S02. RFI 003 (Rubber Tile Banding)_Response.pdf

PDF 763 KB Posted

Attached to
Y1DA--RENOVATE RADIATION THERAPY Federal contract opportunity
Solicitation number
36C25021B0003_1Amend1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document package includes construction drawings and specifications for the renovation of radiation therapy at a Department of Veterans Affairs medical center. The project involves renovating flooring, walls, millwork, and other finishes across multiple exam and treatment rooms as well as corridors, waiting areas, and support spaces. Products specified include luxury vinyl tile, rubber sheet and tile flooring, wallcoverings, ceramic tile, countertops, and other materials. General requirements include preparing substrates, installing transitions at flooring changes, applying paint and wall protection, and coordinating work between phases. The response from the contractor requests clarification on flooring details and provides the relevant drawings.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

TO: Stanley Burdine, Contracting Specialist

RFI NO.: DATE: REFERENCE:

REPLY NEEDED BY:

INFORMATION NEEDED:

REPLY:

REPLY FROM: DATE:

ATTACHMENTS: COPY TO:

PROJECT NUMBER: 541-20-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the

Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Renovate Radiation Therapy

PROJECT LOCATION: Department of Veterans Affairs

VA Medical center

SUBMITTED BY: City/State:

PHONE NO.:

Brigadier Construction Services Twinsburg, Ohio

216.857.4777

ASAP

04.20.202103 Flooring Rubber Tile Banding

Floor rubber tile banding is not shown on the drawing. Please provide an updated drawing/spec.

Attached are Drawings I-101 and I-601 showing flooring patterns.

Tim Huffman 4/21/21

UP UP

35.532.532 36.5 38.5

B

C

A

D

E

38.6

PROJECT SCOPE

PROJECT SCOPE

ELEC

BB245

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219

EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

EXAM 1

BB212

NURSE WORK

BB242A

MECH.

BB217

NUTRITION

BB213A

35.532.532 36.5 38.5

B

C

A

D

E

38.6

PROJECT SCOPE

PROJECT SCOPE

EXAM 2

BB213

EXAM 3

BB214 EXAM 4

BB215

CORRIDOR

BB200A

RECEPTION

BB210A

ENTRY

BB210

Elec

BB245

WORK

BB246

HALL

BB240

RECEPT. WORK

BB242

SUB WAIT

BB226

NU

RS

E W

OR

K

BB

0A

CONF. RM.

BB241

WORK

BB243

WORK

BB244

CORRIDOR

BB200C

CORRIDOR

BB200D

I-601

See enlarged plan for floor finish details this area

2' - 0"

2'

6" 2'

6"

2'

6"

6"

Eq. 7' - 8" Eq.

RBS-2

R

BS

-2

3' - 0" 3' - 0" 3' - 0" 3' - 0"Eq. Eq.

9'

4" Eq

Eq

R

BS

-2

Flooring Notes:

1. Contractor is to field verify all existing conditions and notify COR of any discrepancies.

2. Provide new rubber base and floor coverings as specified throughout. Contractor to prep floors as necessary for new finishes.

3. Contractor to provide temporary protection on all new flooring.

4. Contractor to clear caulk at all door frames where new resilient flooring has been installed within scope limits.

5. Transition and reducing strips are to be installed at all changes in floor material and/or elevation that occurs in areas to be newly finished. Verify with COR each condition and type of transition and/or reducing strip to be used prior to installation. Float floor as required for smooth/flush transition between material changes. Transition to be installed at center of door.

Wall Notes:

1. Prep walls for new finishes, patch and repair walls to create a smooth uniform finish.

2. Contractor to apply at least two coats of paint. Each coat to be equal to 1.6 MIL. apply more if necessary to cover existing color.

3. Contractor is to prep walls as necessary for new wall base.

4. Contractor shall paint all misc. metal items such as electrical panel covers, countertop support brackerts, electrical wire mold, etc. to match adjacent wall color. See wall finish schedule.

5. Indicates wall protection cornerguards and endguards. Refer to finish legend.

General Notes:

1. Existing conditions have been shown from general space observations and existing drawings. Respective trades shall conduct a complete field survey of existing conditions prior to submission of bid price. No additional payment will be made for claims that arise from lack of knowledge of existing conditions.

2. All finishes shall comply with and be installed in accordance with all applicable local codes and ordinances; IBC Sections 803, 804 and 805.

