S02 - ATTACHMENT 8 - Calc. of Self Performed Work General Contractor.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1DA--614-22-105 - Upgrade Elevators Building 1, 1A, and 7
Solicitation number
36C24924R0024
Issued by

About this file

This document contains a template for calculating the percentage of self-performed work on a federal construction contract. The template requires prime contractors bidding on Solicitation Number 36C24924R0024 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 to upgrade elevators in Buildings 1, 1A, and 7 to specify the personnel and material costs for work self-performed and subcontracted by trade specification. Prime contractors must perform at least 15% of total contract costs with their own employees. The template includes sections to enter subcontractor details by specification division, calculate subcontracted and self-performed totals, and certify cost allocations.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for Contractors (NAICS code 236220) must provide
at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)