S02. RFI 003 (Rubber Tile Banding)_Response.pdf
PDF 763 KB Posted
- Attached to
- Y1DA--RENOVATE RADIATION THERAPY Federal contract opportunity
- Solicitation number
- 36C25021B0003_1Amend1
About this file
This document package includes construction drawings and specifications for the renovation of radiation therapy at a Department of Veterans Affairs medical center. The project involves renovating flooring, walls, millwork, and other finishes across multiple exam and treatment rooms as well as corridors, waiting areas, and support spaces. Products specified include luxury vinyl tile, rubber sheet and tile flooring, wallcoverings, ceramic tile, countertops, and other materials. General requirements include preparing substrates, installing transitions at flooring changes, applying paint and wall protection, and coordinating work between phases. The response from the contractor requests clarification on flooring details and provides the relevant drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02. RFI 002_Response.pdf | ||
| S02. RFI 002 (Corridor Off Hours Work)_Response.pdf | ||
| S02. RFI 005 (Substitution Request - Koroseal Wall Protection)_Response.pdf | ||
| S02. Encl 1-2 ICRAMatrixofPrecautions.pdf | ||
| S06. 36C25021B0003 0001.pdf | ||
| S02. RFI 001_Response.pdf | ||
| S02. RFI 001 (VA Rad Therapy Sebesta Report) 2020-02-22.pdf | ||
| S02. RFI 001 (Asbestos Survey)_Response.pdf | ||
| S02. RFI 004 (Privacy Curtain Track)_Response.pdf | ||
| S02. RFI 003 PA_Response.pdf | ||
| S02. RFI 004_Response.pdf | ||
| S02. RFI 005_Response.pdf | ||
| S02. RFI 006 (Cornert Guards Not Shown)_Response.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
TO: Stanley Burdine, Contracting Specialist
RFI NO.: DATE: REFERENCE:
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
PROJECT NUMBER: 541-20-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the
Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Radiation Therapy
PROJECT LOCATION: Department of Veterans Affairs
VA Medical center
SUBMITTED BY: City/State:
PHONE NO.:
Brigadier Construction Services Twinsburg, Ohio
216.857.4777
ASAP
04.20.202103 Flooring Rubber Tile Banding
Floor rubber tile banding is not shown on the drawing. Please provide an updated drawing/spec.
Attached are Drawings I-101 and I-601 showing flooring patterns.
Tim Huffman 4/21/21
UP UP
35.532.532 36.5 38.5
B
C
A
D
E
38.6
PROJECT SCOPE
PROJECT SCOPE
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219
EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
NURSE WORK
BB242A
MECH.
BB217
NUTRITION
BB213A
35.532.532 36.5 38.5
B
C
A
D
E
38.6
PROJECT SCOPE
PROJECT SCOPE
EXAM 2
BB213
EXAM 3
BB214 EXAM 4
BB215
CORRIDOR
BB200A
RECEPTION
BB210A
ENTRY
BB210
Elec
BB245
WORK
BB246
HALL
BB240
RECEPT. WORK
BB242
SUB WAIT
BB226
NU
RS
E W
OR
K
BB
0A
CONF. RM.
BB241
WORK
BB243
WORK
BB244
CORRIDOR
BB200C
CORRIDOR
BB200D
I-601
See enlarged plan for floor finish details this area
2' - 0"
2'
6" 2'
6"
2'
6"
6"
Eq. 7' - 8" Eq.
RBS-2
R
BS
-2
3' - 0" 3' - 0" 3' - 0" 3' - 0"Eq. Eq.
9'
4" Eq
Eq
R
BS
-2
Flooring Notes:
1. Contractor is to field verify all existing conditions and notify COR of any discrepancies.
2. Provide new rubber base and floor coverings as specified throughout. Contractor to prep floors as necessary for new finishes.
3. Contractor to provide temporary protection on all new flooring.
4. Contractor to clear caulk at all door frames where new resilient flooring has been installed within scope limits.
5. Transition and reducing strips are to be installed at all changes in floor material and/or elevation that occurs in areas to be newly finished. Verify with COR each condition and type of transition and/or reducing strip to be used prior to installation. Float floor as required for smooth/flush transition between material changes. Transition to be installed at center of door.
Wall Notes:
1. Prep walls for new finishes, patch and repair walls to create a smooth uniform finish.
2. Contractor to apply at least two coats of paint. Each coat to be equal to 1.6 MIL. apply more if necessary to cover existing color.
3. Contractor is to prep walls as necessary for new wall base.
4. Contractor shall paint all misc. metal items such as electrical panel covers, countertop support brackerts, electrical wire mold, etc. to match adjacent wall color. See wall finish schedule.
