This notice announces a forthcoming solicitation for a firm-fixed-price design-build contract to provide infrastructure upgrades at the VA Palo Alto Health Care System campus in Menlo Park, California. The project involves relocating or remodeling approximately 49 telecommunications rooms and 3 data centers to meet EHRM IT standards while maintaining ongoing IT services. Offerors will be evaluated using a two-phase selection process in accordance with FAR Part 36. The solicitation will be set aside for SDVOSBs with a NAICS code of 236220 and size standard of $39.5 million. The base period of performance is approximately 739 calendar days from notice to proceed. All questions must be submitted in writing by the specified date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3.pdf | ||
| 36C77621R0074 0001.docx | DOCX document | |
| Attachment 2.docx | DOCX document | |
| Attachment 1.pdf | ||
| S02 - Attachment 9 - SOCAMES 6 Design Alert 4.pdf | ||
| S02 - Attachment 6 - SOCAMES 6 Design Alert 1.pdf | ||
| S02 - Attachment 5 - 00 VA OEHRM Site Infrastructure Requirements v2.0.pdf | ||
| S02 - Attachment 3 - Basic Guidance - 208V Power Distribution White Paper.pdf | ||
| S02 - Attachment 11 - Wage Determination - Construction.pdf | ||
| S02 - Attachment 2 - VA Menlo Park EHRM SPECS - Final.pdf | ||
| 36C77621R0074_1.docx | DOCX document | |
| S02 - Attachment 7 - SOCAMES 6 Design Alert 2.pdf | ||
| S02 - Attachment 4 - Basic Guidance - Zone PDU Power Distribution.pdf | ||
| S02 - Attachment 8 - SOCAMES 6 Design Alert 3.pdf | ||
| S02 - Attachment 12 - Wage Determination - Services.pdf | ||
| S02 - Attachment 1 - VA Menlo Park EHRM Narrative - FINAL.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VISN 21 CM/PM Electronic Health
Records Modernization (EHRM) PHASE I Support Task
PO# 612C209
VA Palo Alto Health Care System Menlo Park
Project TeamContributors
Campus Map / Building Information
Fiber Distances
Fiber Distances
Fiber Distances
Fiber Distances
Door Security Clearances
Menlo Park - Bldg. 321
First Floor Plan
Menlo Park - Bldg. 322
First Floor Plan
Menlo Park - Bldg. 324
First Floor Plan
Menlo Park - Bldg. 329
First Floor Plan
Menlo Park - Bldg. 331
First Floor Plan
Menlo Park - Bldg. 332
First Floor Plan
Menlo Park - Bldg. 334
Basement Plan
First Floor Plan
Second Floor Plan
Menlo Park - Bldg. 347
First Floor Plan
Menlo Park - Bldg. 348
First Floor Plan
Identification of Network Spaces:
Menlo Park - Bldg. 349
First Floor Plan
Menlo Park - Bldg. 350
First Floor Plan
Menlo Park - Bldg. 351
First Floor Plan
Menlo Park - Bldg. 352
First Floor Plan
Menlo Park - Bldg. 360
First Floor Plan
Menlo Park - Bldg. 370
First Floor Plan
Menlo Park - Bldg. 371
First Floor Plan
Menlo Park - Bldg. 372
First Floor Plan
Menlo Park - Bldg. 400
First Floor Plan
Menlo Park - Bldg. 410
First Floor Plan
Menlo Park – T365
First Floor Plan
Ta b l e o f C o n t e n t s
Bldgs that are struck off are not in scope of work.
