTING UNDERGROUND POWER LINE
EXISTING FIBER OPTIC LINE
EXISTING GAS LINE
EXISTING STEAM LINE
EXISTING STORM LINE
LIMITS OF DISTURBANCE
EXISTING CONTOURS
FOC FOC FOC
GAS GAS GAS
ST ST
XXXX
3/
/2
2:
:0
P
M
CD101
ZLRFCM
CIVIL DEMOLITION PLAN
1 3MARCH 31, 2022
UPGRADE POWER BLDG 112 695-20-104
MILWAUKEE VA MEDICAL CENTER
5000 W NATIONAL AVE
MILWAUKEE, WI 53295
DEMOLITION NOTES:
KEY NOTES:
1) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY WITH
APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND UTILITY
INSTALLATION CODES.
2) ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN
ACCORDANCE WITH VA STANDARD SPECIFICATIONS.
3) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VERIFY THE LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS
OF CONSTRUCTION AND TO NOTIFY THE ENGINEER AND COR IN CASE
OF DISCREPANCIES THAT AFFECT THE CONSTRUCTION PROJECT.
4) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT ARE
DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR OR
REPLACE SUCH DAMAGED PROPERTY TO THE VA SATISFACTION AT
NO COST TO THE VA.
5) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS AND
SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF THE VA
COR.
6) THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE
TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO
THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING
CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE, BUT ARE
NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,
TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE AS NECESSARY
TO ACCOMPLISH THE WORK.
7) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF
CONSTRUCTION EQUIPMENT OPERATIONS DURING DEMOLITION
ACTIVITY.
8) ALL SUBGRADE PREP AND AREAS OF THE SITE TO RECEIVE FILL
SHALL BE COMPLETED IN STRICT CONFORMANCE WITH THE
RECOMMENDATIONS IN THE GEOTECHNICAL REPORT, DATED MARCH
10, 2021 BY TERRACON. THE CONTRACTOR SHALL HAVE THIS REPORT
ON THE JOB SITE FOR REFERENCE AT ALL TIMES. THE CONTRACTOR
SHALL PROVIDE EARTHWORK OPERATIONS AND CONSTRUCTION
PHASE MONITORING TO ENSURE THAT ALL COMPACTION IS
COMPLETED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT.
THE CONTRACTOR SHALL PROVIDE TESTING REPORTS TO THE COR
REGARDING COMPACTION TESTING PER THE TESTING PROTOCOL IN
THE GEOTECHNICAL REPORT.
9) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL LAWS.
10) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
11) CONTRACTOR TO CONTACT UTILITIES PROTECTION CENTER
PRIOR TO ANY EXCAVATION.
12) CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE VA AND
ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING ANY/ALL
UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE. THE
CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR
RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING
UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.
13) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO
ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT
GROUND COVER IS ESTABLISHED IN ALL DISTURBED AREAS.
14) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL
PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION
DURING CONSTRUCTION.
15) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE
PROTECTED FROM SEDIMENTATION AS REQUIRED BY STATE OR
LOCAL CODES.
1) EXISTING SANITARY SEWER MANHOLE AND ASSOCIATED
LATERALS AND/OR MAINS SHALL BE REMOVED TO OUTSIDE THE
LIMITS OF THE PROPOSED BUILDING FOOTPRINT.
2) EXISTING CONCRETE PAVING, SIDEWALK, AND CURB AND
GUTTER TO BE REMOVED FOR BUILDING 112 EXTENSION.
3) APPROXIMATE LOCATION OF EXISTING UNDERGROUND FUEL
TANK PER VA RECORD DRAWING DATED JULY 17, 1992. FUEL TANK
TO BE PROTECTED DURING CONSTRUCTION. CONTRACTOR SHALL
SURVEY, POTHOLE, AND MARK THE EXACT LOCATION AND LIMITS OF
THE FUEL TANK BEFORE BEGINNING ANY DEMOLITION, EXCAVATION,
OR INSTALLATION OF HELICAL PIERS. CONTRACTOR TO NOTIFY COR
OF ANY DEVIATIONS BETWEEN FUEL TANK LOCATION SHOWN AND
FIELD VERIFIED LOCATION. ANY DISTURBED BACKFILL AROUND FUEL
TANK TO BE REPLACED WITH LIKE MATERIAL.
4) SAW CUT CLEAN JOINT AT CONNECTION OF SIDEWALK TO FUEL
TANK PAD.
5) EXISTING WATER VALVE TO REMAIN AND BE RESET FLUSH WITH
NEW PAVEMENT.