3. The contractor shall guarantee all work and materials for a minimum of twelve (12) months after the date of final completion to contractor under the contract. Any items deemed to be defective shall be replaced at contractors sole expense, but at owner's option and convenience, be repaired, replaced or re-performed.

4. All gypsum board soffits and headers within the scope limit lines to be painted same as adjacent wall color unless noted otherwise.

5. Finish drawings supersede architectural drawings for finish materials, colors and locations only.

6. Finish samples shall be submitted to COR for approval before purchasing and installation.

7. Final countertop grommet locations to be field verified.

PROJECT AREA

ELEC

BB245

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219 EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

EXAM 1

BB212

MECH.

BB217

NURSE WORK

BB242A

Control Area

BB234

Chiller

BB235

Linear Accelerator

BB225

Corridor

BB221

Stair 6

BS6

Dosimetry

BB222

CT Scan

BB223

Mechanical

BB224

Linear Accelerator

BB232

Bio Med

BB233

Bio Med

BB233

Linear Accelerator

BB232

Exam

BB216

Exam

BB215

Exam

BB214

Corridor

BB210B

Corridor

BB210A

Corridor

BB210

Wait

BB212

Staff

BB242

Corridor

BB210E

Nurse

BB240

Physicist

BB238

Mold Room

BB236

Doctor

BB237

Chief

BB239

Reception

BB211

Toilet

BB228

Corridor

BB210D

Chiller

BB234

Control Area

BB230

Linear Accelerator

BB225

Corridor

BB221

Dosimetry

BB222

Stair 6

BS6

CT Scan

BB223

Mechanical

BB224

ETR.

LVT-1 (Staggered)

VCT-1

RBS-1, RBS-2 (See Finish Plan)

LVT-1 (Herringbone)

PCT-1

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

\\p dc

\p ub lic

FT

P\

VA

_R

R T\

Ar ch ite ct ur al

\V

AM

P_ R

R T_

M en ta l H ea lth

_R

_2

4.

rv t 4/

/2

3:

:5

PM

I-101

PARTIAL BASEMENT FLOOR

FINISH PLAN

RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

Scale: 1/8" = 1'-0"I-101

PARTIAL BASEMENT FLOOR FINISH PLAN_PHASE 11

Scale: 1/8" = 1'-0"I-101

PARTIAL BASEMENT FLOOR FINISH PLAN_PHASE 22

GENERAL NOTES FINISH PLAN

KEY PLAN - BASEMENT

FINISH CODED NOTES

1 All walls PT-2 this location unless noted otherwise.

2 Temporary VCT-1 this location. To be removed during phase 2 prior to installation of new rubber floor. Extend paint finish onto all new walls.

3 Set full LVT-1 planks as transition at corridor intersections. Align joint at herringbone pattern center.

4 LVT-1 pattern/orientation change as shown 5 Origin of LVT-1 herringbone pattern at center of corridor 6 Center flooring accent pattern at door opening 7 RBS-2 accent banding - RBS-1 field material 9 Stainless steel base this wall, see elevation. All other base this area to be RB- as scheduled.

10 Rubber flooring this area completed previous phase. See I-601 for overall finished design.

11 Rubber flooring this area to be completed in 2 phases. See I-601 for overall finished design.

13 Corridor, Reception and Waiting area painting and wall protection areas in Ph. 2 to be completed during off hours. Contractor to coordinate and reccomend sections of work that may be completed without interrruption during time available.

14 Stop/start of corridor paint and wall protection to be completed this phase. See phasing plan for temporary partitions.

Not all notes used this sheet

FLOORING LEGEND

REVISIONS: DATE:

FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/14/2020

WALLS

PT-1 (Paint, Field) PPG1025-3 Whiskers Finish: Eggshell

PT-2 (Paint) PPG1025-4 Sharkskin Finish: Eggshell

PT-3 (Paint) PPG1039-4 Pachyderm Finish: Eggshell

PT-4 (Paint, Ceiling) PPG1006-1 Gypsum Finish: Flat

PCTW-1 (Porcelain Tile, wall) Daltile / Fabric Art/ Moden Textile White MT50 Size: 12" x 24"/ Ashlar installation Grout: TEC / Silverado

MST-1 (Mosaic Tile) Daltile / Mosaics / X114 Desert Grey Size: 1"x3" Lattice Weave Grout: TEC / Silverado

MST-2 (Mosaic Tile) Daltile / Mosaics / 0182 Desert Gray Size: 1"x3" Herringbone Mosaics Grout: TEC / Silverado

FLOORING

LVT-1 (Luxury Vinyl Tile - Plank) Patcraft / Mark Making, 1509V / 00500 Pure Size: 5.96" x 48" / Staggered and herringbone pattern install, see finish plan for locations Note: All LVT required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.

