Phillips Drawings for Cath Lab 1.pdf

PDF 5 MB Posted

Attached to
Z2DA--589A7-25-503 Prepare Site for Cath Lab Equipment FY26 NRM
Solicitation number
36C25526R0142_1
Issued by

About this file

This document is a Final Site Preparation Support Document (Revision B dated January 28, 2026) for a Philips Azurion 7 F12 medical imaging system installation at VA Medical Center Wichita in Wichita, Kansas for Cath Lab 1. The document serves as equipment requirements and specifications, not as architectural or construction drawings, and includes comprehensive site preparation guidance for the healthcare facility.

The project includes installation of a Philips Azurion 7 F12 imaging system with associated equipment including a Poly G floor stand, AD7 angio diagnostic table with tilt and cradle capabilities, Certeray iX generator cabinet, Mains 40E cabinet, Image 40E cabinet, multiple auxiliary equipment adapters, monitor suspension systems, control room workstations (IntraSight and SyncVision), and optional Socomec UPS (75 kVA, 2614 lbs). The system requires 480VAC three-phase power (100 kVA branch power, 80A circuit breaker with long-time delay and shunt trip), ceiling height of 9'-6½" (±⅛"), recommended Unistrut support at P1001 specifications, and specific HVAC requirements (4433 BTU/hr exam room, 8184 BTU/hr equipment room, 1876 BTU/hr control room, 8750 BTU/hr for optional UPS). Critical site requirements include floor levelness within ±⅛", proper floor plate installation and leveling at iso center coordinates, ceiling support infrastructure with specific stiffness requirements (10,000,000 N/m horizontal and vertical, 100,000 N·m/rad rotational), and comprehensive electrical distribution including isolated ground systems, equi-potential reference bar grounding, and separate conduit runs for power, signal, and high-voltage cables. The document provides detailed checklists for site readiness validation at 30, 15, 10, and 5 days prior to equipment delivery, network requirements specifications, and comprehensive drawings depicting architectural plans, structural details, electrical schematics, and equipment layouts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

VE

R

S H

EE

T

*Photo shown is not site specific.

CS

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS

AND SHOULD NOT BE SEPARATED. 10.10.2025

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.

Project Details

Philips Contacts

Drawing Number N-MID250366_RevB Date Drawn: 1/29/2026 Quote:

Order:

Project Manager:

Contact Number:

Email:

Pr oj ec t

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

R oo m : C at h

La b

D ra w in g Ti tle

Q-00447188 6600762944

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

Drawn By: Cesar Rodriguez Camacho

TH

E

IN

FO

R M

AT

IO

N

IN

T H

IS

P

AC

KA

G E

IS

P

R O

VI

D

ED

A

S

PH

IL

IP

S

EQ

U

IP

M

EN

T R

EQ

U

IR

EM

EN

TS

, A N

D

IS

N O

T

TO

B E

C O

N

ST

R U

ED

A

S

AR

C H

IT

EC

TU

R

AL

D

R

AW

IN

G

S O

R C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

A zu rio n

F1

TJ Stanley

(316) 558-4453 tj.stanley@philips.com

VA Medical Center Wichita

Wichita, KS

Table of Contents Sheet Number Sheet Name

CS COVER SHEET

GN GENERAL NOTES

A1 ARCHITECTURAL PLANS

AD1 EQUIPMENT DETAILS

AD2 EQUIPMENT DETAILS

S1 STRUCTURAL PLANS

S2 STRUCTURAL PLANS

SD STRUCTURAL DETAILS

E1 ELECTRICAL PLANS

ED ELECTRICAL DETAILS

NN NETWORK NOTES

R REFERENCE 11x17

Final Site Preparation Support Document The equipment components shown in this drawing package are based on the current proposed purchase and are subject to change if modifications are made to the configuration.

www.healthcare.philips.com

NOTE:

ALL SHEETS IN THE "R" SERIES

ARE REFERENCES TO VIEWS IN

THE MAIN SET AND ARE MEANT

TO BE PLOTTED AT 11x17

Important Note:

THE INFORMATION IN THIS PACKAGE IS PROVIDED AS PHILIPS EQUIPMENT REQUIREMENTS, AND IS NOT TO BE CONSTRUED AS ARCHITECTURAL DRAWINGS OR CONSTRUCTION DOCUMENTS.

Philips assumes no liability nor offers any warranty for the fitness or adequacy of the premises or the utilities available at the premises in which the equipment is to be installed, used, or stored.

For Architects and/or Contractors: The latest revision listed must be thoroughly reviewed so that all changes can be incorporated into your project, final revisions are valid for 90 days from latest revision date. Please check with Philips PM for current updates.

Rev. Date Revision Descriptions Planner CPM Approved By

- 10/24/2025 Created Preliminary Site Preparation Support Document per Quote #Q-00447188 and CAD file "2507-WICHITA-VAMC CATHLAB - Floor Plan - LEVEL 2". Marie Moreno TJ Stanley

A 10/13/2025 Created Final Site Preparation Support Document per Order #: 6600762944. CAD background was updated using "NEW 2507-WICHITA VAMC CATHLAB - Floor Plan - LEVEL 2" per request. Cesar Rodriguez Camacho TJ Stanley

B 1/28/2026 Updated CAD background using "2507-WICHITA VAMC CATHLAB - Floor Plan - LEVEL 2 - REFERENCE PLAN" dwg file and updated isocenter shown on CAD per request. Confirmed ceilng height is 9'-6 12" (2908mm) Cesar Rodriguez Camacho TJ Stanley

G

EN

ER

A

L N

O

TE

S

INSPECTIONS

Inspected by: Date:

Facilities:

Clinical:

Infectious Control:

Architect:

Engineer:

Administrator:

Project Manager:

Sales Specialist:

Account Manager:

Service:

(24.0)

GN

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS

AND SHOULD NOT BE SEPARATED. 10.10.2025

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.

Project Details

Philips Contacts

Drawing Number N-MID250366_RevB Date Drawn: 1/29/2026 Quote:

Order:

Project Manager:

Contact Number:

Email:

Pr oj ec t

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

R oo m : C at h

La b

D ra w in g Ti tle

Q-00447188 6600762944

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

Drawn By: Cesar Rodriguez Camacho

TH

E

IN

FO

R M

AT

IO

N

IN

T H

IS

P

AC

KA

G E

IS

P

R O

VI

D

ED

A

S

PH

IL

IP

S

EQ

U

IP

M

EN

T R

EQ

U

IR

EM

EN

TS

, A N

D

IS

N O

T

TO

B E

C O

N

ST

R U

ED

A

S

AR

C H

IT

EC

TU

R

AL

D

R

AW

IN

G

S O

R C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

A zu rio n

F1

TJ Stanley

(316) 558-4453 tj.stanley@philips.com

Electrical Requirements Mains MA Cabinet Maximum Rated Power: 100kW

Supply Configuration: 3 phase, equally sized insulated power conductors and an insulated equipment grounding conductor. Insulated grounding conductor shall have the same or larger size than line conductors. Line wires shall be no smaller than 4 AWG, 90°C or higher temperature rating. The conductor size is dependant on the upstream circuit breaker rating:

Nominal Line Voltage: 380 (Canada) - 480 VAC, 60 Hz

Branch Power Requirement: 100 kVA (System only; verify UPS power requirements)

System Circuit Breaker: 3 phase, Type D with long-time delay and shunt trip

System Circuit Breaker: 80A rating.

UPS breaker: 125A-150A, pending configuration.