LOD LOD LOD
SS SS SS
UG/E UG/E
KEY PLAN
SITE
W W W
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text X
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS GAS
GAS GAS GAS GAS
GAS GAS GAS GAS GAS
ST
ST
STSTST
GASGASGASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGAS
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GASGASGAS
GAS
GAS
GAS
GAS
GA
S
GA
S
C H
A
IN
L
IN
K F
E N
C E
ASPHALT
ASPHALT
ASPHALT
C H
A
IN
LIN
K
FE
N
C E
VAULT
PIPES
ASPHALT
CONCRETE WALK
CONCRETE WALK
FUEL
PUMP
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
WWW
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STEAM TUNNEL P
ER P
LA
N
STEAM TUNNEL P
ER P
LA
N
CONCRETE WALL
CONCRETE
TUNNEL
ACCESS
CONCRETE
CONCRETE
HATCH
CONC.
D E
C K
WOOD
STEPS
W A
TE
R
P E
R P
LA
N
BOLLARDS (TYP.)
BC
651.63
651.43
650.78 BC
650.37
650.43
649.72
650.09650.96
650.72
651.49
H
IN
ES
B
LV
D
GENERAL WOLCOTT BLVD
FLOWER DR
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
20-349CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
#112
100% CONSTRUCTION DOCUMENTS
1" = 10'
SCALE IN FEET
10 5 10 20
LEGEND
CONCRETE SIDEWALK PAVING
HEAVY DUTY CONCRETE PAVING
PROPOSED CURB AND GUTTER
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
PROPOSED BOTTOM OF CURB ELEVATION
SITE NOTES:
KEY NOTES:
3/
/2
2:
:1
CS101
CIVIL SITE LAYOUT PLAN
2 3MARCH 31, 2022
5000 W NATIONAL AVE
MILWAUKEE, WI 53295
1) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE SURVEY
SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW
CONSTRUCTION.
2) CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND
VERTICAL ALIGNMENT OF ALL TIES BETWEEN PROPOSED AND
EXISTING PAVEMENTS, CURB AND GUTTER, SIDEWALKS, WALLS, AND
UTILITIES.
3) ALL BUFFERS, TREE SAVE AREAS, AND UNDISTURBED AREAS
SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR FENCING
PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE.
4) NO OUTSIDE STORAGE IS PERMITTED. THIS INCLUDES SUPPLIES,
VEHICLE, EQUIPMENT, PRODUCTS, ETC.
5) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION
MEASURES SHALL BE INSTALLED PRIOR TO ANY GRADING.
6) MAXIMUM CUT OR FILL SLOPE=3H:1V
7) ALL SUBGRADE PREP AND AREAS OF THE SITE TO RECEIVE FILL
SHALL BE COMPLETED IN STRICT CONFORMANCE WITH THE
RECOMMENDATIONS IN THE GEOTECHNICAL REPORT, DATED
MARCH 10, 2021 BY TERRACON. THE CONTRACTOR SHALL HAVE THIS
REPORT ON THE JOB SITE FOR REFERENCE AT ALL TIMES. THE
CONTRACTOR SHALL PROVIDE EARTHWORK OPERATIONS AND
CONSTRUCTION PHASE MONITORING TO ENSURE THAT ALL
COMPACTION IS COMPLETED IN ACCORDANCE WITH THE
GEOTECHNICAL REPORT. THE CONTRACTOR SHALL PROVIDE
TESTING REPORTS TO THE COR REGARDING COMPACTION TESTING
PER THE TESTING PROTOCOL IN THE GEOTECHNICAL REPORT.
8) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS
DURING CONSTRUCTION FOR PROTECTION OF ADJACENT
ROADWAYS.
1) BUILDING 112 ADDITION. SEE ARCHITECTURAL PLANS FOR
DETAILS.
2) PROVIDE HEAVY DUTY CONCRETE PAVING. SEE DETAIL 3 ON
SHEET C-501
3) PROVIDE SIDEWALK FOR UNDERGROUND STORAGE TANK
ACCESS. SEE DETAIL 2 ON SHEET C-501.
4) PROVIDE VA STANDARD HEADER CURB TO MATCH EXISTING. SEE
DETAIL 1 ON SHEET C-501.
5) PROVIDE CONCRETE SPLASH PAD UNDER NEW DOWNSPOUT. SEE
DETAIL 4 ON SHEET C-501.
6) EXISTING WATER VALVE TO REMAIN AND BE RESET FLUSH WITH
NEW PAVEMENT.
7) APPROXIMATE LOCATION OF EXISTING UNDERGROUND FUEL
TANK PER VA RECORD DRAWING DATED JULY 17, 1992. FUEL TANK TO
BE PROTECTED DURING CONSTRUCTION. CONTRACTOR SHALL
SURVEY, POTHOLE, AND MARK THE EXACT LOCATION AND LIMITS OF
THE FUEL TANK BEFORE BEGINNING ANY DEMOLITION, EXCAVATION,
OR INSTALLATION OF HELICAL PIERS. CONTRACTOR TO NOTIFY COR
OF ANY DEVIATIONS BETWEEN FUEL TANK LOCATION SHOWN AND
FIELD VERIFIED LOCATION. ANY DISTURBED BACKFILL AROUND FUEL
TANK TO BE REPLACED WITH LIKE MATERIAL.