RBS-1 (Rubber Sheet) Nora Rubber/ Noraplan Envirocare / 7041 Whale Watch Size: 3.0 mm thick, 39.37" x 48" Note: All RBS required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.

RBS-2 (Rubber Sheet) Nora Rubber/ Noraplan Envirocare / 7040 Bike Ride Size: 3.0 mm thick, 39.37" x 48" Note: All RBS required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.

VCT-1 (Vinyl Composition Tile) (To Be Determined) Size: 24" x 24"

RB-1 (Rubber Base) Johnsonite / Perceptions, Recess Toe / 4-1/4”H / 38 Pewter

PCT-1 (Porcelain Tile, floor) Daltile / Fabric Art / Modern Textile / MT50 White Size: 12"x24" / Ashlar pattern install Grout: TEC / Silverado

SCONC (Sealed Concrete)

MTB-1 (Metal Tile Cove Base) Schluter/ DILEX-EHK/ Stainless Steel Provide all corner pieces and end trims required for full installation.

SSB-1 (Stainless Steel Base) InPro/ Stainless Steel Cove Toe Base/ 4"H 18 gauge/ #4 brushed finish

WALL PROTECTION

WP-1 (High Impact Wallcovering) C/S Acrovyn / Chameleon Collection / 1350 Sable Elm / Suede Texture /

0.040 gauge Height: top to be at 42" A.F.F Note: All WP-1 required for Phase 1 and 2 to be purchased at start of project to avoid dye lot issues.

WP-2 (High Impact Wallcovering) C/S Acrovyn / Textile Collection / Corduroy / Suede Texture / 0.040 gauge Height:

• In Exam rooms, top to be at 3'-2" A.F.F.

• All other areas, top to be at 3'-6" A.F.F

CG-1 (Corner Guard) C/S Acrovyn / Stainless Steel

CG-2 (Corner Guard, end condition) C/S Acrovyn / Stainless Steel

MILLWORK

SQ-1 (Synthetic Quartz) Cambria/ Britannica

PLAM-1 (Plastic Laminate) Formica / Cherry Riftwood 6411-NG / Natural Grain

CEILINGS

See reflected ceiling plan for products

OTHER

GF-1 (Glass Film) 3M/ Fasara/ Milky White SH2MAML

Adhere edge condition to substrate with Forbo 660 2-Part urethane (or EQ) resilient flooring

Transition - Resilient sheet to resilient tile

Resilient sheet flooring

MANUF. suggested adhesive

Resilient tile flooring

Transition - Resilient flooring to concrete

Sealed concrete floor

MANUF. Suggested adhesive

Adhere edge condition to substrate with Forbo 660 2-part urethane (or EQ)

Johnsonite (or EQ.)

SSR-XX-B Reducer

Scheduled wall tile on thinset mortar

Scheduled partition beyond

Schluter (or eq.) DILEX-stainless steel cove base trim

Scheduled floor tile

Transition - [MTB-1] Wall tile to floor tile cove base

Feather flooring compound at resilient sheet (Min. 36") to achieve flush condition with transition

Min. 36"

Schluter (or eq.) SCHIENE -stainless steel flooring transition

Transition - Resilient tile to porcelain tile

Resilient flooring

Porcelain tile on thinset bedFeather flooring compound at resilient flooring as required to meet transition (Min. 36")

Top of tile flooring & metal trim to be flush

Schluter (or eq.) RENO-TK stainless steel flooring transition

MANUF. suggested adhesive

Adhere edge condition to substrate with Forbo 660 2-Part urethane (or EQ) resilient flooring

Min. 36"

Flooring Notes:

1. Contractor is to field verify all existing conditions and notify COR of any discrepancies.

2. Provide new rubber base and floor coverings as specified throughout. Contractor to prep floors as necessary for new finishes.

3. Contractor to provide temporary protection on all new flooring.

4. Contractor to clear caulk at all door frames where new resilient flooring has been installed within scope limits.

5. Transition and reducing strips are to be installed at all changes in floor material and/or elevation that occurs in areas to be newly finished. Verify with COR each condition and type of transition and/or reducing strip to be used prior to installation. Float floor as required for smooth/flush transition between material changes. Transition to be installed at center of door.

