This solicitation notice seeks proposals for construction services to upgrade elevators in three buildings at the Memphis VA Medical Center in Tennessee. The project has a magnitude between $2 million and $5 million, is set aside 100% for Service-Disabled Veteran-Owned Small Businesses, and has an anticipated completion time of 270 calendar days from notice to proceed. Offerors must be verified by the VA Center for Veterans Enterprise as an SDVOSB, be registered in SAM, and have a current VETS 4212 report on file with the Department of Labor at the time of proposal submission. Questions must be submitted in writing to the contracting officer.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 7
0008 02/15/2024 614-24-3-5607-0002 614-22-105
90C
Department of Veterans Affairs Network Contracting Office 9 (90C) Robert Pritchard, Contracting Officer 1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs
Robert Pritchard, Contracting Officer Email: robert.pritchard2@va.gov
To all Offerors/Bidders
36C24924R0024
12-11-2023
X
X X
X 1
Amendment 0008 is being issued to clarify RFI Questions.
See Below.
Robert Pritchard Contracting Officer
RFI Question Clarification
Question Answer
20. When working in one (1) elevator in a bank of elevators, all other elevators in operation, the 24/7 emergency calls and service are covered and provided by the VA and not the contractor, even though all elevators listed in this scope of work are in the contractor's scope of work. In other words, the contractor is not required to assume the 24/7 emergency calls and service of the VA elevators.
Clarification: RFI 020 states that the contractor is responsible for all service and emergency calls for all elevators in an elevator bank, even if only one of the three elevators is under construction. This is creating a financial risk for the elevator contractors and will be reflected in their bids. Please confirm the government wants servicing of all elevators in a bank to be the responsibility of the contractor even if only one elevator at a time is turned over to the contractor to upgrade.
The contractor assumes the responsibility for the operation and service of all of the elevators in a bank that have been turned over for construction even when only one elevator is taken out of service for the project work.
Confirmed.
22. 01 35 26 1.7 indicates superintendent or CQC manager can dual role as SSHO. 01 45 00 3.4B indicates the CQC manager can have the duties of superintendent and CQC. Will this project be required to have two persons on the project at all times, such as a Superintendent and a CQC Manager with either person performing the role of SSHO? Or can a superintendent also perform SSHO and CQC roles in one person on site?
Clarification: RFI 022 states the superintendent can be the SSHO but not the CQCM, but the CQCM does not need to be on site at all times. Typically, on projects such as this, the CQCM role is fulfilled by the project manager who handles all submittals, RFI’s, etc., and
Specifications allow for Superintendent to be Safety Officer but cannot be CQC also.
The CQC doesn’t need to be on site at all times.
Replace previous response with the following response, 01 35 26, 1.7 does not indicate superintendent or CQC manager can dual
Question Answer makes frequent site visits. Please confirm if the contractors project manager can also be the CQCM or if an employee dedicated as CQCM is needed for this project.
role as SSHO.
01 35 26, 1.7, C. states the SSHO is “a separate qualified individual from the Prime Contractor’s Superintendent and/or Quality Control Manager.”
01 35 26, 1.7, D. states “SSHO or an equally qualified Designated Representative/alternate will maintain a presence on the site during construction operations.”
01 45 00, 3.4, B. states “CQC System manager is on the site at all times during construction” and “CQC System Manager is assigned as CQC System Manager but has duties as project superintendent in addition to quality control.”
47. Can you confirm that there is no commissioning required for the project? If yes provide specs. If yes, will 3rd party commissioning will be provided by the VA and that the Contractor will only be required to participate/coordinate with the Commissioning Agent?
Clarification: RFI 047 response refers to fire sprinklers, but the RFI is asking about project commissioning. Please correct his responses.
Elevator hoistways to have fire sprinkler heads installed where required by NFPA 13.
Plans indicate general scope. Contractor to provide detailed working drawings, calculations, and qualifications per Specification 21 1313. Existing sprinkler heads to be replaced only if requiring relocation due to conflicts with new systems.
Replace previous response with the following response, The new mechanical work for this project includes only the installation of new split systems and therefore only testing listed for that new equipment shall be completed.
48. Can you confirm that there are no requirements to provide structural bracings
The existing rails shall be reused during this modernization. Confirmation of existing and seismic upgrades to the existing building structure as a result of upgrading the elevators? The elevator railings and attachments are to remain in place as shown on demo drawings where the elevator cabs and equipment are upgraded. The contractor assumes that the existing structure in place is adequate not requiring modifications and engineering.
Clarification: RFI 048 response is unclear.
This RFI will attempt to clear up the confusion.
a. The plans show existing elevator hoist beams to remain at all elevators in buildings 1 and 1A.