KEY PLAN
SITE
650.78 BC
649.72
649.72
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
X
3/
/2
2:
:1
CS501
CIVIL DETAILS
3 3MARCH 31, 2022
5000 W NATIONAL AVE
MILWAUKEE, WI 53295
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
20-349CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
#112
100% CONSTRUCTION DOCUMENTS
4,000 PSI COMPRESSIVE STRENGTH CONCRETE
EXISTING SUB-GRADE OR STRUCTURAL FILL SHALL BE
COMPACTED TO 98% STANDARD PROCTOR MAXIMUM DRY
DENSITY (ASTM D698). PROOFROLLING SHALL BE
PERFORMED AND APPROVED BY AN INDEPENDENT
TESTING AGENCY AND SENT TO THE COR FOR
VERIFICATION
12"
6"
6"
PRE-MOLDED FILLER
0.5" R0.125"
(TYP.)
ISOLATION JOINT
JOINT SEALANT IS TO BE FLUSH WITH
PAVING SURFACE.
CONTRACTION JOINT
0.125"
1.50"
R0.125"
(TYP.)
HOT POUR OR LIQUID ASPHALT SEALANT
CONFORMING TO ASTMD6690 OR SILICONE JOINT
SEALANT CONFORMING TO ASTMD5893
FU
LL
D E
P
TH
NOTE:
UNLESS OTHERWISE NOTED ON PLANS, CONTRACTION JOINTS TO BE SAWCUT AT 12'-0" O.C. MAX AND ISOLATION JOINTS TO BE ADJACENT TO CURB AND GUTTER, CHANGE OF DIRECTION, OTHER WALK, UTILITY
APPURTENANCE, COLD JOINTS, OR FACE OF STRUCTURE.
DENSE GRADED AGGREGATE BASE
100% MAXIMUM DRY DENSITY (ASTM D1557)
AutoCAD SHX Text
CONCRETE HEADER
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text
IMPROVED ROADWAY
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text 4" [102mm]
AutoCAD SHX Text 6" [150mm]
AutoCAD SHX Text STANDARD CONCRETE VERTICAL CURB TERMINAL SECTION PER VA STANDARD DETAIL 32 05 23-17 "CONCRETE VERTICLE CURB AND TERMINAL SECTION"
AutoCAD SHX Text 1/2" [13mm] BITUMINOUS JOINT FILLER
AutoCAD SHX Text C-501
AutoCAD SHX Text
NTS
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text NOTES: 1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB OR OTHER ADJACENT STRUCTURES. 2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL EXTEND THE FULL DEPTH OF THE CONCRETE. 3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' [4572mm] OR AT A SPACING THAT MATCHES THE ADJACENT CURB. 4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. 5. SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB. 6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE BRUSH IN A TRANSVERSE DIRECTION. 7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.
AutoCAD SHX Text 1" [25mm] SCORED OR SAWCUT CONTRACTION JOINT.
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text 1/4" [6mm] DEEP SCORED JOINTS
AutoCAD SHX Text 1/4" [6mm] R. (TYP.) FORMED JOINTS ONLY
AutoCAD SHX Text
CLASS "B" CONCRETE
AutoCAD SHX Text EXPANSION JOINT WITH 1/4" [6mm] BITUMINOUS JOINT FILLER
AutoCAD SHX Text
1% MIN. 2% MAX.
AutoCAD SHX Text
1% MIN. 2% MAX.
AutoCAD SHX Text [102mm]
AutoCAD SHX Text 10.5' MAX. [3200mm]
AutoCAD SHX Text
TYPICAL SECTION
AutoCAD SHX Text
EXPANSION AND SCORED JOINT DETAIL
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [102mm]
AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT
AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT
AutoCAD SHX Text
(TYP)
AutoCAD SHX Text
PLANS
AutoCAD SHX Text
PLANS
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
AutoCAD SHX Text C-501
AutoCAD SHX Text NOTE: 1. CONCRETE CONTRACTION JOINTS SHALL BE LOCATED AT NO LESS THAN 12' ON CENTER. THE JOINTS SHALL EXTEND CONCRETE CONTRACTION JOINTS SHALL BE LOCATED AT NO LESS THAN 12' ON CENTER. THE JOINTS SHALL EXTEND TO A DEPTH 1/4 OF THE SLAB THICKNESS. IF SAW CUTTING THE JOINTS IS TO BE EMPLOYED, THE JOINTS SHOULD BE CUT WHILE THE CONCRETE IS STILL "GREEN" AND AS SOON AFTER PLACEMENT AS THE EQUIPMENT CAN BE MOVED ONTO THE PAVEMENT WITHOUT DISTURBING THE CONCRETE FINISH.