(24.1)

AVO NAMING

Line Item Corresponding Naming

FCV0972 (powered by system, in control room) AVOC

FCV0973 (powered by system, in exam room) AVOE

FCVO974 (powered by hospital) AVOX

FCV0975 (4K AVO) AVOK

FCV0976 (XL) AVOL

Integration Kits AVOB

FlexVision Non-Philips Frame AVOM

HVAC Requirement for General Equipment Locations

*Average heat emission during clinical use Data applicable for basic system:

Large monitor + 4 x small monitor in Monitor Ceiling Suspension 1 workstation + 2 x small monitor in Control Room

Add 8750 BTU/hr for optional Socomec UPS Add 1075 BTU/hr for additional large monitor Add 256 BTU/hr for additional small monitor Add 631 BTU/hr for additional workstation See AD details for additional heat load in case of UPS.

Equipment's designed airflow is from front/side to back. Please design the air handling in the rack cabinet equipment area accordingly.

Philips IGT-S systems may only be operated at an altitude of max. 9,843 ft (3,000m) above sea level as defined in our instructions for use (IFU).

(25.0)

These temperature and humidity levels must be maintained in all (3) rooms (equipment, examination and control rooms).

Temperature 59°F (15°C) to 86°F (30°C)

Temperature gradient Max. 1°F / Minute (0.5°C / Minute)

Humidity (non-condensing) Humidity shall be stable within 10% 20% to 80%

Exam Room *4433 BTU/hr

Equipment Room *8184 BTU/hr

Control Room *1876 BTU/hr

Remote Control of Room Lighting Room lighting controls are the responsibility of the customer. Refer to sheet 3-ED for X-ray in use and room light switching requirements.

(25.0)

Milestone and General Conditions for Successful IGT Projects

1. Planning, Design, and Implementation Process

The multidisciplinary project team should be assembled as early as possible in the design process. The multidisciplinary team should include administrators, clinicians, infection preventionists, architects and other design professionals, facility managers, safety officers, security managers, users of equipment, and support staff relevant to the areas affected by the project as well as those with knowledge of the organization's functional goal for the project. Inclusion of patient advocates/consumers, A/E consultants, and construction specialists should be considered. Additionally, adherence to FGI (Facility Guidelibes Institute) and ADA (Americans with Disabilities Act) guidelines should be taken into account.

2. Schedule The customer or general contractor shall provide Philips with a project/construction schedule with milestones to assist in the coordination of delivery of Philips supplied products and primary equipment.

Project schedule must be provided by customer to obtain production slot and delivery.

3. Responsibility The customer shall be solely responsible, at their expense for preparation of site. Philips required specifications and any required MEP, construction and structural alterations shall be incorporated into customer's design and construction documents. Compliance with all safety, electrical, and building design codes relevant to the build out of the clinical area for Philips equipment and its installation is the customer's responsibility. Sufficiency of such plans and specifications, specifically including, but not limited to the accuracy of the dimensions described therein, shall be the sole responsibility of the customer. The customer shall advise Philips of conditions at or near the site, which could adversely affect the function of the equipment and/or carrying out of the delivery and installation work.

a. Customer's structural engineer shall provide Philips with written certification that structural supports meet Philips requirements to permit delivery and installation of equipment.

b. Customer shall acknowledge the final site preparation confirmation document.

c. Upon completion of project, Customer's Architect and Engineers of record shall provide a set of As-Built project construction documents (.dwg) to Philips for closure of the Philips project history file.

This shall ensure that such conditions are compliant and that the site is fully prepared and available for Philips before the installation work is due to begin.

4. Permits Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and shall bear any expense in obtaining same or in complying with any related rules, regulations, ordinances and statutes.

5. Infection Control and Interim Life Safety Measure The customer shall provide all means and methods necessary for compliance with Infection Control (IC) and Interim Life Safety Measures (ILSM) in connection with the construction and installation/operation of the products shown herein and shall bear any expenses related to same.

6. Radiation Protection The customer or their contractor, at their own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection and testing.

7. Asbestos and Other Toxic Substances Philips assumes that there is no hazardous material contained in the project site. The customer is responsible for the removal of any materials, including but not limited to asbestos, deemed hazardous by local authorities, the EPA, OSHA, or any other authority having jurisdiction over the work. If such materials are discovered at any time that the work is proceeding, the work will immediately cease, the owner will be notified, and the work will again proceed after the owner has removed all of the hazardous material from the job site.

8. Labor In the event local labor conditions make it impossible or undesirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate technical support and supervision for proper completion for the Philips equipment installation.

9. Extended Installation or Turnkey Work by Philips If an extended installation or turnkey contract exists between Philips and the customer for room preparation some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract work scope and these drawings, the turnkey contract work scope shall govern.

10. Boom Vendors/3rd party cables Separation of cables shall be provided by boom vendor for the installation of cables within the boom. For example, use liquid-tight plastic conduit.

(25.0)

REQUIRED SITE READINESS - TABLE OF CONTENTS

Items to be completed Prior to Equipment Delivery: Inspected by: Date: Common Site Drawing Reference:

Sheet/Section/Detail

Table Iso Center: Verified per Philips Final Drawings. 1-A1,2-A1.

Floor Levelness: Checked with Laser Level. 1-S1, S1/Equipment Support Information.

Floor Plates: Installed, isolated, and leveled at the correct locations. 1-S1, 2-S1, 3-S1, S1/Equipment Support Information.

Ceiling Unistruts (P1001): Installed and leveled per Sheet with written engineer certification. 2-S2, 4-S2, 6-S2, S2/Equipment Support Information.

Modular Laminar Array with Unistruts (P1001) installed and level per sheet if Class 3 required. 4-S2, S2/Equipment Support Information.

Ceiling Plate for Equipment Rack (EP Boom) (if applicable): Installed and leveled.

Cable Trough/Raceway/Conduit: A Greenlee measuring tape (part no. 435) are Installed, verified and locations checked. E1/Point to Point Run Lengths, 1-E1,4-E1.

3rd Party Booms (if applicable): Structural support installed and verified with boom vendor and locations.

Ceiling Height: Verified and measure from bottom of Unistrut. 3-S2, 4-S2.

Verify the Fixing Blocks sits properly in the Unistrut channel with no obstructions. 4-S2,1-S2.

Ceiling Obstructions: Verify there are no obstructions where Philips rails will be installed. 1-S2, 3-S2.

Clearances: Verified to the closest obstacles (i.e. walls, cabinets), in order to lift up the C-arm, monitor support, etc. 1-AD1.

Back Boxes: Installed with required covers and grommet material. 1-E1, 4-ED, 5-ED.

ERB Conductor Bar Installed per drawing. 1-E1,2-E1.

All electrical boxes and raceway are grounded to the ERB. 1-ED, 2-ED, 5-ED

Mains Power Supply: Installed per drawing (Including impedance, isolated grounds, wire size and circuit breakers verified). ED/Power Quality Requirements (Azurion), ED/Branch Circuit and Wire Gauge Requirement (Azurion).

Mains Supply Wiring installed for connection in Cabinet Rear Cover (CRC) of MA-Cabinet. 5-ED

Video Connection Boxes: video sources, and display destinations are verified with customer and located. A1/AUX Chart.

Med Gas Box (if applicable): Location does not interfere with the installation and movement of table. 3-S1

Walls: Installed and final finished per customers architectural specifications.

Millwork: Completely installed in all rooms.

Leaded glass installed.

Flooring: Installed and covered with protective covering (1/8" masonite). S1/Equipment Support Information.

Lighting and Wall Outlets Installed and functional. ED/General Electrical Information.