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
Ta b l e o f C o n t e n t s
Network Space Design (cont’d) Bldg. 331:
C-169
Design Matrix
Enlarged Plan – Existing
Bldg. 332:
TC1
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
106b & 107
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
A-100
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
B106M
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
C114
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
D-139
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
B-224
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
D-229
Design Matrix
Enlarged Plan – Existing
Bldg. 334:
C-201B
Design Matrix
Enlarged Plan – Existing
Bldg. 347:
C120
Design Matrix
Enlarged Plan – Existing
Network Space Design:
Bldg. 321:
B102
Design Matrix
Enlarged Plan - Existing
Bldg. 321:
C-124
Design Matrix
Enlarged Plan – Existing
Bldg. 322:
Design Matrix
Enlarged Plan – Existing
Bldg. 324:
A-114D
Design Matrix
Enlarged Plan – Existing
Bldg. 324:
B-139A
Design Matrix
Enlarged Plan – Existing
Bldg. 324:
C-139A
Design Matrix
Enlarged Plan – Existing
Bldg. 324:
D-139A
Design Matrix
Enlarged Plan – Existing
Bldg. 324:
E-125B
Design Matrix
Enlarged Plan – Existing
Bldg. 329:
D179
Design Matrix
Enlarged Plan – Existing
Bldg. 331:
A-124
Design Matrix
Enlarged Plan – Existing
Ta b l e o f C o n t e n t s
Appendix A – Power Installation Example
Appendix B – Compliance Requirements
Appendix C – Rack Labeling Standard
Appendix
Bldg. 347:
E113
Design Matrix
Enlarged Plan – Existing
Bldg. 348:
Design Matrix
Enlarged Plan – Existing
Bldg. 349:
Design Matrix
Enlarged Plan – Existing
Bldg. 350:
Design Matrix
Enlarged Plan – Missing
Bldg. 351:
126 and 130
Design Matrix
Enlarged Plan – Existing
Bldg. 352:
126 and 130
Design Matrix
Enlarged Plan – Existing
Bldg. 360:
TC-A101
Design Matrix
Enlarged Plan – Existing
Bldg. 360:
TC-B100
Design Matrix
Enlarged Plan – Existing
Bldg. 360:
TC-D101
Design Matrix
Enlarged Plan – Existing
Bldg. 360:
TC-E101
Design Matrix
Enlarged Plan – Existing
Bldg. 360:
TC-F101
Design Matrix
Enlarged Plan – Existing
Bldg. 360:
TC-G104
Design Matrix
Enlarged Plan – Existing
Bldg. 360:
H240
Design Matrix
Enlarged Plan – Existing
Bldg. 370:
Design Matrix
Enlarged Plan – Existing
Bldg. 371:
Design Matrix
Enlarged Plan – Existing
Bldg. 372:
TC1
Design Matrix
Enlarged Plan – Existing
Bldg. 400:
TC-1
Design Matrix
Enlarged Plan – Existing
Bldg. 410:
1A111
Design Matrix
Enlarged Plan – N/A
Bldg. T365:
A-TC1
Design Matrix
Enlarged Plan – Existing
Bldg. T365:
A-TC2
Design Matrix
Enlarged Plan – Existing
Network Space Design (cont’d)Network Space Design (cont’d)
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
P R O J E C T C O N TA C T D I R E C T O R Y
Concourse Federal Group
123 S. Royal Street Alexandria, Virginia 22314
Tim Hower, Project Manager ........................................................................................thower@concousefederal.com
Lorena Alvarez................................................................................................................IaIvarez@concousefederaI.com
Mike Olson ....................................................................................................................molson@concousefederal.com
Marshall Contino, Concourse A|E Vice President ........................................................mcontino@concousefederal.com
DHE Engineering 3300 N. Central Ave. 3300 Tower Suite, 1520, Phoenix, AZ 85012
Rick Seger P.E., Principal, Electrical Engineer................................................................rseger@dheeng.com
Kory Young, EIT, Senior Mechanical Engineer................................................................kyoung@dheeng.com
VA Palo Alto Health Care System
Jay Kim, Chief Engineer & Acting AD.............................................................................Jay.Kim@va.gov
Tammie Ridder, Palo Alto, OI&T Area Manager.............................................................Tammie.Ridder@va.gov
James Crowe…………………................................................................................................James.Crowe2@va.gov
Frank Quiles, Chief of Facilities Planning and Development..........................................Frank.Quiles@va.gov
C a m p u s M a p – M e n l o P a r k
B u i l d i n g I n f o r m a t i o n
Bldg. # Bldg. Name TR Qty Levels
321 Outpatient Mental Health Center 2 1
322 Chapel 1 1
324 Research 5 1
331 Community Living Center 4 1
332 Methadone Clinic & Mailroom 1 1
334 Outpatient Clinics / Canteen 9 2
347 Domiciliary 3 2
348 VA Police & Next Step Veterans Resource Program 3 1
349 Residential Rehabilitation 1 1
350 Residential Rehabilitation 2 1
351 Residential Rehabilitation 2 1
352 Residential Rehabilitation 2 1
360 Community Living Center 8 1
370 Engineering Services Building 1 2
371 Consolidated Support Center 1 2
372 Logistics 1 1
400 Welcome Center 1 1
410 Field House 1 2
Bldg. # Bldg. Name Data Ctr Levels
329 Resident Dining Hall 1 1
334 Outpatient Clinic / Canteen 1 2
348 Administration 1 1
M e n l o P a r k V A M e d i c a l C e n t e r ( V A M C )
7 9 5 W i l l o w R o a d
M e n l o P a r k , C A 9 4 0 2 5
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
VAMC FIBER DISTANCES
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
VAMC Menlo Park Division
Building Floor Room Distance From Existing
Server Room (Ft.)