AutoCAD SHX Text
NTS
AutoCAD SHX Text
HEAVY DUTY CONCRETE PAVING
AutoCAD SHX Text
AutoCAD SHX Text C-501
AutoCAD SHX Text 35-5/8"
AutoCAD SHX Text 36"
AutoCAD SHX Text 18"
AutoCAD SHX Text 9"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4-1/8"
AutoCAD SHX Text
CONCRETE SPLASH PAD
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text C-501
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text 4"
2-1/4"
BASIC DEVELOPMENT LENGTH AND SPLICE LENGTH
FOR BARS IN COMPRESSION
fy = 60,000 psi f'c = 4,000 psi OR GREATER
BASIC DEVELOPMENT LENGTH SPLICE LENGTH
BASIC CONFINEMENT*
8" 8"
BAR
SIZE BASIC CONFINEMENT*
#3 12" 12"
10" 8" #4 1'-3" 12"
1'-0" 9" #5 1'-7" 1'-3"
1'-3" 11" #6 1'-11" 1'-5"
1'-5" 1'-1" #7 2'-3" 1'-8"
1'-7" 1'-3" #8 2'-6" 1'-11"
1'-10" 1'-5" #9 2'-10" 2'-2"
2'-1" 1'-7" #10 3'-3" 2'-5"
2'-3" 1'-9" #11 3'-7" 2'-8"
BAR ENCLOSED WITHIN SPIRALS OF NOT LESS THAN 1/4 INCH DIAMETER AND NOT
MORE THAN 4 INCH PITCH OR WITHIN #4 TIES IN CONFORMANCE WITH ACI 318.
SECTION 25.7.2 AT NOT MORE THAN 4 INCHES OF CENTER, FACTOR 0.75 USED.
BASIC DEVELOPMENT LENGTH AND SPLICE LENGTH
FOR BARS IN TENSION
BASIC DEVELOPEMTN LENGTH
ld
BASE TOP*
1'-0" 1'-0"
BAR
SIZE
#3
1'-0" 1'-3" #4
1'-3" 1'-7" #5
1'-6" 1'-11" #6
2'-5" 3'-1" #7
3'-0" 3'-11" #8
3'-8" 4'-9" #9
4'-6" 5'-10" #10
5'-5" 7'-0" #11
* TOP REINFORCEMENT IS HORIZONTAL REINFORCEMENT SO PLACED THAT MORE THAN 12 INCHES
OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW REINFORCEMENT.
** FOR MATERIALS OR CONDITIONS DIFFERENT FROM THOSE STATED, LENGTHS SHOWN IN CHART
SHALL BE MODIFIED TO CONFORM TO THE PROVISIONS OF ACI 318, SECTION 25.4.2.
BASE TOP*
1'-0" 1'-4"
1'-7" 2'-1"
2'-4" 3'-0"
3'-1" 4'-0"
4'-11" 6'-4"
6'-0" 7'-9"
6'-9" 8'-9"
7'-7" 9'-10"
8'-5" 10'-11"
CLEAR SPACING ≥ 3" CLEAR SPACING < 3"
CLASS B SPLICE LENGTH
1.3 x ld
BASE TOP*
1'-4" 1'-4"
1-4" 1'-8"
1'-8" 2'-1"
2'-0" 2'-6"
3'-2" 4'-1"
3'-11" 5'-2"
4'-10" 6'-3"
5'-11" 7'-7"
7'-1" 9'-2"
BASE TOP*
1'-4" 1'-9"
2'-1" 2'-9"
3'-1" 3'-11"
4'-1" 5'-3"
6'-5" 8'-3"
7'-10" 10-1"
8'-10" 11'-5"
9'-11" 12'-10"
11'-0" 14'-3"
CLEAR SPACING ≥ 3" CLEAR SPACING < 3"
** BASED ON MATERIALS AND CONDITIONS AS FOLLOWS:
fy = 60,000 psi
UNCOATED BARS
CLEAR COVER ≥ 1.5 INCHES
f'c = 4,000 psi OR GREATER
NORMAL WEIGHT CONCRETE
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
MILWAUKEE VA MEDICAL CENTER
5000 W NATIONAL AVE
MILWAUKEE, WI 53295
/1
/2
:2
:0
P
M S
-3
M ilw a u k e e
U p g ra d e
B d e ta c h e d .r v t
S-001
GENERAL NOTES
1 5JC
UPGRADE POWER BLDG 112
MARCH 31, 2022
100% CONSTRUCTION DOCUMENTS
695-20-10420-349
JMW
GENERAL
1. NO PROVISION OF ANY REFERENCED STANDARD SPECIFICATION, MANUAL OR CODE (WHETHER OR NOT SPECIFICALLY INCORPORATED BY REFERENCE IN THE CONTRACT DOCUMENTS) SHALL BE EFFECTIVE TO CHANGE THE DUTIES AND RESPONSIBILITIES OF OWNER, CONTRACTOR, DESIGN PROFESSIONAL, SUPPLIER, OR ANY OF THEIR CONSULTANTS, AGENTS, OR EMPLOYEES FROM THOSE SET FORTH IN THE CONTRACT DOCUMENTS. NOR SHALL IT BE EFFECTIVE TO ASSIGN TO THE DESIGN PROFESSIONAL OF RECORD OR ANY OF THE DESIGN PROFESSIONAL OF RECORD'S CONSULTANTS, AGENTS, OR EMPLOYEES ANY DUTY OR AUTHORITY TO SUPERVISE OR DIRECT THE FURNISHING OR PERFORMANCE OF THE WORK OR ANY DUTY OR AUTHORITY TO UNDERTAKE RESPONSIBILITIES CONTRARY TO THE
PROVISIONS OF THE CONTRACT DOCUMENTS.