5. Indicates wall protection cornerguards and endguards. Refer to finish legend.
General Notes:
1. Existing conditions have been shown from general space observations and existing drawings. Respective trades shall conduct a complete field survey of existing conditions prior to submission of bid price. No additional payment will be made for claims that arise from lack of knowledge of existing conditions.
2. All finishes shall comply with and be installed in accordance with all applicable local codes and ordinances; IBC Sections 803, 804 and 805.
3. The contractor shall guarantee all work and materials for a minimum of twelve (12) months after the date of final completion to contractor under the contract. Any items deemed to be defective shall be replaced at contractors sole expense, but at owner's option and convenience, be repaired, replaced or re-performed.
4. All gypsum board soffits and headers within the scope limit lines to be painted same as adjacent wall color unless noted otherwise.
5. Finish drawings supersede architectural drawings for finish materials, colors and locations only.
6. Finish samples shall be submitted to COR for approval before purchasing and installation.
7. Final countertop grommet locations to be field verified.
PROJECT AREA
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219 EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
MECH.
BB217
NURSE WORK
BB242A
Control Area
BB234
Chiller
BB235
Linear Accelerator
BB225
Corridor
BB221
Stair 6
BS6
Dosimetry
BB222
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB232
Bio Med
BB233
Bio Med
BB233
Linear Accelerator
BB232
Exam
BB216
Exam
BB215
Exam
BB214
Corridor
BB210B
Corridor
BB210A
Corridor
BB210
Wait
BB212
Staff
BB242
Corridor
BB210E
Nurse
BB240
Physicist
BB238
Mold Room
BB236
Doctor
BB237
Chief
BB239
Reception
BB211
Toilet
BB228
Corridor
BB210D
Chiller
BB234
Control Area
BB230
Linear Accelerator
BB225
Corridor
BB221
Dosimetry
BB222
Stair 6
BS6
CT Scan
BB223
Mechanical
BB224
ETR.
LVT-1 (Staggered)
VCT-1
RBS-1, RBS-2 (See Finish Plan)
LVT-1 (Herringbone)
PCT-1
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
\\p dc
\p ub lic
FT
P\
VA
_R
R T\
Ar ch ite ct ur al
\V
AM
P_ R
R T_
M en ta l H ea lth
_R
_2
4.
rv t 4/
/2
3:
:5
PM
I-101
PARTIAL BASEMENT FLOOR
FINISH PLAN
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
Scale: 1/8" = 1'-0"I-101
PARTIAL BASEMENT FLOOR FINISH PLAN_PHASE 11
Scale: 1/8" = 1'-0"I-101
PARTIAL BASEMENT FLOOR FINISH PLAN_PHASE 22
GENERAL NOTES FINISH PLAN
KEY PLAN - BASEMENT
FINISH CODED NOTES
1 All walls PT-2 this location unless noted otherwise.
2 Temporary VCT-1 this location. To be removed during phase 2 prior to installation of new rubber floor. Extend paint finish onto all new walls.
3 Set full LVT-1 planks as transition at corridor intersections. Align joint at herringbone pattern center.
4 LVT-1 pattern/orientation change as shown 5 Origin of LVT-1 herringbone pattern at center of corridor 6 Center flooring accent pattern at door opening 7 RBS-2 accent banding - RBS-1 field material 9 Stainless steel base this wall, see elevation. All other base this area to be RB- as scheduled.
10 Rubber flooring this area completed previous phase. See I-601 for overall finished design.
11 Rubber flooring this area to be completed in 2 phases. See I-601 for overall finished design.
13 Corridor, Reception and Waiting area painting and wall protection areas in Ph. 2 to be completed during off hours. Contractor to coordinate and reccomend sections of work that may be completed without interrruption during time available.
14 Stop/start of corridor paint and wall protection to be completed this phase. See phasing plan for temporary partitions.
Not all notes used this sheet
FLOORING LEGEND
REVISIONS: DATE:
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/14/2020
WALLS
PT-1 (Paint, Field) PPG1025-3 Whiskers Finish: Eggshell
PT-2 (Paint) PPG1025-4 Sharkskin Finish: Eggshell
PT-3 (Paint) PPG1039-4 Pachyderm Finish: Eggshell
PT-4 (Paint, Ceiling) PPG1006-1 Gypsum Finish: Flat
PCTW-1 (Porcelain Tile, wall) Daltile / Fabric Art/ Moden Textile White MT50 Size: 12" x 24"/ Ashlar installation Grout: TEC / Silverado
MST-1 (Mosaic Tile) Daltile / Mosaics / X114 Desert Grey Size: 1"x3" Lattice Weave Grout: TEC / Silverado
MST-2 (Mosaic Tile) Daltile / Mosaics / 0182 Desert Gray Size: 1"x3" Herringbone Mosaics Grout: TEC / Silverado
FLOORING
LVT-1 (Luxury Vinyl Tile - Plank) Patcraft / Mark Making, 1509V / 00500 Pure Size: 5.96" x 48" / Staggered and herringbone pattern install, see finish plan for locations Note: All LVT required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.