Notes Fiber type Conduit Type
321 1 B-102 (non VA tenants) 1077 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
321 1 C-124 (non VA tenants) 1077 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
322 1 Bible Study (*Cabinet on the wall) 494 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
324 1 A-114D 595 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
324 1 B-139A 595 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
324 1 C-139B 595 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
324 1 D-139A 595 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
329 (Server) (demark) 315 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
324 1 E-125B (BDF) 595 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
331 1 A104A 1280 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
331 1 B161 1540 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
331 1 C169 1779 New TR 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
331 1 A124 2011 New TR 25 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
331 1 C161 1779 Room to be abandoned and relocated to C-169 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
331 1 D161 2011 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
MENLO PARK
332 tc1 (*Next to bathroom) 851 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
334 1 D-139 261 New TR 24 strand single mode Interior - 4" EMT
334 2 D-229 288 New TR
334 1 B106 (Canteen) 261 24 strand single mode Interior - 4" EMT
334 2 B224 288 24 strand single mode Interior - 4" EMT
334 1 C113(Former Willow Clinic - Small Hallway Closet) 261 24 strand single mode Interior - 4" EMT
334 1 C114(Former Willow Clinic - Large Closet) 261 24 strand single mode Interior - 4" EMT
334 2 C201B 288 24 strand single mode Interior - 4" EMT
334 2 C237 288 24 strand single mode Interior - 4" EMT
334 1 D130 261 Room to be abandoned and relocated to D-139 24 strand single mode Interior - 4" EMT
334 2 E202 288 Room to be abandoned and relocated to D-229 24 strand single mode Interior - 4" EMT
334 1 F101 261 Room to be abandoned and relocated to D-139 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
334 1 106b Server Room
334 2 F200 261 Room to be abandoned and relocated to D-229 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
347 1 E113 960 New TR 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
347 1 A105 1106 Room to be abandoned and relocated to E113 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
347 1 D137 918 Room to be abandoned and relocated to E113 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
347 1 E122 960 Room to be abandoned and relocated to E113 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
348 152 1129 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
348 111 1129 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
348 120A 1129 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
348 140 1129 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4"
EMT
VAMC Menlo Park Division
Building Floor Room
Distance From
Existing Server
Room (Ft.)
Notes Fiber type Conduit Type
MENLO PARK
349 1 130 1340 New TR 23 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
349 1 102 1340 Room to be abandoned and relocated new TR room 130 23 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
349 1 133 1340 Room to be abandoned and relocated new TR room 130 24 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
350 130 1555 New TR 23 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
350 102 1555 Room to be abandoned and relocated new TR room 130 24 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
350 outside closet 1555 Room to be abandoned and relocated new TR room 130 24 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
351 130 / 126 1788 New TR 23 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
351 133 1788 Room to be abandoned and relocated new TR room 130 / 126 24 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
351 outside closet 1788 Room to be abandoned and relocated new TR room 130 / 126 24 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
352 130 / 126 1342 New TR 23 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
352 133 1342 Room to be abandoned and relocated new TR room 130 / 126 24 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
352 outside closet 1342 Room to be abandoned and relocated new TR room 130 / 126 24 strand single mode
Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts.
Interior - 4" EMT
VAMC Menlo Park Division
Building Floor Room Distance From Existing Server
Room (Ft.)
Notes Fiber type Conduit Type
MENLO PARK
360 A101 1514 Unable to find in drawings. Used longest run from data center to building 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
360 B100 1800 Unable to find in drawings. Used longest run from data center to building 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
B100 (C wing cable goes to B wing) 1982 Unable to find in drawings. Used longest run from data center to building 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
360 D101 2081 Unable to find in drawings. Used longest run from data center to building 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
360 E101 2232 Unable to find in drawings. Used longest run from data center to building 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
360 F101 2380 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
360 G101 2515 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
360 H240 2680 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
370 113 1588 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
371 111 1889 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
372 TC1 1576 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
TC-1 (across from bathrooms) 896 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
410 971 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
T365 ATC1 (inner) 1187 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
T365 ATC2 (outer) 1187 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
VAMC Menlo Park Division
Building Floor Room
Distance From
Existing Server Room
(Ft.)
