36C77621R0074 0001.docx

DOCX document 36 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades - MPD (VA-21-00024176) Federal contract opportunity
Solicitation number
36C77621R0074
Issued by
Department of Veterans Affairs Headquarters

About this file

This document contains details for a federal contract solicitation and opportunity. The solicitation seeks proposals for design-build services to upgrade electronic health records infrastructure at the VA Palo Alto Health Care System campus in Menlo Park, California. Key requirements include relocating or remodeling approximately 49 telecommunications rooms and 3 data centers to meet EHRM IT standards, with all IT services to remain operational. The solicitation will be issued as a request for proposal conducted under FAR Part 36.3 for two-phase design-build selection. The opportunity is set aside solely for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification code is 236220 with a size standard of $39.5 million. The performance period is approximately 739 calendar days from the notice to proceed. The magnitude of construction is estimated between $10 million to $20 million. Questions must be submitted in writing by the stated deadline.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 640A0-20-700 36C776 Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 00076 Department of Veterans Affairs Department of Veterans Affairs 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 To all Offerors/Bidders

36C77621R0074 07-21-2021

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: August 16, 2021 3PM EDT The purpose of this amendment is as follows:

1.) To post the answers to the technical questions. Please see Attachment 1 2.) To provide a revised Price Schedule Notice. Please see Attachment 2 3.) Provide additional language to the Instructions to Offerors (see below in Amendment 0001 for full details) 4.) To provide evaluation factors and methods of evaluation in section a.10. Please see Amendment 0001 belo w.

5.) Remove in its entirety Provision 2.09 Organizational Conflict of Interest from the RFP.

6.) Revise Provision 2.10 Cost Limitation. See below in Amendment 0001 for the Full Text Provision 7.) Include Provision VAAR Clause 852.209-70 into the RFP (see below in Amendment 0001 for the Full Text Provision).

8.) Provide revised Attachment 1 - VA Menlo Park EHRM Narrative - Final. Please see Attachment 3 9.) To extend the due date to August 16, 2021 3PM EDT. All other terms and conditions remain the same.

Shon Johnson Contracting Officer Additional Instructions to Offerors – Organizational Conflict of Interest All offerors shall note that an Organizational Conflict of Interest may exist for this project. Please refer to VAAR 852.209-70 for instructions on how to address this as part of the Phase I Proposal submission, as applicable. This documentation, if submitted, will not count as part of any page limitation restrictions.

A.10 PROPOSAL REQUIREMENTS:

EVALUATION FACTORS

A. Phase I Evaluation Factors: The Phase I proposal shall address the following evaluation factors. The following factors are in descending order of importance.

Factor 1: Technical Approach

Submission Criteria: The offeror shall provide a brief narrative (page limitation: ten (10) pages) describing the offeror’s approach to achieving design and construction of the EHRM upgrades. The narrative will detail how the contractor intends to prepare the site, renovate the rooms listed, and complete the project within the specified time limits without disruption to operations. If the page limits are exceeded, the pages exceeding the limit will not be read or considered.

The narrative must include:

1. Design Approach: Describe the techniques and methods for an efficient, effective design; and

1. Construction Approach: Describe the techniques and methods for this construction project to include coordination with the design packages, projected timelines and coordination of work.

Evaluation Methodology: The VA will evaluate Technical Approach, and use as an aid, to help determine that the Offeror understands the complexity and risks of performing all the required elements. The Technical Approach will be evaluated for inclusion of the technical areas listed in the criteria. The Offeror's narrative should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed

Factor 2: Specialized Experience

Submission Criteria: Provide a minimum of one (1) and a maximum of three (3) projects completed within the last five years (5) years similar in size, complexity, and scope to this project. Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors to include A-E firms if applicable. *The five (5) years applies from the issuance date of the solicitation. If the contractor does not possess Design-Build (D-B) experience, provide a minimum of (1) and a maximum of two (2) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to three (3) projects submitted for the prime contractor. For purposes of this evaluation, a relevant project is further defined as “design-build. design-bid-build, or design projects completed in a clinical, hospital or other medical related use space similar in size and scope to this EHRM Infrastructure requirement. Project(s) shall have a minimum value of $5M and be 75% completed for Design-Bid-Build (D-B-B) or D-B. Projects shall have a minimum value of $500,000 and be 100% completed for designs completed by the A-E firm in support of D-B or D-B-B.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project. If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by each individual entity, in addition to any work performed by the Joint Venture itself.

