This document is a Standard Form 30 amendment to solicitation 36C78626B0001 for the Columbaria and In-Ground Cremains Expansion project at Fayetteville National Cemetery (Project Number 842CM3027), issued by the Department of Veterans Affairs, National Cemetery Administration, Contracting Services on February 4, 2026. The amendment extends the submission deadline and bid opening from the original date to 10:00 AM Eastern Time on Friday, March 13, 2026.

The document includes contractor questions and government responses addressing clarification requests related to the project. Key points from the responses include: contractors may use the Hill Avenue gate for cemetery access but must coordinate with the City of Fayetteville regarding large vehicles on this busy street; the concrete curb depth is specified at 18 inches; the grass seed mixture follows City of Fayetteville standards and contractors may propose alternates for City approval; stone mulch size is ¾ inch; bid packages must be submitted via email to trevor.disimone@va.gov due to eCMS Vendor Portal issues; required permits include City of Fayetteville Right-of-Way permits and electrical permits; guard cable shall conform to Arkansas Standard Specification for Highway Construction Section 618 with line posts 5 feet in height (3 feet buried) and anchor posts 6 feet in height (4 feet buried); no stormwater permit is required as the project is under 1 acre; grounding for the new fire alarm system must comply with manufacturer requirements and specification section 28 46 00; and a future addendum will address rock removal if Fayetteville Shale Formation materials are encountered during excavation. Virtual bid opening call-in information will be provided once bids are received.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 03-02-2026 842CM3027

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

To all Offerors/Bidders

36C78626B0001

02-04-2026

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-13-2026 10:00 EDT

Please see attached sheet for answers/clarifications for RFIs. The submission deadline and Bid Opening is hereby extended to 10:00am Eastern Time on Friday, March 13th, 2026.

Trevor DiSimone Contracting Officer

AMENDMENT-0001, Solicitation 36C78626B0001

Columbaria and In-Ground Cremains Expansion Fayetteville National Cemetery – 842CM3027 Contractor Questions & GOV Responses

1. Will we be able to use Hill Ave to access the area of construction for mobilization, material deliveries, haul off, etc?

1. GOV Response: There is a gate on Hill Ave. that can be used for entry/exit of the cemetery.

If the contractor are looking to have large vehicles and equipment on Hill Ave for extended periods of time, that will be something they will have to coordinate with the city since that is a fairly busy street. Also, larger vehicles may have a hard time getting in and out of the Hill Ave gate because there is not much room for them to make that turn into the cemetery from the street.

2. CS510 Detail 11: What is the required depth of the concrete curb?

2. GOV Response: Concrete curb shall be 18” deep.

3. The grass seed mixture called out in the specifications is not carried by any local suppliers. Can a grass seed mixture that is available locally be utilized for the project, such as Tiff-Tuff Bermuda?

3. GOV Response: The grass seed mix is taken directly from the City of Fayetteville standard landscape notes. All seeding will be within City right-of-way, contractor may suggest an alternate mix if approved by the City.

4. What size is the stone mulch?

4. GOV Response: ¾”.

5. Solicitation requires bid package to be submitted via the Vendor Portal. We do not see that this project is currently set up in the portal.

5. GOV Response: Due to ongoing issues with the eCMS Vendor Portal, please submit all bid packages via email to trevor.disimone@va.gov.

6. Sheet CD101 Note 1. under Site Prep Notes states to “… Arrange pre-construction meeting with owner / owner’s rep to review all applicable permit conditions… Please provide list of permits that are required for this project.

6. GOV Response: The City of Fayetteville Right-of-Way permit(s) will be required for all work within City ROW. We anticipate the contractor will be required to obtain electrical permits..

7. Sheet CD101 Note 4. Under Site Prep Notes states to “ Coordinate adjustments / abandonment of existing utilities.. with Utility companies…” Is there a list of Utility companies and contacts? Who is responsible for any impact fees to Utility company?

7. GOV Response: The electrical service is existing and to remain. Utility coordination is not anticipated.

8. Is there a specification for the “Guard Cable”? Are there additional details that provide the bury depth of the steel posts?

8. GOV Response: Guard cable shall be in conformance with Arkansas Standard Specification for Highway Construction, Section 618. Per Detail 3 on Sheet CS511, Line Posts shall be 5’ in height (3’ buried) and anchor posts 6’ in height (4’ buried).

9. Are there hazardous materials associated with Hazardous Waste Storage Building removal?

9. GOV Response: No.

10. Spec 01 00 02 1.11 calls for contractor to be “operator” for NPDES permit and VA will make permit application available… What is the contractors responsibility in regards to getting the permit application submitted and or fees, etc?

10. GOV Response: Project is under 1 acre, and therefore doesn’t require a stormwater permit.

11. Can you provide Virtual Bid Opening details?

11. GOV Response: Once a bid package has been received, or an RSVP to the opening, virtual opening call-in information will be transmitted.

12. It’s been our experience on past projects that existing grounding at existing buildings has been an issue when updating Fire Alarm systems. Has as study of existing grounding been performed on this project?

12. GOV Response: A study of the existing grounding was not completed. Please ensure proper grounding is installed for the new fire alarm system in accordance with fire alarm manufacturer requirements, along with grounding as required in specification section 28 46 00 Section 2.3.C.5.

13. Rock was encountered on previous project that developed sections 27A, 31, 32, 33 which is adjacent to new columbarium. Is there a provision for rock removal at excavations?

13. GOV Response: According to the geotechnical report, this project is not anticipated to encounter Hard Weathered Shale, which was encountered at boring locations B-01 through B- 03 at depths 8.5 to 13.5 below existing grade elevations. However, per the Geotech report, these materials are common in residual soils from the Fayetteville Shale Formation and should be expected at various depths across the project site. Fayetteville Shale Formation materials are known to vary in consistency and composition and could provide excavation difficulties at depths deeper than those investigated during this investigation. An addendum will be issued adding a specification section to handle and track rock removal, if encountered.