Wall Notes:

1. Prep walls for new finishes, patch and repair walls to create a smooth uniform finish.

2. Contractor to apply at least two coats of paint. Each coat to be equal to 1.6 MIL. apply more if necessary to cover existing color.

3. Contractor is to prep walls as necessary for new wall base.

4. Contractor shall paint all misc. metal items such as electrical panel covers, countertop support brackerts, electrical wire mold, etc. to match adjacent wall color. See wall finish schedule.

5. Indicates wall protection cornerguards and endguards. Refer to finish legend.

General Notes:

1. Existing conditions have been shown from general space observations and existing drawings. Respective trades shall conduct a complete field survey of existing conditions prior to submission of bid price. No additional payment will be made for claims that arise from lack of knowledge of existing conditions.

2. All finishes shall comply with and be installed in accordance with all applicable local codes and ordinances; IBC Sections 803, 804 and 805.

3. The contractor shall guarantee all work and materials for a minimum of twelve (12) months after the date of final completion to contractor under the contract. Any items deemed to be defective shall be replaced at contractors sole expense, but at owner's option and convenience, be repaired, replaced or re-performed.

4. All gypsum board soffits and headers within the scope limit lines to be painted same as adjacent wall color unless noted otherwise.

5. Finish drawings supersede architectural drawings for finish materials, colors and locations only.

6. Finish samples shall be submitted to COR for approval before purchasing and installation.

7. Final countertop grommet locations to be field verified.

1. See elevations for wall tile this area. May occur at backsplashes or accent locations.

2. Temporary Phase 1 flooring this area = VCT-1. Remove Phase 2 for installation of new rubber floor.

3. Quartz bench seat

Center herringbone pattern in corridors, typical.

(LVT-1, 5.96" x 48" planks)

Stagger/ offset planks 1'-0" within rooms, typical.

(LVT-1, 5.96" x 48" planks)

1'

0"

RBS-2

RBS-2

RBS-2

RBS-2

RBS-2

RBS-2

RBS-2

RBS-1

RBS-2 RBS-2 RBS-2 RBS-2 RBS-2 RBS-2

Align

6" 2'

0"

6" 2'

0"

6" 2'

0"

6" 2'

0"

6"

6"

1'

0"

6"10

6" 11' - 8"

2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0"

Align

3' - 11"

Phase 1

This section completed

3'

6"

CG- Cornerguard WP- abutts cornerguard

WP- panels installed above scheduled base, vertical butt-joined installation

WP- top trim provided by manufacturer

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

\\p dc

\p ub lic

FT

P\

VA

_R

R T\

Ar ch ite ct ur al

\V

AM

P_ R

R T_

M en ta l H ea lth

_R

_2

4.

rv t 4/

/2

9:

:1

AM

I-601

FINISH SCHEDULE, LEGEND &

DETAILS

RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

FINISH MATERIAL LEGEND

FINISH SCHEDULE PHASE 1

Number Name Floor Finish Base Finish Wall - East Wall - North Wall - South Wall - West Counters & Splashes

Wall & Base

Cabinets Ceiling Finish Comments

BB200B CORRIDOR LVT-1 RB-1 PT-3, WP-1 - - PT-4, WP-1 ACT-2

BB212 EXAM 1 LVT-1 RB-1 PT-3, WP-2 PT-3, WP-2 PT-1, MST-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 1

BB213A NUTRITION LVT-1 RB-1 PT-3 - MST-2 PT-3 SQ-1 PLAM-1 GYP. BD

BB217 MECH. ETR ETR ETR ETR ETR ETR ETR

BB218 EXAM 5 LVT-1 RB-1 PT-3, WP-2 PT-3, WP-2 PT-1, WP-2, MST-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 1

BB219 EXAM 6 /

PROCEDURE

LVT-1 RB-1 PT-3, WP-2 PT-1, WP-2 PT-3, WP-2 PT-1, MST-2 SQ-1 PLAM-1 ACT-1 1

BB220 TLT-B PCT-1 MTB MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 SQ-1 PLAM-1 ACT-1 1 BB227 TLT-A PCT-1 MTB MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 MST-2, PCTW-1 SQ-1 PLAM-1 ACT-1 1 BB228 CHG. LVT-1 RB-1 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 3 BB229 CHG. LVT-1 RB-1 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 3

BB230 STAFF BREAK RM. LVT-1 RB-1 PT-3, MST-2 PT-1 PT-1 PT-1 SQ-1 PLAM-1 ACT-1

BB231 SPS STO. LVT-1 RB-1 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 PT-1, WP-2 ACT-1