For each project identified, include the following information at a minimum:

1. Project Title and Description, Project Location (Physical Address); Contract Type (Example: Design-Build, Design-Bid-Build).

1. Project owner name and telephone number of the owner’s contact person.

1. Brief description of the scope of work.

1. Project prime contractor and major subcontractors.

1. Project statistics including start and completion dates (original vs. actual) and project cost (original vs actual). If original vs actual completion dates and project cost differ, please provide an explanation as to why they differ. Offer should be clear as to whether the delay was attributed to the Government, the offeror, or both.

Evaluation Methodology: Specialized Experience will be evaluated on the Offeror’s specialized experience and competence and capability to perform. Specialized experience and competence be evaluated by narrative provided by the Offeror and relevant and recent experience of design-build and/or design-bid-build contracts of comparable size, complexity, and scope within the last five (5) years of the issuance of the solicitation. If D-B experience is not applicable, the construction contractor and the A-E firm will be evaluated on relevant and recent projects to the applicable portion of the project, construction or design respectively.

B. Phase II Evaluation Factors: The Phase II proposal shall address the following evaluation factors. The following factors are in descending order of importance. All Phase II (Non-Price) technical evaluation factors, when combined, are approximately equal to price.

Factor 1: Technical Solution (Volume I - Non-Price):

Submission Criteria: The Offeror shall submit a narrative description, diagrams and/or drawings of how they intend to approach the scope of work to successfully complete design‐build services for this project in accordance with solicitation requirements and VA guidelines. The Offeror’s narrative should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed. The Offeror shall address areas of concern and describe how they will minimize risk in conjunction with the identified areas of concern.

Current COVID restrictions and space limitations result in an inability to allow work to occur at full scale and will necessitate an extensive phasing plan. The Offeror shall provide in its proposal a phasing plan that addressed how they will accommodate such restrictions while still staying within budget and completing project on time.

The Offeror’s phasing plan shall describe how the facility will remain operational while utilities and internal roadways are affected. The narrative will also detail how the contractor intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the facility within any specified time limits. Schedule and minimizing downtime are crucial for this project. The Offeror shall describe the approach for completing the project in a timely manner without causing disruptions to facility during normal business hours. It is critical to the VA mission that services remain intact with minimal disruption.

The Offeror shall propose a solution for materials staging, temporary trailer offices, parking, and other contractor activities. Currently there is no space on campus for a laydown/job office area. Proposals are to assume none is available. During the design effort, the VA and DB Team can reassess whether space has become available on campus.

Evaluation Methodology: Technical Solution (Volume I – Non-Price) will evaluate to determine that the Offeror understands the project and can perform all the required elements. The VA will evaluate the Offeror’s specific details regarding design, constructability, and site-specific considerations.

Factor 2: Management Approach (Volume I - Non-Price):

Submission Criteria: The Offeror shall submit an organizational chart and indicate the prime responsible firm (or firms, if a J/V) and individuals, as well as the roles and responsibilities of individuals proposed as consultants and subcontractors. Provide a list of all consultants and all proposed major subcontractors, including telephone number, address, and name of contact. Please delineate the approximate percentage of work the prime contractor will perform and the approximate percentage of work the subcontractors (collectively) will perform.

The Offeror shall provide resumes that describes the design build team’s qualifications, to include education and/or certification(s), of the following personnel (page limitation, two (2) pages per requested resume):

a. DB Project Manager

b. Construction Project Management/Site Superintendent

c. Lead Architect

d. Lead Electrical Engineer

e. Lead Mechanical Engineer

f. Registered Communications Distribution Designer (RCDD)

g. Physical Security Specialist (note – must have Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification issued by ASIS International) For each of these “key personnel,” the offeror shall identify if those individuals are currently committed/working on another project and note the anticipated completion date.

The Offeror shall describe its approach for managing performance under this solicitation, including techniques for management of work coordination with subcontractors and measures/corrective action that will be taken for substandard performance.

