S02-Attachment-Final SOW Construction-updated.pdf
PDF 131 KB Posted
- Solicitation number
- 36C25526R0142_1
About this file
This is a Statement of Work for construction and renovation services at the Wichita Veterans Affairs Medical Center (VAMC) in Wichita, Kansas. The project, identified as SOW 589A7-25-503, involves site preparation for cardiac catheterization lab equipment installation within Building 2 of the Robert J. Dole VAMC campus. The contractor must complete all work within 365 calendar days after issuance of the Notice to Proceed, with performance requirements outlined in completed bidding documents including contract drawings, specifications, and design narratives.
The scope encompasses renovation of approximately 1,500 square feet of existing clinical space across rooms 216-2, 216A-2, 217-2, 217A-2, 218-2, and supporting spaces. Key work items include selective demolition and removal of existing systems; replacement or relocation of architectural and MEP equipment (medical gas, electrical boom arms, ceiling sterile air curtains, control room casework, and wall outlets); mechanical, plumbing, lighting, fire protection, and electrical system modifications; partition and doorway reconfiguration; new interior finishes (ceiling, flooring, wall protection, and paint); site preparation for government-furnished equipment including structural supports and utilities; and hazardous materials abatement (asbestos, lead, and mold) in compliance with VA, EPA, OSHA, and state/local regulations. The contractor must furnish all labor, supervision, materials, tools, and equipment. Critical execution requirements mandate that construction occur in a fully occupied, operational clinical facility while maintaining uninterrupted medical services through carefully phased construction, strict adherence to Infection Control Risk Assessment (ICRA) protocols, noise and vibration controls, and daily coordination with the VA Contracting Officer's Representative (COR), Mindy Huynh, Healthcare Engineer/COR I.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
St at em en t o f W or k
St at em en t o f W or k
Statement of Work for Project 589A7-25-203, Site Prep for Cath Lab Equipment April 10, 2026
Wichita VAMC 5500 E Kellogg Wichita, KS 67218
SOW 589A7-25-503, Prepare Site for Cath Lab Equipment
April 10, 2026
Period of Performance 365 calendar days after Notice to Proceed (NTP)
Scope of Work Contractor shall perform construction and renovation of existing in Building 2 including, but not limited, rooms to: 216-2, 216A-2,217-2, 217A-2, 218-2, & other supporting spaces at the Robert J. Dole VAMC campus. This project will prepare approximately 1,500 SF of existing clinical space for the installation and operation of a new cardiac catheterization equipment, with the associated control and equipment room.
All construction work shall be performed in full compliance with the completed set of bidding documents, including all contract drawings, specifications, and design narratives associated with this solicitation. The general contractor shall furnish all labor, supervision, materials, tools, and equipment necessary to execute the required scope of work.
Construction will consist of, but is not limited to, the following:
• Selective demolition and removal of existing systems, finishes, and equipment as identified.
• Replacement or relocation of Architectural, MEP equipment, including medical gas modification,/electrical boom arm relocation, ceiling sterile air curtains upgrades, build-in control room desk/casework, additional wall outlets; including mechanical, plumbing, lighting, fire protection, and electrical systems as required.
• Reconfigured partitions and doorways, including new architectural walls, doors, frames, and hardware.
• Instillation of new interior finishes including ceiling, flooring, wall protection, and paint.
Statement of Work for Project 589A7-25-203, Site Prep for Cath Lab Equipment April 10, 2026 2
• Site preparation for installation of government-furnished catheterization lab equipment, including structural supports, utilities, shielding modification, conduits, and interfaces.
• Hazardous materials abatement, including asbestos, lead, and mold as identified or discovered during construction, following all applicable VA, EPA, OSHA, and state/local regulations.
• All other items as described in the contract documents
This construction work is located in an occupied, operational clinical facility and must be performed in a manner that allows medical care services to continue uninterrupted throughout construction, This requires carefully phased construction, strict adherence to ICRA, infection control, noise/vibration limits, and daily coordination with the VA COR and end users.
Construction may also include the abatement of any asbestos as identified on the provided drawings. The construction of this project will take place in a very busy occupied building and is to be completed to allow medical care functions to be maintained uninterrupted throughout construction – necessitating carefully phased construction and coordination with VA COR/users, including strict adherence to ICRA requirements.
Mindy Huynh
Healthcare Engineer /COR I
| Period of Performance |
| Scope of Work |
File details come from the government source that posted it. Updated .