36C25222B0030 0004.docx

DOCX document 22 KB Posted

Attached to
Z2DA--695-20-104 Upgrade Building 112 Power (VA-22-00081866)
Solicitation number
36C25222B0030
Issued by

About this file

This document is an amendment to a solicitation for the Upgrade Building 112 Power project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The Department of Veterans Affairs seeks to upgrade the power for Building 112 through a design-bid-build project with an anticipated award date in early to mid-2023 and notice to proceed in mid to late 2023. The scope of work includes replacing an existing transformer and upgrading switchgear and electrical distribution equipment with long lead times of up to 12 months for some components. The period of performance is 360 days with provisions for limited notice to proceed and project phasing to accommodate equipment procurement schedules. The pre-bid meeting was held on October 12, 2022 and the amendment provides responses to contractor questions, an updated scope of work, wage determination, and notices regarding subcontracting limitations and correspondence procedures.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 695-23-1-6970-0001 695-20-104 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 To all Offerors/Bidders

36C25222B0030 10-05-2022

X X X

SEE ATTACHED SUMMARY OF CHANGES.

CONTINUE TO MONITOR CONTRACT OPPORTUNITIES FOR ANY AND ALL CHANGES TO THIS SOLICITATION.

Stacy Hoover Contracting Officer Upgrade Bldg. 112 Power PROJECT# 695-20-104

CLEMENT J. ZABLOCKI VA MEDICAL CENTER, MILWAUKEE, WI

I. The following changes are to be made to the solicitation:

a. Provide VA responses to questions.

b. Provide updated Scope of Work (SOW)

c. Provide updated Wage Determination II. The following changes are made on project specifications:

N/A III. The following changes are made on project drawings:

N/A IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

Q1: Per the Asbestos Sections of the spec the Survey conducted by Terracon the survey indicates 450 SF of CMU block filler to be abated. 1. How should SF of block filler be tracked, as it is typically some sort of insulation in the cavity of the block walls and is loose fill, typically?

A1: The CMU “filler” was sampled from the corner of the CMU wall, not the interior of the CMU and the material was located below the painted CMU surface (think of the “filler” as a 2-dimensional surface coating on the block wall, located below the paint layer). The asbestos containing material in this sample was located below the painted layer. East wall of generator room is being demolished. 75 SF.

Q2: Per the Asbestos Sections of the spec the Survey conducted by Terracon the survey indicates 21 LF of window glazing is to be abated, but the windows are not being replaced. With the windows not being removed and replaced or repainted they should not be impacted. Please confirm.

A2: Yes, delete requirement Q3: Per the Asbestos Sections of the spec the Survey conducted by Terracon a reference to cloth coated wire is made to assume it is ACM. There was no quantity or length of wire noted in the report. If we are to abate areas impacted only – how is this to be determined? The VA should provide a Qty of wire to anticipate for bid purposed.

A3: The building was constructed in 1979. Cloth wiring was not in use. Delete this requirement.

Q4: The Survey conducted by Terracon provides a list of Hazardous / Universal Waste Inventory. The QTY listed in Appendix “H” is approximately 200 “items”, but locations of these items were not provided. It is not possible to know what would be affected by “areas impacted by demolition and construction.” Please provide Qty of items to be assume to be removed by this contract for bidding purposes.

A4: Potential PCB-Containing Items: (5) light ballasts; Metal Containing Items: (10) Fluorescent Lamps, greater than 4-foot, (1) Mercury Switch Thermostat (Electronic Thermostats); Miscellaneous Hazardous/ Universal Waste: (2) Door Closers.

Q5: What is the anticipated award / NTP / Start timeline for this project?

A5: It is the VA’s intention to award the construction project in early to mid Q1 with Notice to Proceed (NTP) being completed in mid to late Q1.

Q6: In the electrical industry, as in all construction, there are very long procurement times for equipment. What remedies do we have with the contract length if procurement times take most of the construction time set aside for this project?

A6: See Attached updated SOW.
1. Issuance of Limited Notice to Proceed (SOW page 2)
2. Project phasing (SOW pages 2-4)

Q7: The Period of performance on this contract is 360 days. How will long lead times be dealt with? There is a potential for the new Transformer to take up to 12 months to get the transformer. This would not be possible in the given period of performance.

A7: See Attached updated SOW.
1. Issuance of Limited Notice to Proceed (SOW page 2)
2. Project phasing (SOW pages 2-4)

V. General Information:

1. REMINDER: VAAR 852.219-77 VA Notice of Limitations on Subcontracting – Certificate of Compliance for Services and Construction is included in this solicitation (see SF1442 pages 51-52); signed certification must accompany bid to be considered for award.

2. The public bid opening is October 12, 2022, at 11:00am local time.

NOTE: Ensure all correspondence is mailed or hand-carried to the following address:

Department of Veterans Affairs Great Lakes Acquisition Center ATTN: Stacy Hoover and Rosalyn Howard 115 S. 84th St., Suite 101 Milwaukee, WI 53214-1476

3. UPDATED SOW ATTACHED

4. UPDATED WAGE DETERMINATION ATTACHED.

UPGRADE BUILDING 112 POWER, PROJECT# 695-20-104, AT THE CLEMENT J. ZABLOCKI VA MEDICAL CENTER, MILWAUKEE, WI See attached document: S06 - SOW - Updated_10.3.2022.

See attached document: S06 - Wage Determination_8.5.2022.

ACCOMPANYING 36C25222B0030 0004