Updated Drawings-589A7-25-503.pdf
PDF 15 MB Posted
- Solicitation number
- 36C25526R0142_1
About this file
These are 100% Contract Documents for Bidding prepared by Moon Tree, LLC for the Department of Veterans Affairs Robert J. Dole VA Medical Center in Wichita, Kansas. The project, titled "Prepare Site for Cath Lab Equipment" (VA Project Number 589A7-25-503), involves comprehensive renovation work to prepare two cardiac catheterization laboratory spaces on the second floor of a VA medical facility. The scope includes demolition of existing partitions, equipment, and infrastructure; installation of new walls, doors, and finishes; modification of mechanical, electrical, plumbing, and fire protection systems; and provision of structural support for new Philips angiography equipment (Angio Diagnostic 7 Premium systems with associated components).
The work encompasses 39 drawing sheets detailing architectural, structural, mechanical, electrical, plumbing, and fire protection modifications across two phases. Key specifications include lead-lined gypsum board walls in procedure rooms, new ceiling systems at 9'-6.5" height per equipment requirements, welded sheet vinyl flooring, new medical gas outlets with slide brackets, and HEPA-filtered negative air pressure systems for infection control (ICRA Class IV work). The construction must comply with 2021 NFPA 101 Life Safety Code, 2020 NEC, ASHRAE 90.1 energy standards, and VA design requirements. The documents include phasing plans, equipment layouts showing Philips-provided items, control room designs, and detailed schedules for mechanical equipment, electrical components, and finishes. All work must be coordinated with the active medical facility, maintain existing building systems operability, and coordinate with vendor-supplied equipment installation requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 1A
20 13 12
AREA OF WORK
VENDOR DRAWINGS - PHILIPS LAB 1
NUMBER SHEET DESCRIPTION
CS
GN
A1
AD1
AD2
S1
S2
E1
ED
COVER SHEET
ELECTRICAL DETAILS
ELECTRICAL PLANS
STRUCTURAL PLANS
STRUCTURAL PLANS
EQUIPMENT DETAILS
EQUIPMENT DETAILS
ARCHITECTURAL PLANS
GENERAL NOTES
TOTAL SHEETS: 20
R-A1.1
R-A1.2
R-S1.1
R-S2.1 CEILING SUPPORT LAYOUT - EQUIPMENT
FLOOR AND WALL SUPPORT LAYOUT
EQUIPMENT LAYOUT
SITE LAYOUT
NN NETWORK NOTES
R-E1.1
R-EC1
R-EC2 POINT TO POINT RUN LENGTHS
POINT TO POINT RUN LENGTHS
ELECTRICAL PLAN
R-S2.2 CEILING SUPPORT LAYOUT - UNISTRUT
R-ED.5 ELECTRICAL SCHEMATIC WITH SOCOMEC CFL DETAIL
VENDOR DRAWINGS - PHILIPS LAB 2
NUMBER SHEET DESCRIPTION
CS
GN
A1
AD1
AD2
S1
S2
E1
ED
COVER SHEET
ELECTRICAL DETAILS
ELECTRICAL PLANS
STRUCTURAL PLANS
STRUCTURAL PLANS
EQUIPMENT DETAILS
EQUIPMENT DETAILS
ARCHITECTURAL PLANS
GENERAL NOTES
R-A1.1
R-A1.2
R-S1.1
R-S2.1 CEILING SUPPORT LAYOUT - EQUIPMENT
FLOOR AND WALL SUPPORT LAYOUT
EQUIPMENT LAYOUT
SITE LAYOUT
NN NETWORK NOTES
R-E1.1
R-EC1
R-EC2 POINT TO POINT RUN LENGTHS
POINT TO POINT RUN LENGTHS
R-S2.2 CEILING SUPPORT LAYOUT - UNISTRUT
R-ED.5 ELECTRICAL SCHEMATIC WITH SOCOMEC CFL DETAIL
SD STRUCTURAL DETAILS
ELECTRICAL PLAN
SD STRUCTURAL DETAILS
TOTAL SHEETS: 20
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
MOON TREE, LLC
1808 Deep Creek Rd Oklahoma City, OK 73131
(405) 509-5254
STRUCTURAL / CIVIL
ENGINEER
MOON TREE, LLC
1808 DEEP CREEK ROAD
OKLAHOMA CITY, OK 73131
(405) 509-5254
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
FIRE PROTECTION
ENGINEER
F U
L L
Y S
P R
IN
K
L E
R E
D
BOWMAN FOSTER & ASSOCIATES, INC
6353 CENTER DRIVE, #101
NORFOLK, VA 23502
(757) 466-7400
/1
/2
:2
:3
A
M
GI-000
COVER SHEET
JDA
1 37
DW
100% CONTRACT DOCUMENTS FOR BIDDING
PREPARE SITE FOR CATH LAB EQUIPMENT
VA PROJECT NUMBER: 589A7-25-503
PREPARE SITE FOR CATH LAB
EQUIPMENT
08/17/2026
589A7-25-503
DEPARTMENT OF VETERANS AFFAIRS
ROBERT J. DOLE VA MEDICAL CENTER
5500 KELLOGG DR. WICHITA, KS 67218
RALPH H. JOHNSON MEDICAL CENTER
DEPARTMENT OF VETERANS AFFAIRS
ROBERT J. DOLE VA MEDICAL CENTER
5500 KELLOGG DR. WICHITA, KS 67218
100% CONTRACT DOCUMENTS FOR
BIDDING
02-
SHEET INDEX
NUMBER SHEET NAME
[01] GENERAL
GI-000 COVER SHEET
GI-001 GENERAL INFORMATION
GI-101 ICRA AND PHASING PLAN
GI-011 LIFE SAFETY PLANS