HVAC system is operational and commissioned to engineered specifications. GN/HVAC Requirement for General Equipment Locations.

3rd Party Booms (if applicable): Installed prior to Philips equipment delivery.

UPS: Fully installed per Philips Final Drawings, and startup has been scheduled with vendor. 5-ED.

X-Ray in Use Light is installed. 3-ED.

Physicist: If required has been scheduled.

UPS: Commissioned and certified by UPS vendor.

Permits Inspections: Completed or scheduled by applicable governing authorities.

All network information provided by facility IT, i.e. IP addresses (static IPs only), AE Titles, SNM, GTWY and DNS server are available. NN.

Project Space: Is clean, free of dust, all construction-related debris and tools have been removed.

PPE requirements identified (Construction and Hospital). No open electrical or hazardous materials on site. GN/Milestone and General Conditions for Successful IGT project.

Site Access Is available for after hours. Storage for tools, parts, covers and packing material has been arranged.

Room is secure with keys provided.

Complete Delivery Path Route and backup for bad weather has been reviewed & reverfied with the customer and lead FSE.

Customer Project Manager - Site Readiness Checklist

SITE PREP TO BE COMPLETED PRIOR TO FIRST MILESTONE DATE / REQ/ PRIOR TO DELIVERY

Site Planning Requirements/Checklist REQUIRED 15 DAYS PRIOR TO FINAL PHILIPS INSPECTION Room: cabinets, furniture, millwork, and counter tops installed.

System Orientation: Verified per Philips Final Drawings Customer (contractor) completed the Site ready validation (Unistrut conformance) email acknowledgment. Document archived in note/attachments.

Network Connections: Hardware (J-boxes, conduits, and network cable) is installed per Philips Final Drawings.

FlexArm Clearance (if applicable): Verified per Philips Final Drawings. Clearances: Verified to the closest obstacles (i.e. walls, cabinets), in order to lift up the C-arm, monitor support, etc.

UPS: Fully installed per Philips Final Drawings, and startup has been scheduled with vendor.

3rd Party Booms (if applicable): Compatibility, locations, and isolation kits have been verified with boom vendor and the Philips Final Drawings are updated with the information. If required, a 'Request for Modification' has been submitted.

Cable Trough/Cable Raceway/Conduit: Installed, cleaned and locations per Philips Final Drawings. Cable openings are clear, without sharp edges.

UPS: Comm cable is run from UPS to M Cabinet

Video Connection Boxes: Locations, video sources, and display destinations are verified with customer, and the Philips Final Drawings are updated with the information.

Conduit worksheet documenting validation of electrician's run length measurements has been uploaded to PSA.

HVAC (Climate Equipment): Customer/Contractor has verified system is operational and balanced to meet humidity and temperature requirements per Philips Final Drawings.

Med Gas Box (if applicable): Location does not interfere with the installation and movement of the Philips equipment. The Philips Final Drawings are updated with the location.

Greenlee measuring tape (part no. 435 or equal) installed and validates run lengths. Door Interlock Switch: If required, is installed per Philips Final Drawings.

Drawings (Final): Approved by Customer shows all room obstacles to include millwork, lighting overlay, structure overlay, medical gases and plumbing.

Mains Power Supply: Installed per Philips Final Drawings. (Including impedance,isolated grounds, wire size verified, and distribution unit has been installed).

Customer Site Preparation: Verified per Philips Final Drawings.

SITE PREP TO BE COMPLETED PRIOR TO FIRST MILESTONE DATE / REQUIRED

PRIOR TO DELIVER

Back Boxes: Check label that the back boxes are manufactured by The DMG Group, Installed with required covers and grommet material per Philips Final Drawings.

Specifically, the spacing between the boxes and height off of finished floor.

PRE-DELIVERY DAY REQUIREMENTS

GC Schedule aligns with Philips equipment delivery date. Permits and Inspections:

completed by applicable governing authorities

Ceiling Plate for Equipment Rack (EP Boom) (if applicable): Installed and leveled per Philips Final Drawings.

3rd Party Booms (if applicable): Installed prior to Philips equipment delivery.

Performance Testing Requirements Identified: Determine if certificate of compliance is required REQUIRED 10 DAYS PRIOR TO FINAL PHILIPS INSPECTION Installation Team: Has received the room drawings and necessary contact phone numbers.

Existing Equipment: Is dismantled and removed from the site Hospital Mains Supply: Allura R8.2 and Azurion, Installed per Philips Final Drawings, for connection in Cabinet Rear Cover (CRC) of MA-Cabinet.

Philips Project Space: Is clean, free of dust, all construction-related debris and tools have been removed.

REQUIRED 30 DAYS PRIOR TO FINAL PHILIPS INSPECTION

Hospital Mains Supply: For system versions prior to Allura R8.2 (in the USA), the hospital mains must be available for connection at the PDU or gssPDU, and then to MA & ME-Cabinets (by the electrician).

Site Is Safe To Work: PPE requirements identified (Construction and Hospital). No open mains, slippery floors, sharp edges, or hazardous goods on site.

Ceiling Unistruts (P1001 or engineer specified): Installed and leveled per Philips Final Drawings.

ERB Grounding Block: Installed within 6 feet or 150cm of building steel, and non-Philips-provided electrical equipment ground conductors, to include wall outlets installed per Philips Final Drawings.

Delivery Path and Truck Parking: Has been checked with the customer, including verifying floor loading, delivery route, elevator capacity, height, width and depth clearances, and a plan for bad weather.

Fixing Blocks: Provided by Philips, properly seat in the Unistrut channel with no obstructions, as designed.

ERB Grounding Block: All Philips-provided electrical boxes and contractor-provided raceway are bond grounded to the ERB.

Transport & Handling Tools: Crane, forklift, wheels and trolleys have been specified with the LMP/rigging company. NOTE: If rigging provided by Philips, verify the vendor is on the Philips' approved suppliers list.

Unistrut Height: Verified per Philips Final Drawings. Single plane measured from finished floor to bottom of Unistrut. For Bi-Plane, from Clea plate to bottom of Unistrut.

Measurements have been documented and archived within PSA "Notes and Attachments".

Ceiling (False): Installed. Site Access: Is available for after hours. Storage for tools, parts, covers and packing material has been arranged.

Unistrut is square to the edge of the floor plate(s). Ceiling (Hard): Installed Room Security: Room is secure, with keys and alarm codes provided

Unistrut validation workbook uploaded to PSC Room Lighting: Installed and operational. Parking: Parking area identified for installers.

Floor Plates: Patient support and stand (if applicable), are installed, isolated, and leveled, at the correct locations per Philips Final Drawings. For Biplane systems, the plates are spaced correctly and squared with each other.

Restricted ceiling area "A" is free from any objects that project below the finished ceiling. Restroom Facilities: Toilet facilities, including area to wash up, are available.

Floor Levelness: Checked with laser level and is level per Philips Final Drawings. Restricted ceiling Area "B" is free of any objects that project more than the specified maximum distance below the finished ceiling.

CPM has coordinated any ongoing work that will overlap with the installation window with the lead installer

Table Isocenter: Verified per Philips Final Drawings. Ceiling Obstructions: Verify there are no obstructions where Philips rails will be installed.

Philips Field Pre-Job Safety Brief completed and posted on door.

Walls: Installed. REQUIRED 5 DAYS PRIOR TO FINAL PHILIPS INSPECTION PRIOR TO PHILIPS SYSTEM POWER UP Sprinklers: Installed. Lead-Lined Doors: Installed. Wall Outlets: Installed and functional.

