S02_Attachment 5_IFB Contractor Cost Estimate Worksheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1PZ--Fayetteville National Cemetery, Columbaria and In-ground Cremains Burial Expansion (VA-25-00092710)
Solicitation number
36C78626B0001
Issued by

About this file

This file is a blank contractor cost estimate worksheet template for an Invitation for Bid (IFB) related to the Fayetteville National Cemetery Columbaria and In-ground Cremains Burial Expansion project. The worksheet is structured around the NCA Master Construction Specifications divisions and requires contractors to submit lump sum bids for each applicable construction division. The template includes line items for Division 0 (Special Sections) through Division 33 (Utilities), covering all major construction trades including general requirements, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, equipment, furnishings, plumbing, HVAC, electrical, communications, earthwork, exterior improvements, and utilities. Contractors may mark divisions as "N/A" if not applicable to the project or add additional line items as needed.

The worksheet accommodates pricing for a Base Bid and three additional Contract Line Item Numbers (CLINs), with separate columns for each pricing scenario. Each division requires a total cost input, and the template includes rows for bonds, overhead, and profit calculations to arrive at a grand total. The format is designed to ensure consistent cost estimation across all bidders and facilitate comparison of proposals submitted in response to the IFB for this Department of Veterans Affairs National Cemetery Administration construction project.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

IFB Number
Project Name
DivisionBase BidCLIN1CLIN 2CLIN3Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $ $ $ $

File details come from the government source that posted it. Updated .