Evaluation Methodology: Management Approach (Volume I – Non-Price) will evaluate the relevant management, technical personnel and subcontractor capabilities and qualifications of the team to provide the required planning, implementation, and completion of the project. The VA will consider education and certifications, as well as experience in an operational health care facility. The VA will also evaluate how the Offeror organized personnel for this project, and the lines of authority between the construction firm, design firm, and key subcontractors.

Factor 3: Draft Project Schedule (Volume I - Non-Price):

Submission Criteria: The Offeror shall submit a draft Critical Path Method (CPM) schedule for the design and construction satisfying the requirements of this project. The schedule should show the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including design, acquiring materials, plant, and equipment, mobilization, demolition, installation, finalization, etc.). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given point during the period.

The VA will evaluate and use as an aid to help determine that the Offeror understands and can perform all of the required elements to complete the project in the time frame specified with limited impact, to the greatest extent possible, to the Medical Center. (The draft project schedule submitted with the offer should not be construed as the agreed upon schedule as per FAR 52.236-15, the contractor shall, within twenty-one (21) calendar days after receiving the Notice to Proceed, submit an interim project schedule which will supersede the draft project schedule submitted in the Phase II proposal. The interim project schedule will be subject to VA approval and must show the project being accomplished within the time frame specified on the SF 1442 (Block 11).

Evaluation Methodology: Draft Project Schedule (Volume I – Non-Price) will evaluate and use as an aid to help determine that the Offeror understands and can perform all of the required elements to complete the project in the time frame specified with limited impact, to the greatest extent possible, to the Medical Center.

Factor 4: Price Proposal Requirements (Volume II):

Submission Criteria: Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the Price Schedule when submitting price offers. Submit a bid guarantee as stipulated in the solicitation. Please note commercial bid bonds are not acceptable.

In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for all Line Items. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s solicitation and attachments or pricing requirements or otherwise preclude the Government from evaluating the offer or render the offer as nonconforming or unacceptable.

If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from discussions.

Evaluation Methodology: Price (Volume II - Price) the total evaluated price will be determined by the Offeror’s price for all the Line Items listed. Note: The VA will look at the total evaluated price and (Non-Price) technical factors to determine the best value. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements. In accordance with FAR 15.101-1, all Phase II (Non-Price) technical evaluation factors, when combined, are approximately equal to price.

2.10 COST LIMITATION – Target Ceiling

The target ceiling for contract award for design and construction is $16,841,853.00, based on the funds made available for this project. The Government cannot guarantee that additional funds will be made available for award. Offerors are under no obligation to approach this ceiling.

(End of Provision)

A.1 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020)

(a) It is in the best interest of the Government to avoid situations which might create an organizational conflict of interest or where the Offeror’s performance of work under the contract may provide the Contractor with an unfair competitive advantage. The term ‘‘organizational conflict of interest’’ means that because of other activities or relationships with other persons, a person is unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or the person has an unfair competitive advantage.

(b) The Offeror shall provide a statement with its offer which describes, in a concise manner, all relevant facts concerning any past, present, or currently planned interest (financial, contractual, organizational, or otherwise) or actual or potential organizational conflicts of interest relating to the services to be provided under this solicitation. The Offeror shall also provide statements with its offer containing the same information for any consultants and subcontractors identified in its proposal and which will provide services under the solicitation. The Offeror may also provide relevant facts that show how its organizational and/or management system or other actions would avoid or mitigate any actual or potential organizational conflicts of interest.

(c) Based on this information and any other information solicited or obtained by the Contracting Officer, the Contracting Officer may determine that an organizational conflict of interest exists which would warrant disqualifying the Contractor for award of the contract unless the organizational conflict of interest can be mitigated to the Contracting Officer’s satisfaction by negotiating terms and conditions of the contract to that effect. If the conflict of interest cannot be mitigated and if the Contracting Officer finds that it is in the best interest of the United States to award the contract, the Contracting Officer shall request a waiver in accordance with FAR 9.503.

(d) Nondisclosure or misrepresentation of actual or potential organizational conflicts of interest at the time of the offer or arising as a result of a modification to the contract, may result in the termination of the contract at no expense to the Government.

(End of Provision)

End of Document See attached document: Attachment 1.

See attached document: Attachment 2.

See attached document: Attachment 3.

File details come from the government source that posted it. Updated .