S02_Attachment 5_IFB Contractor Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Y1PZ--Fayetteville National Cemetery, Columbaria and In-ground Cremains Burial Expansion (VA-25-00092710)
- Solicitation number
- 36C78626B0001
About this file
This file is a blank contractor cost estimate worksheet template for an Invitation for Bid (IFB) related to the Fayetteville National Cemetery Columbaria and In-ground Cremains Burial Expansion project. The worksheet is structured around the NCA Master Construction Specifications divisions and requires contractors to submit lump sum bids for each applicable construction division. The template includes line items for Division 0 (Special Sections) through Division 33 (Utilities), covering all major construction trades including general requirements, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, equipment, furnishings, plumbing, HVAC, electrical, communications, earthwork, exterior improvements, and utilities. Contractors may mark divisions as "N/A" if not applicable to the project or add additional line items as needed.
The worksheet accommodates pricing for a Base Bid and three additional Contract Line Item Numbers (CLINs), with separate columns for each pricing scenario. Each division requires a total cost input, and the template includes rows for bonds, overhead, and profit calculations to arrive at a grand total. The format is designed to ensure consistent cost estimation across all bidders and facilitate comparison of proposals submitted in response to the IFB for this Department of Veterans Affairs National Cemetery Administration construction project.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number |
| Project Name |
| Division | Base Bid | CLIN1 | CLIN 2 | CLIN3 | Total |
| Division 0 | |||||
| Special Sections | |||||
| Division 01 | |||||
| General Requirements | |||||
| Division 02 | |||||
| Existing Conditions | |||||
| Division 03 | |||||
| Concrete | |||||
| Division 04 | |||||
| Masonry | |||||
| Division 05 | |||||
| Metals | |||||
| Division 06 | |||||
| Wood, Plastic, and Composites | |||||
| Division 07 | |||||
| Thermal and Moisture Protection | |||||
| Division 08 | |||||
| Openings (Doors, Windows, etc...) | |||||
| Division 09 | |||||
| Finishes | |||||
| Division 10 | |||||
| Specialties | |||||
| Division 11 | |||||
| Equipment | |||||
| Division 12 | |||||
| Furnishings | |||||
| Division 13 | |||||
| Special Construction | |||||
| Division 14 | |||||
| Fire Suppression | |||||
| Division 22 | |||||
| Plumbing | |||||
| Division 23 | |||||
| Heat, Ventilating, and Air Conditioning | |||||
| Division 25 | |||||
| Integrated Automation | |||||
| Division 26 | |||||
| Electrical | |||||
| Division 27 | |||||
| Communications | |||||
| Division 28 | |||||
| Electronic Safety and Security | |||||
| Division 31 | |||||
| Earthwork | |||||
| Division 32 | |||||
| Exterior Improvements | |||||
| Division 33 | |||||
| Utilities | |||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $ $
File details come from the government source that posted it. Updated .