2. CONTRACT DOCUMENTS INCLUDE, BUT ARE NOT LIMITED TO, THE STRUCTURAL DOCUMENTS (DRAWINGS AND SPECIFICATIONS), BUT DO NOT INCLUDE SHOP DRAWINGS, VENDOR DRAWINGS, OR MATERIAL PREPARED AND SUBMITTED BY THE CONTRACTOR.
3. REFERENCE TO STANDARD SPECIFICATIONS OF ANY TECHNICAL SOCIETY, ORGANIZATION, OR ASSOCIATION OR TO CODES OF LOCAL OR STATE AUTHORITIES, SHALL MEAN THE LATEST STANDARD, CODE, SPECIFICATION OR TENTATIVE SPECIFICATION ADOPTED AT THE DATE OF
TAKING BIDS, UNLESS SPECIFICALLY STATED OTHERWISE.
4. CONTRACT DOCUMENTS SHALL GOVERN IN THE EVENT OF A CONFLICT WITH THE CODE OF PRACTICE OR SPECIFICATIONS OF ACI, PCI, AISC, SJI OR OTHER STANDARDS. WHERE A CONFLICT OCCURS WITHIN THE CONTRACT DOCUMENTS, THE STRICTEST REQUIREMENT SHALL
GOVERN.
5. MATERIAL, WORKMANSHIP, AND DESIGN SHALL CONFORM TO THE REFERENCED BUILDING CODE.
6. CONTRACTOR SHALL COORDINATE THE STRUCTURAL DOCUMENTS WITH THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND CIVIL DOCUMENTS. DESIGN PROFESSIONAL SHALL BE NOTIFIED OF ANY DISCREPANCY OR OMISSION. FOR DIMENSIONS NOT SHOWN ON THE
STRUCTURAL DRAWINGS SEE THE ARCHITECTURAL DRAWINGS.
7. CONTRACTOR SHALL VERIFY EXISTING DIMENSIONS, ELEVATIONS, AND SITE CONDITIONS BEFORE STARTING WORK. DESIGN PROFESSIONAL
SHALL BE NOTIFIED OF ANY DISCREPANCY.
8. CONTRACTOR SHALL VERIFY THE STRUCTURALLY SUPPORTED MECHANICAL EQUIPMENT WEIGHTS, OPENING SIZES AND LOCATIONS IDENTIFIED ON THE STRUCTURAL DRAWINGS WITH ARCHITECTURAL AND MECHANICAL DRAWINGS.
9. CONTRACTOR SHALL VERIFY THAT MISCELLANEOUS FRAMING SHOWN ON THE STRUCTURAL DRAWINGS FOR MECHANICAL EQUIPMENT, OWNER-FURNISHED ITEMS, PARTITIONS, ETC. IS CONSISTENT WITH THE REQUIREMENTS OF SUCH ITEMS.
10. THE STRUCTURE IS STABLE ONLY IN ITS COMPLETED FORM. TEMPORARY SUPPORTS REQUIRED FOR STABILITY DURING ALL INTERMEDIATE STAGES OF CONSTRUCTION SHALL BE DESIGNED, FURNISHED, AND INSTALLED BY THE CONTRACTOR.