The plans show hoist beam replacement only for the 6 elevators in building 7. Is this correct?
hoistway elevator beams for placement of elevator equipment for traction elevators must be coordinated with equipment supplier.
Correct.
50. Can Starcwall fireblock temporary panels be used for the temporary barriers around the elevator lobby space in lieu of walls shown on the drawings where negative air machines and dust control measures are used? Use of Starcwall panels for containment will minimize impacts to the existing ceilings and floors over installing a temporary metal stud wall system with drywall. And fire ratings can be obtained by these types of temp wall panels.
Clarification: RFI 050 response identifies temporary barriers as 1 hour rated. Just to clarify, the Star wall fireblock panels are only fire rated if they extend to a fire rated ceiling. Since the elevator lobbies are ACT, and not fire rated, that would require the wall panel to extend to deck. Since this is not possible, are gypsum wall barriers required?
All temporary barriers must meet both Infection Control and 1 hour fire ratings as per the drawings and the specifications. Fire rating must meet ASTM E84 and E119.
Existing sprinklers must be maintained.
Response as previously stated.
51. Can you confirm that the existing elevator pit ladders are ok and will not need to be replaced?
Clarification: RFI 051 response says, “Modification of existing pit ladders if only deficient to meet codes or if interference with new equipment occurs.” Since this is not a design build project, the Government should instruct bidders to either replace or not replace the ladders.
Modification of existing pit ladders if only deficient to meet codes or if interference with new equipment occurs.
If found deficient or interferes with new equipment, a contract change will be issued for the corrective work.
56. Can you confirm that all traction and hydraulic guide rails and support system remains unchanged for this project? Can we assume that these existing guide rails and support systems meet current seismic requirements as note in spec section provided 1983 documents?
Clarification: RFI 056 response states “Per specifications works in building 1 and 7 shall reuse existing car and guide rails but must be cleaned or adjusted as necessary.” Does this mean that elevator rails in Building 1A are to be replaced?
Per specifications works in building 1 and 7 shall reuse existing car and guide rails but must be cleaned or adjusted as necessary.
No.
149. Electrical gen note C says to install new lightning protection on all new roof top HVAC units. Does this apply to the small split system roof units?
The RFI 149 response says to provide new lightning protection on new roof top HVAC units. The plan call for the lightning protection system to be tested. Is this testing referring to a testing the new components to be added to the lightning protection system or does the entire lightning protection system in the affected
Yes, provide lightning protection for all roof mounted mechanical equipment.
Drawing E000 Electrical Symbols and Abbreviations, Electrical General Notes states “C. NEW ROOF MOUNTED
EQUIPMENT SHALL BE BONDED TO
EXISTING BUILDING LIGHTNING
PROTECTION SYSTEM IF ONE EXISTS.
PROVIDE AIR TERMINALS ON TOP OF
EQUIPMENT AND BOND TO EXISTING
SYSTEM PER NFPA 780 AND UL 96A
REQUIREMENTS. PROVIDE UL
area need to be tested?
If the entire lightning protection system needs to be tested, how can the contractor be responsible for a system that they did not put in place?
INSPECTION AND/OR LPI SYSTEM
INSPECTION AS REQUIRED TO OBTAIN
UL MASTER LABEL RECERTIFICATION,
UL MASTER LABEL AND/OR LPI SYSTEM
CERTIFICATE.”
Change from “PROVIDE UL INSPECTION
AND/OR LPI SYSTEM INSPECTION AS
REQUIRED TO OBTAIN UL MASTER
LABEL RECERTIFICATION, UL MASTER
LABEL AND/OR LPI SYSTEM
CERTIFICATE” to “PROVIDE UL
INSPECTION AND/OR LPI SYSTEM
INSPECTION OF NEW INSTALLATION
FOR CONFORMANCE WITH UL MASTER
LABEL AND/OR LPI SYSTEM
REQUIREMENTS.”
This is not a request for a certification/listing of the entire system.
163. Detail C3/A-501 says to refer to plan for hoist beam size. However, there does not appear to be a size listed anywhere in the plans. Please provide the beam size for each hoist beam.
Clarification: RFI 163 response refers to answer 48. However, the plans call for new hoist beams in building 7. If the beams in building 7 are to be replaced the bidders must have beam sizes. Please provide.
See response to Question 48 above.
Provide W8X35.
185. It appears a discrepancy exists in the elevator specifications. There is a spec section for elevators P5, P6, S2 and S3 in building 1, however the plans identify the elevators in building 1 as P6, P7, S2 and S3. Please confirm if the elevator in question is P5 or P7.
Correct typographical error, Section 01 00 00 General Requirements and Section 14 21 00 Modernization of Traction Elevators, replace “P5” with “P7”.