BB242A NURSE WORK (VCT-1*), RBS-1,

RBS-2

RB-1 PT-2 PT-2, PT-3 PT-2 PT-2 (PLAM-1*)

SQ-1

ACT-1 2

BB245 ELEC ETR ETR ETR ETR ETR ETR ETR

FINISH SCHEDULE PHASE 2

Number Name Floor Finish Base Finish Wall - East Wall - North Wall - South Wall - West Counters & Splashes

Wall & Base

Cabinets Ceiling Finish Comments

BB200A CORRIDOR LVT-1 RB-1 PT-1, WP-1 PT-1, WP-1 PT-3 PT-2 ACT-2/

GYP BD.

BB200C CORRIDOR LVT-1 RB-1 PT-1, WP-1 PT-3 PT-2 PT-1, WP-1 ACT-2/

GYP BD.

BB200D CORRIDOR LVT-1 RB-1 PT-1 - PT-2 PT-1, WP-1 ACT-2/

GYP BD.

BB200E NURSE WORK (VCT-1*),

RBS-1, RBS-2

RB-1 PT-1 PT-1, PT-3 PT-3 PT-3 (PLAM-1*)

SQ-1

ACT-1 2

BB210 ENTRY RBS-1 RB-1 PT-1 PT-2 - PT-1 ACT-2/

GYP BD.

BB210A RECEPTION RBS-1, RBS-2 RB-1,

SSB-1

PT-1 PT-1 PT-3, MST-1 PT-3 ACT-2/

GYP BD.

BB211 WAITING RBS-1, RBS-2 RB-1 PT-2, WP-2 PT-2, WP-2 - PT-2, WP-2 ACT-2/

GYP BD.

BB213 EXAM 2 LVT-1 RB-1 PT-3, WP-2 PT-3, WP-2 PT-1, MST-1 PT-1, WP-2 SQ-1 PLAM-1 ACT-1 1

BB213A NUTRITION LVT-1 RB-1 PT-3 - MST-2 PT-3 SQ-1 PLAM-1 GYP. BD

BB214 EXAM 3 LVT-1 RB-1 PT-1, WP-2 PT-3, WP-2 PT-1, MST-2 PT-3, WP-2 SQ-1 PLAM-1 ACT-1 1 BB215 EXAM 4 LVT-1 RB-1 PT-1, WP-2 PT-3 PT-1/ MST-2 PT-3, WP-2 SQ-1 PLAM-1 ACT-1 1

BB217 MECH. ETR ETR ETR ETR ETR ETR ETR

BB226 SUB WAIT RBS-1, RBS-2 RB-1 PT-2, WP-2 PT-2, WP-2 - PT-2, WP-2 ACT-1

BB226A ALCOVE LVT-1 RB-1 PT-1, WP-1 - PT-1, WP-1 PT-1, WP-1 GYP. BD

BB240 HALL RBS-1, RBS-2 RB-1 PT-2 PT-2 PT-2 PT-2 ACT-1

BB240A NURSE WORK RBS-1 RB-1 PT-3 PT-3 PT-2 - SQ-1 PLAM-1 ACT-1

BB241 CONF. RM. RBS-1, RBS-2 RB-1 PT-2, WP-2 PT-2, WP-2 PT-2, WP-2 PT-3 ACT-2/

GYP BD.

BB242 RECEPT. WORK RBS-1, RBS-2 RB-1 PT-3 PT-2, PT-3 PT-3 PT-2 SQ-1 PLAM-1 ACT-1

BB243 WORK RBS-1 RB-1 PT-2 PT-2 PT-3 PT-3 SQ-1 ACT-1

BB244 WORK RBS-1 RB-1 PT-2 PT-2 PT-3 PT-3 SQ-1 ACT-1

BB246 WORK RBS-1 RB-1 PT-3 PT-3 PT-2 PT-2 SQ-1 ACT-1

FINISH FLOORING TRANSITIONS

GENERAL NOTES FINISH PLANFINISH SCHEDULE - KEYED COMMENTS

Scale: 1/4" = 1'-0"I-601

FINISH FLOOR ENLARGED PLAN2

WALL PROTECTION TYPICAL INSTALLATION

REVISIONS: DATE:

FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/14/2020

2021.04.20 - RFI 03 (Rubber Tile Banding)
I-101
Sheets
I-101 - PARTIAL BASEMENT FLOOR FINISH PLAN
I-601
Sheets
I-601 - FINISH SCHEDULE, LEGEND & DETAILS