This document contains an amendment to a solicitation for construction services and the related federal contract opportunity. The Department of Veterans Affairs is seeking proposals to upgrade elevators in Buildings 1, 1A, and 7 at the Memphis VA Medical Center. The amendment provides answers to questions from offerors. The project number is 614-22-105 and has a magnitude between $2 million and $5 million. It has a NAICS code of 236220 and small business size standard of $45 million. The anticipated completion time from notice to proceed is 270 calendar days. Offerors must be verified by the VA's Center for Veterans Enterprise as a Service-Disabled Veteran-Owned Small Business and be registered in the System for Award Management at the time of proposal submission for the proposal to be considered responsive. The closing date is not provided.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0009 02/15/2024 614-24-3-5607-0002 614-22-105
90C
Department of Veterans Affairs Network Contracting Office 9 (90C) Robert Pritchard, Contracting Officer 1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs
Robert Pritchard, Contracting Officer Email: robert.pritchard2@va.gov
To all Offerors/Bidders
36C24924R0024
12-11-2023
X
X X
X 1
Amendment 0009 is being issued to answer additional questions.
See below.
Robert Pritchard Contracting Officer
Solicitation Number 36C24924R0024
Project 614-22-105, Upgrade Elevators, Buildings 1, 1A and 7 at the Memphis VA Medical Center
1. Page 18, third paragraph. Under the heading Evaluation Process, the RFP states: “The Vendor Information Pages (VetBiz registry) will be checked to ensure that any offeror submitting a proposal to perform the work is both listed and verified.” Please confirm that this should reference the Veteran Small Business Certification (SBA VetCert). This is a critical update needed in the solicitation, as it is the first compliance verification in the evaluation process, and the VA is no longer responsible for certifying SDVOSB firms.
Answer – Correct, VetCert
2. Please confirm that the email confirmation of the VETS-4212 report filing is not required in the proposal submission. This is not stated as a requirement in the paragraph on page 14.
Answer – VETS-4212 is required with submission.
3. Page 19, the RFP states that the proposals are to be submitted as two sections. The answer to question 69 stated that the SF1442 and amendments should go in the price section. Page 12 describes a list of documents that are required in the submission, but did not provide information on which section to include them in. Please confirm or correct our understanding that the following items should be included in the price section:
Answer – Contractor shall also include Attachment 8 – Calc. of Contractors Self Performed Work in the technical section.
a. One (1) electronic copy of an original, fully completed and signed and dated SF 1442 Offer page, acknowledgment of all amendments issued by completing block 19 of the SF1442 and providing them with the SF 1442 Offer page; prices online item(s) listed on the Price/Cost Schedule
Answer – in the price section.
b. Completed Representations and Certifications section (FAR 52.204-8, 52.209-5 (Deviation), and 52.209-7)
Answer – in the technical section
c. Fully completed Contractor Experience Modification Rate (EMR) Certification documents.
Answer – in the technical section
d. OSHA Logs
Answer – in the technical section
e. One (1) electronic copy of an original completed and signed SF 24 Bid Bond or other allowable Bid Security
Answer – in the price section
f. “Solicitation Attachment-Price Schedule” worksheet
Answer – in the price section
4. The answer to Q73 states: “You can exclude the pricing schedule from the page count.
Pricing page count will be increased from 25 pages to 30 pages.” Are all RFI answers taken into the consideration by the evaluators? Or will they only see actual redline changes made to the solicitation? Because this change was not made to the solicitation itself, please clarify if the evaluators need the solicitation to be modified.
Answer – All Amendments will be provided to the evaluation board. Yes, the solicitation was changed via amendments to the solicitation.