RBS-1 (Rubber Sheet) Nora Rubber/ Noraplan Envirocare / 7041 Whale Watch Size: 3.0 mm thick, 39.37" x 48" Note: All RBS required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.
RBS-2 (Rubber Sheet) Nora Rubber/ Noraplan Envirocare / 7040 Bike Ride Size: 3.0 mm thick, 39.37" x 48" Note: All RBS required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.
VCT-1 (Vinyl Composition Tile) (To Be Determined) Size: 24" x 24"
RB-1 (Rubber Base) Johnsonite / Perceptions, Recess Toe / 4-1/4”H / 38 Pewter
PCT-1 (Porcelain Tile, floor) Daltile / Fabric Art / Modern Textile / MT50 White Size: 12"x24" / Ashlar pattern install Grout: TEC / Silverado
SCONC (Sealed Concrete)
MTB-1 (Metal Tile Cove Base) Schluter/ DILEX-EHK/ Stainless Steel Provide all corner pieces and end trims required for full installation.
SSB-1 (Stainless Steel Base) InPro/ Stainless Steel Cove Toe Base/ 4"H 18 gauge/ #4 brushed finish
WALL PROTECTION
WP-1 (High Impact Wallcovering) C/S Acrovyn / Chameleon Collection / 1350 Sable Elm / Suede Texture /
0.040 gauge Height: top to be at 42" A.F.F Note: All WP-1 required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.
WP-2 (High Impact Wallcovering) C/S Acrovyn / Textile Collection / Corduroy / Suede Texture / 0.040 gauge Height:
• In Exam rooms, top to be at 3'-2" A.F.F.
• All other areas, top to be at 3'-6" A.F.F
CG-1 (Corner Guard) C/S Acrovyn / Stainless Steel
CG-2 (Corner Guard, end condition) C/S Acrovyn / Stainless Steel
MILLWORK
SQ-1 (Synthetic Quartz) Cambria/ Britannica
PLAM-1 (Plastic Laminate) Formica / Cherry Riftwood 6411-NG / Natural Grain
CEILINGS
See reflected ceiling plan for products
OTHER
GF-1 (Glass Film) 3M/ Fasara/ Milky White SH2MAML
Adhere edge condition to substrate with Forbo 660 2-Part urethane (or EQ) resilient flooring
Transition - Resilient sheet to resilient tile
Resilient sheet flooring
MANUF. suggested adhesive
Resilient tile flooring
Transition - Resilient flooring to concrete
Sealed concrete floor
MANUF. Suggested adhesive
Adhere edge condition to substrate with Forbo 660 2-part urethane (or EQ)
Johnsonite (or EQ.)
SSR-XX-B Reducer
Scheduled wall tile on thinset mortar
Scheduled partition beyond
Schluter (or eq.) DILEX-stainless steel cove base trim
Scheduled floor tile
Transition - [MTB-1] Wall tile to floor tile cove base
Feather flooring compound at resilient sheet (Min. 36") to achieve flush condition with transition
Min. 36"
Schluter (or eq.) SCHIENE -stainless steel flooring transition
Transition - Resilient tile to porcelain tile
Resilient flooring
Porcelain tile on thinset bedFeather flooring compound at resilient flooring as required to meet transition (Min. 36")
Top of tile flooring & metal trim to be flush
Schluter (or eq.) RENO-TK stainless steel flooring transition
MANUF. suggested adhesive
Adhere edge condition to substrate with Forbo 660 2-Part urethane (or EQ) resilient flooring
Min. 36"
Flooring Notes:
1. Contractor is to field verify all existing conditions and notify COR of any discrepancies.
2. Provide new rubber base and floor coverings as specified throughout. Contractor to prep floors as necessary for new finishes.
3. Contractor to provide temporary protection on all new flooring.
4. Contractor to clear caulk at all door frames where new resilient flooring has been installed within scope limits.
5. Transition and reducing strips are to be installed at all changes in floor material and/or elevation that occurs in areas to be newly finished. Verify with COR each condition and type of transition and/or reducing strip to be used prior to installation. Float floor as required for smooth/flush transition between material changes. Transition to be installed at center of door.