SP and TV J-Boxes: Located per Philips Final Drawings. Lead-Sheilded Glass: Installed. PRIOR TO INSTALL COMPLETE

CPM has updated PSC with facility IT contact information Walls: Final finished, (i.e. final coat painted and/or tiled). Physicist: If required, verify the Physicist has been scheduled.

Video Wall Boxes: Located per Philips Final Drawings Hard Ceiling: Painted. UPS: Commissioned and certified by UPS vendor.

HVAC (Climate Equipment): Installed. Flooring: Installed and covered with protective covering (i.e. scratch protection). X-Ray in Use or Warning Light: If required, is installed per Philips Final Drawings.

(25.0)

(25.0)

AD7 Table Floor Plate ℄Poly G Floor Plate ℄ 13'-5"

4089mm

9' -1

1" m m 9'

-1 1" m m

6'-53 8"

1965mm

9'-85 8"

2962mm

4' -0 m m

4'-0" 1219mm

4'-0" 1219mm

4' -0 m m

Po ly

G

Ta bl e

Iso Center The Iso Center is the initial and most crucial control point in the construction of a procedure room. Once established, it guides the placement of all imaging equipment, third-party devices, mechanical, electrical, and plumbing systems (MEPs), as well as the overall construction. These are positioned relative to the Iso Center's X, Y, and Z coordinates to avoid operational issues and clinical limitations.

12'-73 4"

3854mm

7' -1

05 8" m m1'-63 4"

476mm 1'

-6 3 4"

6m m

18'-41 8"

5591mm

1'-01 8"

306mm

3' -7

5 8" m m 2' -0

3 4"

9m m

1'-11 8"

333mm

1' -8

8m m

2'-01 2"

622mm25 '-2

7 8" m m27 '-1

1 2" m m

5'-93 4"

1772mm

10'-57 8"

3197mm

16'-35 8"

4969mm

8"

243mm

1' -1

1"

4m m

2'-0" 610mm

2' -0

0m m

2'-01 2"

622mm

4'-115 8"

1514mm

9'-81 8"

2950mm

4' -9 m m

9' -8

5 8" m m

Po ly

G Fl oo r P la te

Poly G / Table ℄

AD

Ta bl e Fl oo r P la te

3' -1

13 8" m m

5' -4

1 2" m m

'-1

01 8" m m

1' -0

3 8"

4m m

3' -7

5 8" m m

1' -6

3 4"

6m m

1' -3

3 4"

0m m 4'-0"

1219mm

6' -1

17 8" m m5' -0

3 4" m m

'-6

1 8" m m

2'-0" 610mm

2' -0

0m m

2' -0

0m m

1' -7

5 8"

8m m

3'-1" 940mm

7'-47 8"

2257mm

16'-91 4"

5112mm

TV

AT

Y

Exact location to be coordinated by Customer and local Philips service.

D B

PG

FV

XL

AU

X1

AU

X1

M

AV

AD

Is o

C en te r

Customer's Physio

(PHY)

CY

CR1

UPS

SBO

9'-81 8"

2950mm

4' -9 m m

9' -8

5 8" m m

Po ly

G Fl oo r P la te

Poly G / Table ℄

AD

Ta bl e Fl oo r P la te

FJB1 AVOE1 AUX4 AUX5 AUX6 AUX7

AUX9 AUX10

AV

O

X2

MAMB

ME

Se rv ic e ar ea to m ee t N

EC

/E

SA

re qu ire m en t

SH

3' -6

1 8" m m

2' -9

7 8"

9m m

2' -1

05 8"

9m m

AUX8

AVOX1

AUX2 AUX1

INT

SYNC

AUX3

5'-91 8"

1754mm

5'-91 8"

1755mm

Elevation check needed x-ax is

C en te r l in e of Tr an sv er sa l m ov em en t

No fly zone

9'

61 2"

1 8" (2

8m m

3m m

U ni st ru t h ei gh t m ea su re d fro m fi ni sh ed flo or to b ot to m o f U ni st ru t.

Se e de ta il

S2 /1

Fi ni sh ed fl oo r t o bo tto m o f u pp er d ec k he ig ht

5'-21 4"

1581mm

5'-21 4"

1581mm

2' -3

1 2"

6m m

2' -3

3 4"

4m m

1' -3

5 8"

7m m

Min. distance for booms Min. distance for booms.

Patient Right Patient Left

Walls

Soffit

Existing (to be removed)

Beams or other building construction elements

Legend

A R

C H

IT

EC

TU

R

A L

PL

A

N S

Important Notes:

* Field to verify all room dimensions by customer and Philips

Table Movement Ceiling Equipment Movement Table Pinch Hazard

Legend

Service Area Required Ventilation

A1

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS

AND SHOULD NOT BE SEPARATED. 10.10.2025

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.

Project Details

Philips Contacts

Drawing Number N-MID250366_RevB Date Drawn: 1/29/2026 Quote:

Order:

Project Manager:

Contact Number:

Email:

Pr oj ec t

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

R oo m : C at h

La b

D ra w in g Ti tle

Q-00447188 6600762944

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

Drawn By: Cesar Rodriguez Camacho

TH

E

IN

FO

R M

AT

IO

N

IN

T H

IS

P

AC

KA

G E

IS

P

R O

VI

D

ED

A

S

PH

IL

IP

S

EQ

U

IP

M

EN

T R

EQ

U

IR

EM

EN

TS

, A N

D

IS

N O

T

TO

B E

C O

N

ST

R U

ED

A

S

AR

C H

IT

EC

TU

R

AL

D

R

AW

IN

G

S O

R C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

A zu rio n

F1

TJ Stanley

(316) 558-4453 tj.stanley@philips.com

Existing to be MovedH

Equipment Designation

Description

Equipment Legend

Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor

G

D C B

Furnished and installed by PhilipsA

F E

Furnished by Philips and installed by Philips 3rd PartyI

Weight (lbs)

Weight (kg)

Detail Sheet

A FVXL 65" FlexVision XL + (2) 27" LCD Monitor Suspension

607 276 AD1

Minimum FGI Area for Circulation Pathway

Anesthesia Zone 6'x8' (1829mm x 2438mm)

Legend Important Notes:

FGI 2022 Appendix A1.2-1.2 was referenced to create general, non-site-specific guideline diagrams for planning purposes.

It is the customer's architect's responsibility to verify the guidelines and determine the best fit for the system. Final validation is up to the architet of record, as states may use different versions of the codes or interpret them differently.

SCALE:

A1

FGI GUIDELINES CLASS 2 (Not Site Specific)(If Applicable)

3/16" = 1' - 0"

(24.0)

SCALE:

A1

ELEVATION (Not Site Specific)

1/4" = 1' - 0"

(25.0)

SCALE:

Recommended Unistrut Height: 9' - 6 12 ", ± 18" (2908mm, ± 3mm) Unistrut height measured from finished floor to bottom of Unistrut.

A1

EQUIPMENT LAYOUT

1/4" = 1' - 0"

SCALE:

Recommended Unistrut Height: 9' - 6 12 ", ± 18" (2908mm, ± 3mm) Unistrut height measured from finished floor to bottom of Unistrut.

A1

SITE LAYOUT

1/4" = 1' - 0"

* Architect to coordinate with end users/technicians to determine final placement of control desk components prior to installation in order to avoid rework. Architect to coordinate with Philips Project Manager to reflect final placement on Philips drawings.