Notes Fiber type Conduit Type
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
VHAPALCahoK Line
DOOR SECURITY REQUIREMENTS
MENLO PARK
I D E N T I F I C AT I O N O F N E T WO R K S PAC E S
BLDG: 3 2 1
LEVEL: 1
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
FIRE ALARM
B-102
EXPAND IN PLACE
IRMS
C-124
BLDG: 3 2 2
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
RELOCATE
CABINET ON WALL
TO MECH. RM.
NEW LOCATION
NEW CABINET REQUIRED
BLDG: 3 2 4
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
TELE
E-125B
*Verification of Room Location
Needed
EXPAND IN PLACE
STORAGE
A-114D
EXPAND IN PLACE
TELE
D-139A
EXPAND IN PLACE
TELE
C-139B
EXPAND IN PLACE
TELE
B-139A
BLDG: 3 2 9
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
RELOCATE TO D179
TELEPHONE
D178
D179
EXISTING MPOE/MDF
MDF FUNCTION TO
RELOCATE TO BLDG. 334,
ROOMS 106b & 107
MPOE TO REMAIN
N
BLDG: 3 3 1
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
ABANDON
RELOCATE TO A-124
TELE CLOSET
D-165
ABANDON
RELOCATE TO C-169
TELE CLOSET
C-161
ABANDON
RELOCATE TO C-169
TELE
B-161
ABANDON
RELOCATE TO A-124
TELE
A-104A
NEW TR
RELOCATE B-161 AND C-161
TO ROOM C-169
NEW TR
RELOCATE A104A AND D-165
TO ROOM TO A-124
BLDG: 3 3 2
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
REMEDIATE IN PLACE
IT
NOT IN SCOPE
BLDG: 3 3 4
LEVEL: BASEMENT
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
EXPAND IN PLACE
TELE. EQUIP
106b
EXPAND INTO 107
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
EXPAND IN PLACE
TELE
B-106M
ABANDON
RELOCATE TO D-139
TELE
D-130
REMEDIATE IN PLACE
COMP
C-114
OI&T
C-113
RELOCATE TO C-114
NEW TR ROOM
D-139
ABANDON
RELOCATE TO D-139
TELE
F-101
REMEDIATE IN PLACE
BLDG. MGMT. STOR.
A-100
LEVEL: 2
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
IRM ROOOM
C-201B
ABANDON
RELOCATE TO C-201B
I. T. CLOSET
B-263
ABANDON
RELOCATE TO D-229
TELE
E202
RELOCATE TO C-201B
I.T. CLOSET
C-237
ABANDON
RELOCATE TO D-229
TELE
F-200
NEW TR ROOM
D-229
REMEDIATE IN PLACE
B-224
BLDG: 3 4 7
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
ABANDON
RELOCATE TO TEL E113
SIG.
A105
ABANDON
RELOCATE TO TEL E113
TELE
E122
ABANDON
RELOCATE TO TEL E113
TELE
D137
REMEDIATE IN PLACE
TEL. EQUIP.
C120
NEW TR ROOM
TEL.
E113
BLDG: 3 4 8
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
UNDER CONSTRUCTION
NO WORK
TEL.
UNDER CONSTRUCTION
NO WORK
TEL
UNDER CONSTRUCTION
NO WORK
SIG
ROOM 152
CURRENTLY SERVER AND
FIBER DISTRIBUTION FOR
NEARBY AREA CAMPUS.
RELOCATE SERVER AND FIBER
DISTRIBUTION TO BLDG. 334,
ROOMS 106b & 107.