GI-100 INFECTION CONTROL DETAILS
[02] STRUCTURAL
SF101 STRUCTURAL SUPPORT INFORMATION AND DETAILS
[03] ARCHITECTURAL
AD-100 DEMOLITION PLANS- FIRST FLOOR
AD-101 DEMOLITION PLANS - SECOND FLOOR
AE-100 REFERENCE AND COMPLIANCE PLAN
AE-101 NEW WORK PLAN
AE-102 EQUIPMENT PLAN
AE-103 REFLECTED CEILING PLANS
AE-104 ENLARGED PLAN, INTERIOR ELEVATIONS
AF-701 FINISH FLOOR PLANS
1" = 160'-0"
STATION MAP1
SHEET INDEX
NUMBER SHEET NAME
[04] FIRE PROTECTION
FP101 FIRE SPRINKLER MODIFICATION PLAN
[05] PLUMBING
PD-101 SECOND FLOOR MEDICAL GAS PIPING PLAN - DEMOLITION
PM-101 SECOND FLOOR MED CAS PIPING PLAN
[06] MECHANICAL
M-001 MECHANICAL LEGEND, ABBREVIATIONS AND NOTES
MD-101 SECOND FLOOR PLAN - MECHANICAL DEMOLITION
MD-102 ATTIC FLOOR PLAN - DUCTWORK DEMOLITION
MD-103 ATTIC FLOOR PLAN - PIPING DEMOLITION
MH-101 SECOND FLOOR PLAN - DUCTWORK PLAN
MH-102 ATTIC FLOOR DUCTWORK PLAN
MP-101 SECOND FLOOR PIPING PLAN
MP-102 ATTIC FLOOR PIPING PLAN
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-701 TEMPERATURE CONTROLS
[07] ELECTRICAL
E-001 ELECTRICAL LEGEND, ABBREVIATIONS AND NOTES
ED-101 SECOND FLOOR ELECTRICAL PLAN - DEMOLITION
ED-102 ATTIC FLOOR ELECTRICAL PLAN - DEMOLITION
EL-101 SECOND FLOOR PLAN LIGHTING
EP-101 SECOND FLOOR POWER PLAN
EP-102 ATTIC FLOOR POWER PLAN
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL SCHEDULES
E-602 EXIST ONE-LINE POWER RISER DIAGRAM
E-603 EXIST ONE-LINE POWER RISER DIAGRAM – DEMOLITION
E-604 EXIST ONE-LINE POWER RISER DIAGRAM - NEW WORK
TOTAL SHEETS: 39
K SAN AS
NSE EC DIL
A8404
A TR CC EH TI
R E AF YI EN RN SEJ
03/17/26
08/17/2026
NOTE - VENDOR DRAWINGS ARE PROVIDED FOR REFERENCE FOR BIDDING PURPOSES. FINAL INSTALLATION DRAWINGS AND SPECIFICATIONS FOR VENDOR SUPPLIED EQUIPMENT MAY DIFFER FROM THOSE SHOWN REGARDING EXACT EQUIPMENT, MOUNTING, HARDWARE, AND PLACEMENT. THE GC SHALL COORDINATE WITH THE VENDOR FOR FINAL DRAWINGS AND SPECIFICATIONS OF THE VENDOR SUPPLIED EQUIPMENT UPON START OF
CONSTRUCTION.
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,
FIXTURES, AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
VA TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
"M A
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" M
A X
T O
B .O
R
E F
L E
C T
IV
E
S U
R F
A C
E
M
A X
17 MIN
2' -3
M
IN
3' -0
M
A X
1'-6" MIN
WALL
2' -9
" 4' -0
M
IN
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-5" - 1'-7" (AMBULATORY)
1'-4" - 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
1'-0" MIN
3'-6" MIN 1'-0"MAX
4'-6" MIN
1' -5
'-7
M
IN
A
N S
I
IC
C A
.1
M
IN
A D
A /A
B A
2' -9
'-0
WALL
WALL
4' -0
M
A X
WALL HOOK
7' -0
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
"M A
X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS AND
BUMPERGUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2021 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 INTERNATIONAL MECHANICAL CODE
• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: WICHITA, KS
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING
ATTIC AND OTHER: R-49 EXISTING
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 N/A
WOOD-FRAMED AND OTHER: R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. N/A.
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 N/A
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 EXISTING
OPERABLE: U-0.45 EXISTING
ENTRANCE DOOR: U-0.63 N/A
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN
ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,
EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR
INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60
CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS
DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER
MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE
THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS
REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,
IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME
SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY
OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE
INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN
ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY
AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT.