Important Notes:

Input Source Location Displayed

AUX1 INT Control FlexVision

AUX2 SYNC Control FlexVision

AUX3 Physio Control FlexVision

AUX4 TBD TBD FlexVision

AUX5 TBD TBD FlexVision

AUX6 TBD TBD FlexVision

AUX7 TBD TBD FlexVision

AUX8 TBD TBD FlexVision

AUX9 TBD TBD FlexVision

AUX10 TBD TBD FlexVision

AUX11 TBD Exam FlexVision

AUX12 TBD Exam FlexVision

Input Source Location Displayed

AVOE1 MB TBD TBD

AVOX2 MB Exam TV2

* Table is shown fully extended toward the head-end.

Table can float toward the foot-end 3'-11 14" (1200mm).

A PG Poly G Stand (Floor Version) 1927 871 AD1

A ME Certeray iX Generator Cabinet 320 145 AD1

A MA Mains 40E Cabinet 717 325 AD1

A DB Documentation Box - Mounted on Wheels (Final location to be coordinated with customer and/or local Philips Service)

176 80 AD1

A ATY Exam Room Auxiliary Box 7 3 AD1

A MB Image 40E Cabinet 497 225 AD1

A CY Control Room Junction Box 73 33 AD2

A AUX1 Auxiliary Equipment Adapter 4 2 AD2

A AUX12 Auxiliary Equipment Adapter 4 2 AD2

A CR1 Control Room Equipment Adapter 4 2 AD2

A SH Service Hub 7 3 AD2

A AD7 Angio Diagnost 7 Premium Tilt & Cradle Table (Pivot, Tilt, Cradle, APC, and Volcano)

992 450 AD1

Items not on Philips Quote/Order

D UPS Socomec Compact Full UPS 2614 1186 AD1

D SBO Signaling Box Option (for Socomec UPS) 6.7 3 AD1

A minimum of 3'-0" (915mm) clear distance is recommended around the foot end of the AD7 table when fully extended to ensure adequate space for staff flow.

Per 2018 FGI Guidelines, equipment closet shall not open into the procedure room. Architect/Engineer of record to verify all applicable requirements/codes.

Exact equipment configuration to be verified:

· [1] 3rd party video cloning (FCV0974) is listed on quote, but [2] are shown per Intrasight 7 and Monitor on Cart requirements.

· [1] Port2 Track250cm&Trolley column 57cm is not listed on quote, but is shown per project requirements.

· [1] Port2 cable spooler 250CM is not listed on quote, but is shown per lamp installation requirements.

Field to verify delivery path of equipment is adequate. 4'-0" (1220mm) door recommended [3'-8" (1120mm) minimum].

A FJB1 Flex Junction Box 3 2 AD2

A AVOE1 Auxiliary Video Output (Powered by MB) 4 2 AD2

A AVOX1 Auxiliary Video Output 4 2 AD2

A TV2 Single LCD Monitor on Cart 75 34 AD2

A SYNC SyncVision 71 32 AD2

A INT IntraSight- Workstation 83 38 AD2

A MAV Mavig 2.5m Ceiling Track 360 w/ Rad Shield and Y LED 1F Surgical Light

167 76 AD2

A AVOX2 Auxiliary Video Output 4 2 AD2

Potential collision of equipment with noted door / wall / column.

View of patient may be limited. Verify with customer requirement.

Planning Issues and Considerations

Verify quantity and designation of Video Cloning with local Philips Service.

Patient loading may be difficult. Verify with customer requirement.

EQ

U

IP

M

EN

T

D

ET

A

IL

S

1' -0

[3 m m

2' -7

3 16

[7 m m

3' -6

3 16

[1

2m m

M ax

Top

Side

5'-1011 16"

[1795mm]

11 7 16"

[290mm]

11 7 16"

[290mm]Front

Table Pivot is optional. This allows the table to rotate -90, +180 degrees about center of table base.

R ec om m en de d U ni st ru t h ei gh t

1' -7

1 16

[4 m m

1' -7

1 16

[4 m m

5'-1011 16"

[1795mm]

Optional Table Pivot ℄ (-90, +180 degrees)

Indicates equipment movement

1' -0

[3 m m

1'-11 3 16"

[588mm]

9' -6

1 2"

[2

8m m

9'-85 8"

[2962mm]

4'-71 2"

[1410mm]

3' -5

15 16

[1

5m m

4' -1

11 16

[1

2m m

]7' -4

1 4"

[2

1m m

45° 45°

7'-93 4"

[2382mm]

0°

110°

9'-85 8"

[2962mm]

Minimum distance to wall for installation frame

'-6

11 16

[3

3m m

1'-81 2"

[521mm]

Floor Plate ℄

(24.0)

PG

Poly G Stand (Floor Version) Weight

1927 lbs

(25.0)

AD7

Angio Diagnost 7 Weight

992 lbs

AD1

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS

AND SHOULD NOT BE SEPARATED. 10.10.2025

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.

Project Details

Philips Contacts

Drawing Number N-MID250366_RevB Date Drawn: 1/29/2026 Quote:

Order:

Project Manager:

Contact Number:

Email:

Pr oj ec t

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

R oo m : C at h

La b

D ra w in g Ti tle

Q-00447188 6600762944

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

Drawn By: Cesar Rodriguez Camacho

TH

E

IN

FO

R M

AT

IO

N

IN

T H

IS

P

AC

KA

G E

IS

P

R O

VI

D

ED

A

S

PH

IL

IP

S

EQ

U

IP

M

EN

T R

EQ

U

IR

EM

EN

TS

, A N

D

IS

N O

T

TO

B E

C O

N

ST

R U

ED

A

S

AR

C H

IT

EC

TU

R

AL

D

R

AW

IN

G

S O

R C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

A zu rio n

F1

TJ Stanley

(316) 558-4453 tj.stanley@philips.com

SCALE:

AD1

TRANSPORT DETAILS - POLY G FLOOR

N.T.S.

Detail - Poly Diagnost G Floor Transport Details

Detail - Poly Diagnost G Floor Transport Details Split (C-ARC)

Transport Possibilities

Crate Pallet Klick Wheels Skateboards Height 85.04" (2160mm) 82.48" (2095mm) 76.57" (1945mm) 77.52" (1969mm)

Weight 2998 lbs (1360 kg) 2866 lbs (1300 kg) 2756 lbs (2756 kg) 2480 lbs (1125 kg)

7' -7

7 16

[2

3m m

3'-2 1 16"

[967mm]

7' -7

7 16

[2

3m m

5'-43 4"

[1645mm]

8' -2

7 16

[2

0m m

3'-7 5 16"

[1100mm]

8' -2

7 16

[2

0m m

3'-7 5 16"

[1100mm]

Transport Possibilities

Crate Pallet Klick Wheels Shortest (Rot 24) Shortest (Rot 42) Skateboards Height 77.95" (1980mm) 75.59" (1920mm) 68.90" (1750mm) 76.30" (1938mm) 85.67" (2176mm) 76.57" (1945mm)

Weight 2028 lbs (920 kg) 1907 lbs (865 kg) 1764 lbs (800 kg) 1764 lbs (800 kg) 1764 lbs (800 kg) 1488 lbs (675 kg)

6' -1

9 16

[2

3m m

3'-2 5 16"

[974mm]

7' -4

1 8"

[2

8m m

6' -1

015 16

[2

6m m

5'-47 8"

[1647mm]

5'-47 8"

[1647mm]

7' -7

11 16

[2

8m m

5'-47 8"

[1647mm]

3'-7 5 16"

[1100mm]

7' -1

05 8"

[2

4m m

8' -2

7 16

[2

0m m

3'-7 5 16"

[1100mm]

Detail - Poly Diagnost G Floor Plate Transport Details for Base

1135 lbs (515 kg)

4' -1

01 2"

[1

5m m

3'-3"

[991mm] 3'-3"[991mm]

(12.0)

Front

Cabinet Rear Cover Deep

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

10 5 16"

[262mm]1'-95 8"

[550mm]

Cabinet Rear Cover Deep

8"

[10mm]

2"

[12mm]

13 16

[3 m m

16"

[300mm]

1' -3

3 4"

[4 m m

* Required ventilation for the front - 1113 16" (300mm)

* Required ventilation for the top - 1'-33 4" (400mm)

Notes:

* The CRC Cover must be attached to the back box.

* Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

Front

Cabinet Rear Cover Deep

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

10 5 16"

[262mm]1'-95 8"

[550mm]

Cabinet Rear Cover Deep

8"

[10mm]

2"

[12mm]

13 16

[3 m m

1' -3

3 4"

[4 m m

16"

[300mm]

* Required ventilation for the front - 1113 16" (300mm)

* Required ventilation for the top - 1'-33 4" (400mm)

Notes:

* The CRC Cover must be attached to the back box.

* Acoustic noise level: <= 48 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[175mm]1'-95 8"

[550mm]

Front

CRC Cover

CRC Cover

13 16

[3 m m

16"

[300mm]

1' -3

3 4"

[4 m m

* Required ventilation for the front - 1113 16" (300mm)

* Required ventilation for the top - 1'-33 4" (400mm)

Notes:

* The CRC Cover must be attached to the back box.

* Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

(24.0)

ME

Certeray iX Generator 40E Cabinet Weight

320 lbs

(24.0)

MA

Mains 40E Cabinet

Weight

717 lbs

(24.0)

MB

Image 40E Cabinet Weight

497 lbs

Front

Top

Side

9 16

[6 5m m

16"

[195mm]

1 4"

[2 m m

(23.0)

ATY

Auxiliary Box Weight

7 lbs

Front

Top

Side

1'-95 8"

[550mm]

4' -0

[1

0m m

3' -8

1 16

[1

0m m

1'-1 3 16"

[335mm]

1' -1

3 16

[3 m m

(23.0)

DB

Documentation Box

Weight

176 lbs

SCALE:

AD1

SYSTEM CABINET DETAILS

N.T.S. SCALE:

AD1

DOCUMENTATION BOX DETAIL

N.T.S.

SCALE:

AD1

AUXILIARY BOX DETAIL

N.T.S.

SCALE:

AD1

SYSTEM DETAIL

N.T.S.

Front

Top

Side

6'-43 4"

[1950mm]

6' -1

13 16

[1

5m m

12'-9 9 16"

[3900mm]

5'-21 2"

[1587mm]

9'-515 16"

[2895mm]

11'-6 3 16"

[3510mm]

51 8"

[1 m m

97 8"

[2 m m

For swing labs, 2700mm long ceiling rails are delivered. Maximum longitudinal column travel = 2100mm.

Weight shown is total weight including monitors, suspension, cabling, and options.

Bearing Forces:

(Tension) Tmax = 661 lbs/support (Shear) Vmax = 150 lbs/support

360°

(25.0)

FVXL

65" + (2) 27" LCD Monitor Suspension Weight

607 lbs

SCALE:

AD1

65" MONITOR SUSPENSION DETAIL

N.T.S.

Front

Signaling Box Option

Top

SideFront

Top

6" [1 m m

1'-1158"

[600mm] 2'-11"

[890mm]

6' -7

[2

7m m

6' -7

[2

7m m

77 8"

[2 m m

2' -1

1" [8 m m

77 8"

[2 m m

215 16

[7 5m m

7 1 16"

[179mm]

87 8"

[2 m m

6" [1 m m

8"

[200mm]

8"

[200mm]

(22.1)

Socomec - Compact Full Load UPS

Weight Heat Dissipation

UPS 2614 lbs 8750 BTU/hr

SBO 6.7 lbs - BTU/hr

UPS Cabinet

Front

* Required ventilation for the front - 77 8" (200mm)

* Required ventilation for the rear - 77 8" (200mm)

* Required ventilation for the top - 6" (155mm)

Notes:

* Acoustic noise level: <= 58 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

SCALE:

AD2

SOCOMEC CFL UPS DETAIL

N.T.S.

EQ

IP

M

EN

T

D

ET

A

IL

S

AD2

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS

AND SHOULD NOT BE SEPARATED. 10.10.2025

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.

Project Details

Philips Contacts

Drawing Number N-MID250366_RevB Date Drawn: 1/29/2026 Quote:

Order:

Project Manager:

Contact Number:

Email:

Pr oj ec t

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

R oo m : C at h

La b

D ra w in g Ti tle

Q-00447188 6600762944

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

Drawn By: Cesar Rodriguez Camacho

TH

E

IN

FO

R M

AT

IO

N

IN

T H

IS

P

AC

KA

G E

IS

P

R O

VI

D

ED

A

S

PH

IL

IP

S

EQ

U

IP

M

EN

T R

EQ

U

IR

EM

EN

TS

, A N

D

IS

N O

T

TO

B E

C O

N

ST

R U

ED

A

S

AR

C H

IT

EC

TU

R

AL

D

R

AW

IN

G

S O

R C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

A zu rio n

F1

TJ Stanley

(316) 558-4453 tj.stanley@philips.com

SCALE:

AD2

AUXILIARY

EQUIPMENT ADAPTER

N.T.S.SCALE:

AD2

SERVICE HUB

N.T.S. SCALE:

AD2

CONTROL ROOM

EQUIPMENT ADAPTER

N.T.S.

Front

Top

Side

4"

[234mm] 8"

[136mm]

3 16

[5 5m m

(23.0)

SH

Service Hub

Weight

7 lbs

(23.0)

CR1

Control Room Equipment Adapter Weight

4 lbs

Front

Top

Side

16"

[278mm]

9 5 16"

[236mm]

7 16

[6 1m m

SCALE:

AD2

CONTROL ROOM JUNCTION BOX DETAIL

N.T.S.

(23.0)

AUX1

AUX12

Auxiliary Equipment Adapter Weight

4 lbs

Front

Top

Side

16"

[278mm]

9 5 16"

[236mm]

7 16

[6 1m m

MAV

8'-2 7 16"

[2500mm]

Max.

Cross Support

1' -1

1 4"

[3 m m

Radiation Shield

Front

Top

Side

1'-11 4"

[337mm]

31 4"

[8 3m m

Detail - Cross Support (Not to scale)

Two, 12" (12mm) Dia. holes

Bearing Forces:

(Tension) Tmax =908 lbs/support (Shear) Vmax = 38 lbs/support

(25.0)

MAV

Mavig 2.5m Ceiling Track 360 w/ Radiation Shield and Y LED 1F light

Weight 167 lbs

Front

Top

Side

9 7 16"

[240mm]

63 8"

[1 m m

3 9 16"

[90mm]

Cable Spooler

Y LED 1F Surgical Light

360°

50°

360°

360°

45°

Maximum Travel

R6'-1 9 16"

[R1868mm]

1 16

[1 m m

7'-21 4"

[2190mm]

2'-5 9 16"

[750mm]

5'-53 8"

[1660mm]

1'-115 8"

[600mm]

2' -515 16

[7 m m

2'-71 2"

[800mm]

Control Module (Optional)

Review Module

Front Side

Top

Front Side

Top

Touch Screen Module (Optional)

DVD Writer (Optional)

1'-0" [304mm]

9 16

[1 m m

6 5 16"