Wall Notes:
1. Prep walls for new finishes, patch and repair walls to create a smooth uniform finish.
2. Contractor to apply at least two coats of paint. Each coat to be equal to 1.6 MIL. apply more if necessary to cover existing color.
3. Contractor is to prep walls as necessary for new wall base.
4. Contractor shall paint all misc. metal items such as electrical panel covers, countertop support brackerts, electrical wire mold, etc. to match adjacent wall color. See wall finish schedule.
5. Indicates wall protection cornerguards and endguards. Refer to finish legend.
General Notes:
1. Existing conditions have been shown from general space observations and existing drawings. Respective trades shall conduct a complete field survey of existing conditions prior to submission of bid price. No additional payment will be made for claims that arise from lack of knowledge of existing conditions.
2. All finishes shall comply with and be installed in accordance with all applicable local codes and ordinances; IBC Sections 803, 804 and 805.
3. The contractor shall guarantee all work and materials for a minimum of twelve (12) months after the date of final completion to contractor under the contract. Any items deemed to be defective shall be replaced at contractors sole expense, but at owner's option and convenience, be repaired, replaced or re-performed.
4. All gypsum board soffits and headers within the scope limit lines to be painted same as adjacent wall color unless noted otherwise.
5. Finish drawings supersede architectural drawings for finish materials, colors and locations only.
6. Finish samples shall be submitted to COR for approval before purchasing and installation.
7. Final countertop grommet locations to be field verified.
1. See elevations for wall tile this area. May occur at backsplashes or accent locations.
2. Temporary Phase 1 flooring this area = VCT-1. Remove Phase 2 for installation of new rubber floor.
3. Quartz bench seat
Center herringbone pattern in corridors, typical.
(LVT-1, 5.96" x 48" planks)
Stagger/ offset planks 1'-0" within rooms, typical.
(LVT-1, 5.96" x 48" planks)
1'
0"
RBS-2
RBS-2
RBS-2
RBS-2
RBS-2
RBS-2
RBS-2
RBS-1
RBS-2 RBS-2 RBS-2 RBS-2 RBS-2 RBS-2
Align
6" 2'
0"
6" 2'
0"
6" 2'
0"
6" 2'
0"
6"
6"
1'
0"
6"10
6" 11' - 8"
2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0"
Align
3' - 11"
Phase 1
This section completed
3'
6"
CG- Cornerguard WP- abutts cornerguard
WP- panels installed above scheduled base, vertical butt-joined installation
WP- top trim provided by manufacturer
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
\\p dc
\p ub lic
FT
P\
VA
_R
R T\
Ar ch ite ct ur al
\V
AM
P_ R
R T_
M en ta l H ea lth
_R
_2
4.
rv t 4/
/2
9:
:1
AM
I-601
FINISH SCHEDULE, LEGEND &
DETAILS
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
FINISH MATERIAL LEGEND
FINISH SCHEDULE PHASE 1
Number Name Floor Finish Base Finish Wall - East Wall - North Wall - South Wall - West Counters & Splashes
Wall & Base
Cabinets Ceiling Finish Comments
BB200B CORRIDOR LVT-1 RB-1 PT-3, WP-1 - - PT-4, WP-1 ACT-2
BB212 EXAM 1 LVT-1 RB-1 PT-3, WP-2 PT-3, WP-2 PT-1, MST-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 1
BB213A NUTRITION LVT-1 RB-1 PT-3 - MST-2 PT-3 SQ-1 PLAM-1 GYP. BD
BB217 MECH. ETR ETR ETR ETR ETR ETR ETR
BB218 EXAM 5 LVT-1 RB-1 PT-3, WP-2 PT-3, WP-2 PT-1, WP-2, MST-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 1
BB219 EXAM 6 /
PROCEDURE
LVT-1 RB-1 PT-3, WP-2 PT-1, WP-2 PT-3, WP-2 PT-1, MST-2 SQ-1 PLAM-1 ACT-1 1
BB220 TLT-B PCT-1 MTB MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 SQ-1 PLAM-1 ACT-1 1 BB227 TLT-A PCT-1 MTB MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 SQ-1 PLAM-1 ACT-1 1 BB228 CHG. LVT-1 RB-1 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 3 BB229 CHG. LVT-1 RB-1 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 3
BB230 STAFF BREAK RM. LVT-1 RB-1 PT-3, MST-2 PT-1 PT-1 PT-1 SQ-1 PLAM-1 ACT-1
BB231 SPS STO. LVT-1 RB-1 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 ACT-1
BB242A NURSE WORK (VCT-1*), RBS-1,
RBS-2
RB-1 PT-2 PT-2, PT-3 PT-2 PT-2 (PLAM-1*)
SQ-1
ACT-1 2
BB245 ELEC ETR ETR ETR ETR ETR ETR ETR
FINISH SCHEDULE PHASE 2
Number Name Floor Finish Base Finish Wall - East Wall - North Wall - South Wall - West Counters & Splashes
Wall & Base
Cabinets Ceiling Finish Comments
BB200A CORRIDOR LVT-1 RB-1 PT-1, WP-1 PT-1, WP-1 PT-3 PT-2 ACT-2/
GYP BD.
