36C24924R0024 0007.pdf

PDF 124 KB Posted

Attached to
Y1DA--614-22-105 - Upgrade Elevators Building 1, 1A, and 7
Solicitation number
36C24924R0024
Issued by

About this file

This document contains a solicitation notice and related federal contract opportunity. The solicitation notice is for construction services for Project #614-22-105 to upgrade elevators in Buildings 1, 1A, and 7 at the Memphis VA Medical Center in Memphis, Tennessee. The project magnitude is between $2 million and $5 million, and the NAICS code is 236220. The set-aside is for 100% Service-Disabled Veteran-Owned Small Businesses. The anticipated completion time from notice to proceed is 270 calendar days. Offerors must have a current VETS 4212 report on file with the Department of Labor, be registered in SAM, and must apply for and receive verification from the Department of Veterans Affairs Center for Veterans Enterprise of their SDVOSB status by the time of proposal submission. The federal agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0007 02/13/2024 614-24-3-5607-0002 614-22-105

90C

Department of Veterans Affairs Network Contracting Office 9 (90C) Robert Pritchard, Contracting Officer 1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129

90C

Network Contracting Office 9 Department of Veterans Affairs

Robert Pritchard, Contracting Officer Email: robert.pritchard2@va.gov

To all Offerors/Bidders

36C24924R0024

12-11-2023

X

X X

X 1

Amendment 0007 is being issued to correct answer 22 of the questions and answers.

See corrected response below.

Robert Pritchard Contracting Officer

Correction to Question 22 for Questions and Answers

22. 01 35 26 1.7 indicates superintendent or CQC manager can dual role as SSHO. 01 45 00 3.4B indicates the CQC manager can have the duties of superintendent and CQC. Will this project be required to have two persons on the project at all times, such as a Superintendent and a CQC Manager with either person performing the role of SSHO? Or can a superintendent also perform SSHO and CQC roles in one person on site?

Replace previous response, Specifications allow for Superintendent to be Safety Officer but cannot be CQC also. The CQC doesn’t need to be on site at all times.

Replace with the following response, 01 35 26, 1.7 does not indicate superintendent or CQC manager can dual role as SSHO.

01 35 26, 1.7, C. states the SSHO is “a separate qualified individual from the Prime Contractor’s Superintendent and/or Quality Control Manager.”

01 35 26, 1.7, D. states “SSHO or an equally qualified Designated Representative/alternate will maintain a presence on the site during construction operations.”

01 45 00, 3.4, B. states “CQC System manager is on the site at all times during construction” and “CQC System Manager is assigned as CQC System Manager but has duties as project superintendent in addition to quality control.”