MOONTREE, LLC, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
1023A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00"
4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
/1 A101
X0000
6"
3' -0
M
A X
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPXOY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
3"
6" 1'
-6
6" MAX
7" - 9" 11" MIN
17" - 25"
M
IN
6' -0
(ANSI ICC A117.1)
39"- 41"
(A N
S I
IC
C A
.1
M
IN
(A N
S I
IC
C A
.1
3' -6
M
A X
5' -0
M
A X
R
RAF RESILIENT ATHETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICLAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
MOON TREE, LLC
1808 Deep Creek Rd Oklahoma City, OK 73131
(405) 509-5254
STRUCTURAL / CIVIL
ENGINEER
MOON TREE, LLC
1808 DEEP CREEK ROAD
OKLAHOMA CITY, OK 73131
(405) 509-5254
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
FIRE PROTECTION
ENGINEER
F U
L L
Y S
P R
IN
K
L E
R E
D
BOWMAN FOSTER & ASSOCIATES, INC
6353 CENTER DRIVE, #101
NORFOLK, VA 23502
(757) 466-7400
/1
/2
:2
:3
A
M
GI-001
GENERAL INFORMATION
JDA
2 37
DW
100% CONTRACT DOCUMENTS FOR BIDDING
PREPARE SITE FOR CATH LAB
EQUIPMENT
08/17/2026
589A7-25-503
DEPARTMENT OF VETERANS AFFAIRS
ROBERT J. DOLE VA MEDICAL CENTER
5500 KELLOGG DR. WICHITA, KS 67218 02-
K SAN AS
NSE EC DIL
A8404
A TR CC EH TI
R E AF YI EN RN SEJ
03/17/26
08/17/2026
UP
3 4 5 6
7 8 10
A
B
C
D
E
F
UP
PHASING FLOOR PLAN LEGEND
AREA NOT IN CONTRACT
AREA OF WORK PHASE 2
NOTE: ALL SYMBOLS MAY NOT BE USED
MINIMUM PROGRAM AREA TO
REMAIN FULLY FUNCTIONAL
DURING CONSTRUCTION. THIS
MEETS THE MINIMUM
FUNCTIONAILITY
REQUIREMENTS SET FORTH BY
THE VA
AREA OF WORK PHASE 1
AREA OF WORK PHASE 1A
3 4 5 6 7 8 10
C
D
E
F
WOMENS TOILET
208A-2
WORK
209-2
UPS/BATTERY
209A-2
RECOVERY
212-2
PT TOILET
211-2
HK
210-2
WOMENS LOCKER
208-2
NURSE OFFICE
205-2
UTILITY
204A-2
UPS/COMP
203A-2
CONTROL
203-2 WAITING
200-2
CATH LAB 1
218-2
CATH LAB 2
216-2
CLEAN UTILITY
217A-2
STERILE SUPPLIES
215-2
HOLDING/PREP
214-2
CORRIDOR
C-2-1
HK
210-2
ELEC
201-2
STAIR
211-3
CONTRACTOR
ENTRANCE
CORRIDOR
C-2-3 STERILE SUPPLIES
215-2
CATH LAB 2
216-2
EQUIPMENT ROOM
216A-2
CONTROL ROOM
217-2
CLEAN UTILITY
217A-2
CATH LAB 1
218-2
CORRIDOR
207A-26
COM
202-2
P5P6
P7
H O
LD
4' -0
3 4 5 6 7 8 10
C
D
E
F
WOMENS TOILET
208A-2
WORK
209-2
UPS/BATTERY
209A-2
RECOVERY
212-2
PT TOILET
211-2
HK
210-2
WOMENS LOCKER
208-2
WOMENS LOCKER
208-2
NURSE OFFICE
205-2
UTILITY
204A-2
UPS/COMP
203A-2
CONTROL
203-2 WAITING
200-2
CATH LAB 1
218-2
CATH LAB 2
216-2
CLEAN UTILITY
217A-2
STERILE SUPPLIES
215-2
CORRIDOR
C-2-3
HOLDING/PREP
214-2
CORRIDOR
C-2-1
HK
210-2
ELEC
201-2
STAIR
211-3
H O
L D
CONTRACTOR
ENTRANCE
STERILE SUPPLIES
215-2
CORRIDOR
C-2-3
CATH LAB 1
218-2 CONTROL ROOM
217-2
EQUIPMENT ROOM
216A-2
CLEAN UTILITY
217A-2
CATH LAB 2
216-2
P3
P4
FOR THE PURPOSE OF THE RENOVATION, THE CONSTRUCTION WORK IS CONSIDERD ICRA
CLASS IV. THE DUST CONTROL PLAN SHALL BE DISTRIBUTED AND REVIEWED BY ALL
CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT.
A. EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
1. COORDINATE WITH COR TO DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN
OPERATE TEMPORARILY ON RECIRCULATED AIR; IF FEASIBLE SEAL OFF ADJACENT AIR
INTAKES.
2. IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS
FREQUENTLY AND REPLACE AS NEEDED TO AVOID BUILDUP OF PARTICULATE.
3. SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR
INTRUSION (OPEN DOORS IN STAIRWELLS AND CORRIDORS) ESPECIALLY IN
PROTECTIVE ENVIRONMENT (PE) AREAS.
B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. BARRIER SYSTEMS: THE AREA SHALL BE ISOLATED, AS THE PROJECT REQUIRES (FOR
ICRA CLASS III AND IV PROJECTS OR AS OTHERWISE DIRECTED BY COR). SMALL, SHORT
DURATION PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC
SHEETING, BUT SHALL BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT
OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT PRODUCE MODERATE
TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER
WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR
TO CEILING. SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED
FOR CONTAINMENT. LARGE DUSTY PROJECTS NEED AN ENTRY VESTIBULE FOR
CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHALL BE MAINTAINED AT
THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST
BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID
IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY
CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION
OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO
MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. CONTRACTOR
PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE
EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST
EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF
INSECTS AND FLIES, WET CEILING TILES, ETC.
2. TRAFFIC CONTROL: DESGINATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED.
EGRESS PATHS SHALL BE FREE OF DEBRIS, DESIGNATED ELEVATORS SHALL BE USED
DURING SCHEDULED TIMES, AND ONLY AUTHORIZED PERSONNELL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
3. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE
USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD
OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE
VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT IN USED. FILTERS SHALL BE BAGGED
AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE
CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT
PRIOR APPROVAL OF THE VAMC.
4. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION ROM ANY
ADJACENT EXCAVATION DEBRIS.
C. VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RECIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM
CLEAN TO DIRTY AREAS. COORDINATE WITH COR.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE
NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTIONOF AIR
SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN
THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE,
PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER
MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC.
IF EXHAUST MUST BE TIED INTO A RECIRCULATED AIR SYSTEM, PRE-FILTER AND HEPA
FILTER SHALL BE USEDBEFORE EXHAUST TO PREVENT CONTAMINATION OF THE
DUCTS.
3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL
BE VERIFIED DAILY.
4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR WILL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION
ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM
THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON
PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE
THROUGHOUT THE PROJECT.
D. CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE
SOILS ND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE
APPAREL IS NOT WORM (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-
FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE
LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR
SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING MATERIALS, ETC.
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND
MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
2. CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHALL BE MAINTAINED IN A CLEAN
MANNER BY CONTRACTORS AND SWEPT OF HEPA-VACUUMED DAILY OR MORE
FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE
IMPACTED BY THE CONSTRUCTION SHALL BE DAMP MOPPED DAILY OR MORE
FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES
SHALL BE UTILIZED TO MINIMIZE TRACKING OF HEAVY DIRT AND DUST FROM
CONSTRUCTION AREAS.
