S02. RFI 006 (Cornert Guards Not Shown)_Response.pdf
PDF 636 KB Posted
- Attached to
- Y1DA--RENOVATE RADIATION THERAPY Federal contract opportunity
- Solicitation number
- 36C25021B0003_1Amend1
About this file
This document contains responses to contractor questions regarding a federal solicitation for renovation work at a Department of Veterans Affairs medical center. The solicitation seeks to renovate the radiation therapy department, with work including preparation of walls for new finishes, installation of flooring, wall protection, and painting. One contractor inquired about corner guards shown in drawings but not depicted, and the contracting office attached a marked-up drawing indicating locations for corner guards. The response addresses phase 1 and 2 work areas and temporary partitions for corridor painting and installation of wall protections.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06. 36C25021B0003 0001.pdf | ||
| S02. RFI 001_Response.pdf | ||
| S02. RFI 001 (VA Rad Therapy Sebesta Report) 2020-02-22.pdf | ||
| S02. RFI 002_Response.pdf | ||
| S02. RFI 002 (Corridor Off Hours Work)_Response.pdf | ||
| S02. RFI 005 (Substitution Request - Koroseal Wall Protection)_Response.pdf | ||
| S02. Encl 1-2 ICRAMatrixofPrecautions.pdf | ||
| S02. RFI 001 (Asbestos Survey)_Response.pdf | ||
| S02. RFI 004 (Privacy Curtain Track)_Response.pdf | ||
| S02. RFI 003 PA_Response.pdf | ||
| S02. RFI 003 (Rubber Tile Banding)_Response.pdf | ||
| S02. RFI 004_Response.pdf | ||
| S02. RFI 005_Response.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
TO: Stanley Burdine, Contracting Specialist
RFI NO.: DATE: REFERENCE:
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
PROJECT NUMBER: 541-20-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the
Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Radiation Therapy
PROJECT LOCATION: Department of Veterans Affairs
VA Medical center
SUBMITTED BY: City/State:
PHONE NO.:
Brigadier Construction Services Twinsburg, Ohio
216.857.4777
ASAP
06 04.22.2021 Wall Protection Not Shown
Drawing I-601/Finish Material Legend/Wall Protection specifies CG-1/CG-2 Corner guards and Drawing I-102/Partial Basement Wall Finish Plan - Wall notes/5 indicates wall protection corner guards and end guards.
Refer to finish legend.
There are no Corner Guards shown on either plans 1/I-102 Finish Plan Phase 1 or 2/I-102 Finish Plan Phase 2.
Attached is drawing I-102 showing corner guard locations.
Tim Huffman 4/23/21
I-102
UP UP
35.532.532 36.5 38.5
B
C
A
D
E
38.6
PROJECT SCOPE
PROJECT SCOPE
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219 EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
PT
-3
PT-3, WP-2
PT-3, WP-2
PT
-3
, W P-
PT
-4
, W P-
PT-3, WP-2
PT
-3
, W P-
PT
-1
, W P-
PT
-3
, W P-
PT
-3
PT
-3
NURSE WORK
BB242A
MECH.
BB217
NUTRITION
BB213A
PT
-1
, W P-
PT-1, MST-2
PT
-1
, M
ST
-2
PT-1, WP-2
PT-1, WP-2,
MST-2
PT
-3
, W P-
PT-3
CG-1
CG-1 CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
PT-2
PT-2
PT
-2
PT
-2
PT
-2
PT-2
Remainder of walls this area
PT-1
35.532.532 36.5 38.5
B
C
A
D
E
38.6
PROJECT SCOPE
PROJECT SCOPE
EXAM 2
BB213
EXAM 3
BB214 EXAM 4
BB215
CORRIDOR
BB200A
RECEPTION
BB210A
ENTRY
BB210
WORK
BB246
HALL
BB240
RECEPT. WORK
BB242
SUB WAIT
BB226
NU
RS
E W
OR
K
BB
0ACONF. RM.
BB241
WORK
BB243
WORK
BB244
PT
-3
, W P-
PT
-3
, W P-
PT
-3
, W P-
PT-2, WP-2
PT-3
PT
-2
PT-3
PT-3 PT-3
PT
-2
PT-3
PT
-3
PT-3
PT
-3
PT
-1
PT-2
PT
-1
PT
-2
, W P-
PT
-2
, W P-
PT
-1
MST-1
PT-1,
WP-1
PT
-2
PT-3 MST-2
PT-1 WP-1
PT
-1
, W P-
PT-2
PT-2
PT-1,
WP-1
PT-1
PT
-1
PT-2
PT
-1
,W P-
PT-3
PT-2,
WP-2
PT
-3
PT
-3
PT-3
PT
-3
PT
-2
, W P-
PT
-2
, W P-
PT-1 WP-1
CORRIDOR
BB200C
CORRIDOR
BB200D
WAITING
BB211
ALCOVE
BB226A
PT
-1
, W P-
PT-1, MST-2
PT
-1
, W P-
PT-1, MST-2
PT-2, WP-2
PT-2, WP-2
PT
-2
, W P-
CG-1
CG-1
CG-1
CG-1CG-2
CG-2
CG-2 CG-2
CG-2
CG-1
CG-1
CG-1 CG-1
CG-1CG-1CG-1
CG-1 CG-1
CG-1
CG-1 CG-1
CG-1
CG-1
PT-3
PT
-1
, W P-
PT-1, MST-2
CG-2
PT-3
PT-2PT-2PT-2
This area painted Ph. 1
PT-3
PT
-3
PT-3
PT
-1
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219 EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
MECH.