[160mm]

13 16

[2 0m m

Front Side

Top

LCD Monitor

65 8"

[1 m m

1'-10 3 16"

[564mm]

1' -3

1 2"

[3 m m

Front Side

Top

Keyboard / Mouse

83 8"

[2 m m

315 16

[1 m m

1'-7 5 16"

[490mm]

8"

[60mm] 13 8"

[3 5m m

Front Side

Top

Junction Box (See SD for mounting options)

5 16

[1 m m

2'-413 16"

[732mm] 1' -4

1 4"

[4 m m

5 16

[1 m m

81 2"

[2 m m

Front Side

Top

1'-5 7 16"

[442mm]

1'-5 7 16"

[442mm]

4" [1 m m

Front Side

Top

61 4"

[1 m m

9" [228mm]

11 2"

[3 8m m

(24.0)

CY

Control Room Junction Box (All Components)

Weight

73 lbs

(24.1)

AVOX1

AVOX2

Auxiliary Video Output Weight

4 lbs

Front

Top

Side

16"

[278mm]

9 5 16"

[236mm]

7 16

[6 1m m

Applicable for all types of AVOs

(AVOC / AVOE / AVOX / AVOK /

AVOL / AVOB / AVOM)

SCALE:

AD2

AUXILIARY VIDEO OUTPUT DETAIL

N.T.S.

SCALE:

AD2

MAVIG 2.5m CEILING TRACK DETAIL

N.T.S.

AVOE1

Auxiliary Video Output (Powered by MB) Weight

4 lbs

SCALE:

AD2

FLEX JUNCTION BOX DETAIL

N.T.S.

Front

Top

Side

8"

[289mm]

9 5 16"

[236mm]

23 8"

[6 0m m

(23.0)

FJB1

Flex Junction Box

Weight

3 lbs

Front

Top

Side

5' -6

9 16

[1

0m m

1'-1 3 16"

[335mm]

5' -0

7 16

[1

4m m

1'-1113 16"

(24.0)

TV2

Single LCD Monitor on Cart Weight

75 lbs

SCALE:

AD2

MONITOR ON CART DETAIL

N.T.S.

Front

Top

Side

8"

[212mm]

37 8"

[9 9m m

Weight shown is for all components.

Front Side

Top

Front Side

Control Console- Keyboard / Mouse

CPU (46.6 lbs)

Front Side

Front Side

Sony Medical Grade Printer (12.2 lbs)

19" (480mm) LCD Monitor (13.2 lbs)

(24.0)

INT

IntraSight - Workstation

Weight

83 lbs

Top Top

Isolation Transformer (~10 lbs)

Front Side

Top 16"

[223mm]

7 16

[1 m m

1'-0 1 16"

[306mm]

1'-43 4"

[425mm]

1' -6

7 8"

[4 m m

7 7 16"

[189mm]

10" [255mm]

1'-4 7 16"

[418mm]

1' -5

5 16

[4 m m

11" [280mm]

8"

[60mm] 13 8"

[3 5m m

5" [1 m m

Top

1'-3 9 16"

[396mm]

2' -3

3 16

[6 m m

1'-05 8"

[321mm]

2' -3

1 4"

[6 m m

1'-101 4"

[565mm]

IntraSight Cart (Optional)

SCALE:

AD2

INTRASIGHT - WORKSTATION DETAIL

N.T.S. SCALE:

AD2

SYNCVISION DETAIL

N.T.S.

Front

Top

Side

2' -3

3 16

[6 m m

1'-05 8"

[321mm]

2' -3

1 4"

[6 m m

1'-101 4"

[565mm]

IntraSight Cart (Optional)

Front Side

Top

Front Side

Control Console- Keyboard / Mouse

CPU (46.6 lbs)

Front Side

19" (480mm) LCD Monitor (13.2 lbs)

Top Top

Isolation Transformer (~10 lbs)

Front Side

Top 16"

[223mm]

7 16

[1 m m

1'-0 1 16"

[306mm]

1'-43 4"

[425mm]

1' -6

7 8"

[4 m m

7 7 16"

[189mm]

10" [255mm]

1'-4 7 16"

[418mm]

1' -5

5 16

[4 m m

11" [280mm]

8"

[60mm] 13 8"

[3 5m m

5" [1 m m

Weight shown is for all components.

(24.0)

SYNC

SyncVision Weight

71 lbs

3'-0" 914mm

4' -2 m m

5'-9"1753mm

1' -2

6m m

Le ve l o f f lo or

1 8" m m w ith in th is a re a.

U ni st ru t h ei gh t s ha ll be s et a t 9

'-6 1 2" a bo ve hi gh t p oi nt w ith in th is a re a.

AD

C P

Is o

C en te r

9'-81 8"

2950mm

4' -9 m m

9' -8

5 8" m m

Po ly

G Fl oo r P la te

Poly G / Table ℄

AD

Ta bl e Fl oo r P la te

SH

1' -0

5m m

Level of floor within this area ± 18" (6mm).

ST

R

U C

TU

R

A L

P

LA

N S

Important Notes:

1. Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor.

2. Anchors for items that are installed/anchored by Philips shall be provided by Philips. If customer's engineering documents specify anchors other than those listed in this document, the anchors shall be provided by customer/contractor and installed by Philips.

3. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.

Equipment Support Information

11. Requirements for External Vibration The maximum allowed external vibration level of floors and ceilings, to which the equipment is mounted that will not adversely affect the image quality, is specified in terms of RMS velocity levels in 1/3-octave or terts bands, as follows:

B SH Service Hub SD/3

Floor & Wall Support Legend

Item Number

Description

Detail Sheet

Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor

G

D C B

Furnished and installed by PhilipsA

F E

Furnished by Philips and installed by Third PartyH

Center frequency [Hz] 1 1.25 1.6 2 2.5 3.15 4 5 6.3 8

Terts band value [μm/s]

(RMS) 50.8 50.8 50.8 50.8 63.5 80.01 101.6 127 160 203.2

Center frequency [Hz] 10 12.5 16 20 25 31.5 40 50 63 80

Terts band value [μm/s]

(RMS) 254 317.5 406.4 406.4 406.4 406.4 406.4 406.4 406.4 406.4

Center frequency [Hz] 100 125 160 200

Terts band value [μm/s]

(RMS) 406.4 406.4 406.4 406.4

Terts Band Specification for External Vibrations

A graphical representation of this specification is given below:

D CP Poly G Floor Plate S1/2

D AD7 AD7 Universal Floor Plate S1/4

S1

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET CS

AND SHOULD NOT BE SEPARATED. 10.10.2025

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

9.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he co py rig ht h ol de r.

Project Details

Philips Contacts

Drawing Number N-MID250366_RevB Date Drawn: 1/29/2026 Quote:

Order:

Project Manager:

Contact Number:

Email:

Pr oj ec t

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

R oo m : C at h

La b

D ra w in g Ti tle

Q-00447188 6600762944

VA

M ed ic al C en te r W ic hi ta

W ic hi ta

, K S

Drawn By: Cesar Rodriguez Camacho

TH

E

IN

FO

R M

AT

IO

N

IN

T H

IS

P

AC

KA

G E

IS

P

R O

VI

D

ED

A

S

PH

IL

IP

S

EQ

U

IP

M

EN

T R

EQ

U

IR

EM

EN

TS

, A N

D

IS

N O

T

TO

B E

C O

N

ST

R U

ED

A

S

AR

C H

IT

EC

TU

R

AL

D

R

AW

IN

G

S O

R C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

A zu rio n

F1

TJ Stanley

(316) 558-4453 tj.stanley@philips.com

Equipment Support Information

1. General The customer shall be solely responsible, at its expense, for preparation of the site, including any required structural alterations. The site preparation shall be in accordance with this plan and specifications, the architectural/construction drawings and in compliance with all safety and building codes. The customer shall be solely responsible for obtaining all construction permits from jurisdictional authority.