GENERAL INFECTION CONTROL PLAN NOTES
A. PRIOR TO ANY WORK, CONTRACTOR TO SUBMIT ALL REQUIRED SAFETY, WASTE MANAGEMENT, ICRA AND OTHER FRONT END SUBMITTALS AND PLANS TO COR AND OBTAIN APPROVAL TO PROCEED WITH WORK, REFER TO SPECIFICATIONS FOR MORE INFORMATION.
B. BARRIERS TO BE IMPLEMENTED UNDER DIRECTION OF THESE DRAWINGS AND ACCORDING TO THE COR AND ICRA REVIEW SHALL BE INSTALLED BY THE CONTRACTOR PRIOR TO ANY WORK SHOWN WHETHER IT
BE DEMOLITION OR NEW CONSTRUCTION.
C. ICRA INFORMATION SHOWN THIS SHEET DOES NOT CONSTITUTE A COMPLETE BARRIER OR AIRLOCK
SYSTEM SUCH AS REQUIRED FOR ASBESTOS ABATEMENT. REFER TO ABATEMENT DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS FOR BARRIERS, AIRLOCKS, AND OTHER SAFETY REQUIREMENTS PRIOR TO START OF ABATEMENT, DEMOLITION, OR CONSTRUCTION ACTIVITIES.
ICRA BARRIER NOTES
A. THIS SHALL SERVE AS A GENERAL GUIDELINE ONLY. PHASES REPRESENT GENERAL DESCRIPTION OF WORK BUT ITEMS OF WORK IN EACH PHASE WILL OCCUR AT DIFFERENT TIMES ACCORDING TO THE COORDINATION SCHEDULE AVAILABLE AT REQUEST TO THE COR WHICH IS AN INTEGRAL PART OF THE TIMELINE OF WORK TOBE REFERENCED AS A PART OF THIS PACKAGE. FOR BID PURPOSES, ALL OF THE NOISE-PRODUCING WORK DESCRIBED IN THIS CONTRACT MAY BE CONDUCTED DURING NORMAL WORKING HOURS, UNLESS OTHERWISE
DIRECTED BY COR, AS NO PATIENTS ARE HOUSED IN THIS BUILDING.
B. CONSTRUCTION TRAFFIC THROUGH THE FACILITY SHALL BE COORDINATED WITH THE OWNER. ALL CONSTRUCTION WORKERS, MATERIALS AND CLOTHING WILL BE TRANSPORTED THROUGH THE FACILITY DUST FREE. ANY DUSTY, ODOROUS, OR WET MATERIALS SHALL BE TRANSPORTED IN SEALED CLEAN BAGS. TRAFFIC ROUTES WILL BE AT THE DISCRETION OF THE OWNER BUT ARE SHOWN AS PROPOSED ON THESE DRAWINGS.
C. COORDINATE TEMPORARY EGRESS OF BUILDINGS WITH THE COR WHERE ANY BARRIERS ARE INSTALLED.
D. ICRA CONTAINMENT DOES NOT REFLECT FINAL CONFIGURATION INCLUDING MULTIPLE TEMPORARY LOCATIONS OF MOBILE CART CONTAINMENT WORK. CONTRACTOR SHALL SUBMIT CONTAINMENT PLANS PRIOR TO START OF WORK. ALL WALLS AND MOBILE CONTAINMENT PLANS AND CONSTRUCTION REQUIRE APPROVAL OF COR
BEFORE STARTING WORK WITHIN CONTAINED AREAS.
E. CONTRACTOR TO PERFORM BARRIER INSTALLATION AND SUBMIT ALL REQUIRED SAFETY, WASTE MANAGEMENT, ICRA AND OTHER FRONT END SUBMITTALS AND PLANS TO COR AND OBTAIN APPROVAL TO PROCEED WITH
WORK, REFER TO SPECIFICATIONS FOR MORE INFORMATION.
F. CONTRACTOR WILL DEMOLISH EXISTING SYSTEMS AND COMPONENTS AS INDICATED ON DEMOLITION PLAN.
G. CONTRACTOR WILL INSTALL NEW MECHANICAL, ELECTRICAL AND PLUMBING AND FINISH ARCHITECTURAL MODIFICATIONS IN PERPARATION FOR INSTALLATION OF NEW/RELOCATED VA FURNITURE AND EQUIPMENT.
H. EQUIPMENT WILL BE INSTALLED IN FINAL LOCATION INDICATED ON EQUIPMENT PLAN BY VA.
I. IF ADDITIONAL BARRIERS ARE TO BE IMPLEMENTED FOR ASBESTOS REMEDIATION, PHASING, OR UNDER DIRECTION OF THE COR, THEY SHALL BE INSTALLED BY THE CONTRACTOR PRIOR TO WORK UNDER THIS
CONTRACT.
GENERAL PHASING PLAN NOTES
A. ANY INCIDENTS DURING DEMOLITION AND/OR CONSTRUCTION THAT CAUSE OTHER AREAS TO BECOME CONTAMINATED/DAMAGED AS DETERMINED BY VA HEALTH AND SAFETY OFFICIALS AND/OR CONSULTANTS WILL REQUIRE CONTRACTOR TO IMMEDIATELY PERFORM ALL NECESSARY WORK/CLEANING/REPLACEMENT OF SUCH AREAS AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE VA CONTRACTING OFFICER
THAT THE AFFECTED AREA HAS BEEN RESTORED TO ESTABLISHED STANDARDS.
B. CONTRACTOR SHALL SUBMIT AN ICRA PLAN SHOWING BARRIER STRUCTURE LOCATION AND TIME REQUIRED FOR CONTINUOUS BARRIER USE. SUBMIT ICRA PLAN AND BARRIER TIME SCHEDULE ALONG WITH OVERALL CONSTRUCTION SCHEDULE (REFER TO SPECIFICATIONS). VA WILL HAVE FINAL APPROVAL OF BARRIER
SCHEDULE; VA MAY REQUIRE DAILY DISASSEMBLY TO MAINTAIN VA OPERATIONS.
