S02 - Attachment D4 - Shutdown Checklist.pdf

PDF 199 KB Posted

Attached to
J061--Electrical Inspection, Testing & Maintenance Follow on Base | Start: 11/1/25
Solicitation number
36C25026Q0069
Issued by

About this file

This document is an Electrical Lock Out/Tag Out/Shutdown Safety Checklist for a VA (Veterans Affairs) project. The checklist provides a detailed, step-by-step procedure for safely shutting down and working on electrical panels, specifically focusing on the PDP (Panel Distribution Panel) in switchboard-2, room 1-B260C. The document includes sections for VA employees present, engineering approval signatures, and a comprehensive 27-step safety protocol that covers equipment verification, power shutdown, temporary power arrangements, voltage confirmation, breaker management, and reinstallation procedures.

Key safety steps include verifying lockout/tagout equipment, checking arc flash labels for proper PPE, confirming no other contractors are working in the area, turning off normal power equipment, notifying relevant departments (switchboard, boiler plant), and meticulously documenting breaker positions, wire sizes, and lengths. The checklist requires signatures from VA electricians and engineers, and provides a structured approach to electrical system maintenance with an emphasis on safety, voltage verification, and systematic equipment handling.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Expected Start Date:

Scheduled Start Time

Schedule End Time

Expected Completion Date

Actual Start Time

Actual End Time

X

X

Signature

Signature

X CHECK BOX

Fed From Mechanical Lockout / I-LINE

Equipment Location Personal Lock Out ID Tag's

Area Affected

Contractor:

Foreman:

Lockout/Tagout Equipment Required

Equipment to be Shutdown Padlocks

ELECTRICAL LOCK OUT/TAG OUT/SHUTDOWN SAFETY CHECKLIST

Date:

Project:

Contract Number:

General Contractor:

Project Manager or Superintendent:

Jacob Jebb, VA Engineer

VERIFY AND CHECK LOCKOUT/TAGOUT EQUIPMENT IS READY AND AVAILABLE

CHECK PANEL ARC FLASH LABEL FOR PROPER PPE AND DON CORRECT PPE, DOCUMENT LABEL INFO ON PROTECTIVE DEVICE LIST

VA Employees Present, Title Engineering Approval Signatures, Title

Scott Bank, VA Electrician Tom Belongia, VA Engineer

Phil Marentette, VA Electrician

Scott Kern, VA Electrician

VERIFY WITH ENG. DEPT. THAT NO OTHER CONTRACTORS ARE WORKING IN AREA

CONFIRM NO VOLTAGE AT PANEL PDP

VERIFY BREAKER SETTINGS VIA BREAKER MENU AND DOCUMENT ON DRAWINGS, SHEET EP-100 & EP-102

DOCUMENT ALL BREAKER POSITIONS FOR PANEL PDP ON NEXT PAGE

OPEN ALL BREAKERS IN PANEL PDP

REQUEST HVAC TECHNICIAN TO TURN OFF NORMAL POWER EQUIPMENT WITH CONTROL SYSTEM

CONFIRM TEMP POWER FOR SPS IS IN PLACE FOR PANELS BD ABD BD-1

CONFIRM DIETETICS STAFF ARE FINISHED FOR THE DAY AND TEMP PROVISIONS HAVE BEEN MADE, THEY FINISH AT 7PM.

CONFIRM TEMPORARY POWER IS AVAILABLE FOR OTHER CONTRACTORS.

INFORM SWITCHBOARD OF SCHEDULED SHUTDOWN AND REQUEST OVERHEAD ANNOUNCEMENT AT EXT 13875

NOTIFY BOILER PLANT EXT 13880 OR REQUEST SWITCHBOARD TO CALL THEM.

Contractor Completion Sign-Off, Title

Printed Name:

ENERGIZE ALL PDP FEEDER BREAKERS INDIVIDUALLY.

CONFIRM ALL BREAKERS ARE IN AS FOUND STATE (NEXT PAGE)

INSTALL ALL TESTING LABELS ON GEAR AND ON EACH BREAKER.

REMOVE LOCKS AND TAGS FROM PDP FEEDER BREAKER IN SWITCHBOARD-2 AND RE-ENERGIZE

VERIFY CORRECT VOLTAGE ON PANEL PDP BUS WITH MULTIMETER

RE-INSTALL PANEL COVER

REINSTALL ALL BREAKERS AND TORQUE LUGS

VERIFY ALL RE-INSTALLED BREAKERS ARE IN THE OFF POSITION EXCEPT FOR PDP MAIN (LEAVE MAIN ON FOR VOLTAGE VERIFICATION)

REINSTALL DEAD FRONT

TAG/LABEL/OR OTHERWISE IDENTIFY BREAKER LOCATIONS AND REMOVE FOR TESTING

DOCUMENT ALL WIRE SIZES, LENGTHS, AND QUANTITY FROM EVERY BREAKER ON DRAWINGS, SHEETS EP102 & EP-111

PERFORM TESTING AND MAINTENANCE

REMOVE PANEL COVER AND VERIFY VOLTAGE

OPEN AND LOCK OUT FEEDER BREAKER PDP LOCATED IN SWBD-2 ROOM 1-B260C