BLDG: 3 4 9
SCALE: 1/16” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
ABANDON
RELOCATE TO ROOM 130
TEL
ABANDON
RELOCATE TO ROOM 130
TEL
NEW TR ROOM
BLDG: 3 5 0
SCALE: 1/16” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
ABANDON
RELOCATE TO ROOM 130
TEL
ABANDON
RELOCATE TO ROOM 130
TEL
NEW TR ROOM
BLDG: 3 5 1
SCALE: 1/16” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
ABANDON
RELOCATE TO NEW TR
TEL
ABANDON
RELOCATE TO NEW TR
TEL
NEW TR ROOM
OPTION #2
NEW TR ROOM
OPTION #1
BLDG: 3 5 2
SCALE: 1/16” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
ABANDON
RELOCATE TO NEW TR
TEL
ABANDON
RELOCATE TO NEW TR
TEL
NEW TR ROOM
OPTION #2
NEW TR ROOM
OPTION #1
BLDG: 3 6 0
SCALE: 1/64” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
TEL / DATA
TC-G104
REMEDIATE IN PLACE
TEL / DATA
TC-F101
REMEDIATE IN PLACE
TEL / DATA
TC-E101
REMEDIATE IN PLACE
TEL / DATA
TC-D01
REMEDIATE IN PLACE
TEL / DATA
TC-B100
REMEDIATE IN PLACE
TEL / DATA
TC-A101
REMEDIATE IN PLACE
TEL / DATA
H240
BLDG: 3 7 0
SCALE: 1/64” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
PHONE / DATA
TRs that have been struck off are not in scope of work.
VHAPALCahoK Line
BLDG: 3 7 1
SCALE: 1/64” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
EXPAND IN PLACE
PHONE / DATA
VHAPALCahoK Line
BLDG: 3 7 2
SCALE: 3/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
TC1
LOCATED ON FIRST FLOOR
IN A WALL CABINET
VHAPALCahoK Line
BLDG: 4 0 0
SCALE: 1/16” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
PHONE / DATA
VHAPALCahoK Line
BLDG: 4 1 0
SCALE: 1/16” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
TELECOM
This is the only floor plan that has been provided. No CAD files.
VHAPALCahoK Line
BLDG: T 3 6 5
SCALE: 1/32” = 1’-0”
DATE: 10/15/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
REMEDIATE IN PLACE
TEL / DATA 2
A-TC2
REMEDIATE IN PLACE
TEL / DATA 1
A-TC1
N E T WO R K S PAC E D E S I G N
BLDG: 3 2 1 M e n l o P a r k
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
B-102
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
IT/ENG. RM.
B-102
Building 321 Room B-102 IT/Engineering Room
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Provide 1.5 ton ductless mini-split.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
X No condensate leak detection Needs condensate leak detection X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X Remote Controlled battery thermostat Wired thermostat X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Micro condensate pump Commercial condensate pump X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 126
Approximate total cable length = 20790'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment provide new rack as required.
BLDG: 3 2 1 M e n l o P a r k
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
B-107 (C-124)
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
Building 321 Room B-107
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
IT recommended Room 107 be relocated to Room 106. Provide 1.5 ton ductless mini-split, commercial condensate pump, leak detector, and wired BACnet thermostat.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
X No condensate leak detection Needs condensate leak detection Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X Remote Controlled battery thermostat Wired thermostat
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Micro condensate pump Commercial condensate pump
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
BLDG: 3 2 2
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
NEW LOCATION
NEW CABINET
REQUIRED
RELOCATE
CABINET ON WALL
TO MECH. RM.
MECH. RM
TEMP. WORKSTATION
Building 322 Room 106
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
Provide Vertiv VRC air conditioner with EMI/RFI Shielded Cabinet
Relocated to adjacent mechanical room
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
Room Temperature/Humidity
Monitoring Inadequate
Electrical box relocating from 107 into room 106. Room needs new
COMBINATION temperature and humidity monitoring and/or controls from BMS
Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
X Piping over equipment Relocate piping or install pipe trough with floor tape-type leak detector X
Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
Micro condensate pump Commercial condensate pump
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
144 Approximate total cable length
= 23760'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment provide one new rack.
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
A-114D
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
NEW WALL
INFILL EXISTING DOOR
REMOVE
SECTION OF
EXISTING WALL
Building 324 Room A-114D
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Provide 1.5 ton ductless mini-split.
Room is to be expanded.
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
X No condensate leak detection Needs condensate leak detection Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X Remote Controlled battery thermostat Wired thermostat
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Micro condensate pump Commercial condensate pump
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 144
Approximate total cable length = 23760'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
B-139A
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
NEW WALL
REMOVE
EXISTING WALL STORAGE
B-139BTELE
B-139A
Building 324 Room B-139A
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
Room to expand in place per CFG.
Provide 1.5 ton ductless mini-split, commercial condensate pump, leak detector, and wired BACnet thermostat. Condenser to be located on roof.