C. REFER TO DEPARTMENT OF VETERANS AFFAIRS "SOP NO.120/NFS-006" (AVAILABLE FROM COR) FOR ADDITIONAL REQUIREMENTS FOR HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) PLAN TO BE
FOLLOWED BY ALL WORKERS ON SITE.
GENERAL CONTRACTOR WORK NOTE
NOTE: ALL SYMBOLS MAY NOT BE USED
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE REMOVED
EXISTING DOOR & FRAME TO REMAIN
EXISTING DOOR, FRAME, & PARTITION
TO BE REMOVED
EXISTING DOOR & FRAME TO BE
REMOVED
PRE-MANUFACTURED MOBILE ICRA
CONTAINMENT CART. FOR USE IN AREAS
OF MINOR WORK ABOVE CEILING
OUTSIDE OF CONTAINED AREAS SHOWN
PROVIDE TEMPORARY INFECTION AND DUST
CONTROL BARRIERS AT THIS LOCATION.
REMOVE AFTER CONTSRUCTION IS COMPLETED.
WALK-OFF DUST MAT (2'-0" X 3'-0")
NEGATIVE AIR HEPA FILTER SYSTEM
INFECTION AND DUST CONTROL PLAN LEGEND
VISQUENE INFECTION CONTROL BARRIER, WHEN
PERMITTED BY FACILITY
NAG MANOMETER (NEGATIVE AIR GAUGE)
AREA NOT IN CONTRACT
3 4 5 6 7 8 10
C
D
E
F
WOMENS TOILET
208A-2
WORK
209-2
UPS/BATTERY
209A-2
RECOVERY
212-2
PT TOILET
211-2
HK
210-2
WOMENS LOCKER
208-2
WOMENS LOCKER
208-2
NURSE OFFICE
205-2
UTILITY
204A-2
UPS/COMP
203A-2
CONTROL
203-2 WAITING
200-2
CATH LAB 1
218-2
CATH LAB 2
216-2
CLEAN UTILITY
217A-2
STERILE SUPPLIES
215-2
CORRIDOR
C-2-3
HOLDING/PREP
214-2
CORRIDOR
C-2-1
HK
210-2
ELEC
201-2
STAIR
211-3
H O
L D
HOLD
3'-4
CONTRACTOR
ENTRANCE
STERILE SUPPLIES
215-2
CORRIDOR
C-2-3
CATH LAB 1
218-2 CONTROL ROOM
217-2
EQUIPMENT ROOM
216A-2
CLEAN UTILITY
217A-2
CATH LAB 2
216-2
P1
P1
P1
P2
BUILDING 1
BUILDING 2
AREA OF WORK
ELEVATOR
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
MOON TREE, LLC
1808 Deep Creek Rd Oklahoma City, OK 73131
(405) 509-5254
STRUCTURAL / CIVIL
ENGINEER
MOON TREE, LLC
1808 DEEP CREEK ROAD
OKLAHOMA CITY, OK 73131
(405) 509-5254
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
FIRE PROTECTION
ENGINEER
F U
L L
Y S
P R
IN
K
L E
R E
D
BOWMAN FOSTER & ASSOCIATES, INC
6353 CENTER DRIVE, #101
NORFOLK, VA 23502
(757) 466-7400
/1
/2
:2
:4
A
M
GI-101
ICRA AND PHASING PLAN
JDA
3 37
DW
100% CONTRACT DOCUMENTS FOR BIDDING
PREPARE SITE FOR CATH LAB
EQUIPMENT
08/17/2026
589A7-25-503
DEPARTMENT OF VETERANS AFFAIRS
ROBERT J. DOLE VA MEDICAL CENTER
5500 KELLOGG DR. WICHITA, KS 67218 02-
Scale: 1/8" = 1'-0"
LEVEL 2 - PHASE 2
Scale: 1/8" = 1'-0"
LEVEL 2 - PHASE 1A
Scale: 1" = 40'-0"
KEY PLAN
Scale: 1/8" = 1'-0"
LEVEL 2 - PHASE 1
PHASING KEYNOTES
P1 GENERAL CONTRACTOR TO INSTALL ICRA BARRIERS FOR PHASE 1
P2 GENERAL CONTRACTOR TO COMPLETE WORK REQUIRED FOR NEW SWING DOOR TO CLEAN UTILITY ROOM
P3 GENERAL CONTRACTOR TO REWORK ICRA BARRIER AND OPEN ACCESS TO THE CLEAN UTILITY FOR
REMAINDER OF PHASE 1
P4 GENERAL CONTRACTOR TO PERFORM ALL SCOPE OF WORK FOR CATH LAB 2
P5 GENERAL CONTRACTOR TO REMOVE ICRA BARRIER AND OPEN ACCESS CATH LAB 2
P6 GENERAL CONTRACTOR TO INSTALL ICRA BARRIERS FOR PHASE 2
P7 GENERAL CONTRACTOR TO REWORK ICRA BARRIER AND OPEN ACCESS TO THE CLEAN UTILITY FOR
REMAINDER OF PHASE 2
Scale: 1" = 30'-0"
DEMOLITION MATERIALS ROUTE
**DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, SEE ADDITIONAL NOTES THIS SHEET.
K SAN AS
NSE EC DIL
A8404
A TR CC EH TI
R E AF YI EN RN SEJ
03/17/26
3 4 5 6
7 8 10
A
B
C
D
E
F
NFPA 101 2024 EDITION
BUILDING HEIGHT: BUILDING 2
3 STORIES, 50'-0" HEIGHT
BUILDING AREA:
AREA LIMITATION: UNLIMITED SF PER FLOOR (2024 IBC TABLE 504.3)
AREA OF FLOOR (EXISTING): 4,991 S.F.