11. CONTRACTOR HAS SOLE RESPONSIBILITY TO COMPLY WITH ALL OSHA REGULATIONS.
12. REVIEW OF SUBMITTALS OR SHOP DRAWINGS BY THE DESIGN PROFESSIONAL DOES NOT RELIEVE THE CONTRACTOR OF THE SOLE RESPONSIBILITY TO REVIEW AND CHECK ALL SUBMITTALS AND SHOP DRAWINGS BEFORE SUBMITTING TO THE DESIGN PROFESSIONAL.
CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO MEMBER SIZES, DETAILS, AND DIMENSIONS SPECIFIED IN THE CONTRACT DOCUMENTS.
13. DETAILS LABELED "TYPICAL" ON THE STRUCTURAL DRAWINGS APPLY TO ALL SITUATIONS OCCURRING ON THE PROJECT THAT ARE THE SAME OR SIMILAR TO THE TYPICAL DETAILS UNLESS THOSE LOCATIONS ARE SPECIFICALLY DETAILED OTHERWISE.
14. STRUCTURAL DESIGN PROFESSIONAL IS NOT RESPONSIBLE FOR THE DESIGN OF COLD-FORMED METAL FRAMING, OR OTHER SYSTEMS NOT SHOWN IN THE STRUCTURAL DOCUMENTS. SUCH SYSTEMS SHALL BE DESIGNED, FURNISHED, AND INSTALLED AS REQUIRED BY OTHER
PORTIONS OF THE CONTRACT DOCUMENTS.
FOUNDATION
1. FOUNDATION DESIGN IS BASED ON THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT PREPARED BY TERRACON, REPORT NUMBER 58215015 DATED 10 MARCH 2021. DESIGN PROFESSIONAL IS NOT RESPONSIBLE FOR SUBSURFACE CONDITIONS ENCOUNTERED IN THE FIELD
DIFFERENT TO THOSE ASSUMED FOR DESIGN.
2. STRUCTURAL TESTING/INSPECTION AGENCY SHALL CERTIFY THE BEARING MEDIUM.
3. PROOF ROLL BUILDING AREAS WITH TWO COMPLETE COVERAGES OF A LOADED DUMP-TRUCK OR SCRAPER. REPLACE SOFT AREAS WITH
COMPACTED STRUCTURAL FILL AS REQUIRED BY THE SPECIFICATIONS.
4. STRUCTURAL FILL SHALL CONTAIN NO ORGANIC MATERIAL AND BE APPROVED BY A GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT.
STRUCTURAL FILL UNDER SLABS AND WITHIN 10'-0" OF THE BUILDING FOOTPRINT SHALL BE PLACED IN LIFTS OF THICKNESS DETERMINED BY THE INDEPENDENT TESTING AGENCY AND COMPACTED TO AT LEAST 95% OF ITS STANDARD PROCTOR MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D698. THE TOP 12" SUB-BASE UNDER SLABS ON GRADE SHALL BE COMPACTED TO AT LEAST 98% OF ITS STANDARD PROCTOR MAXIMUM DRY DENSITY. ALL BACKFILL, COMPACTION AND PROOF ROLLING OPERATIONS SHALL BE OBSERVED BY AN
INDEPENDENT TESTING LABORATORY.
5. SLABS-ON-GRADE SHALL BE PLACED ON A 4" GRANULAR BASE, COMPACTED TO 98% OF ITS STANDARD PROCTOR MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D698, AND COVERED WITH A 10 MIL CONTINUOUSLY SEALED VAPOR BARRIER. SEE DETAIL 5/S-501. THE BASE FOR SLABS-ON-GRADE SHALL BE INSPECTED BY A GEOTECHNICAL ENGINEER PRIOR TO EACH PLACEMENT OF CONCRETE.
6. FOOTINGS SHALL BE CENTERED ABOUT COLUMN LINES UNLESS NOTED OTHERWISE.
7. ALL FOOTINGS AND TURN DOWN SLAB EDGES SHALL PENETRATE TO A MINIMUM DEPTH OF 2'-6" BELOW FINISHED GRADE.
REINFORCEMENT
1. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60, UNLESS NOTED OTHERWISE.
2. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185 AND HAVE MINIMUM SIDE AND END LAPS OF 8".
3. SUBMIT SHOP DRAWINGS WHICH ADEQUATELY DEPICT THE REINFORCING BAR SIZES AND PLACEMENT. WRITTEN DESCRIPTION OF REINFORCEMENT WITHOUT ADEQUATE SECTIONS, ELEVATIONS, AND DETAILS IS NOT ACCEPTABLE.
4. SPLICES SHALL BE CLASS B IN ACCORDANCE WITH ACI 318, UNLESS NOTED OTHERWISE. REINFORCEMENT SHALL BE SPLICED ONLY AT LOCATIONS SHOWN OR NOTED IN THE STRUCTURAL DOCUMENTS, EXCEPT REINFORCEMENT MARKED "CONTINUOUS" CAN BE SPLICED AT LOCATIONS DETERMINED BY CONTRACTOR. SPLICES AT OTHER LOCATIONS SHALL BE APPROVED IN WRITING BY THE DESIGN
PROFESSIONAL.