BB217
NURSE WORK
BB242A
Chiller
BB235
Control Area
BB234
Linear Accelerator
BB225
Corridor
BB221
Stair 6
BS6
Dosimetry
BB222
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB232
Bio Med
BB233
Bio Med
BB233
Linear Accelerator
BB232
Exam
BB216
Exam
BB215
Exam
BB214
Corridor
BB210B
Corridor
BB210A
Corridor
BB210
Wait
BB212
Staff
BB242
Corridor
BB210E
Nurse
BB240
Physicist
BB238
Mold Room
BB236
Doctor
BB237
Chief
BB239
Reception
BB211
Toilet
BB228
Corridor
BB210D
Control Area
BB230
Chiller
BB234
Linear Accelerator
BB225
Corridor
BB221
Stair 6
BS6
Dosimetry
BB222
CT Scan
BB223
Mechanical
BB224
PROJECT AREA
Flooring Notes:
1. Contractor is to field verify all existing conditions and notify COR of any discrepancies.
2. Provide new rubber base and floor coverings as specified throughout. Contractor to prep floors as necessary for new finishes.
3. Contractor to provide temporary protection on all new flooring.
4. Contractor to clear caulk at all door frames where new resilient flooring has been installed within scope limits.
5. Transition and reducing strips are to be installed at all changes in floor material and/or elevation that occurs in areas to be newly finished. Verify with COR each condition and type of transition and/or reducing strip to be used prior to installation. Float floor as required for smooth/flush transition between material changes. Transition to be installed at center of door.
Wall Notes:
1. Prep walls for new finishes, patch and repair walls to create a smooth uniform finish.
2. Contractor to apply at least two coats of paint. Each coat to be equal to 1.6 MIL. apply more if necessary to cover existing color.
3. Contractor is to prep walls as necessary for new wall base.
4. Contractor shall paint all misc. metal items such as electrical panel covers, countertop support brackerts, electrical wire mold, etc. to match adjacent wall color. See wall finish schedule.
5. Indicates wall protection cornerguards and endguards. Refer to finish legend.
General Notes:
1. Existing conditions have been shown from general space observations and existing drawings. Respective trades shall conduct a complete field survey of existing conditions prior to submission of bid price. No additional payment will be made for claims that arise from lack of knowledge of existing conditions.
2. All finishes shall comply with and be installed in accordance with all applicable local codes and ordinances; IBC Sections 803, 804 and 805.
3. The contractor shall guarantee all work and materials for a minimum of twelve (12) months after the date of final completion to contractor under the contract. Any items deemed to be defective shall be replaced at contractors sole expense, but at owner's option and convenience, be repaired, replaced or re-performed.
4. All gypsum board soffits and headers within the scope limit lines to be painted same as adjacent wall color unless noted otherwise.
5. Finish drawings supersede architectural drawings for finish materials, colors and locations only.
6. Finish samples shall be submitted to COR for approval before purchasing and installation.
7. Final countertop grommet locations to be field verified.
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
\\p dc
\p ub lic
FT
P\
VA
_R
R T\
Ar ch ite ct ur al
\V
AM
P_ R
R T_
M en ta l H ea lth
_R
_2
4.
rv t 4/
/2
9:
:4
AM
I-102
PARTIAL BASEMENT WALL FINISH
PLAN
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
Scale: 1/8" = 1'-0"I-102
PARTIAL BASEMENT WALL FINISH PLAN_PHASE 11
Scale: 1/8" = 1'-0"I-102
PARTIAL BASEMENT WALL FINISH PLAN_PHASE 22
KEY PLAN - BASEMENT
GENERAL NOTES FINISH PLAN
FINISH CODED NOTES
1 All walls PT-2 this location unless noted otherwise.
2 Temporary VCT-1 this location. To be removed during phase 2 prior to installation of new rubber floor. Extend paint finish onto all new walls.
3 Set full LVT-1 planks as transition at corridor intersections. Align joint at herringbone pattern center.
4 LVT-1 pattern/orientation change as shown 5 Origin of LVT-1 herringbone pattern at center of corridor 6 Center flooring accent pattern at door opening 7 RBS-2 accent banding - RBS-1 field material 9 Stainless steel base this wall, see elevation. All other base this area to be RB- as scheduled.
10 Rubber flooring this area completed previous phase. See I-601 for overall finished design.
11 Rubber flooring this area to be completed in 2 phases. See I-601 for overall finished design.
13 Corridor, Reception and Waiting area painting and wall protection areas in Ph. 2 to be completed during off hours. Contractor to coordinate and reccomend sections of work that may be completed without interrruption during time available.
14 Stop/start of corridor paint and wall protection to be completed this phase. See phasing plan for temporary partitions.
Not all notes used this sheet
REVISIONS: DATE:
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/14/2020
| 2021.04.21 - RFI 06 (Corner Guards Not Shown) PA Reply |
| I-102 |
| Sheets |
| I-102 - PARTIAL BASEMENT WALL FINISH PLAN |
File details come from the government source that posted it. Updated .