AREA OF WORK: 1,938 SF
BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT
CONSTRUCTION TYPE: (TABLE A.8.2.1.2): TYPE I (332)
FIRE RESISTANCE RATINGS:
• EXTERIOR BEARING WALLS:
• SUPPORTING MORE THAN ONE FLOOR, COLUMN OR OTHER BEARING WALL:3 HR / EXISTING
• SUPPORTING A FLOOR ONLY: 2 HR / EXISTING
• SUPPORTING A ROOF ONLY: 2 HR / EXISTING
• INTERIOR BEARING WALLS:
• SUPPORTING MORE THAN ONE FLOOR, COLUMN OR OTHER BEARING WALL:3 HR / EXISTING
• SUPPORTING A FLOOR ONLY: 2 HR / EXISTING
• SUPPORTING A ROOF ONLY: 2 HR / EXISTING
• COLUMNS:
• SUPPORTING MORE THAN ONE FLOOR, COLUMN OR OTHER BEARING WALL:3 HR / EXISTING
• SUPPORTING A FLOOR ONLY: 2HR / EXISTING
• SUPPORTING A ROOF ONLY: 2HR / EXISTING
• BEAM, GIRDERS, TRUSSES:
• SUPPORTING MORE THAN ONE FLOOR, COLUMN OR OTHER BEARING WALL: 3 HR / EXISTING
• SUPPORTING A FLOOR ONLY: 2 HR / EXISTING
• SUPPORTING A ROOF ONLY: 2 HR / EXISTING
• FLOOR/CEILING ASSEMBLIES: 2 HR / EXISTING
• ROOF/CEILING ASSEMBLIES: 2HR / EXISTING
• EXTERIOR NON-BEARING WALLS: 0 HR / EXISTING
• INTERIOR NON-BEARING WALLS: 0 HR
FIRE-RESISTIVE REQUIREMENTS:
• NON COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS, ROOF DECK, EXTERIOR NON-
BEARING WALLS, INTERIOR NON-BEARING WALLS
CHAPTER 21: EXISTING AMBULATORY HEALTHCARE OCCUPANCY
OCCUPANT LOADS (TABLE 7.3.1.2):
• SECOND FLOOR AMBULATORY HEALTHCARE USE = 100 SF / PERSON
4,991 SF / 100 = 49.9 PERSONS / EXISTING
49.9 (0.2) = 9.98" EXIT WIDTH REQUIRED.
MINIMUM EXITS REQUIRED: 2
SHAFTS CONNECTING LESS THAN 4 STORIES (8.6.5)
• 1 HR MINIMUM
DEAD END CORRIDOR (21.2.5.3.1)
• MAXIMUM DISTANCE: 50'
COMMON PATH OF TRAVEL (21.2.5.2.1)
• MAXIMUM DISTANCE: 100'
TRAVEL DISTANCE (21.2.6.2.1 / 21.2.6.2.2.)
• MAXIMUM DISTANCE: 200'
CORRIDOR MINIMUM FIRE RATING (21.3.6. NO REQUIREMENTS)
• 0 HR
ALL EXISTING EXIT DOORS PROVIDED ARE 36" LEAF MINIMUM YIELDING 34" CLEAR EXIT WIDTH.
PROTECTED AREAS:
• STORAGE ROOMS / CLEAN / SOILED - REQUIRED PER VA FIRE PROTECTION DESIGN MANUAL 3.1.A AND
PER NFPA 101: 23.3.2 AND 8.7 SMOKE PARTITIONS WITH SPRINKLER PROTECTION, PROVIDED.
• MEDICAL RECORDS STORAGE - 1 HR PER VA FIRE PROTECTION DESIGN MANUAL SECTION 3.1.B.
SMOKE COMPARTMENTALIZATION:
NOT REQUIRED FOR AMBULATORY OCCUPANCIES, NOT PROVIDED.
FIRE ALARM SYSTEM:
REQUIRED / EXISTING.
LIFE SAFETY CODE ANALYSIS
LIFE SAFETY LEGEND
FEC FIRE EXTINGUISHER CABINET
EXIT LIGHT / SIGN
BUILDING EXIT
EGRESS PATH
EGRESS START
AREA NOT IN SCOPE
FIRE-RATED PARTITIONS & SMOKE BARRIERS
EXISTING FIRE - 1 HOUR
EXISTING FIRE - 2 HOUR
EXISTING FIRE / SMOKE - 1 HOUR
EXISTING FIRE / SMOKE - 2 HOUR
SUITE
NON-RATED SMOKE RESISTIVE ENCLOSURE
1 HOUR HAZARDOUS ROOM (NFPA 101)
SMOKE RESISTIVE HAZARDOUS ROOM (NFPA 101)
HOLDING/PREP
214-2
RECOVERY
212-2
MECHAINCIAL
ACCESS
213-2
95 SF
STERILE SUPPLIES
215-2
410 SF
CATH LAB 2
216-2
68 SF
CLEAN UTILITY
217A-2
MENS LOCKER
207-2
432 SF
CATH LAB 1
218-2
STAIR
211-3
WAITING
200-2
ELEC
201-2
WOMENS LOCKER
208-2
CORRIDOR
C-2-1
UPS/COMP
203A-2
UTILITY
204A-2
NURSE OFFICE
205-2
PHYSICIANS OFFICE
206-2
MENS TOILET
207A-2
WOMENS TOILET
208A-2
WOMENS LOCKER
208-2
WORK
209-2
UPS/BATTERY
209A-2
HK
210-2 PT TOILET
211-2
CONTROL
203-2
ROOF
ROOF
107' - 3"
24 sec
203 SF
CONTROL ROOM
217-2
99 SF
EQUIPMENT ROOM
216A-2 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
MOON TREE, LLC
1808 Deep Creek Rd Oklahoma City, OK 73131
(405) 509-5254
STRUCTURAL / CIVIL
ENGINEER
MOON TREE, LLC
1808 DEEP CREEK ROAD
OKLAHOMA CITY, OK 73131
(405) 509-5254
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
FIRE PROTECTION
ENGINEER
F U
L L
Y S
P R
IN
K
L E
R E
D
BOWMAN FOSTER & ASSOCIATES, INC
6353 CENTER DRIVE, #101
NORFOLK, VA 23502
(757) 466-7400
/1
/2
:2
:3
A