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or install pipe trough with floor tape-type leak detector X
Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
UPS Central Monitoring BACnet conversion X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
No condensate leak detection Needs condensate leak detection X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
Remote Controlled battery thermostat Wired thermostat
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
Micro condensate pump Commercial condensate pump X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 144
Approximate total cable length = 23760'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment provide two new racks.
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
C-139A
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
NEW WALL
REMOVE
EXISTING
WALL & DOOR
Building 324 Room B-139A
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
Room to expand in place. Provide
1.5 ton ductless mini-split.
Condenser to be located on roof.
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
X No condensate leak detection Needs condensate leak detection X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X Remote Controlled battery thermostat Wired thermostat X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Micro condensate pump Commercial condensate pump X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 144
Approximate total cable length = 23760'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment provide two new racks.
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
D-139A
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
NEW WALL
REMOVE
EXISTING WALL
Building 324 Room D-139A Telephone Closet
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Provide 1.5 ton ductless mini-split.
Room is to be expanded.
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
Cooling inadequate There is no air condition in this room X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X Micro condensate pump Commercial condensate pump
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 162
Approximate total cable length = 26730'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment provide one new rack.
DawnHarringtonLEEDAP
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
E-125B
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
TELE
E-125B
Building 324 Room E-125B
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
Cooling inadequate There is no air condition in this room Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X Piping over equipment Relocate piping or pipe trough
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
No condensate leak detection Needs condensate leak detection
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
Remote Controlled battery thermostat Wired thermostat
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
Micro condensate pump Commercial condensate pump X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 90
Approximate total cable length = 14850'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
BLDG: 3 2 9
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
D179
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
MPOE
D179
TELEPHONE
D178
RELOCATE TO ROOM D179
ABANDON D178
Building 329 Room SP12 (D179)
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
Room D178 to relocated to D179.
Provide 1.5 ton ductless mini-split.
Condenser to be located on roof.
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
X Piping over equipment Relocate piping or install pipe trough with floor tape-type leak detector X
Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X Micro condensate pump Commercial condensate pump
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
144 Approximate total cable length
= 23760'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment Provide 4 new racks.
SERVERS AND FIBER
DISTRIBUTION IN THIS
ROOM ARE TO BE
RELOCATED TO BLDG. 334,
ROOM 106b/107
MPOE TO REMAIN
Note: Any Servers are to be Relocated to Building 334, Room 106b/107
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
N
NEW TR ROOM A-124
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
EXISTING TR ROOMS A-104A AND D-161
TO RELOCATE TO ROOM A-124. EXISTING
TR ROOMS WILL BE ABANDONED
NEW TR ROOM
A-124
Building 331 Room A-124
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
Room A-104A and D-165 to be relocated to room A-124. Provide
1.5 ton ductless mini-split.
Condenser to be located on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X Micro condensate pump Commercial condensate pump
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 216
Approximate total cable length = 35640'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
NEW TR ROOM C-169
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
EXISTING TR ROOMS B-161 AND C-161
TO RELOCATE TO ROOM C-169.
EXISTING TR ROOMS WILL BE ABANDONED
N
NEW TR ROOM
C-169
Building 331 Room C-169
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
UPS Central Monitoring BACnet conversion X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
No condensate leak detection Needs condensate leak detection X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
Remote Controlled battery thermostat Wired thermostat
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
Micro condensate pump Commercial condensate pump X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 144
Approximate total cable length = 23760'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
BLDG: 3 3 2
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
TC1
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
N
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
Building 332 Room TC1
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicted HVAC unit X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X Micro condensate pump Commercial condensate pump
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment provide two new racks.
IT
TC1
LEVEL: BASEMENT
SCALE: 1/4” = 1’-0”
DATE: 10/15/2020
106b
PALO ALTO HEALTHCARE SYSTEM
MENLO PARK
N
Building 334 Room 106b
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
FCU-3N serves B-106. B-106 is to be expanded into room 106M. After room is expanded, add new 1.5 ton fan coil unit.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Cooling inadequate Needs dedicated HVAC unit Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X Piping over equipment Relocate piping or install pipe trough with floor tape-type leak detector
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X No condensate leak detection Needs condensate leak detection
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X Remote Controlled battery thermostat Wired thermostat
C A
B
LI
N G
X Inadequate fiber optic cabling to
TR
Install new as required
X Micro condensate pump Commercial condensate pump X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.