Customer's structural engineer shall provide Philips with written certification that structural supports meet Philips requirements to permit delivery and installation of equipment. Upon completion of project, Customer's Architect and Engineers of record shall provide a set of As-Built project construction documents (dwg) to Philips for closure of the Philips project history file.

2. Equipment Anchorage Philips provides, with this plan and specifications, information relative to equipment size, weight, shape, anchoring hole locations and forces which may be exerted on anchoring fasteners. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of equipment anchoring to floors, wall and/or ceiling of the building. Any anchorage test required by local authority shall be the customer's responsibility. Stud type anchor bolts should not be specified as they hinder equipment removal for service. Consult with Philips service prior to specifying anchor methods. Philips equipment must be electrically isolated from anchorage.

3. Floor Loading and Surface Philips provides, with this plan and specifications, information relative to size, weight and shape of floor mounted equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings confirmation of the structural adequacy of the floor upon which the equipment will be placed. Any load test required by local authority, shall be the customer's responsibility.

The floor surface/base plates upon which Philips equipment is to be located shall be flat and level to within 0.05 degrees.

4. Seismic Anchorage (For Seismic Zones Only) All seismic anchorage hardware, including brackets, backing plates, bolts, etc., shall be supplied and installed by the customer/contractor unless otherwise specified within the support legend on this sheet. Installation of electronic cabinets to meet seismic anchorage requirements must be accomplished using flush mounted expansion type anchor/bolt systems to facilitate the removal of a cabinet for maintenance. Do not use threaded rod/adhesive anchor systems. Philips equipment must be electrically isolated from anchorage. Seismic anchoring information and planning modifications are available upon request. Architect of Record to determine seismic planning needed for site. Consult with Philips regarding any anchor system issues.

5. Floor Obstructions/ Floor Coverings There shall be no obstructions on the floor (sliding door tracks, etc.) within the serviceability area of the Philips technical cabinets.

Floor must be clear to allow cabinets to be pulled away from the wall for service. Technical equipment room floor shall be commercial grade "VCT" Vinyl Composition Tile or a flooring material of equal hardness and compression resistance.

(25.0)

Terts Band Specification for External Vibrations

Terts band spectra shall be calculated on the basis of time traces with a duration of 10 minutes (600 seconds), taken at representative locations and during representative times during working days.

(23.1)

SCALE:

S1

AZURION 7 F12 - FLOOR STRUCTURAL

N.T.S.

Detail - Structural Azurion 7 F12

(19.0)

9'-85 8"

[2962mm] Floor Plate ℄

(Scribe Marks)

1' -1

15 8"

[6 m m

2'-3 9 16"

[700mm]

AD7 Universal Floor Plate

Cable Entrance Area

Floor plates supplied by Philips / installed by contractor.

Counterbored holes are sized for 12" (12mm) anchors per Seismic requirements.

AD7 Table Floor Plate to Floor Bolt Forces:

(Tension) Tmax = 1950 lbs/bolt (Shear) Vmax = 776 lbs/bolt

Poly G (Floor Version) Floor Plate to Floor Bolt Forces:

(Tension) Tmax = 1950 lbs/bolt (Shear) Vmax = 776 lbs/bolt

Poly Diagnost G Base:

Eight mounting holes for supplied M12 bolts

Poly Diagnost G Floor Plate

STANDARD DEFAULT FLOOR PLATE

1. Floor plate supplied by Philips / installed by contractor.

2. 1.18" (30mm) thick floor plate, flush mounted with top of slab.

3. Level within 1/32" (1mm) per 39" (1m) across surface of plate.

4. Anchor bolts with washer must not protrude above surface of floor plate. DO

NOT GRIND DOWN THE NUT

5. Counterbore holes are sized for 1/2" (12mm) anchors per Seismic requirements.

(25.0)

Four holes, 0.74" (19mm) dia.

Counterbored 1.57" (40mm) dia. x 0.83" (21mm) deep

Stand

5" (130mm) Core Drill

AD7 Table Floor Plate to Floor Bolt Forces:

(Tension) Tmax = 1950 lbs/bolt (Shear) Vmax = 776 lbs/bolt 1'-811

16"

[525mm] 1'-511

16"

[450mm]11 2"

[38mm] 11 2"

[38mm]

1' -8

11 16

[5 m m

1' -5

11 16

[4 m m

57 8"

[1 m m

8"

[150mm]

8"

[200mm]

Conduits are not routed through center of plate.

Section A - A

Universal AD7 Floorplate (to be supported completely)

AD7

Flange

Slab level Max floor covering 5mm

Epoxy Concrete

Concrete

A A Offset the border of the vinyl floor covering outward from the outline of the raised portion of the floor plate to prevent covering holes needed for fluid protection plate mounting. The outline should be measured from the center of the plate and is (1'-4") x (1'-5").

1'-5" [432mm]

1' -4

[4 m m

SCALE:

S1

AD7 UNIVERSAL PLATE - FLUSH

TABLE CLEARANCE DETAIL

N.T.S. SCALE:

S1

AD7 UNIVERSAL PLATE -

FLUSH MOUNT INSTALLATION DETAIL

N.T.S.

3'-0" [914mm]

Volcano Bedside Utility Box (BUB) *BUB is provided with IntraSight and may cause tripping hazard

41 2"

[1 m m

1'

-0 7 8"

[3 m m

2'-3" [686mm]

1'-13 4"

[350mm]

1'-11 3 16"

[588mm]

1'-11 7 16"

[595mm]

1' -8

11 16

[5 m m

1' -1

015 16

[5 m m

10 5 16"

[262mm]

Floor Plate ℄

Philips Flush Mounted Floor Plate (24.0)

3 8"

[1 0m m

Detail - AD7 SyncraTilt/Tilt Table, Fixed/Pivot Base - Clearance Area (Not to scale)

Area available for additional customer and/or non-Philips equipment such as Med Gases, electrical outlets, etc.

73°

SCALE:

S1

POLY DIAGNOST G FLOOR - INSTALLATION DETAIL

N.T.S.

1'-67 8"

[480mm]

1'-1013 16"

[580mm]

16"

[50mm]

1 4"

[2 m m

1 4"

[2 m m

3 16

[3 0m m

2' -0

13 16

[6 m m

1' -1

3 8"

[3 m m

1'-05 8"

[320mm]

16"

[176mm]

A

A

1. 0.79" (20mm) thick floor plate, flush mounted with top of slab.

2. Level within 1/32" (1mm) per 39" (1m) across surface of plate.

3. Align center of Poly Diagnost G floor plate with center of AD7 universal floor plate.

1. Use Jam nuts M16 (h=8.0mm) or (h=9.5mm)

2. Use only 1 washer.

3. Use loctite 243 instead of a lock washer.

4. Torque value to be determined by structural engineer of record.

(24.0)

Six holes, 0.75" (19mm) dia.

Counterbored 1.38" (35mm) dia. x 0.55" (14mm) deep

Table

Floor plate mounting to the building:

In case threaded rods are used and the nut protrudes above the floor plate surface, DO NOT GRIND DOWN THE NUT, but follow the procedure stated below to ensure the nut is flush with the floor plate surface.

Offset border of floor covering (Vinyl) by 9.84"…