M
GI-011
LIFE SAFETY PLANS
JDA
4 37
DW
100% CONTRACT DOCUMENTS FOR BIDDING
PREPARE SITE FOR CATH LAB
EQUIPMENT
08/17/2026
589A7-25-503
DEPARTMENT OF VETERANS AFFAIRS
ROBERT J. DOLE VA MEDICAL CENTER
5500 KELLOGG DR. WICHITA, KS 67218 02-
Scale: 1/4" = 1'-0"
LEVEL 2 - LIFE SAFETY PLAN
Scale: 1" = 40'-0"
KEY PLAN
K SAN AS
NSE EC DIL
A8404
A TR CC EH TI
R E AF YI EN RN SEJ
03/17/26
LOW RISK
ICRA ASSESSMENT - PATEINT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREAS
• OUTDOORS
• MEP ROOMS
• RETAIL
• STAGE
• RECREATION
• THEATER
• STAIRWELLS
• OTHER
• CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY/MRI
• RESPIRATORY THERAPY
• OUTPATIENT CLINICS
• WAITING ROOMS
• SLEEP LABS
• MENTAL HEALTH
• DOMICILIARY
• ORTHOTICS
• EMERGENCY ROOM
• KITCHEN
• FOOD PREP AREAS
• DINING
• CANTEEN
• RADIOLOGY / MRI
• RESPIRATORY THERAPY
• NUCLEAR MEDICINE
• SENIOR MENTAL HEALTH
• CLEAN SUPPLY
• COMMUNITY LIVING
• CARDIAC CATH / CARDIOLOGY
• STERILE PROCESSING SERVICE
• INPATIENT MEDICAL / SURGICAL
• INTENSIVE CARE UNITS
• ISOLATION ROOMS
• CHEMOTHERAPY / ONCOLOGY
• OPERATING ROOMS
• PHARMACY
• CLINICAL LABORATORIES
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III/IV
II
III
III/IV
III/IV
III/IV
IV
IV
IV
ICRA CLASS DESIGNATION MATRIX
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE
THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
ICRA CLASS DESIGNATION MATRIX
TYPE A - INSPECTION AND NON-INVASIVE ACTIVITIES (MINOR MEP / PAINTING (NOT SANDING))
TYPE B - SMALL SCALE SHORT ACTIVITIES (CABLE INSTALLATION, ACCESS TO CHASES FOR WORK)
TYPE C - DUCT CAUSING ACTIVITIES (DEMO, CUTTING, SANDING, FINISH REMOVAL, MEP INSTALLS)
TYPE D - MAJOR DEMOLITION ACTIVITIES REQUIRING CONSTANT WORK SHIFTS, COMPLETE DEMO
1. DETAILS ARE DIAGRAMMATIC AND FINAL CONFIGURATION MAY VARY. SUBMIT ICRA AND PHASING PLAN FOR APPROVAL
PRIOR TO INSTALLATION OF ICRA BARRIERS OR START OF DEMOLITION OR CONSTRUCTION.
2. ALL PERSONNEL ENTERING THE CONSTRUCTION SITE ARE MUST WEAR A HARD FROM WORK AREA THROUGH ICRA OR PHASING BARRIERS. HAT AND SAFETY GLASSES ALONG WITH AND OTHER PPE REQUIRED IN THAT AREA.
3. ALL APPLICABLE FORMS, PERMITS, AND SUBMITTALS SHALL BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION FLOW. NEGATIVE PRESSURE MACHINES MUST BE IN OPERATION 24/7. NEGATIVE AIR HEPA FILTER UNIT SHALL BE MAINTAINED WITH FILTER REPLACEMENT SCHEDULED AS REQUIRED OR OCCURRING WHEN FILTERS BECOME FULL, CLOGGED OR IMPACT AIR FLOW. PRE-FILTERS REQUIRE WEEKLY MINIMUM REPLACEMENT. HEPA FILTERS REQUIRE MONTHLY MINIMUM REPLACEMENT.
5. CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS PRIOR TO REMOVING FROM CONTROLLED VENTILATION AREAS
INTO GENERAL HOSPITAL AREAS.
6. DURING CONSTRTUCTION, ENSURE THAT:
• BARRIERS ARE INTACT AND MAINTAINED, WITH NO LEAKS
• PARTICLE COUNT METER IS AVAILABLE
• NEGATIVE PRESSURE INDICATOR IS INSTALLED AND EASILY VIEWED
• FIRE EXTINGUISHERS ARE CURRENT ON INSPECTIONS AND READILY AVAILABLE
• WALK-OFF AND STICKY MATS ARE MAINTAINED AND REPLACED PROPERLY
GENERAL NOTES
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT
SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE: SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH
HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
6. SEAL ALL HOLES, PUNCTURES, AND MEP PENETRATIONS IN BARRIERS AND EXISTING WALLS AT PERIMETER OF SCOPE
AREA.
7. CONSTRUCT ANTE-ROOM IN ADDITION TO ICRA BARRIER DOORWAY, OR ALL WORKERS CAN WEAR PAPER/CLOTH
COVERALLS THAT ARE REMOVED EACH TIME THEY EXIT WORK AREA.
CLASS IV WORK ITEMS NOTES
C
LA
S S
IV
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. UPON COMPLETION, RESTORE H.V.A.C. SYSTEM WHERE WORK WAS PERFORMED.