5. REINFORCING STEEL DESIGNATED CONTINUOUS SHALL BE LAPPED AS FOLLOWS:
• CONCRETE REINFORCEMENT: CLASS B TENSION LAP
6. PLACE REINFORCEMENT AS FOLLOWS, UNLESS NOTED OTHERWISE:
A. CONCRETE REINFORCEMENT COVER
EXPOSED TO EARTH OR WEATHER:
• UNFORMED CAST AGAINST EARTH: 3” CLEAR
• FORMED #5 AND SMALLER: 1-1/2” CLEAR
NOT EXPOSED TO EARTH OR WEATHER:
• SLABS: 3/4" CLEAR
7. ADHESIVE FOR REINFORCING DOWELS IN EXISTING CONCRETE SHALL CONFORM TO ASTM C881-02, TYPE IV, GRADE 3, CLASS A, B, & C EXCEPT GEL TIMES AND EPOXY CONTENT. ADHESIVE SHALL CONSIST OF A TWO COMPONENT ADHESIVE SYSTEM CONTAINED IN SIDE BY SIDE PACKAGING CONNECTEED TO A MIXING NOZZLE WHICH THOROUGHLY MIXES THE COMPONENTS AS IT IS INJECTED INTO THE HOLE.
ADHESIVE SHALL HAVE PASSED ICC EVALUATION SERVICES, INC ACCEPTANCE CRITERIA 308 FOR LONG TERM CREEP AND BE SPECIFICALLY APPROVED FOR USE IN CRACKED CONCRETE. INSTALL IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. MINIMUM
EMBEDMENT LENGTH SHALL BE 12 BAR DIAMETERS, UNLESS NOTED OTHERWISE.
8. ALL DOWELS AND TERMINATING BARS SHALL HAVE A STANDARD 90 DEGREE HOOK.
9. ALL HORIZONTAL REINFORCING SHALL BE CONTINUOUS THROUGH CONTROL AND/OR CONSTRUCTION JOINTS AND AROUND CORNERS.
CAST-IN-PLACE CONCRETE
1. CONCRETE WORK SHALL CONFORM TO ACI 318 AND CRSI STANDARDS.
2. CONCRETE SHALL HAVE THE FOLLOWING MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH:
A. NORMAL WEIGHT STRUCTURAL CONCRETE:
• FOOTINGS: 3000 PSI
• SLABS-ON-GRADE: 4000 PSI
3. PIPES OR DUCTS SHALL NOT EXCEED ONE-THIRD THE SLAB OR WALL THICKNESS INCLUDING CROSSING UNLESS SPECIFICALLY DETAILED IN THE STRUCTURAL DOCUMENTS. ALL PIPES AND DUCTS SHALL BE PLACED IN THE MIDDLE THIRD OF THE SLAB OR WALL THICKNESS UNLESS SPECIFICALLY DETAILED OTHERWISE IN THE STRUCTURAL DOCUMENTS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATION OF
SLEEVES, ACCESSORIES, ETC.
4. REFER TO ARCHITECTURAL DRAWINGS FOR MOLDS, GROOVES, ORNAMENTS, CLIPS OR GROUNDS REQUIRED TO BE ENCASED IN CONCRETE
AND FOR LOCATION OF FLOOR FINISHES AND SLAB DEPRESSIONS.
5. CONSTRUCTION JOINT LOCATIONS SHALL BE APPROVED BY THE DESIGN PROFESSIONAL. NO HORIZONTAL CONSTRUCTION JOINTS ARE
PERMITTED EXCEPT THOSE SHOWN ON THE STRUCTURAL DRAWINGS.
6. DEFECTIVE AREAS IN CONCRETE INCLUDING, BUT NOT LIMITED TO, HONEY-COMBING, SPALLS, AND CRACKS WITH WIDTHS EXCEEDING 0.016 INCH SHALL BE REPAIRED. EXTENT OF DEFECTIVE AREA TO BE DETERMINED BY THE DESIGN PROFESSIONAL.
STRUCTURAL STEEL
1. STRUCTURAL STEEL SHALL CONFORM TO ASTM A992, UNLESS NOTED OTHERWISE.
• STRUCTURAL CHANNELS, MISCELLANEOUS PLATES AND CONNECTION MATERIAL SHALL CONFORM TO ASTM A36, UNLESS NOTED
OTHERWISE.