BB200C CORRIDOR LVT-1 RB-1 PT-1, WP-1 PT-3 PT-2 PT-1, WP-1 ACT-2/
GYP BD.
BB200D CORRIDOR LVT-1 RB-1 PT-1 - PT-2 PT-1, WP-1 ACT-2/
GYP BD.
BB200E NURSE WORK (VCT-1*),
RBS-1, RBS-2
RB-1 PT-1 PT-1, PT-3 PT-3 PT-3 (PLAM-1*)
SQ-1
ACT-1 2
BB210 ENTRY RBS-1 RB-1 PT-1 PT-2 - PT-1 ACT-2/
GYP BD.
BB210A RECEPTION RBS-1, RBS-2 RB-1,
SSB-1
PT-1 PT-1 PT-3, MST-1 PT-3 ACT-2/
GYP BD.
BB211 WAITING RBS-1, RBS-2 RB-1 PT-2, WP-2 PT-2, WP-2 - PT-2, WP-2 ACT-2/
GYP BD.
BB213 EXAM 2 LVT-1 RB-1 PT-3, WP-2 PT-3, WP-2 PT-1, MST-1 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 1
BB213A NUTRITION LVT-1 RB-1 PT-3 - MST-2 PT-3 SQ-1 PLAM-1 GYP. BD
BB214 EXAM 3 LVT-1 RB-1 PT-1, WP-2 PT-3, WP-2 PT-1, MST-2 PT-3, WP-2 SQ-1 PLAM-1 ACT-1 1 BB215 EXAM 4 LVT-1 RB-1 PT-1, WP-2 PT-3 PT-1/ MST-2 PT-3, WP-2 SQ-1 PLAM-1 ACT-1 1
BB217 MECH. ETR ETR ETR ETR ETR ETR ETR
BB226 SUB WAIT RBS-1, RBS-2 RB-1 PT-2, WP-2 PT-2, WP-2 - PT-2, WP-2 ACT-1
BB226A ALCOVE LVT-1 RB-1 PT-1, WP-1 - PT-1, WP-1 PT-1, WP-1 GYP. BD
BB240 HALL RBS-1, RBS-2 RB-1 PT-2 PT-2 PT-2 PT-2 ACT-1
BB240A NURSE WORK RBS-1 RB-1 PT-3 PT-3 PT-2 - SQ-1 PLAM-1 ACT-1
BB241 CONF. RM. RBS-1, RBS-2 RB-1 PT-2, WP-2 PT-2, WP-2 PT-2, WP-2 PT-3 ACT-2/
GYP BD.
BB242 RECEPT. WORK RBS-1, RBS-2 RB-1 PT-3 PT-2, PT-3 PT-3 PT-2 SQ-1 PLAM-1 ACT-1
BB243 WORK RBS-1 RB-1 PT-2 PT-2 PT-3 PT-3 SQ-1 ACT-1
BB244 WORK RBS-1 RB-1 PT-2 PT-2 PT-3 PT-3 SQ-1 ACT-1
BB246 WORK RBS-1 RB-1 PT-3 PT-3 PT-2 PT-2 SQ-1 ACT-1
FINISH FLOORING TRANSITIONS
GENERAL NOTES FINISH PLANFINISH SCHEDULE - KEYED COMMENTS
Scale: 1/4" = 1'-0"I-601
FINISH FLOOR ENLARGED PLAN2
WALL PROTECTION TYPICAL INSTALLATION
REVISIONS: DATE:
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/14/2020
| 2021.04.20 - RFI 03 (Rubber Tile Banding) |
| I-101 |
| Sheets |
| I-101 - PARTIAL BASEMENT FLOOR FINISH PLAN |
| I-601 |
| Sheets |
| I-601 - FINISH SCHEDULE, LEGEND & DETAILS |
File details come from the government source that posted it. Updated .