UPON COMPLETION OF PROJECT
EXISTING CEILING SYSTEM
EXISTING STRUCTURE ABOVE
C E
IL
IN
G H
E
IG
H T
S T
R U
C T
U R
E H
E
IG
H T
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
EXISTING STRUCTURE ABOVE
C E
IL
IN
G H
E
IG
H T
3 5/8" 16 GA. METAL STUDS AT 16"
O.C. WITH 5/8" FIRE RESISTANT
GYPSUM BOARD EACH SIDE
A
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
TYPE BTYPE
FIRE/U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
EXISTING CEILING SYSTEM
EXISTING STRUCTURE ABOVE
C E
IL
IN
G H
E
IG
H T
CTYPE
FIRE/U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
FIRE/U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
PLASTIC BARRIER NOTE:
WHERE DEMOLITION AND CONSTRUCTION DEBRIS IS
NOT PRESENT DURING WORK WITHIN THE
CONTAINED AREA AND DUST CONTAINMENT IS THE
ONLY CONCERN, A PLASTIC SHEET BARRIER CAN BE
CONSTRUCTED FROM FLOOR TO CEILING (AND FROM
CEILING TO STRUCTURE FOR WORK ABOVE CEILING)
WITH A ZIPPERED ACCESS OPENING
ICRA BARRIER WALL CONSTRUCTION TYPES
REFER TO SPECIFICATION SECTION 01 35 25: "SAFETY REQUIREMENTS" FOR MORE INFORMATION ON BARRIER CONSTRUCTION
ALL BARRIERS REQUIRE PRIOR APPROVAL FROM COR. CONTRACTOR SHALL SUBMIT BARRIER AND MOBILE CONTAINMENT PLANS BEFORE ANY BARRIERS ARE CONSTRUCTED. COR SHALL ALSO REVIEW AND APPROVE CONSTRUCTION OF BARRIERS PRIOR TO START OF ANY WORK
3 5/8" 16 GA. METAL STUDS AT 16"
O.C. WITH 5/8" FIRE RESISTANT
GYPSUM BOARD EACH SIDE
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
DANGER
A .F
.F
A P
P R
X
C.O.R.
CONTACT
INFORMATION
CONST. SUPERVISOR
NAME AND CELL
PHONE
XXXXX
XXXXX
XXXXX
SAFETY
REQUIREMENTSPOC LIST
PRESSURE
LOG
ICRA
ILSM
1. DOOR SIGNAGE SHALL BE POSTED/MOUNTED
BOARD WITH 8.5"x11" PLASTIC SLEEVES TO
CONTAIN ITEMS SHOWN ON DIAGRAM
2. WHEN ZIPPERED DOOR ACCESS IS UTILIZED IN
SUBSTITUTION FOR SWING SOLID DOOR, BOARD
SHALL BE MOUNTED ON WALL ADJACENT TO
DOORWAY
NOTES:
PRESSURE GAUGE INDICATOR CONTRACTOR
SHALL PROVIDE MAGNEHELIC PRESSURE
GAUGE
SAFETY
REQUIREMENTS
PRESSURE
LOG
POC LIST
ICRA
ILSM
1'-8"
DANGER
CONSTRUCTION AREA
KEEP OUT
PERSONNEL ENTERING MUST HAVE: HARD
HAT, SAFETY GLASSES AND PROPER I.D.
1. SIGN SIZE SHALL BE 7"x10". BLACK PANEL SHALL BE 2 1/4"x 9 3/8". "DANGER" TEXT SHALL BE 1 5/8" HEIGHT, ARIAL BOLD STYLE, WITH RED BACKGROUND WITHIN
OVAL
2. SIGNS SHALL HAVE ROUNDED CORNERS AND BE
FREE OF BURRS OR SPLINTERS
3. BLACK TEXT SHALL BE ARIAL BOLD STYLE,
PROPORTIONED AS SHOWN
4. RE: SPECIFICATIONS FOR ADDITION INFO NOT NOTED
5. PROVIDE SIGNS FOR PLACEMENT AT ALL BARRIER
ENTRANCES OR AS ADDITIONALLY DIRECTED BY COR
NOTES:
EMERGENCY CONTACTS
EMS/MEDICAL
EMERGENCY:
CALL 911
DIRECT: (XXX) XXX-XXXX
EXT XXXXX FROM VA
TELEPHONE
FIRE STATION LEVEL
FIREHOUSE:
CALL 911
DIRECT: (XXX) XXX-XXXX
EXT XXXXX FROM VA
TELEPHONE
POLICE: (XXX) XXX-XXXX
EXT XXXXX FROM VA
TELEPHONE
VERIFY EMERGENCY
CONTACT INFORMATION WITH
COR PRIOR TO POSTING
SIGNS
ACCESS DOOR ELEVATION
POC LIST DETAIL
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
F
LE
X
D U
C T
SUPPLY/RETURN DUCTS: COVER ALL
WITH FILTER MATERIAL TO KEEP
DUST OUT.
SEAL AND TAPE ALL
INFILTRATION EXISTING
SERVICE CONNECTIONS TO
PREVENT AGAINST
CONTAMINATION OF DUST
A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
ZIPPERED PLASTIC
BARRIER WALL OR
SEALED DOORWAY
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE PRESSURE
MONITORING OUTSIDE OF ICRA BARRIER FOR VA'S
INSPECTION. INDICATOR MUST BE AT -0.01 OR MORE
NEGATIVE PRESSURE (VERIFY DAILY), IF NOT VERIFY ALL
OPENINGS SUCH AS DOORS ARE CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER. DO NOT PROCEED WITH
WORK UNTIL PRESSURE IS AS INDICATED ABOVE
WALK OFF MAT INSIDE WORK AREA, CHANGE WHEN NO
LONGER TACKY OR WHEN OTHERWISE NECESSARY TO
MAINTAIN CLEANLINESS
ICRA, ISLM, FIRE INSPECTION,
AND EMERGENCY CONTACT
INFO SHEETS VISIBLE ON
PUBLIC SIDE OF BARRIER
WHERE FLEX DUCT
PENETRATES CEILING PLANE,
SEAL PENETRATION WHEN
REMAINDER OF CEILING PLANE
IS INTACT
DOOR OPENING
FIRE PULL STATION WITH AUDIO/
VISUAL
ILSM SIGNAGE
ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION
GI-100
GI-100
PRE-FILTER, CHANGE
WEEKLY OR WHEN FULL
THERMAL CUTOFF IN CIRCUIT
HEPA FILTER NEGATIVE AIR UNIT
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING OPENING IN ATTIC
WHERE FLEX DUCT
PENETRATES CEILING PLANE,
SEA…