2. BOLTS AND ANCHORS:
A. BOLTED CONNECTIONS SHALL BE TYPE N (BEARING TYPE WITH THREADS INCLUDED IN SHEAR PLANE) WITH MINIMUM 3/4" DIAMETER
(UNO) A325 BOLTS. SUBMIT PROPOSED BOLT TIGHTENING PROCEDURE FOR REVIEW.
B. ANCHOR BOLTS SHALL BE HEADED BOLTS CONFORMING TO ASTM F1554 AND SHALL BE HEADED RODS OR THREADED RODS WITH HEAVY HEXAGONAL NUT WELDED TO THE BOTTOM OF THE THREADED ROD, GRADE A36, UNLESS NOTED OTHERWISE.
C. EXPANSION ANCHORS SHALL HAVE BEEN EVALUATED BY THE ICC EVALUATION SERVICES, INC (ICC-ES) WITH A PUBLISHED EVALUATION REPORT. ANCHORS SHALL BE EVALUATED BY ICC-ES ACCEPTANCE CRITERIA 193 AND BE SPECIFICALLY APPROVED FOR USE IN CRACKED CONCRETE. CONTACT DESIGN PROFESSIONAL FOR DETERMINATION OF CRACKED OR UNCRACKED CONCRETE CONDITION UNLESS CONDITION IS NOTED ON THE DRAWINGS. ALL ANCHORS SHALL BE APPROVED FOR RESISTING WIND AND SEISMIC LOADS.
INSTALL IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. MINIMUM EMBEDMENT SHALL BE EQUAL TO 4.5 TIMES THE
ANCHOR DIAMETER, UNLESS NOTED OTHERWISE.
D. ADHESIVE ANCHORS SHALL CONSIST OF AN ALL-THREAD STEEL ANCHOR WITH ADHESIVE CONFORMING TO ASTM C881-02, TYPE IV, GRADE 3, CLASS A, B, & C EXCEPT GEL TIMES AND EPOXY CONTENT. ADHESIVE SHALL CONSIST OF A TWO COMPONENT ADHESIVE SYSTEM CONTAINED IN SIDE BY SIDE PACKAGING CONNECTED TO A MIXING NOZZLE WHICH THOROUGHLY MIXES THE COMPONENTS AS IT IS INJECTED INTO THE HOLE. ADHESIVE SHALL HAVE PASSED ICC EVALUATION SERVICES, INC ACCEPTANCE CRITERIA 308 FOR LONG TERM CREEP AND BE SPECIFICALLY APPROVED FOR USE IN CRACKED CONCRETE. INSTALL IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. MINIMUM EMBEDMENT SHALL BE EQUAL TO 4.5 TIMES THE ANCHOR DIAMETER, UNLESS NOTED
OTHERWISE.
3. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED ACCORDING TO BOTH THE AISC “SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS” AND THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES".
4. SUBMIT SHOP DRAWINGS WHICH ADEQUATELY DEPICT THE STRUCTURAL ELEMENTS AND CONNECTIONS SHOWN IN THE CONTRACT DOCUMENTS. CONNECTIONS SHALL BE DETAILED BASED ON THE DESIGN INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS.
CONNECTIONS SHALL BE DESIGNED FOR THE SERVICE LOAD REACTION VALUES SHOWN ON THE STRUCTURAL DRAWINGS. FOR STEEL MEMBERS WHOSE REACTIONS ARE NOT SHOWN, THE DESIGN REACTION SHALL BE OBTAINED FROM THE TABLES ENTITLED "MAXIMUM TOTAL UNIFORM LOAD" IN PART 3 OF THE AISC "MANUAL OF STEEL CONSTRUCTION", FOURTEENTH (14TH) EDITION. THE DESIGN REACTION IS EQUAL TO HALF THE TABULATED VALUE FOR NONCOMPOSITE BEAMS. DEVIATION FROM THE CONNECTION DETAILS DEPICTED IN THE CONTRACT DOCUMENTS SHALL NOT BE PERMITTED WITHOUT WRITTEN PERMISSION FROM THE DESIGN PROFESSIONAL. REVIEW DOES NOT RELIEVE THE CONTRACTOR OF THE FULL RESPONSIBILITY FOR THE DESIGN AND ADEQUACY OF SUCH CONNECTIONS. DESIGN PROFESSIONAL SHALL BE COMPENSATED BY THE CONTRACTOR FOR THE COST INVOLVED IN THE REDESIGN OF CONNECTIONS FOR THE
CONVENIENCE OF THE CONTRACTOR. SINGLE ANGLE CONNECTIONS ARE NOT ACCEPTABLE.
5. USE PRE-QUALIFIED WELDED JOINTS IN ACCORDANCE WITH AISC AND THE STRUCTURAL WELDING CODE OF THE AMERICAN WELDING
SOCIETY. "NON-PRE-QUALIFIED JOINTS" SHALL BE QUALIFIED PRIOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .